AMENDMENT NO 0001 - SOLICITATION NO HSCG82-17-B-PMV004

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO.

12/22/2016 4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

7088616

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT MIAMI

15608 SW 117TH AVENUE

MIAMI, FL 33177-1630

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT MIAMI

15608 SW 117TH AVENUE

MIAMI, FL 33177-1630

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

PROSPECTIVE BIDDERS

9A. AMENDMENT OF SOLICITATION NO.

HSCG82-17-B-PMV004

9B. DATED (SEE ITEM 11)

11/22/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)

AMENDMENT REASON: RESPONE AND CLARIFICATION TO REQUEST FOR INFORMATION (RFI)

A. Responses/Clarifications to RFI’s are provided on page 2.

B. Bid Opening date is changed to January 10, 2017 at 2:00PM (EST) Miami, FL.

PLEASE PROVIDE A SIGNED AND DATED COPY OF AMENDMNET ALONG WITH YOUR BID.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

ODALYS MCGEE, CONTRACTING OFFICER, USCG

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

AMENDMNET NO. 0001

Solicitation No. HSCG-17-B-PMV004

Repair Cutter Shore-Ties at USCG Sector Mobile, AL

RESPONSE AND CLARIFICATION TO REQUEST FOR INFORMATION (RFI) ARE AS FOLLOWS:

QUESTION -1.)

Due to work on and near the waterfront, will bidders required to have USL&H insurance in accordance with the Longshore and Harbor Workers Compensation Act <https://urldefense.proofpoint.com/v2/url?u=http- 3A__jwfisk.com_uslh_&d=CwMFAg&c=0NKfg44GVknAU- XkWXjNxQ&r=8BHAwH4CnpSu11xdvIcvWksr7KiMBjCvWdQDOQ8CGPw&m=3DaWr10yHuGdeakvoUuhvEAStfLVs_S i6pMvpCdPM00&s=DYLDVX_0hrhcg3jVYH8BEJ8D75Pe4S48ECfDbH3tY2M&e=> ?

RESPONSE: Contractors need to determine whether LHWCA applies to the work and the employees, and if it does they need to provide appropriate insurance that covers LHWCA liability. Your insurance agents would be able to assist with this as well. The following website provides additional information:

http://www.lhwca.com/about/when-does-the-lhwca-apply/

QUESTION-2.) Some of the work will have to be accomplished by barge or boat will the contractor be required to coordinate with any other authority other than USCG?

RESPONSE: The Contractor will be required to notify USCG POC prior to launching a skiff/boat to work out of under pier for safety and security reasons. No other agency coordination is required.

QUESTION-3.) Due to the complexity of this project we request a site visit and we believe it is in the best interest to make it a ‘mandatory’ pre-bid visit.

RESPONSE: USCG Government Procurement Regulations cannot require a “Mandatory” bidding contractor site visit.

If a contractor wishes to visit the site the instructions/procedure is located in Specification Section 01 11 00 GENERAL REQUIREMENTS, Article 1.3 Inspection Prior to Bid as follows:

“Prospective bidders are encouraged to visit the site to familiarize themselves with the existing conditions.

Arrangements for visiting the site may be made by contacting the following:

Base Engineer: Jerry Willhite U.S. Coast Guard Sector Mobile 1500 15th street Mobile, Alabama 36615-1390 Telephone: Office: (251) 441-6241, Cell: (251) 583-1631

Alternate Contacts: Direck W. Satterfield (251) 441-5195 Jay T. Chason (251) 441-5378”

QUESTION-4.) Specification Electrical Shore Tie Section D.2.1 Portable Isolation Transformer Units. Will a trailer mounted unit be required in this project? Along with ST-3 & ST-4.

RESPONSE: The reference is SILC-CSTO-36 11 21 27, which is the USCG Configuration Standard Technical Order and is only a Project Reference Material item. It is NOT a specification item. The project technical specifications are Division 01 through Division 33 as listed in the Project TOC (Table of Contents, Index). The design plans and specifications are already in full compliance. The reference material is for contractors use only and offers various explanations and general descriptions of what is already indicated to be provided on plans and specifications.

http://www.lhwca.com/about/when-does-the-lhwca-apply/

QUESTION-5.) Do you have an estimate of how thick parking lot concrete maybe were the new Platform for Panel WPB?

RESPONSE: Drawing E-11 DETAILS-WPB SERVICE PLATFORM indicates a nominal 6” thick existing concrete vehicle parking area.

QUESTION-6.) Drawing Set 1_07-M9829-1999 show a 4” conduit, breakers and wiring for a temporary plug. Is this to be provided in this bid? There is no reference to it in the general requirement 01 11 00.

RESPONSE: Drawing Set 1_07-M9829-1999 is a Reference Material only and not a part of the work required. The drawing set was the original design for ST-3 and ST-4. It is for contractor’s information use only. Contract work required on this 1999 installed power system is indicated on Sheets E-2, E-3, E-6 and E-7.

QUESTION-7.) Request a bid date extend. This is to insure that Coast Guard get’s the best pricing on equipment and install As possible

RESPONSE: The Bid Opening Date is extended to January 10, 2017 at 2:00PM (EST), Miami Florida

QUESTION-8.) The dock we will be working under is actually 60 to 80 feet deep and the pilings are only 3 to 4 feet apart so getting a 14 foot skiff in and maneuvering may be impossible plus scaffolding will be needed on top of the skiff to reach the work, so a custom barge or platform may need to a be built. In such case, will the contractor be allowed to tie up to the dock for the project or will the floating platforms need to be removed from the water daily?

RESPONSE: The Contractor can use whatever safe means that he or she deems necessary to complete the job as long as it doesn't interrupt CG Operations. As for the barge or platform they can leave it in the water as long as it is secured properly and doesn't block vessel traffic or sink causing a hazard.

QUESTION-9.) The Portable Transformer Trailer in the bid package was not mentioned in the scope and was not visible on site. Is this unit part of the project or was it mentioned as a typical configuration located at other homeports?

RESPONSE: Same response to FRI dated 12/21/16. The reference is SILC-CSTO-36 11 21 27, which is the USCG Configuration Standard Technical Order and is only a Project Reference Material item. It is NOT a specification item.

The project technical specifications are Division 01 through Division 33 as listed in the Project TOC (Table of Contents, Index). The design plans and specifications are already in full compliance. The reference material is for contractors use only and offers various explanations and general descriptions of what is already indicated to be provided on plans and specifications.

None of the sole sourced equipment suppliers have provided pricing yet. So we request the bid date be extended to the later of January 4th or 3 business days after RFI questions are answered.

RESPONSE: The Bid Opening Date is extended to January 10, 2017 at 2:00PM (EST), Miami Florida