Attachment_3_PPQ.pdf
PDF 119 KB Posted
- Attached to
- Inspection and Maintenance Services at USCG Forward Operating Location (FOL) St. Paul, AK
- Solicitation number
- HSCG84-16-Q-A17502
About this file
Attachment 3 - PPQ
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3
PAST PERFORMANCE QUESTIONNAIRE
PAST PERFORMANCE QUESTIONNAIRE (PPQ)
U.S. COAST GUARD
SHORE INFRASTRUCTURE LOGISTICS CENTER
CONTRACTOR EVALUATION FORM
The Coast Guard, Shore Infrastructure Logistics Center is currently procuring Inspection and Facilities Maintenance Services for the USCG Forward Operating Location (FOL) in
Saint Paul, AK under solicitation number HSCG84-16-Q-A17502. As a result, we are performing a past performance survey and reference investigation on potential contractors for the upcoming contract.
The information contained herein is considered “Source Selection Information” in accordance with FAR 3.104. Therefore, it is asked that you treat it accordingly. While the results of the overall past performance survey may be discussed with the contractor, FAR 15.610 and 15.1004 prohibits the release of the name of the individual responding to the survey.
Responses to this questionnaire should be EMAILED TO Ms. Jillian Noblett, USCG-
SILC-COB2 at Jillian.L.Noblett@uscg.mil before JULY 21, 2016 / 4:00PM (EST).
Should you have any questions concerning this survey, please contact the above named person at (757) 628-4113.
This portion is to be completed by the Offeror.
Contract Number: ____________________________________________________
Offeror’s Company Name: _____________________________________________
Address: ________________________________________________________
Telephone/Fax Number: _______________________________________________
Point of Contact: ____________________________________________________
Email: _____________________________________________________________
Was work performed as a subcontractor under a prime contract? Yes No If yes, include, Prime Contract Number: ______________________________________________
Prime Contractor’s Name: _____________________________________________
Address: __________________________________________________________
Telephone/Fax Number: _______________________________________________
Point of Contact: _____________________________________________________
Email: _____________________________________________________________ mailto:Jillian.L.Noblett@uscg.mil
Offeror Name: _______________________ Solicitation: _____________________
Project Title and Detailed Description of Work for which the Contractor was responsible to perform:
Description or details of the remote location where services were performed:
This portion is to be completed by the Respondent
Name and Title of Evaluator: ___________________________________________
Company Name: ____________________________________________________
Address: _________________________________________________________
Telephone/Fax Number: _______________________________________________
Point of Contact: __________________________________________________
Email: ______________________________________________________________
1. Contractor performed as Prime Contractor Subcontractor Key
Personnel
2. The description of work as stated above accurately or does not accurately describe the work that was performed by Contractor being rated.
3. The location where services were performed is considered a remote / secluded location. Yes No
4. The contract was IAW (check all that apply): FFP CR T&M IDIQ SCA Davis Bacon Sole Source Subcontracting
4. The total dollar value awarded: ______________________________________
5. The total dollar value performed to date: __________________________________
6. The Period of Performance awarded: ____________________________________
7. The Period of Performance performed to date: _____________________________
Choose the appropriate letter on the scale (E, G, S, M, U, and N) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A
NARRATIVE EXPLANATION FOR ANY RATINGS OF E, G, M or U.
E Exceptional Performance meets contractual requirements with many exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.
G Very Good Performance meets contractual requirements with some exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than some minor problems for which corrective actions taken by the contractor were effective.
S Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.
M Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub- element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.
U Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective
N Neutral Performance was not observed or not applicable to the current effort being reported against.
Place an “X” in the appropriate column using the definitions matrix above.
The contractor: E G S M U N
QUALITY
1 Followed approved quality control plan.
2 Provided effective quality control and/or inspection procedures to meet contract requirements.
3 Corrected deficiencies in timely manner and pursuant to their quality control procedures.
4 Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.
SCHEDULE
1 Developed realistic progress schedules.
2 Met established project schedules.
3 Provided timely resolution of warranty defects.
4 Paid subcontractors/suppliers in a timely manner.
MANAGEMENT
1 Provided experienced on-site personnel with the technical and administrative abilities needed to meet contract requirements.
2 Home office participated in solving significant local problems.
3 Delegated authority to on-site personnel commensurate with contract requirements.
4 Provided timely resolution of contract discrepancies.
5 Identified problems as they occurred.
6 Suggested alternative approaches to problems.
7 Displayed initiative to solve problems.
8. Was responsive to contract changes.
9 Provided adequate project supervision.
10 Managed Program w/Integration & Coordination of the customer.
11 Managed Key Personnel
12 Managed Subcontracts
13 Integrity/Ethics Program
14 Reasonable and Cooperative in Behavior with Government personnel
REGULATORY
1 Complied with Environmental laws and regulations
2 Complied with Labor laws and regulations
3 Complied with other regulations and codes and safety requirements
4 How would you rate the contractor's overall performance?
Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”
YES/NO Contract discrepancy reports (or equivalent) frequent YES/NO
ADDITIONAL COMMENTS ON ANY RATING ELEMENT CAN BE MADE BELOW:
End of Survey
File details come from the government source that posted it. Updated .