Attachment_1_SCHEDULE_B.xls

XLS spreadsheet 96 KB Posted

Attached to
Fabrication and Delivery of Foam-Filled Steel River Buoys
Solicitation number
HSCG84-17-R-BHQ002
Issued by

About this file

Attachment 1 Schedule B - Offer Pricing

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base YR

SCHEDULE B - ADDENDA – SCHEDULE OF SUPPLIES/SERVICES
Supplies: The Contractor shall provide all necessary management and
administration, personnel, equipment, materials, supplies and transportation in accordance with the
Specifications in Attachments 2 to 9.
PRICE ALL INCLUSIVE: The offer must include prices for the Base Period and all Option
Periods listed in section B. The offeror must also complete the EPA tables in Attachment 11.
BASE PERIOD: 01 September 2017 thru 31 August 2018
ITEMDESCRIPTIONESTESTIMATED
QTYUNITUNIT PRICETOTAL
0000Fabricate First Article Buoys
0000A4th Class Nun Radar Reflective10EA$ - 0$ - 0
Steel River Buoys (4NR)
0000B4th Class Can Radar Reflective10EA$ - 0$ - 0
Steel River Buoys (4CR)
0000C6th Class Nun Radar Reflective10EA$ - 0$ - 0
Steel River Buoys (6NR)
0000D6th Class Can Radar Reflective10EA$ - 0$ - 0
Steel River Buoys (6CR)
0000E6th Class Nun Tall Steel River Buoys (6NT)10EA$ - 0$ - 0
0000F6th Class Can Tall Steel River Buoys (6CT)10EA$ - 0$ - 0
0000GFirst Article Test Plan and Procedures1JB$ - 0$ - 0
(IAW RFP, Sec. F.7 and I.3)
0000HQuality Control Plan (IAW RFP, Sec. F.7 and I.3)1JB$ - 0$ - 0
0000IFirst Article Test Report (IAW RFP, Sec. F.7 and I.3)1JB$ - 0$ - 0
Total Estimated Price of Clins 0000A thru 0000I$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
0001Fabricate Production Buoys
0001A4th Class Nun Radar Reflective3000EA$ - 0$ - 0
Steel River Buoys (4NR)
0001B4th Class Can Radar Reflective3000EA$ - 0$ - 0
Steel River Buoys (4CR)
0001C6th Class Nun Radar Reflective1150EA$ - 0$ - 0
Steel River Buoys (6NR)
0001D6th Class Can Radar Reflective1150EA$ - 0$ - 0
Steel River Buoys (6CR)
0001E6th Class Nun Tall Steel River Buoys (6NT)300EA$ - 0$ - 0
0001F6th Class Can Tall Steel River Buoys (6CT)250EA$ - 0$ - 0
Total Estimated Price of Clins 0001A thru 0001F$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
0002Transportation
TRANSPORTATION COSTS: Includes costs related to shipping
1. 4NR/4CR - Lot Size = 50 Buoys - Estimated 160 trips Per Year
2. 6NR/6CR/6NT/6CT - Lot Size = 100 Buoys - Estimated 49 Trips Per Year
3. Out of Cycle Transportation for Recovery and Disposal of Buoys (RFP Sec. C.6)
4. Lot Size = 1 Truck Load (Truck shall be of the same size and dimensions [Standard 48 ft length trailers]
as those used to deliver new 4NR/4CR and 6NR/6CR/6NT/6CT listed in the above CLINS
5. Estimated 6 Trips for Out of Cycle Transportation Per Year - Destination TBD - The Contractor shall be
reimbursed at the destination prices listed below under Transportation Cost CLINs.
(Note: Estimated 6 Trips are not included in the estimated quantities listed below.)
0002ADemopolis, AL7LT$ - 0$ - 0
0002BEufala, AL3LT$ - 0$ - 0
0002CMobile, AL5LT$ - 0$ - 0
0002DPine Bluff, AR13LT$ - 0$ - 0
0002EChattahooche, FL2LT$ - 0$ - 0
0002FDubuque, IA13LT$ - 0$ - 0
0002GKeokuk, IA9LT$ - 0$ - 0
0002HEast Peoria, IL13LT$ - 0$ - 0
0002JLevenworth, KS2LT$ - 0$ - 0
0002KHickman, KY15LT$ - 0$ - 0
0002LOwensboro, KY11LT$ - 0$ - 0
0002MColfax, LA2LT$ - 0$ - 0
0002NSt. Louis, MO14LT$ - 0$ - 0
0002OGreensville, MS11LT$ - 0$ - 0
0002PNatchez, MS16LT$ - 0$ - 0
0002QVicksburg, MS11LT$ - 0$ - 0
0002ROmaha, NE6LT$ - 0$ - 0
0002SSallisaw, OK11LT$ - 0$ - 0
0002TSewickley, PA5LT$ - 0$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
0002UBuchanan, TN15LT$ - 0$ - 0
0002VE. Chattanooga, TN12LT$ - 0$ - 0
0002WMemphis, TN13LT$ - 0$ - 0
Total Estimated Price of Clins 0002A thru 0002W$ - 0
0003Quarterly Compensation to the Government
0003AQuarterly Compensation for Useable Steel4EATBDTBD
Counterweight Plates
Total Estimated Value for Base Period$ - 0

