Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
01/29/2016 4. REQUISITION/PURCHASE REQ. NO.
21-16-826PMV042
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
CONTRACTING OFFICER
USCG, CIVIL ENGINEERING UNIT MIAMI
15608 SW 117TH AVENUE
MIAMI, FL 33177-1630
SAME AS BLOCK 6.
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
Prospective Bidders
9A. AMENDMENT OF SOLICITATION NO.
HSCG82-16-B-PMV042
9B. DATED (SEE ITEM 11)
01/05/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)
SOLICITATION NUMBER: HSCG82-16-B-PMV042 –MAJOR M & R MAIN BUILDING AT USCGC KANAWHA, PINE BLUFF, AR
IS AMENDED AS FOLLOWS:
A. THE ATTACHED SPECIFICATION SECTION 07 21 29 SPRAYED FOAM BUILDING INSULATION AND REVISED DRAWING WALL SECTION DETAILS A-06, SHEET 7 AND REFERENCE DRAWING FIRE ALARM PLAN E-1, SHEET 1 SHALL BE INCORPORATED IN THE SOLICIATION. ALSO ATTACHED IS THE BID BOND STANDARD FORM 24.
B. THIS AMENDMENT ALSO PROVIDES ANSWERS FROM CONTRACTOR’S REQUEST FOR INFORMATION ON
ATTACHED PAGES.
C. BID DUE DATE IS EXTENDED TO FEBRUARY 10, 2016 AT 2:00 PM EASTERN TIME, LOCAL TIME MIAMI, FL.
15A. NAME AND TITLE OF SIGNER (Type or Print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
ADA HOGGARD, CONTRACT SPECIALIST, USCG
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
HSCG82-16-B-PMV042
AMENDMENT 001
QUESTION: Are there any liquidated damages for this project if the 180 calendar day period of performance is not met? If so, please identify the amount of the liquidated damages per calendar day?
ANSWER: Liquidated damages are not included in this project.
QUESTION: Section H.7 “Required Insurance”, there is no requirement for OCP (Owner’s Protective Liability Insurance). Please confirm that this is not required or, if it is, please provide the limits of liability.
ANSWER: Insurance is required as per Section H.7 and FAR Clause 52.228-5 Insurance – Work on a Government Installation and the minimum amounts of Liability under FAR Clause 28.307-2.
RFI
RECEIVED
BY PM
QUESTION ANSWER
1 1/21/2016
1. Will there be an on-site contact or Contracting Officers Representative? POC is listed in specification section 01 11 00 paragraph 1.8.
Our office will assign a COR as required for all construction projects
2. Will progress meetings via conference calls be acceptable for updates to
Miami, FL team?
TBD by the construction manager at time of award
3. Section 1.5.2 of Regulatory Requirements states that all workers are to have
30-hour OSHA certification. Will 10-hour be acceptable for workers, and 30-hour be acceptable for the superintendents/foreman?
Specification call for 30-hour and this requirement shall remain
4.Will the new ductwork have enough clearance in the interstitial space between the new ceiling height and the bottom of the existing concrete roof beams?
Attached revised drawing A-06 and new Spec. Section 07 21 29 SPRAYED FOAM BUILDING INSULATION. Replace blanket insulation with spray insulation. New note on sheet A-06 to read: UNDERSIDE OF THE ROOF TO
RECEIVE CLOSED CELL FOAM INSULATION MIN R-21 (SPRAY APPLICATION)
Mechanical response and detail attached.
5. Are existing precast concrete roof beams tensioned? Will IR scans be required before any penetrations? New detail and note on sheet A-06. Attached revised drawing A-06.
6. What is the proper method to fill roof void/hole after the removal of the existing A/C unit on Roof Three? New detail and note on sheet A-06. Attached revised drawing A-06.
2 1/27/2016
1.) Demo note 1 on sheet E-02 states Replace existing Panel “A” with new
120/208V, 3 phase panelboard fed from Panel “M”. Existing panel “M” is
120/240v, 3 phase. You cannot get 120/208V from Panel “M”.
