TECHNICAL_EXHIBIT_1_-_12.docx
DOCX document 210 KB Posted
- Solicitation number
- HSCG84-13-R-B13029
About this file
Technical Exhibits 1-12
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_-_SF30-Amend-3.doc | DOC document | |
| Corrected_Past_Performance_Survey.doc | DOC document | |
| Schedule_of_Suppliesservices-2013-2018.xls | XLS spreadsheet | |
| Solicitation_-_Buoy_Maint-2.doc | DOC document | |
| Past_Performance_Survey.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY
AND
QUALITY ASSURANCE SURVEILLANCE PLAN
TECHNICAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY
1. The purpose of this Performance Requirements Summary is to:
1.1 List those contract requirements (column 1) which are paid for on the basis of a payment computation system specified in paragraph 4 of this Technical Exhibit. The absence from this Performance Requirement Summary (PRS) of any contract requirement, however, shall not detract from its enforceability or limit the rights or remedies of the Government under any other provision of the contract.
1.2 Define the standard of performance for each required service (column 2).
1.3 Show the maximum allowable degree of deviation from specified performance for each requirement that shall be allowed by the Government before contract performance is considered unsatisfactory (column 3).
1.4 Explain the quality assurance method the Coast Guard will use to evaluate the Contractor's performance in meeting the contract requirements (column 4).
1.5 Show the percentage of the contract price that each listed contract requirement represents (column 5).
1.6 Define the procedure the Government will use in reducing the Contractor's payment if satisfactory performance is not rendered by the Contractor.
2. The Government may use a variety of surveillance methods to evaluate the Contractor's performance. The government's primary quality assurance procedure will be 100% surveillance of the requirements listed in column 1. Other areas will be reviewed periodically (i.e., monthly, quarterly, semiannually) using the Government's Quality Assurance Surveillance Plan.
3. The Contractor's performance will be evaluated by the Quality Assurance Evaluator (QAE). When the Contractor's performance is discovered by the QAE to be unacceptable, the QAE shall complete a Contract Discrepancy Report (CDR). In the CDR the Contractor will explain in writing why performance was unsatisfactory, how performance will be returned to satisfactory levels, and how recurrence of the problem will be prevented in the future. The criteria for these requirements were derived from estimates of the level of performance experienced when the service was done by government personnel and are the levels of performance deemed acceptable to the Government. The Contracting Officer will evaluate the Contractor's explanation and determine if full payment, partial payment or the contract termination process is applicable. The Contractor's payment for service rendered will be calculated as stated in paragraph 4.
4. The Contractor shall be paid for all work performed in accordance with the contract standards. Payments for Work Orders will be reduced for late or unsatisfactory performance using the following method:
4.1 Contractor performance will be compared to contract standards using the Quality Assurance Surveillance Plan (QASP) in this Technical Exhibit.
4.2 If performance in any required service is unsatisfactory, and the poor performance was not caused by Government action, or lack of action, an amount of money up to an amount equal to the line item price multiplied by the percentage cost of the service as stated in column five of the Performance Requirements Summary Table, shall be deducted.
5. Work Order payments to the Contractor will be reduced for unsatisfactory performance using the following methods:
5.1 Example of Deduct Computation for buoys:
Assume an 8X26 LR is being routinely overhauled and outfitted and that the line item price for this work is $1000.00 for the overhaul and $500.00 for the outfitting. The combined price is $1500.00. The work request is dated 24 September 2007. Assume a buoy is available at the time of the work request. As stated in Technical Exhibit 5, the Contractor has twelve calendar days to deliver the satisfactorily completed buoy. Therefore, the buoy must be delivered and accepted by the Government by 6 October 2007. Assume the buoy is delivered on 8 October 2007 and is accepted by the Government. The buoy is two days late. The deduction computation is made as follows:
(1) Line item price for service $1500.00
(2) Percentage deduction 2 days times 5% per day X10%
(3) Deduction from current Work Order’s invoice $ 150.00
PERFORMANCE REQUIREMENTS
SUMMARY
BUOY MAINTENANCE
| (1) | (2) | (3) | (4) | (5) | |||
| DEDUCT | |||||||
| FROM | |||||||
| CONTRACT | |||||||
| MAXIMUM | PRICE | ALLOWABLE FOR | |||||
| SERVICE DEGREE OF METHOD OF | EXCEED | ||||||
| REQUIRED | STANDARD DEVIATION SURVEILLANCE MAXIMUM |
| 1. Delivery | Accomplished None | 100% | 5% for buoys to | within | every day |
| Tongue Point | schedule late | ||||
| Facility, | established | ||||
| Base Support | in para. | ||||
| Unit | C-5.1.5.3 |
Seattle, Marine Support Unit, Portland, NAVSTA Everett Port of Astoria, Port of Aberdeen Port of Newport, or Port of Coos Bay (Routine)
| 2. Delivery | Accomplished None 100% | 15% for |
| of buoys to | within | every day |
| Tongue Point | schedule | late |
| Facility, | established |
Base Support in para.
Unit Seattle C-5.1.5.7 Marine Support Unit, Portland, NAVSTA Everett Port of Astoria, Port of Aberdeen, Port of Newport or Port of Coos Bay (Emergency)
1. Purpose: This Quality Assurance Surveillance Plan (QASP) describes methods that the Government will use to monitor whether the Contractor’s performance of the contract work is acceptable. The QASP is the Government’s written plan for administering the Contract and monitoring major aspects of the Contractor’s performance. The QASP is not part of the Contract. It is provided to the Contractor solely for the informational purposes and is subject to change by the Government at any time during the contract performance period. Therefore, the Government reserves the right to perform more or less surveillance that is provided in this QASP.
2. Introduction: The QASP establishes a method to evaluate the services the Contractor is required to furnish. It is designed to provide an effective method of monitoring Contractor performance for each list objective on the Performance Requirements Summery (PRS) in the contract. The Government is concerned with the quality of the services provided, and not with the method that the Contractor uses to provide these services. If performance of any required service is unsatisfactory as a result of the Contractor’s actions or omissions, then the Government may reduce the contract payments to reflect the decreased value of the services received in accordance with the PRS and/or applicable FAR clauses.