&RHSCG84-17-R-BHQ002

Steel Foam-Filled River Buoy &P of 11 &LAttachment 1

Opt I

OPTION PERIOD 1: 01 September 2018 thru 31 August 2019
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
1001Fabricate Production Buoys
1001A4th Class Nun Radar Reflective3000EA$ - 0$ - 0
Steel River Buoys (4NR)
1001B4th Class Can Radar Reflective3000EA$ - 0$ - 0
Steel River Buoys (4CR)
1001C6th Class Nun Radar Reflective1150EA$ - 0$ - 0
Steel River Buoys (6NR)
1001D6th Class Can Radar Reflective1150EA$ - 0$ - 0
Steel River Buoys (6CR)
1001E6th Class Nun Tall Steel River Buoys (6NT)300EA$ - 0$ - 0
1001F6th Class Can Tall Steel River Buoys (6CT)250EA$ - 0$ - 0
Total Estimated Price of Clins 1001A thru 1001F$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
1002Transportation
TRANSPORTATION COSTS: Includes costs related to shipping
1. 4NR/4CR - Lot Size = 50 Buoys - Estimated 160 trips Per Year
2. 6NR/6CR/6NT/6CT - Lot Size = 100 Buoys - Estimated 49 Trips Per Year
3. Out of Cycle Transportation for Recovery and Disposal of Buoys (RFP Sec. C.6)
4. Lot Size = 1 Truck Load (Truck shall be of the same size and dimensions [Standard 48 ft length trailers]
as those used to deliver new 4NR/4CR and 6NR/6CR/6NT/6CT listed in the above CLINS
5. Estimated 6 Trips for Out of Cycle Transportation Per Year - Destination TBD - The Contractor shall be
reimbursed at the destination prices listed below under Transportation Cost CLINs.
(Note: Estimated 6 Trips are not included in the estimated quantities listed below.)
1002ADemopolis, AL7LT$ - 0$ - 0
1002BEufala, AL3LT$ - 0$ - 0
1002CMobile, AL5LT$ - 0$ - 0
1002DPine Bluff, AR13LT$ - 0$ - 0
1002EChattahooche, FL2LT$ - 0$ - 0
1002FDubuque, IA13LT$ - 0$ - 0
1002GKeokuk, IA9LT$ - 0$ - 0
1002HEast Peoria, IL13LT$ - 0$ - 0
1002JLevenworth, KS2LT$ - 0$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
1002KHickman, KY15LT$ - 0$ - 0
1002LOwensboro, KY11LT$ - 0$ - 0
1002MColfax, LA2LT$ - 0$ - 0
1002NSt. Louis, MO14LT$ - 0$ - 0
1002OGreensville, MS11LT$ - 0$ - 0
1002PNatchez, MS16LT$ - 0$ - 0
1002QVicksburg, MS11LT$ - 0$ - 0
1002ROmaha, NE6LT$ - 0$ - 0
1002SSallisaw, OK11LT$ - 0$ - 0
1002TSewickley, PA5LT$ - 0$ - 0
1002UBuchanan, TN15LT$ - 0$ - 0
1002VE. Chattanooga, TN12LT$ - 0$ - 0
1002WMemphis, TN13LT$ - 0$ - 0
Total Estimated Price of Clins 1002A thru 1002W$ - 0
1003Quarterly Compensation to the Government
1003AQuarterly Compensation for Useable Steel4EATBDTBD
Counterweight Plates
Total Estimated Value for Option Period 1$ - 0