Demo note 1 on sheet E-01 shall be change to " Remove and replace existing panel "A" with new 1 phase, 120/240 V. See panel schedule on E-01". Panel "A" schedule on E-01 shall be revised to 1 phase, 42 circuits with 100amp main breaker. The intention is increase the number of breaker to feed new circuits from panel "A".
2.) Existing feeder to Panel “A” is 100amp, 1 phase; New schedule for Panel
“A” is 1 phase; Please verify which is correct.
Feed new panel "A" from panel "M" circuit 22/24, feeder conductors size shall be 3#1 & #6G as shown on E-01.
3 1/27/2016
4.) Drawing Sheet A-01: What areas of the existing building will remain occupied and/or in use by occupants during construction remodeling? Garage area will be occupied. The unit will need access to the garage.
PINE BLUFF MAJOR M&R MAIN BUILDING
Project #4426061
RFI
RECEIVED
BY PM
QUESTION ANSWER
5.) Drawing Sheet A-01: General Note #2: Will personal effects such as beds, frames, dressers, desks, chairs, file cabinets, microwaves, refrigerators, etc. be relocated to the temporary berthing trailer by USCG personnel or is the contractor responsible for removing, relocating and /or storing all furniture and furnishing withing the building?
Bid as specified in Section 01 11 00, General Requirements 1.1.4.
Contractor to move all the furniture and equipment. Unit request that 4 beds and 4 wardrobe/dressers be set up in the trailer, 2 in each bedroom.
Additionally, it is requested that the TV, TV stand, coffee table, and couches and chairs from the lounge be set up in the trailer. All other furniture will go into Konex boxes/storage on the unit grounds provided by the contractor. The government will remove all personnel belongings and Computers. All other furniture/furnishing should be handled by the contractors.
6.) Drawing Sheet A-02: General Note #3:Since there is no Life Safety Plan provided, can you identify which walls/or ceilings are considered "fire rated" walls or ceilings?
All the walls separating berthing rooms, mechanical closets, office spaces, garages and emergency corridors, emergency exits. (means of egress) shall be fire-rated. Any existing wall that goes up to the underside of the concrete roof are considered a fire rated wall. Penetration in existing ceilings are considered fire rated if the walls surrounding the space are not to the underside of the concrete roof, concrete roof is a rated ceiling as well as the concrete walls.
New interior doors shall be fire rated doors. Attached Reference drawing Fire Alarm Plan showing fire rated walls as a reference drawing only.CONTRACTOR
SHALL VERIFY ALL INFORMATION IN THE FIELD.
PINE BLUFF MAJOR M&R MAIN BUILDING
PROJECT # 4426061
Response to question # 4:
After all existing batt insulation above ceiling has been removed spray insulation will be applied to the structure or inside double tee trusses to gain duct routing space. Based on this; the maximum ductwork routing height shall not exceed 14 inches. Revise main supply duct coming out AHU-2 to reduce from 18x16 to 18x14 and return duct going to AHU-2 to reduce from 18x16 to 18x14 as well.
Attached is included a “Standard Ceiling Diffuser Connection Detail for Limited Ceiling Space” to be used in low roof sections of the building. Detail requests for a pre-fabricated insulated galvanized sheet metal short radius elbows same size as diffuser neck to connect to flexible ducts.
Due to limited ceiling space wrap sheet metal ductwork with 1” insulation. Refer to spec section 23 07 00 for product information and requirements.
2 3 4
FiRE ALARM SYSTEM NOTES:
SYMBOL DESCRIPTION
NEW REPLACEMENT ZONED FIRE ALARM PANEL TO MATCHFACP EXISTING. PANEL SHALL BE 12OVAC OPERATED WITH 24V0C
BATTERY BACKUP OPERATION. LOCATION OF PANEL REMOTE
SUPERVISORY AND ALARM CONTACTS.
EXISTING LOCATION OF 135 DEGREE FIXED TEMPERATURE CEILING
TYPE HEAT DETECTOR. REPLACE COMPLETELY WITH NEW FIXED
TEMPERATURE AND RATE OF RISE HEAT DETECTOR.