3. Responsibility for Quality Control: The Contractor, not the Government, is responsible for quality control and management actions to meet the terms of the Contract. The Government performs quality assurance to monitor whether Contract standards are achieved.
3. Surveillance Methods: The Government will evaluate the Contractor’s performance under this contract. Government surveillance may include, but not limited to, the following methods:
a. COR inspections; and/or
b. Periodic surveillance
BUOY OVERHAUL
Buoy Serial number ______________________
NOTE: Items 1, 2, and 4-17 apply to overhaul of lighted buoys. Items 1, 2, 3, 12, 16 and 17 apply to overhaul of unlighted buoys.
ITEM CONTRACT REQUIREMENT S/U
SECTION
1. Buoy Body C-5.1.9.1.1 a. All dents larger than 1 foot in (lighted) diameter or 4 inches deep repaired.
| ------------------------------------ | |
| C-5.1.9.2.1 | b. All pit holes and cracks |
(unlighted) repaired by welding.
| --------------------------------------------- | |
| c. Pits deeper than 1/8 inch | |
| repaired by welding and ground | |
| flush. | |
| --------------------------------------------- | |
| d. Replaced plate does not overlap. |
2. Mooring C-5.1.9.1.2.1 a. Inside surface built up to Eye (lighted) original size and shape using C-5.1.9.2.2.1 welding, or replacement eye (unlighted) installed.
| 3. Mooring | C-5.1.9.1.2.2 | a. Bent arms straightened. |
| Arm | (lighted) | ------------------------------------ |
| b. Inside surface built up to |
original size and shape using welding or replacement arm installed.
| ------------------------------------ |
| c. Attachment pins replaced or |
built up to original diameter or replaced.
| 4. Chafing | C-5.1.9.1.3 | a. Chafing block replaced, if |
| Block | (lighted) applicable. |
| 5. Counter- | C-5.1.9.1.4 | a. Tube straight. |
| weight | (lighted & | ------------------------------------ |
| tube | unlighted) | b. All pit holes and cracks |
repaired by welding and ground flush.
| ------------------------------------ |
| c. Pits deeper than 1/8 inch |
repaired by welding and ground flush.
| 6. Flanges | C-5.1.9.1.5.1 | a. Not warped, cracked or pitted. |
| & Covers | (lighted) |
| 7. Gaskets | C-5.1.9.1.5.2 | a. New gasket installed. |
| (lighted) |
| 8. Closure | C-5.1.9.1.5.3 | a. All swingbolts or bolts operate |
| Device | (lighted) properly. | |
| ------------------------------------ |
b. All swingbolts or bolts are standard type.
| 9. Vent | C-5.1.9.1.5.4 | a. Vent line complete as per |
| Lines | (lighted) applicable drawing. | |
| ------------------------------------ | ||
| b. No breaks, cracks, pinched |
sections, loose fittings, missing or damaged plastic hose or plugged 2 inch diameter crossover tube or other damage.
| 10. Battery | C-5.1.9.1.5.5 | a. All cracks, holes or pits | |
| (lighted) | repaired by welding. | ||
| Cylin- | ------------------------------------ | ||
| ders | b. No foreign matter in cylinder. | ||
| ------------------------------------ | |||
| c. No slag in crossover tube. |
| 11. Radar | C-5.1.9.1.6.1 | a. No plates bent more than 3 | |
| Reflec- | (lighted) | degrees from right angle. | |
| tor | ------------------------------------ | ||
| C-5.1.9.2.3 | b. All cracks, holes or pits |
(unlighted) repaired by welding.
| 12. Tower | C-5.1.9.1.6.2 | a. All tower legs and feet attached |
| Legs | (lighted & | to buoy body. |
| and | unlighted) | ------------------------------------ |
| Members | b. No legs bent more than 3 inches |
from straight line over a 2 foot
| length. |
| ------------------------------------ |
c. Tower perpendicular (2 degree tolerance).
| 13. Lantern | C-5.1.9.1.6.3 | a. Lantern ring straight and |
| Ring | (lighted) | completely around tower. |
| ------------------------------------ | ||
| b. Lantern mounting plate not |
corroded or damaged.
| ------------------------------------ | |
| c. If outfitted with, Guano bars |
are not missing or damaged.
| 15. Welds | C-5.1.9.4 | a. Welds of proper size. |
| C-5.1.9.6.3 | ------------------------------------ | |
| (lighted & | b. Fillet welds have sufficient | |
| Unlighted) | throat, proper convexity, are not |
undercut more than 1/32 inch, sufficient leg and penetration.
| ------------------------------------ | |
| c. Groove welds have sufficient | throat, proper convexity, are not |
undercut, sucked back, or overlapped.
| ------------------------------------ |
| d. Welds are not cracked, and do \ |
not have porosity, voids, solid inclusion, incomplete fusion or gaps.
d. All temporary welds have been ground flush and all scars (more than 1/16 inch deep) from these welds have been repaired.
e. Welds around lifting eyes, mooring eyes, and mooring arms have been inspected and tested, and tests documented.
| 16. Paint | C-5.1.9.5 | a. Coating uniform. |
| (lighted & | ------------------------------------ | |
| unlighted) | b. Coating of required thickness. |
Signature of QAE Date
BUOY OUTFITTING Page 1 Buoy Serial number ______________________
NOTE: Items 1-3 apply to outfitting of lighted buoys. Only item 3 applies to outfitting of unlighted buoys.