&RHSCG84-17-R-BHQ002

Steel Foam-Filled River Buoys &P of 11 &LAttachment 1

Opt II

OPTION PERIOD 2: 01 September 2019 thru 31 August 2020
ITEM
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
2001Fabricate Production Buoys
2001A4th Class Nun Radar Reflective3000EA$ - 0$ - 0
Steel River Buoys (4NR)
2001B4th Class Can Radar Reflective3000EA$ - 0$ - 0
Steel River Buoys (4CR)
2001C6th Class Nun Radar Reflective1150EA$ - 0$ - 0
Steel River Buoys (6NR)
2001D6th Class Can Radar Reflective1150EA$ - 0$ - 0
Steel River Buoys (6CR)
2001E6th Class Nun Tall Steel River Buoys (6NT)300EA$ - 0$ - 0
2001F6th Class Can Tall Steel River Buoys (6CT)250EA$ - 0$ - 0
Total Estimated Price of Clins 2001A thru 2001F$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
2002Transportation
TRANSPORTATION COSTS: Includes costs related to shipping
1. 4NR/4CR - Lot Size = 50 Buoys - Estimated 160 trips Per Year
2. 6NR/6CR/6NT/6CT - Lot Size = 100 Buoys - Estimated 49 Trips Per Year
3. Out of Cycle Transportation for Recovery and Disposal of Buoys (RFP Sec. C.6)
4. Lot Size = 1 Truck Load (Truck shall be of the same size and dimensions [Standard 48 ft length trailers]
as those used to deliver new 4NR/4CR and 6NR/6CR/6NT/6CT listed in the above CLINS
5. Estimated 6 Trips for Out of Cycle Transportation Per Year - Destination TBD - The Contractor shall be
reimbursed at the destination prices listed below under Transportation Cost CLINs.
(Note: Estimated 6 Trips are not included in the estimated quantities listed below.)
2002ADemopolis, AL7LT$ - 0$ - 0
2002BEufala, AL3LT$ - 0$ - 0
2002CMobile, AL5LT$ - 0$ - 0
2002DPine Bluff, AR13LT$ - 0$ - 0
2002EChattahooche, FL2LT$ - 0$ - 0
2002FDubuque, IA13LT$ - 0$ - 0
2002GKeokuk, IA9LT$ - 0$ - 0
2002HEast Peoria, IL13LT$ - 0$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
2002JLevenworth, KS2LT$ - 0$ - 0
2002KHickman, KY15LT$ - 0$ - 0
2002LOwensboro, KY11LT$ - 0$ - 0
2002MColfax, LA2LT$ - 0$ - 0
2002NSt. Louis, MO14LT$ - 0$ - 0
2002OGreensville, MS11LT$ - 0$ - 0
2002PNatchez, MS16LT$ - 0$ - 0
2002QVicksburg, MS11LT$ - 0$ - 0
2002ROmaha, NE6LT$ - 0$ - 0
2002SSallisaw, OK11LT$ - 0$ - 0
2002TSewickley, PA5LT$ - 0$ - 0
2002UBuchanan, TN15LT$ - 0$ - 0
2002VE. Chattanooga, TN12LT$ - 0$ - 0
2002WMemphis, TN13LT$ - 0$ - 0
Total Estimated Price of Clins 2002A thru 2002W$ - 0
2003Quarterly Compensation to the Government
2003AQuarterly Compensation for Useable4EATBDTBD
Steel Counterweight Plates
Total Estimated Value for Option Period 2$ - 0