EXISTING LOCATION OF CEILING TYPE HARD—WIRED SMOKE
DETECTOR. REPLACE WITH NEW PHOTOELECTRIC CEILING TYPE
SMOKE DETECTOR AND BASE ASSEMBLY.
NEW LOCATION AND INSTALLATION OF CEILING TYPE FIXED
TEMPERATURE AND RATE OF RISE HEAT DETECTOR.
NEW LOCATION AND INSTALLATION OF CEILING TYPE PHOTOELECTRIC
SMOKE DETECTOR AND BASE ASSEMBLY TO PROVIDE CORRIDOR
EGRESS COVERAGE.
EXISTING FIRE ALARM AUDIO APPLIANCE BELL (VARIOUS DIAMETER
. SIZES). REPLACE WITH NEW FIRE ALARM WALL MOUNTED HORN
COMBINATION AUDIBLE/VISUAL SIGNAL NOTIFICATION APPLIANCE
WITH, 3S BEAT FIRE ALARM AUDIO SIGNAL AND FLASHING STROBE
VISUAL ALARM SIGNAL.
F EXISTING WALL MOUNTED FIRE ALARM MANUAL PULL STATION.
REPLACE WITH NEW FA SYSTEM MANUAL PULL STATION CENTERLINE
AT 48” A.F.F.
/— FA—.. NEW FIRE ALARM SYSTEM EXPOSED PLENUM FIRE RATED CABLES
“S INSTALLED CONCEALED ABOVE CEILING SYSTEM OR CONDUIT WITH
FA CABLES INSTALLED. ALL EXISTING FIRE ALARM SYSTEM
CABLES SHALL BE REPLACED WITH NEW CABLES. FIELD VERIFY
EXACT EXISTING WIRING METHOD AND ABOVE CEILING CONDITIONS
PRIOR TO BID.
XP WP
NEW CEILING MOUNTED EXPLOSIDN/MOSITURE PROOF TYPE FIXED
HO TEMPERATURE 136 DEG. F HEAT DETECTOR. REPLACEMENT
DEVICE TO BE INSTALLED IN SAME LOCATION AS EXISTING.
TYPICAL OF ONE REQUIRED IN HAZARDOUS PAINT LOCKER
STORAGE ROOM. CONTRACTOR HAS THE OPTION OF PROVIDING
AN INTRINSICALLY SAFE MOSITURE RESISTANT HEAT DETECTOR.
[]] THE EXISTING FIRE ALARM SYSTEM EQUIPMENT BY FARADAY HAS FAILED,
REACHED END OF LIFE, AND REQUIRES REPLACEMENT. REPLACE THE
MAIN FIRE ALARM PANEL, ALL SYSTEM WIRING, AND ALL SYSTEM DEVICES.
PROVIDE UP—GRADES TO THE LIFE SAFETY SYSTEM COVERAGE TO
CONFORM TO THE LATEST EDITION OF NFPA—72 NATIONAL FIRE ALARM
CODE. PROVIDE 135 DEGREE FIXED TEMPERATURE AND RATE OF RISE
PROTECTION FOR THE STATION BATH/LAUNDRY ROOM. PROVIDE SMOKE
DETECTOR COVERAGE FOR THE EGRESS CORRIDORS. PROVIDE
COMBINATION AUDIBLE/VISUAL SIGNAL NOTIFICATION DEVICES. NEW
REPLACEMENT AUDIO SIGNALS SHALL BE HORNS, MARCH TIME BEAT (3’S).
FIRE ALARM SYSTEM REPLACEMENT PANEL SHALL BE 12OVAC OPERATED
WITH 24VDC BATTERY BACKUP. PROVIDE WITH 12OVAC AND 24VDC
TRANSIENT AND SURGE PROTECTION DEVICES. PROVIDE WITH DACT FOR
REMOTE SITE MONITORING. WALL MOUNTED STROBES 110 CANDELA,
24VDC.