ITEM CONTRACT REQUIREMENT
S/U SECTION
1. Equipment C-5.1.11.1 a. Bell, gong, properly installed Installation if requested in work request
| (lighted & | ------------------------------------ | |
| Unlighted) | b. Tapper balls not worn more than ¾ |
inch or broken.
c. Steel hinge bar not worn more than ¾ inch diameter & support ring no more than 1/16 inch
| ------------------------------------ | |
| d. Tapper swings freely. | |
| ------------------------------------ |
e. Battery box installed if requested in work request.
f. Whistle properly installed, adjusted, whistle balls move freely
| 2. Painting | C-5.1.10.3 | a. Paint system,color scheme as |
| (lighted & | called for in | |
| unlighted) | work request. | |
| ------------------------------------ |
b. Coating uniform and proper total thickness
3. Buoy Batt- C-5.1.11.3.2 a. Battery pocket vent lines capped ery Pocket (lighted & ------------------------------------air test unlighted) b. Battery pocket couplings plugged
Signature of QAE Date
TECHNICAL EXHIBIT 2
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT AND SERVICES
TECHNICAL EXHIBIT 2
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICE
1. The Government will furnish the following buoy parts:
ITEM DRAWING NUMBER UNIT
a. 85 lbs. Bell 120994 each
b. 225 lbs. Bell 120994 each
c. 85 lbs. Bell Stand 120998 each
d. 225 lbs. Bell Stand 120998 each
e. 20 in. Gong 60 lbs. 120994 each
f. 20 in. Gong 70 lbs. 120994 each
g. 20 in. Gong 75 lbs. 120994 each
h. 20 in. Gong Stand 120998 each
i. Short Tapper, Small Ball 121159 each
j. Short Tapper, Large Ball 121159 each
k. Long Tapper 121159 each
l. Large Tapper Ball 120382 each
m. Small Tapper Ball 120382 each
n. Tapper Cushions each
o. Whistle 120777 each
p. Whistle Valve 120777 each
q. Whistle Balls 120777 each
r. Whistle Valve Cover Gasket 120777 each
s. 22” Pocket Cover 121104 each
t. 24” Pocket Cover 121143 each
u. 22” Pocket Conversion Kit 121162 each
v. 24” Pocket Conversion Kit 121162 each
w. Gasket, Pocket Cover (Roll) 121143/121104 foot
x. Gasket, 12 Bolt Pattern each 24 inch
y. Gasket, 12 Bolt Pattern each 22 inch
z. Radar Reflector, 5X11LR & 121024 each 3X8LR Can
aa. Radar Reflector, 5X11LR & 120316 each 3X8LR Nun
ab. Replacement Tower, 9x35LWR 121151 each
ac. Replacement Tower, 9x32LR 121132 each
dd. Replacement Tower, 8x26LR & 121174 each 8x26LWR
ee. Replacement Tower, 9x20R & 121175 each 8x21LR
ff. Replacement Tower, 7x17LR & 121176 each 6x20LR
gg. Replacement Radar Reflector 121109 each
1CR
hh. Replacement Radar Reflector 121108 each
1NR
ii. Replacement Radar Reflector 121111 each
2CR
jj. Replacement Radar Reflector 121110 each
2NR
kk. External Battery Box 121154 each
ll. 3-1/2LR & 5x11LR Pocket 121106 each Cover/Radar Reflector Mount
mm. Lifting Eye for 4X7, 3 ½ x8, 121140 each 5x11, 1st, 2nd and 3rd class buoys
nn. Lifting Eye for 5x9, 6x20, 121140 each 8x26 and 9x20 buoys
oo. Lifting eye for 9x32 and 121140 each 9x35 buoys
pp. Top Mark Assembly 121045 each
The above listed material will be provided by the Government for use in overhaul and outfitting of steel A/N buoys. Item “a” thur “y” will be provided at the request of the Contractor, based on the need for these materials in the overhaul and outfitting of buoys per work requests. Items "z" thru “jj” will be issued to repair buoys that have received heavy damage, and/or lost either their cage or radar reflector. These will be provided on a case-by-case basis by the COR.
2. The Government will furnish the crane service at Coast Guard Tongue Point Facility, Astoria, Oregon, Marine Safety Unit, Portland, Base Support Unit Seattle, NAVSTA Everett, Washington, Port of Astoria, Port of Coos Bay, Port of Newport and Port of Aberdeen Washington required to load and unload buoys and GFP from the Contractor's vehicles.
3. The Government will furnish Chapters 2 & 3, Aids to Navigation Manual-Technical, Commandant Instruction M16500.3.
TECHNICAL EXHIBIT 3
CRITERIA FOR DESIGNATING A BUOY FOR SCRAP
TECHNICAL EXHIBIT 3
CRITERIA FOR DESIGNATING A BUOY AS SCRAP
1. The COR shall be the final authority on the designation of a buoy as scrap.
2. All buoys of riveted construction shall be designated as scrap.
3. All lighted buoys that are not equipped with radar reflectors (pre-1952 type buoys) shall be designated as scrap. This does not include 1962 type buoys from which the cages have been lost.
4. The following is a list of all obsolete buoy types:
9X42 6X18 9X39 6X12 9X34 5X15 9X14 5X12
9X14 5X11 (1928 TYPE ONLY)
8X30 4X35 8X24 4X24 8X23 4X14 8X20 4X11 8X13 1C 8X12 1N 7X22 2C 7X18 2N 7X15 3C 7X14 3N 6X23 4C 6X22 4N
5. Any buoy built prior to 1962 (1928, 1942 & 1952 type) that is missing its counterweight or cage shall be designated as scrap.
6. Contractor shall notify COR at 40% of max labor hours listed in section 7, with the estimated remaining labor required to complete the work for a “stop” or “proceed” determination from the COR. This will minimize wasted time and costs.
7. Buoys not included above shall be examined to determine the estimated number of labor hours that will be required to complete the repairs to the buoy. For this purpose, repair does not include surface preparation, painting or testing. When the estimated number of labor hours exceeds the number set forth below, the buoy will be designated as scrap:
LABOR HOUR LIMITS FOR ECONOMICAL REPAIR AND UPGRADE OF STEEL BUOYS AND TOWERS.
(Excluding blast cleaning, painting, and outfitting)
BUOY TYPE LABOR HOURS
TOWER* TOTAL BUOY**
9X35 40 90 9X32 30 90 9X20/8X21 20 70 8X26 20 70 7X17/6X20 10 45 5X11/3-1/2X8 25
1CR/1NR 25
2CR/2NR 25
3CR/3NR 10
* As per USCG Aids to Navigation Technical Manual (COMDTINST.M16500.3A)paragraph 2.E.4.d.(2) towers that cannot be economically repaired in the time specified in Table 2-10 shall be replaced.
