Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
02/05/2016 4. REQUISITION/PURCHASE REQ. NO.
21-16-826PMV042
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
CONTRACTING OFFICER
USCG, CIVIL ENGINEERING UNIT MIAMI
15608 SW 117TH AVENUE
MIAMI, FL 33177-1630
SAME AS BLOCK 6.
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
Prospective Contractors
9A. AMENDMENT OF SOLICITATION NO.
HSCG82-16-B-PMV042
9B. DATED (SEE ITEM 11)
01/05/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)
SOLICITATION NUMBER: HSCG82-16-B-PMV042 –MAJOR M & R MAIN BUILDING AT USCGC KANAWHA, PINE BLUFF, AR IS AMENDED
AS FOLLOWS:
A. THIS AMENDMENT PROVIDES ANSWERS FROM CONTRACTOR’S REQUEST FOR INFORMATION ON THE ATTACHED PAGE.
B. BID DUE DATE OF FEBRUARY 10, 2016, 2:00 PM., EASTERN TIME, LOCAL MIAMI, FL IS HEREBY POSTPONED TO ALLOW THE
GOVERNMENT SUFFICIENT TIME TO PROVIDE ADDITIONAL CLARIFICATION AND INFORMATION.
C. A NEW BID OPENING DATE WILL BE ESTABLISHED IN THE NEAR FUTURE.
D. PLEASE RETURN A SIGNED COPY OF THIS AMENDMENT WITH YOUR BID.
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
ADA HOGGARD, CONTRACT SPECIALIST, USCG
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
RFI QUESTION ANSWER
1.) Will combining two sheets of 5/8" sheetrock be acceptable to use to establish the fire-rated walls?
Bid as specified in Sheet A-08 Detail-8
2.) Will the modular housing building, including its porch need to be ADA compliant?
No, the temporary modular housing building does not need to comply.
3.) Our modular home builder has notified us that 2" x 8" prefabricated trusses are non-standard and have to be custom made (Cost prohibitive for one building).
2" x 4" or 2" x 6" are industry standard. May these sizes be used instead?
2x6 floor or roof joists will be acceptable provided they will withstand the specified floor and/or roof loads and wind loads at the required spacing. The modular building shop drawings shall be submitted for approval indicating which loads are being used and what framing is being used for the floors and roof.
4.) As an example, for the small amount of work that will be required for a plumber on this project or the crew that may set up and tie down the modular building, the OSHA 30 requirement seems excessive. Will you and/or the project team re-evaluate the requirement for this to remain?
Site superintendent MUST have 30-hour OSHA all other Workers must have 10-hour. This will be acceptable.
PINE BLUFF MAJOR M&R MAIN BUILDING
Project #4426061
A002