PROVIDE ALL SITE LABOR TO DISCONNECT AND REMOVE ALL EXISTING
FIRE ALARM SYSTEM DEVICES AND WIRING AND TO INSTALL COMPLETE
ALL NEW SYSTEM EQUIPMENT AND WIRE.
NEW REPLACEMENT SYSTEM SHALL BE CERTIFIED AS MEETING ALL
REQUIREMENTS OF NFPA—72 NATIONAL FIRE ALARM CODE, iggg EDITION.
FIRE ALARM CONTRACTOR SHALL VISIT THIS SITE AND DETERMINE ALL
EXISTING FIELD CONDITIONS NECESSARY FOR A COMPLETE FIRE ALARM
SYSTEM REPLACEMENT. CONTRACTOR PRICE SHALL BE “TURN—KEY”.
PRICE SHALL INCLUDE ANNUAL MAINTENANCE SERVICE CHARGE FOR ONE
YEAR PERIOD.
FIRE ALARM SYSTEM PROPOSALS SHALL BE COMPLETE WITH A
DESCRIPTION OF PROPOSED SYSTEM AND EQUIPMENT AND SHALL LIST A
SIMPLIFIED “BILL—OF—MATERIAL”.
PRICE PROPOSALS SHALL BE SUBMITTED TO SSD PINE BLUFF EPO.
FIRE ALARM CONTRACTOR SHALL MARK—UP ON ONE SET OF DRAWINGS
THE ACTUAL SYSTEM WIRING. INDICATE THE INSTALLED WIRE FROM
POINT—TO—POINT AND INDICATE THE TYPE OF WIRE INSTALLED. NOTE IF
WIRE IS INSTALLED IN A CONDUIT OR IS EXPOSED PLENUM RATED ABOVE
CEINING SYSTEM.
USCGC KANAWHA
75’ PUSH—TUG
SSD PINE BLUFF
4101 PORT ROAD
BOX 7627
PINE BLUFF, AK 71611—7627
(870) 850—0548
FAX: (870) 850—0549
EPO P01 GEORGE K. MERRIL
OIC MC JAMES C. SCHMADER
(870) 536—1134
GROUP LOWER MISSISSIPPI
CPO LEONARD R. RMSCH
(901) 544—391 2 ENGINEERiNG
FAX: (901) 544-0554
FIRE ALARM SYSTEM LEGEND
A NEW INSTALLATION OF
1/13/03 REVISIONS TO REC DECK/GALLEY
AREA: 1.) SWITCH LOCATIONS OF SMOKE AND
HEAT DETECTORS IN DINNING AND KITCHEN.
2.) PROVIDE SMOKE DETECTORS IN LIEU OF
HEAT DETECTORS IN THE REC DECK.
— NW
—so I-’-. cic) ii
L1
U. S. COAST GUARD
CIVIL ENGINEERING UNIT
MIAMI
‘t’1NEERIN
USCG, CEU MIAMI
15608 Sw 117TH AVE
MIAMI, FL 33177—1630
GARAGE
ISSUE
FINAL Iii /25/02 I FINAL DESIGN PACKAGE
/27. 111/14/021 /GZ DESIGN REVIEW
MARK I DATE I DESCRIPTION
FIRE ALARM PLAN
SCALE: 1/8’ = 1—0”
A/E PROJECT NO:
CAD FILE NAME: MO761EO1.OWG
DESIGNED BY: OAR
GRAPHIC SCALE
SCALE: AS SHOWN PLOT SCALE: DS:48
SHEET TITLE
A
FIRE ALARM SYSTEM REPLACEMENT
SSD PINE BLUFF
PINE BLUFF ARKANSAS
DEPOT OFFICE/SHOP
ELECTRICAL
FIRE ALARM PLAN
REVIEWED BY: REVIEWED BY: REVIEWED BY:
OAR
PROJECT ENG. I aRANCH CHIEF I ,TECH. DIRECTOR
PRO,
0H IL ER I DATE
ER I DRAWING NUMBER
0208—MO3031 M0761 —D
DISCIPLINE/SHT ND
SHEET 1 OFI 3 I 4
MAJOR M&R MAIN BUILDING / CGC KANAWHA PROJECT NO. 4426061
PINE BLUFF, AR
SECTION 07 21 29
Sprayed Foam Building Insulation
SPRAYED FOAM BUILDING INSULATION
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Spray Polyurethane Foam Insulation in the attic area to completely seal attic spaces from outside unconditioned air.