** Includes all hours required for repair and upgrade of the entire buoy including the tower.
TECHNICAL EXHIBIT 4
BUOY SHIPPING WEIGHTS
TECHNICAL EXHIBIT 4
BUOY SHIPPING WEIGHTS
Buoy Diameter X Length Shipping Classification (ft. X ft.) Weight (lbs.)
9X35LWR* 9 X 35 18,500
9X32LR* 9 X 32 17,500
9X20R* 9 X 20 8,000
8X26LR 8 X 26 11,800
8X26LWR 8 x 26 12,100 8x21LR 8 X 21 13,900
7X17LR 7 X 17 7,800
6X20LR 6 X 20 6,500
5X11 5 X 12 3,000 3 ½ X8 3 X 9 1,500
1CR 5 X 19 5,600
1NR 5 X 20 5,400
2CR 4 X 14 2,700
2NR 4 X 15 2,600
3CR 3 X 9 1,000
3NR 3 X 10 1,000
* denotes an oversize load Note: Weights provided are approximate and may vary from buoy to buoy.
TECHNICAL EXHIBIT 5
REQUIRED DELIVERY DAYS ROUTING AND EMERGENCY BUOY MAINTENANCE
TECHNICAL EXHIBIT 5
REQUIRED DELIVERY DAYS
ROUTINE AND EMERGENCY BUOY MAINTENANCE
I. ROUTINE.
CALENDAR DAYS
BUOY WORK ALLOWED FOR
CLASSIFICATION REQUIRED ROUTINE MAINTENANCE
LIGHTED BUOYS
9X35LWR, 9X32LWR....... OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
9X35LR, 9X32LR..........OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
8X26LR, 8X21LR..........OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
8X26LWR.................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
7X17LR, 9X20BR..........OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
6X20LR, LBR.............OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
5X11LR..................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
3 ½ X8LR................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
I. ROUTINE (CONT.)
CALENDAR DAYS
BUOY WORK ALLOWED FOR
CLASSIFICATION REQUIRED ROUTINE MAINTENANCE
UNLIGHTED BUOYS
1CR.....................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
1NR.....................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
2CR.....................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
2NR.....................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
3CR.....................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
3NR.....................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
II. EMERGENCY.
CALENDAR DAYS
BUOY WORK ALLOWED FOR
CLASSIFICATION REQUIRED EMERGENCY MAINTENANCE
LIGHTED BUOYS
9X35LWR, 9X32LWR.........OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
9X35LR, 9X32LR...........OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
8X26LR, 8X21LR...........OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
8X26LWR..................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
7X17LR, 9X20BR...........OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
6X20LR...................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
5X11LR...................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
3 ½ X8LR.................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
II. EMERGENCY (CONT.)
CALENDAR DAYS
BUOY WORK ALLOWED FOR
CLASSIFICATION REQUIRED EMERGENCY MAINTENANCE
UNLIGHTED BUOYS
1CR.....................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
1NR.....................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
2CR.....................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
2NR.....................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
3CR.....................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
3NR.....................OUTFIT or COLOR CHANGE
OVERHAUL & OUTFIT
TECHNICAL EXHIBIT 6
WELDING
TECHNICAL EXHIBIT 6
WELDING
1.0 PROCESS. Shielded Metal-Arc-Welding (SMAW), Gas-Metal-Arc Welding (GMAW) or Flux-Cored-Arc-Welding (FCAW) shall be used to weld the steel. Gas-Metal-Arc or Gas-Tungsten-Arc welding shall be used to weld any aluminum. The plates, bars, and other shapes forming the various subdivisions and components shall be fitted and faired prior to being welded in place. The gap between parts shall never exceed 3/16 in.
2.0 WELDING FILLER METALS (ELECTRODES). Welding filler metals shall conform to the American Welding Society (AWS) Filler Metal Specifications. All electrodes for medium steel and medium steel casting shall conform to E60XX or E70XX series electrodes. SMAW filler metal shall conform to AWS Filler Metal Specification A5.1. GMAW filler metal shall conform to AWSW Filler Metal Specification A5.18 or A5.20. FCAW filler metal shall conform to AWS Filler Metal Specification A5.20. Corrosion-resisting steels shall be welded with electrodes conforming to AWS Filler Metal Specification A5.4. For aluminum, the welding filler metals shall meet the requirements of AWS Filler Metal Specification A5.10 and be compatible with the aluminum alloy being welded.
3.0 WELD QUALITY.
3.1 PREPARATION OF SURFACE. Surfaces and edges to be welded shall be smooth, uniform and free from fins, tears, cracks and other discontinuities which would adversely affect the quality or strength of the weld. Surfaces to be welded and surfaces adjacent to a weld shall also be free from loose scale, slag, rust, moisture, grease and other contaminants. Machining, cutting, chipping or grinding shall be used for joint preparation or the removal of unacceptable work or metal.
3.2 WELD SIZE. Fillet weld size shall be equal to the thickness of the thinner member of the joints. Reinforcement of groove welds shall not exceed 1/16 in. and no depression in the groove weld finish surface shall be below the surface of the joined members. Welds used to build up the edges of cut pieces for fit shall not be more than 1/4 in. wide.
3.3 WELD DEFECTS. Fillet welds shall be free of harmful defects such as insufficient throat, excessive convexity (excessive reinforcement), excessive undercut (greater than 1/32 inch), insufficient leg, and inadequate penetration. Groove weld contours shall not exhibit excessive convexity, insufficient throat, suck back, excessive undercut or overlap. All welds shall be free of harmful defects such as cracks, porosity, voids, solid inclusion, incomplete fusion or gaps. There shall be no burn through. Angular or thickness misalignment, warpage or dimensional change due to heat from the welding process shall not exceed 1/4 in. Welds shall not be peened, caulked or slugged.
3.4 TEMPORARY WELDS. Upon removal of clips, brackets, etc., which have been temporarily welded, the welds shall be chipped off and ground flush. All gouges, undercuts, or other scars in the base metal that are more than 1/16 in. in depth shall be filled with weld metal and faired out by grinding.