&RHSCG84-17-R-BHQ002

Steel Foam-Filled River Buoys &P of 11 &LAttachment 1

Opt III

OPTION PERIOD 3: 01 September 2020 thru 31 August 2021
ITEM
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
3001Fabricate Production Buoys
3001A4th Class Nun Radar Reflective3000EA$ - 0$ - 0
Steel River Buoys (4NR)
3001B4th Class Can Radar Reflective3000EA$ - 0$ - 0
Steel River Buoys (4CR)
3001C6th Class Nun Radar Reflective1150EA$ - 0$ - 0
Steel River Buoys (6NR)
3001D6th Class Can Radar Reflective1150EA$ - 0$ - 0
Steel River Buoys (6CR)
3001E6th Class Nun Tall Steel River Buoys (6NT)300EA$ - 0$ - 0
3001F6th Class Can Tall Steel River Buoys (6CT)250EA$ - 0$ - 0
Total Estimated Price of Clins 3001A thru 3001F$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
3002Transportation
TRANSPORTATION COSTS: Includes costs related to shipping
1. 4NR/4CR - Lot Size = 50 Buoys - Estimated 160 trips Per Year
2. 6NR/6CR/6NT/6CT - Lot Size = 100 Buoys - Estimated 49 Trips Per Year
3. Out of Cycle Transportation for Recovery and Disposal of Buoys (RFP Sec. C.6)
4. Lot Size = 1 Truck Load (Truck shall be of the same size and dimensions [Standard 48 ft length trailers]
as those used to deliver new 4NR/4CR and 6NR/6CR/6NT/6CT listed in the above CLINS
5. Estimated 6 Trips for Out of Cycle Transportation Per Year - Destination TBD - The Contractor shall be
reimbursed at the destination prices listed below under Transportation Cost CLINs.
(Note: Estimated 6 Trips are not included in the estimated quantities listed below.)
3002ADemopolis, AL7LT$ - 0$ - 0
3002BEufala, AL3LT$ - 0$ - 0
3002CMobile, AL5LT$ - 0$ - 0
3002DPine Bluff, AR13LT$ - 0$ - 0
3002EChattahooche, FL2LT$ - 0$ - 0
3002FDubuque, IA13LT$ - 0$ - 0
3002GKeokuk, IA9LT$ - 0$ - 0
3002HEast Peoria, IL13LT$ - 0$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
3002JLevenworth, KS2LT$ - 0$ - 0
3002KHickman, KY15LT$ - 0$ - 0
3002LOwensboro, KY11LT$ - 0$ - 0
3002MColfax, LA2LT$ - 0$ - 0
3002NSt. Louis, MO14LT$ - 0$ - 0
3002OGreensville, MS11LT$ - 0$ - 0
3002PNatchez, MS16LT$ - 0$ - 0
3002QVicksburg, MS11LT$ - 0$ - 0
3002ROmaha, NE6LT$ - 0$ - 0
3002SSallisaw, OK11LT$ - 0$ - 0
3002TSewickley, PA5LT$ - 0$ - 0
3002UBuchanan, TN15LT$ - 0$ - 0
3002VE. Chattanooga, TN12LT$ - 0$ - 0
3002WMemphis, TN13LT$ - 0$ - 0
Total Estimated Price of Clins 3002A thru 3002W$ - 0
3003Quarterly Compensation to the Government
3003AQuarterly Compensation for Useable4EATBDTBD
Steel Counterweight Plates
Total Estimated Value for Option Period 3$ - 0