1.2 REFERENCES
A. ASTM C 518 - Standard Test Method for Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus.
B. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials.
C. ASTM E 96 - Standard Test Methods for Water Vapor Transmission of Materials.
D. ASTM E 283 - Standard Test Method for Determining Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen.
E. ASTM D 1621 - Standard Test Method for Compressive Properties Of Rigid Cellular Plastics.
F. ASTM D 1622 - Standard Test Method for Apparent Density of Rigid Cellular Plastics.
G. ASTM G 21 - Standard Practice for Determining Resistance of Synthetic Polymeric Materials to Fungi.
H. NFPA 286 - Standard Methods of Fire Tests for Evaluating Room Fire Growth Contribution of Wall and Ceiling Interior Finish.
I. UL 1715 - Fire Test of Interior Finish Material.
J. ANSI/AF&PANDS - National Design Specification for Wood Construction
1.3 PERFORMANCE REQUIREMENTS
A. Conform to IBC Codes for flame and smoke, concealment, and over coat requirements.
1.4 SUBMITTALS
A. Submit under provisions of Section 01 33 00. Highlight submittal and supporting documents with corresponding requirements below:
B. Product Data: Manufacturer's data sheets on each product to be used, including:
1. Preparation instructions and recommendations.
2. Storage and handling requirements and recommendations.
3. Installation methods.
C. Manufacturer's Certificates: Certify products meet or exceed specified requirements.
Submit supporting documents that the product is approved by ICC Code to be installed in a min. Type VA building construction.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing urethane foam products and systems of this section with minimum ten years documented experience.
B. Installer Qualifications: A current Qualified Applicator, approved by the manufacturer, specializing in performing Work of this section with minimum three years documented experience.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Store products in manufacturer's unopened packaging, clearly marked with the manufacturer's name, brand name, product identification, type of material, safety information, manufacture date, and lot numbers until ready for installation.
B. Store spray foam materials between 65 degrees F (18 degrees C) and 85 degrees F (29 degrees C) with careful handling to prevent damage to products.
C. Protect all materials from freezing and other damage during transit, handling, storage, and installation.
D. Store and dispose of solvent-based materials, and materials used with solvent-based materials, in accordance with requirements of local authorities having jurisdiction.
1.7 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.
B. Do not apply the polyurethane foam when substrate or ambient air temperatures are below 40 degrees F (4.4 degrees C) or above 120 degrees F (49 degrees C) and relative humidity is greater than 85 percent unless advance means and methods are recommended by the manufacturer.
C. Do not apply the polyurethane foam when substrate or ambient air temperatures are below 30 degrees F (minus 1.1 degrees C) or above 80 degrees F (27 degrees C) and relative humidity is less than 85 percent unless advance means and methods are recommended by the manufacturer.
PART 2 PRODUCTS
2.1 POLYURETHANE FOAM
A. Closed Cell Spray Foam Insulation R-21: Two-component, closed cell polyurethane foam with a nominal density of 1.9 to 2.2 pcf, with minimum physical properties when cured:
1. Core Density: 1.9 to 2.2 lbs/ft3 when tested in accordance with ÅSTM D 1622.
2. Compressive Strength: 25 psi when tested in accordance with ÅSTM D 1621.
3. R-Value (aged): When tested in accordance with ASTM C 518:
a. 6.9 at 1 inch.
b. 24 at 3.5 inches.
c. 38 at 5.5 inches.
d. 54 at 7.9 inches.
4. Closed Cell Content: Greater than 90 percent when tested in accordance with ÅSTM D
2856.