3.5 WELD APPEARANCE. All welds shall be uniform in size and contour. Fillet welds shall be extended around the ends of members to form closed loops. Weld craters at the ends of increments in intermittent welds and elsewhere shall be filled up to prevent cracking. All welding slag, oxide and spatter shall be completely removed from exterior surface before painting.
4.0 QUALIFICATION OF WELDERS. All welders employed for welding under this specification shall be qualified by the Contractor with procedures which meet the requirements of AWS D1.1 and D1.2. If at any time during the contract, a welder's work becomes questionable, the COR may require re-qualification of the welder. Any such re-qualification shall be at the expense of the Contractor. The Contractor shall establish a formal, written training program and shall certify those welders in writing. If the quality of work from these welders is not satisfactory, the QAE may require re-qualification of the welder. If re-qualification is necessary a second time, the Contracting Officer may prohibit the Contractor from using that employee to perform welding tasks.
TECHNICAL EXHIBIT 7
COATING SYSTEM FOR BUOYS
TECHNICAL EXHIBIT 7
COATING SYSTEM FOR BUOYS
1.1 PRIMERS.
1.1.1 SURFACE PREPARATION. Not withstanding the Attachment 3, Chapter 16, Protective Coating and Aids to Navigation, the buoy shall be cleaned of all marine growth, corrosion, paint, and mill scale to a near white metal SP-10 as defined by the Steel Structures Painting Council. Prior to painting it must also be free of all contaminants such as oil, grease, water, blasting grit, etc. All exterior surface and all interior surfaces where entrance openings are provided, including the interior of the battery pocket and the complete inside surface of the whistle tube on whistle buoys and other buoys with open counterweight tubes, shall be cleaned. Metal parts of the buoy shall be sandblasted with silica, shot, or grit.
1.1.2 PAINTING. All exterior metal surface and all interior surfaces where entrance openings are provided, including the interior of the battery pocket, shall be painted. Additionally, if the buoy has a whistle type tube running through the buoy body, the entire inside surface of the tube shall be painted. All painting shall be performed after proper surface preparation of the buoy. All welding, machinery cutting, drilling, severe forming or any other operation which may damage the protective finish shall be performed prior to the application of the finish. Natural rubber, synthetic rubber and all brass or bronze items shall not be painted.
1.1.3 MULTIPURPOSE EPOXY PRIMER.
1.1.3.1 APPROVED TYPE. The following type of high build epoxy is authorized for use:
Paints which meet MILSPEC MIL-P24647 and are obtained from one of the companies on the Qualified Product List QPL-24647.
1.1.3.2 APPLICATION. High Build Epoxy shall be applied with an airless spray gun to a near white metal blast (SSPC-SP-10) surface that is completely free of weld splatter and dirt. Generally, use of High Build Epoxy will require 5 hour periods between each coat. The buoy shall be "striped"; that is, a coat of epoxy shall be painted across all sharp edges, corners, welds and difficult to spray areas. After striping, High Build Epoxy shall be applied in contrasting colors in two coats, 5 mil minimum dry film thickness per each coat. To avoid holidays, the epoxy shall be built up by laying the paint out first in one direction followed by a second series of passes 90 degrees to the first. High Build Epoxy shall be applied, thinned and mixed in accordance with the manufacturer's instructions.
3.1.3.3 DRYING. Drying time before re-coating shall be at least 5 hour at 70 degrees F. Lower temperatures shall require a longer drying time as outlined below:
Temperature Minimum Drying Time 60 degrees F 6 hours
Buoys shall not be painted when the buoy metal surface or air temperature is below 60 degrees.
1.2 TOP COATINGS.
1.2.1 APPROVED TYPE. The following type of aliphatic urethane gloss enamel is authorized for use:
Paints which meet MILSPEC MIL-P-24647 and are obtained from one of the companies on the Qualified Products List QPL-24647.
1.2.2 SURFACE PREPARATION. The surface of the buoy shall be clean of all foreign matter such as sand, blasting material, oil, water, and other contaminates. The epoxy primer shall be cured so that it is hard enough to resist denting yet still soft enough to leave a thumb print. If the epoxy hardens completely, then a mist coat of epoxy shall be applied and allowed to partially cure before applying the top coat. Cured epoxy exposed to the sun becomes resistant to new paint and shall be sand swept (with light air pressure) to create roughness before applying an epoxy tack coating followed by top coating.
1.2.3 ALIPHATIC URETHANE GLOSS ENAMEL COLOR COAT. These coats give the buoy its characteristic visual signal. The color system used shall be specified in the work request. The color system uses solids of red, green or yellow; horizontal bands of red and green; horizontal bands of red and black; or vertical stripes of red and white. Buoys shall be painted above the waterline (minimum freeboard) for seven types of marks. These are:
STARBOARD BUOYS - Solid red color on all steel and aluminum surfaces above the waterline.
PORT BUOYS - Solid green color on all steel and aluminum surfaces above the waterline.
SPECIAL PURPOSE BUOYS - Solid yellow on all steel and aluminum surfaces above the waterline.
PREFERRED CHANNEL BUOYS – Buoy shall be painted in the preferred channel color scheme. The buoy shall be painted with three horizontal stripes above the waterline. The stripes will be red/green/red or green/red/green. All lighted buoys with radar towers shall have thetop radar panels painted in the primary color, the bottom radar panels and tower legs painted in the secondary color, and the buoy top head to the waterline painted in the primary color. For unlighted buoys, the radar reflector shall be painted in the primary color. The top head to the waterline shall be split in half with the upper half being painted with the secondary color and the lower half being painted with the primary color.
ISOLATED DANGER BUOYS - Buoy shall be painted in the isolated danger scheme. The buoy shall be painted with three horizontal stripes above the waterline. The stripes will be black/red/black. All lighted buoys with radar towers shall have the top radar panels painted in the primary color, the bottom radar panels and tower legs painted in the secondary color, and the buoy top head to the waterline painted in the primary color. Unlighted can and nun buoys are not used as isolated danger buoys.