&RHSCG84-17-R-BHQ002

Steel Foam-Filled River Buoys &P of 11 &LAttachment 1

Opt IV

OPTION PERIOD 4: 01 September 2021 thru 31 August 2022
ITEM
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
4001Fabricate Production Buoys
4001A4th Class Nun Radar Reflective3000EA$ - 0$ - 0
Steel River Buoys (4NR)
4001B4th Class Can Radar Reflective3000EA$ - 0$ - 0
Steel River Buoys (4CR)
4001C6th Class Nun Radar Reflective1150EA$ - 0$ - 0
Steel River Buoys (6NR)
4001D6th Class Can Radar Reflective1150EA$ - 0$ - 0
Steel River Buoys (6CR)
4001E6th Class Nun Tall Steel River Buoys (6NT)300EA$ - 0$ - 0
4001F6th Class Can Tall Steel River Buoys (6CT)250EA$ - 0$ - 0
Total Estimated Price of Clins 4001A thru 4001F$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
4002Transportation
TRANSPORTATION COSTS: Includes costs related to shipping
1. 4NR/4CR - Lot Size = 50 Buoys - Estimated 160 trips Per Year
2. 6NR/6CR/6NT/6CT - Lot Size = 100 Buoys - Estimated 49 Trips Per Year
3. Out of Cycle Transportation for Recovery and Disposal of Buoys (RFP Sec. C.6)
4. Lot Size = 1 Truck Load (Truck shall be of the same size and dimensions [Standard 48 ft length trailers]
as those used to deliver new 4NR/4CR and 6NR/6CR/6NT/6CT listed in the above CLINS
5. Estimated 6 Trips for Out of Cycle Transportation Per Year - Destination TBD - The Contractor shall be
reimbursed at the destination prices listed below under Transportation Cost CLINs.
(Note: Estimated 6 Trips are not included in the estimated quantities listed below.)
4002ADemopolis, AL7LT$ - 0$ - 0
4002BEufala, AL3LT$ - 0$ - 0
4002CMobile, AL5LT$ - 0$ - 0
4002DPine Bluff, AR13LT$ - 0$ - 0
4002EChattahooche, FL2LT$ - 0$ - 0
4002FDubuque, IA13LT$ - 0$ - 0
4002GKeokuk, IA9LT$ - 0$ - 0
4002HEast Peoria, IL13LT$ - 0$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
4002JLevenworth, KS2LT$ - 0$ - 0
4002KHickman, KY15LT$ - 0$ - 0
4002LOwensboro, KY11LT$ - 0$ - 0
4002MColfax, LA2LT$ - 0$ - 0
4002NSt. Louis, MO14LT$ - 0$ - 0
4002OGreensville, MS11LT$ - 0$ - 0
4002PNatchez, MS16LT$ - 0$ - 0
4002QVicksburg, MS11LT$ - 0$ - 0
4002ROmaha, NE6LT$ - 0$ - 0
4002SSallisaw, OK11LT$ - 0$ - 0
4002TSewickley, PA5LT$ - 0$ - 0
4002UBuchanan, TN15LT$ - 0$ - 0
4002VE. Chattanooga, TN12LT$ - 0$ - 0
4002WMemphis, TN13LT$ - 0$ - 0
Total Estimated Price of Clins 4002A thru 4002W$ - 0
4003Quarterly Compensation to the Government
4003AQuarterly Compensation for Useable4EATBDTBD
Steel Counterweight Plates
Total Estimated Value for Option Period 4$ - 0
Total Base Year plus all 4 Option Periods$ - 0

&RHSCG84-17-R-BHQ002

Steel Foam-Filled River buoys &P of 11 &LAttachment 1

File details come from the government source that posted it. Updated .