5. Surface Burning Characteristics: Less than 25 when tested in accordance with ASTM E 84 and SDI less than 450 when tested in ASTM E 84.
6. Tensile Strength: 60 psi when tested in accordance with ÅSTM D 1623.
7. Moisture Vapor Transmission (permeance) when tested in accordance with ÅSTM E 96.
a. 0.80 Perms at 1 inch.
b. 0.23 Perms at 3.5 inches.
c. 0.16 Perms at 5 inches.
d. 0.10 Perms at 7.9 inches.
8. Dimensional Stability: (7 days at 158 degrees F, 95 percent RH) less than 10 percent change in volume when tested in accordance with ÅSTM D 2126.
9. Air Leakage Rate: Less than 0.02 (L/s)/m2 when tested in accordance with ASTM E 283 and ASTM E 2178.
10. Fungi Resistance: Zero Rating when tested in accordance with ÅSTM G 21.
11. VOC Regulations: Provide products which comply with applicable regulations controlling the use of volatile organic compounds.
B. IGNITION BARRIER
1. Ignition Barrier installed in accordance with IBC Section 2603.4.1.6. Products meeting IBC Code without the ignition barrier will be considered.
2. The ignition barrier must be non-toxic, low vapors, low VOC and have no formaldehyde.
PART 3 EXECUTION
3.1 EXAMINATION
A. Do not begin installation until substrates have been properly prepared.
B. Verify that all surfaces to receive polyurethane foam insulation are clean, dry and free of dust, dirt, debris, oil, solvents and all materials that may adversely affect the adhesion of the polyurethane foam.
3.2 PREPARATION
SURFACE PREPARATION
A. Clean, prepare, and treat substrate according to manufacturer's written instructions. Provide clean, dust-free, and dry substrate for air barrier application.
1. Ensure that penetrating work by other trades is in place and complete.
2. Prepare surfaces by brushing, scrubbing, scraping, grinding or compressed air to remove loose mortar, dust, oil, grease, oxidation, mill scale and other contaminants which will affect adhesion of the closed-cell, medium density spray polyurethane foam.
3. Where there are release agents or other non-compatible coatings, wipe down metal surfaces to remove these release agents or other non-compatible coatings, using clean sponges or rags soaked in a solvent compatible with the spray polyurethane foam.
4. Ensure veneer anchors are in place.
B. Protection from Spray Applied Materials:
1. Mask and cover adjacent areas to protect from overspray.
2. Ensure any required foam stop or back up material are in place to prevent over spray and achieve complete seal.
3. Seal off existing ventilation equipment. Install temporary ducting and fans to ensure exhaust fumes. Provide for make-up air.
4. Erect barriers, isolate area and post warning signs to advise non-protected personnel to avoid the spray area. Non-protected personnel shall be kept from the spray area
3.3 PRIMER APPLICATION
A. Prepare surfaces and apply primer in accordance with manufacturer's instructions.
B. Apply primer to the properly prepared substrates in accordance with the manufacturer's instructions to achieve a minimum thickness of dry film thickness. Allow primer to cure 24 hours prior to application of spray polyurethane foam or other products.
3.4 INSTALLATION
A. Install spray foam in accordance with manufacturer's instructions.
B. Spray polyurethane foam components (A) and (B) shall be processed in accordance with instructions found on the manufacturers product datasheet.
C. Schedule application to anticipate climatic conditions prior to application to ensure highest quality foam and to maximize yield. All substrates to be sprayed must be dry at the time of application. Moisture in the form of rain, fog, frost, dew, or high humidity greater than 85 percent R.H is not permitted unless Contractor reviews means and methods of spraying with manufacturer's representative prior to installation. Use screens, masking and other precautions to prevent damage to adjacent areas from fugitive overspray.
D. An ignition barrier must be installed in accordance with IBC Section 2603.4.1.6. The ignition barrier must be installed in a manner so that the foam plastic insulation is not exposed.