SAFE WATER BUOYS - Vertically striped buoys in red and white on all steel and aluminum surfaces above the waterline. Lighted buoys with four-sided towers shall be divided into eight equal vertical segments that alternate red and white. The segments shall be arranged to bisect the 90 degree angle of the radar reflector. Unlighted can and nun buoys are not used as safe water buoys.
MOORING BUOYS – Solid White color on all steel surfaces above the waterline. “Narrow” Blue band painted horizontally around buoy midway between the buoy top and the waterline. Usually 2nd Class unlighted buoy hulls are used for mooring buoys.
1.2.3.1 APPLICATION. Aliphatic urethane gloss enamel color coats shall be applied by spraying, using clean equipment which will not contaminate the paint. The color coats shall be applied, thinned and mixed in accordance with the manufacturer's instructions. One coat shall be applied above the waterline, 2.0 to 3.0 mils dry film thickness. This coat gives the buoy its characteristic visual signal. Color used shall be as specified in the work request. This coat shall consist of a vertical and a horizontal pass over the surface being coated.
1.2.3.2 DRYING. Drying time for the final coat shall be at least 24 hours at temperatures above 77 degrees F.
1.3 ABLATIVE ANTI-FOULING COAT.
1.3.1 APPROVED TYPE. The following type of ablative anti-fouling is authorized for use:
Paints which meet MILSPEC MIL-P-24647 and are obtained from one of the companies on the Qualified Product List QPL-24647.
1.3.2 APPLICATION. Ablative anti-fouling paint shall be applied by spraying, using clean equipment which will not contaminate the primer. The anti-fouling shall be applied, thinned and mixed in accordance with the manufacturer's instructions. At least two coats shall be applied below the waterline (minimum freeboard), 4.0 to 6.0 mils dry film thickness each, to give a dry film thickness of 8.0 to 12.0 mils using contrasting colors for each coat. Each coat shall consist of a vertical and a horizontal pass over the surface being coated. Film thickness control is critical. Service life is a direct function of film thickness.
1.3.3 DRYING. Drying time before re-coating shall be at least 4 hours at temperatures above 77 degrees F. Drying time for the final coat shall be at least 5 hours at temperatures above 77 degrees F.
1.3.4 THINNING. Do not thin the ablative anti-fouling paint. Film thickness control is critical to the performance life of this coating.
TECHNICAL EXHIBIT 8
HISTORICAL WORKLOAD DATA
TECHNICAL EXHIBIT 8
HISTORICAL WORKLOAD DATA
1. The following historical data is provided of information only. The Government does not certify that the amount of work specified below will be equal to the amount the Contractor will be required to perform under this contract. The following information and data is provided as work accomplished from 2008 through 2012 and should be used to assist the Contractor in preparing an order.
TASK 2008 2009 2010 2011 2012
9X35LWR & 9X32LWR
OUTFIT
OVERHAUL & OUFIT 5 5 3 1 3
DISPOSAL
SANDBLASTING
COLOR CHANGE
9X35LR & 9X32LR
OUTFIT
OVERHAUL & OUTFIT 1 0 1 3 1
DISPOSAL
SANDBLASTING
COLOR CHANGE 1
9X20GR/BR
OUTFIT
OVERHAUL & OUTFIT 1 0 2 2 1
DISPOSAL
SANDBLASTING
COLOR CHANGE
8X26LWR
OUTFIT
OVERHAUL & OUTFIT 1 0 1 3 1
DISPOSAL
SANDBLASTING
COLOR CHANGE 1 1
8X26LR & 8X21LR
OUTFIT
OVERHAUL & OUTFIT 2 8 10 6 4
DISPOSAL
SANDBLASTING
COLOR CHANGE
TASK 2008 2009 2010 2011 2012
7X17LR
OUTFIT
OVERHAUL & OUTFIT 0 1 3 6 3
DISPOSAL
SANDBLASTING
COLOR CHANGE
6X20LR
OUTFIT
OVERHAUL & OUTFIT 3 6 9 12 3
DISPOSAL
SANDBLASTING
COLOR CHANGE
5X11LR & 3-1/2X8LR
OUTFIT
OVERHAUL & OUTFIT 3 5 2 2 0
DISPOSAL
SANDBLASTING
COLOR CHANGE
1CR & 1NR
OUTFIT
OVERHAUL & OUTFIT 5 1 3 1 0
DISPOSAL
SANDBLASTING
COLOR CHANGE
2CR & 2NR
OUTFIT
OVERHAUL & OUTFIT 5 5 4 2 2
DISPOSAL
SANDBLASTING
COLOR CHANGE
3CR & 3NR
OUTFIT
OVERHAUL & OUTFIT 0 4 0 0 1
DISPOSAL
SANDBLASTING
COLOR CHANGE
FLANGE CONVERSION 2 4 0 0 0
2” CROSSOVER TUBE 0 0 0 0 0
CONVERSION
INSTALLATION OF BELL 4 2 2 3 2
GONG
TASK 2008 2009 2010 2011 2012
INSTALLATION OF 0 1 0 0 0 WHISTLE
INSTALLATION OF 0 0 0 0 0 LIFTING EYES
FABRICATION & INSTALL-0 0 0 0 0
ATION OF BELL STAND
SUPPORT PLATE
INSTALLATION OF 11 7 1 20 7
EXTERNALBATTERY BOX
COLOR SCHEMES:
HORIZONTAL BANDED:
GREEN-RED-GREEN: 1 0 0 0 0
RED-GREEN-RED: 0 3 1 2 0
BLACK-RED-BLACK: 1 0 0 3 1
WHITE-BLUE STRIPE: 3 2 1 2 1
SOLID COLOR:
YELLOW: 6 1 5 5 1
RED: 13 17 18 12 8
GREEN: 8 10 12 9 7
VERTICAL STRIPE:
RED-WHITE: 3 3 1 1 1
TRANSPORTATION HISTORY
TASK 2008 2009 2010 2011 2012
CONTRACTOR TO/FM 28 22 26 29 15 TONGUE POINT ASTORIA
CONTRACTOR TO/FM 15 13 14 16 6
NAVAL BASE EVERETT
CONTRACTOR TO/FM 3 5 0 4 0
STORAGE FAC PORTLAND
CONTRACTOR TO/FM 0 0 1 0 0
SUPPORT COMMAND SEATTLE
NAVSTA EVERETT TO/FM 3 8 7 2 4
TONGUE POINT ASTORIA
TONGUE POINT ASTORIA 1 1 0 1 0
TO/FM BLUEBELL
TONGUE POINT ASTORIA 0 2 0 0 0
TO/FM PORT OF ASTORIA
BLUEBELL TO/FM 0 0 2 0 0
NAVSTA EVERETT
BUOY MAINTENANCE HISTORY YEARS 2008 THROUGH 2012
The following data is provided for information only. The Government does not certify that the amount of work specified below will be equal to the amount the Contractor will be required to perform under this contract. The following information is provided as work accomplished from 2008 through 2012 and should be used to assist the Contractor in preparing an order.