3.5 ACCESSORY APPLICATION
A. Joint Filler Foam and Caulk: Use joint filler foam and/or caulk to seal around wiring sleeves, conduits, sill plates, multiple studs, etc.
3.6 FIELD QUALITY CONTROL
A. Protect installed products until completion of project.
3.7 PROTECTION
A. Protect installed products until completion of project.
B. After completing work, clean glass and spattered surfaces.
C. Touch-up, repair or replace damaged products before Substantial Completion.
END OF SECTION
| PINE BLUFF_RFI-RESPONSES-01-28-16-rev.pdf |
| M1914A06-REV |
| M0761E01-EXISTING ALARM-FIRE RATED WALLS. |
| 4426061_07 21 29_SPRAY FOAM INSULATION-NEW |
| PINE BLUFF_RFI-RESPONSES-01-28-16 |
| RESPONSE TO PINE BLUFF RFI-QUESTION-4 |
| Low Profile Diffuser Detail |
BID BOND
( See instructions on reverse)
DATE BOND EXECUTED (Must not be later than bid opening date) OMB Number: 9000-0045
Expiration Date: 6/30/2016 Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspects of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, DC 20405.
PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)
INDIVIDUAL
JOINT VENTURE
PARTNERSHIP
CORPORATION
STATE OF INCORPORATION
SURETY(IES) (Name and business address)
PERCENT
OF BID
PRICE
PENAL SUM OF BOND
AMOUNT NOT TO EXCEED
MILLION (S) THOUSAND(S) HUNDRED(S) CENTS
BID IDENTIFICATION
BID DATE
FOR (Construction, supplies, or Services)
INVITATION NO.
OBLIGATION
We, the Principal and Surety (ies) are firmly bound to the United States of America (hereinafter call the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit or liability is the full amount of the penal sum.
CONDITIONS:
The principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10 days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to executes such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each surety executing this instrument agrees that its obligations is not impaired by any extension(s) of the time for acceptance of the bid that the principal may grand to the Government. Notice to the surety (ies) of extensions (s) are waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the periods originally allowed for acceptance of the bid.
WITNESS
The principal and Surety (ies) executed this bid bond and affixed their seals on the above date.
PRINCIPAL
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1. 2.
2.
3.
3.
(Seal) (Seal) (Seal) Corporate Seal
INDIVIDUAL SURETY(IES)
NAME(S)
(Seal) (Seal)
CORPORATE SURETY(IES)
SU
R
ET
Y
A
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT ($)
2. Corporate
AUTHORIZED FOR LOCAL REPRODUCTION
Pervious edition is usable
STANDARD FORM 24 (REV. 10/1998)
Prescribed by GSA - FAR (48 CFR) 53.228(a)
B
STATE OF INC. LIABILITY LIMIT ($)
2. Corporate
Corporate
LIABILITY LIMIT ($)STATE OF INC.
1.NAME(S) &
C
LIABILITY LIMIT ($)
STATE OF INC.
D
E
F
G
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. any deviation from this form will require the written approval of the Administrator of General Services.
2, Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., ab attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporation executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitation listed therein. where more than one corporate surety is involved, their names and address shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY (IES)." In the space designed "SURETY (IES)" on the face of the form, insert only the letter identification of the sureties.
(b) Where individual sureties are involved, a completed Affidavit of Individual surety (Standard Form 28), or each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word " Corporate Seal";
and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "Offeror."
STANDARD FORM 24 (REV. 10/1998) BACK
BID BOND
( See instructions on reverse)
DATE BOND EXECUTED (Must not be later than bid opening date)
OMB Number: 9000-0045
Expiration Date: 6/30/2016
Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspects of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, DC
20405.
PRINCIPAL (Legal name and business address)
TYPE OF ORGANIZATION ("X" one)
INDIVIDUAL
JOINT VENTURE
PARTNERSHIP
CORPORATION
STATE OF INCORPORATION
SURETY(IES) (Name and business address)
PERCENT OF BID PRICE
PENAL SUM OF BOND
AMOUNT NOT TO EXCEED
MILLION (S)
THOUSAND(S)
HUNDRED(S)
CENTS
BID IDENTIFICATION
BID DATE
FOR (Construction, supplies, or Services)
INVITATION NO.