CALENDAR YEAR 2008
W/O # 1: 9X20 1 EA, 8X26 1 EA, 1CR 3 EA, 2CR 1 EA
W/O # 2: 8X26 3 EA, 8X26LWR 1 EA
W/O # 3: 9X35LWR 1 EA, 9X32 1 EA
W/O # 4: 9X35LWR 1 EA, 9X32 1 EA, 8X26 2 EA
W/O # 5: 8X26 2 EA, 6X20 2 EA, 1CR 1 EA, 2NR
2 EA
W/O # 6: 8X26 1 EA, 6X20 1 EA
W/O # 7: 9X35LWR 1 EA, 8X26 1 EA
W/O # 8: 9X35LWR 1 EA, 8X26 1 EA, 5X11 3 EA,
2NR 2 EA
W/O # 9: 9X35LWR 1 EA
CALANDER YEAR 2009
W/O #10: 6X20 2 EA, 5X11 2 EA, 2CR 1 EA,
2NR 1 EA
W/O #11: 9X35LWR 1 EA, 8X26LWR 1 EA, 6X20 1 EA,
5X11 1 EA, 2CR 1 EA
W/O #12: 9X35LWR 1 EA, 6X20 1 EA, 5X11 1 EA
W/O #13: 2NR 1 EA, 3NR 4 EA
W/O #14: 9X35LWR 1 EA, 8X26 1 EA, 7X17 1 EA,
5X11 1 EA
W/O #15: 8X26 3 EA, 6X20 1 EA
W/O #16: 9X35LWR 2 EA
W/O #17: 8X26 4 EA, 6X20 1 EA, 2CR 1 EA
CALANDER YEAR 2010
W/O #18: 8X26 3 EA, 7X17 2 EA, 1CR 1 EA
W/O #19: TRANSPORT ONLY
W/O #20: 8X26 1 EA, 6X20 1 EA, 5X11 2 EA,
1NR 1 EA
W/O #21: 9X35LWR 1 EA, 8X26 1 EA, 8X21 1 EA
W/O #22: 9X35LWR 1 EA, 9X32 1 EA, 8X26 2 EA,
6X20 2 EA
W/O #23: 9X20 1 EA, 7X17 1 EA, 6X20 3 EA
W/O #24: 9X35LWR 1 EA, 8X26LWR 1 EA, 6X20 1 EA,
1NR 1 EA, 2NR 1 EA
W/O #25: 9X20 1 EA EMERGENCY
W/O #26: 8X26 2 EA, 2CR 1 EA, 2NR 2 EA
CALANDER YEAR 2011
W/O #27: 9X20 1 EA, 7X17 2 EA, 6X20 1 EA
W/O #28: 9X35LWR 1 EA, 9X35 1 EA, 9X32 1 EA,
8X26LWR 1 EA, 8X26 1 EA, 7X17 1 EA,
6X20 2 EA
W/O #29: 9X20 1 EA, 8X26LWR 2 EA, 7X17 3 EA,
6X20 2 EA, 5X11 1 EA, 2CR 1 EA
W/O #30: 8X26 1 EA, 6X20 5 EA, 5X11 1 EA
W/O #31: 8X26LWR 1 EA, 8X26 1 EA, 6X20 1 EA,
1NR 1 EA
W/O #32: 8X26 1 EA, 6X20 1 EA, 2CR 1 EA
CALANDER YEAR 2012
W/O #33: 9X32 1 EA, 8X26 2 EA
W/O #34: 8X21 1 EA, 7X17 1 EA, 6X20 1 EA, 3CR 1 EA,
2CR 1 EA
W/O #35: 9X35LWR 2 EA, 8X26LWR 1 EA, 2NR 1 EA
W/O #36: 9x35LWR 1 EA, 9X20BR 1 EA, 8X21 1 EA, 7X17 2 EA, 6X20 2 EA
TECHNICAL EXHIBIT 9
WRITTEN REPORTS AND DELIVERABLES
TECHNICAL EXHIBIT 9
WRITTEN REPORTS AND DELIVERABLES
The Contractor shall submit the following reports and plans which may be in addition to reports and plans required by contract clauses:
SECTION C
NAME/DESCRIPTION FREQUENCY SUBMIT TO PARA #
1. Project Manager Two days after Contracting C-2.2.1 Notification Contract Officer, award/within with copy five days of to COR any changes in Project Manager
2. Identified Upon start of Contracting C-2.2.1(a,b,c) Personnel Contract Officer, Notification within five with copy days of any to COR changes
3. Quality Control Within 10 Contracting C-2.3.1 Program calendar days Officer, after con- with copy tract award for COR
4. Strike Prior to Contracting C-2.6 Contingency Plan Contract Officer Start
5. Buoy Status Within 24 hrs COR C-5.1.7 of Request
6. Quantity of Quarterly COR C-5.1.8.3
GFE/GFP
TECHNICAL EXHIBIT 10
FORMS
TECHNICAL EXHIBIT 10
FORMS
The following forms shall be used in the performance of this contract:
SECTION C
NAME/DESCRIPTION FREQUENCY SUBMIT TO PARA #
1. DD-1149 Pick up & COR C-5.1.3.2 Requisition and Delivery of Invoice/Shipping Buoys & GFP Document
2. OF 347 Pick up & FINCEN C-5.1.3.2 Task Order Delivery of Buoys & GFP
DD-1149
TECHNICAL EXHIBIT 11
SAFE LOADING CONFIGURATIONS
TECHNICAL EXHIBIT 11
Safe Loading Configurations
Packaging. The buoys shall be shipped fully assembled. The ends of the vent tubes shall be capped to protect them from damage and to prevent water from entering the battery pockets. On buoys outfitted with bells or gongs the tapper arms shall be secured to the tower to prevent them from being damaged in shipment. The buoys shall be properly supported and protected from abrasive wear to prevent damage to the buoy, including the paint, during shipment. The lighted buoy towers and the counterweights shall be supported to prevent vibration during shipment. The counterweight shall be supported so that the buoy ships flat (horizontal) on the flat bed. Chocks shall be used to support the opposite end of the buoy body.
Following hulls require an oversize load permit (over 8’ but less than 10’ in width): 9x35, 9x32 9x20
Following combinations can be hauled on a 45’ flat bed trailer:
| 1 ea: 9x35, 9x32 | 2 ea: 9x20 |
| 2 ea: 8x26 | 2 ea: 7x17 |
| 2 ea: 6x20 | 4 ea: 5x11 |
| 2 ea: 1st Class | 3 ea: 2nd Class |
8 ea: 3rd Class
Note: The Contractor remains responsible for loading buoys, securing and configuring loads in such a manner that transport and delivery can be accomplished safely. The Government is providing information on past loading practices which have proven successful, however this is solely for informational and reference purposes, and the Contractor shall be completely responsible to ensure that all loads are configured safely.
TECHNICAL EXHIBIT 12
ESTIMATES BY BUOY TYPE AND COLOR
ESTIMATES BY BUOY COLOR AND TYPE
The following projections are provided for information only. The Government does not certify that the amount of work specified below will be equal to the amount the Contractor will be required to perform under this contract.
BASE YEAR
| Red |
| Grn |
| Yellow |
| Blk/Red |
| Red/Grn |
| Red/Wht |
| Wht/Blue |
| Wht/Orange |
| Grn/Red |
| Est Total |
| 8x26LWR |
| 1 |
| 1 |
| 9x35LWR |
| 1 |
| 1 |
| 7x17LR |
| 2 |
| 8x26LR |
| 5 |
| 2 |
| 5 |
| 6x20LR |
| 9 |
| 4 |
| 8x26LBR |
| 2 |
| 2 |
9x32LBR
5x11LCR
| 1 |
| 1 |
8x21LR
3CR
2CR
| 5x11LNR |
| 4 |
8x26LGR
| 6x20LBR |
| 1 |
1CR
| 2NR |
| 1 |
3NR
9x20BR
1NR
9x32LR
9x35LR
OPTION YEAR 1
| Red |
| Grn |
| Yellow |
| Blk/Red |
| Red/Grn |
| Red/Wht |
| Grn/Red |
| Wht/Blue |
| Wht/Orange |
| Est Total |
8x26LWR
| 9x35LWR |
| 1 |
| 7x17LR |
| 2 |
| 1 |
| 8x26LR |
| 5 |
| 4 |
| 4 |
| 6x20LR |
| 5 |
| 2 |
| 8x26LBR |
| 3 |
9x32LBR
5x11LCR
8x21LR
3CR
2CR
| 5x11LNR |
| 4 |
8x26LGR
| 6x20LBR |
| 1 |
1CR
| 2NR |
| 1 |
| 1 |
| 2 |
3NR
9x20BR
1NR
9x32LR
9x35LR
OPTION YEAR 2
| Red |
| Grn |
| Yellow |
| Blk/Red |
| Red/Grn |
| Red/Wht |
| Grn/Red |
| Wht/Blue |
| Wht/Orange |
| Est Total |
8x26LWR
| 9x35LWR |
| 3 |
| 7x17LR |
| 2 |
| 1 |
| 8x26LR |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| 6x20LR |
| 3 |
| 2 |
| 8x26LBR |
| 4 |
| 1 |
9x32LBR
5x11LCR
8x21LR
3CR
2CR
| 5x11LNR |
| 2 |
8x26LGR
| 6x20LBR |
| 2 |
| 1 |
1CR
| 1 |
| 1 |
| 2NR |
| 4 |
| 3NR |
| 4 |
9x20BR
1NR
9x32LR
9x35LR
OPTION YEAR 3
| Red |
| Grn |
| Yellow |
| Blk/Red |
| Red/Grn |
| Red/Wht |
| Grn/Red |
| Wht/Blue |
| Wht/Orange |
| Est Total |
| 8x26LWR |
| 1 |
| 9x35LWR |
| 2 |
| 7x17LR |
| 4 |
| 3 |
| 8x26LR |
| 3 |
| 4 |
| 1 |
| 6x20LR |
| 9 |
| 9 |
8x26LBR
9x32LBR
5x11LCR
8x21LR
| 1 |
| 1 |
3CR
2CR
| 5x11LNR |
| 1 |
8x26LGR
6x20LBR
1CR
2NR
3NR
9x20BR
1NR
9x32LR
9x35LR
OPTION YEAR 4
| Red |
| Grn |
| Yellow |
| Blk/Red |
| Red/Grn |
| Red/Wht |
| Grn/Red |
| Wht/Blue |
| Wht/Orange |
| Est Total |
| 8x26LWR |
| 3 |
| 1 |
9x35LWR
| 7x17LR |
| 1 |
| 2 |
| 8x26LR |
| 1 |
| 2 |
| 6x20LR |
| 4 |
| 3 |
| 8x26LBR |
| 4 |
| 2 |
| 2 |
| 1 |
9x32LBR
5x11LCR
8x21LR
3CR
2CR
| 5x11LNR |
| 2 |
8x26LGR
| 6x20LBR |
| 1 |
1CR
| 2NR |
| 2 |
3NR
9x20BR
1NR
9x32LR
9x35LR image1.emf image2.emf