OBLIGATION
We, the Principal and Surety (ies) are firmly bound to the United States of America (hereinafter call the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the
Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit or liability is the full amount of the penal sum.
CONDITIONS:
The principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10 days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to executes such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each surety executing this instrument agrees that its obligations is not impaired by any extension(s) of the time for acceptance of the bid that the principal may grand to the Government. Notice to the surety (ies) of extensions (s) are waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the periods originally allowed for acceptance of the bid.
WITNESS
The principal and Surety (ies) executed this bid bond and affixed their seals on the above date.
PRINCIPAL
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1.
2.
2.
3.
3.
(Seal)
(Seal)
(Seal)
Corporate Seal
INDIVIDUAL SURETY(IES)
SIGNATURE(S)
NAME(S)
(Typed)
1.
1.
2.
2.
(Seal)
(Seal)
CORPORATE SURETY(IES)
SURETY A
NAME & ADDRESS
STATE OF INC.
LIABILITY LIMIT ($)
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1.
2.
2.
Corporate Seal
AUTHORIZED FOR LOCAL REPRODUCTION Pervious edition is usable
STANDARD FORM 24 (REV. 10/1998)
Prescribed by GSA - FAR (48 CFR) 53.228(a)
SURETY B
NAME & ADDRESS
STATE OF INC.
LIABILITY LIMIT ($)
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1.
2.
2.
Corporate Seal
Corporate Seal
LIABILITY LIMIT ($)
STATE OF INC.
2.
2.
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME & ADDRESS
SURETY C
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INC.
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME & ADDRESS
SURETY D
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INC.
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME & ADDRESS
SURETY E
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INC.
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME & ADDRESS
SURETY F
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INC.
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME & ADDRESS
SURETY G
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. any deviation from this form will require the written approval of the
Administrator of General Services.
2, Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., ab attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation
(e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporation executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitation listed therein. where more than one corporate surety is involved, their names and address shall appear in the spaces
(Surety A, Surety B, etc.) headed "CORPORATE SURETY (IES)." In the space designed "SURETY (IES)" on the face of the form, insert only the letter identification of the sureties.
(b) Where individual sureties are involved, a completed Affidavit of Individual surety (Standard Form 28), or each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word " Corporate Seal";
and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "Offeror."
STANDARD FORM 24 (REV. 10/1998) BACK
8.2.0.3062.1.452232.445150
DATE BOND EXECUTED. Enter 2 digit month, 2 digit day and 4 digit year.:
PRINCIPAL (Legal Name and business Address):
TYPE OF ORGANIZATION ( X ONE) INDIVIDUAL: 0
TYPE OF ORGANIZATION ( X ONE) JOINT VENTURE: 0
TYPE OF ORGANIZATION ( X ONE) CORPORATION: 0
TYPE OF ORGANIZATION ( X ONE) PARTNERSHIP: 0
STATE OF INCORPORATION :
SURETY(IES) (Name and business address):
PERCENT OF BID PRICE:
PENAL SUM OF BOND. AMOUNT NOT TO EXCEED. THOUSAND(S):
PENAL SUM OF BOND. AMOUNT NOT TO EXCEED. HUNDRED(S):
DATE Enter 2 digit month, 2 digit day and 4 digit year.:
BID IDENTIFICATION INVITATION NUMBER:
FOR (CONSTRUCTION SUPPLIES, OR SERVICES):
Principal signature(s) 1:
Principal signature(s) 2:
Principal signature(s) 3:
1. Name(s) and title(s) (types):
2. Name(s) and title(s) (types):
3. Name(s) and title(s) (types):
INDIVIDUAL SURETY(IES) 1. NAME(S) (TYPED) :
INDIVIDUAL SURETY(IES) 2. NAME(S) (TYPED) :
SIGNATURE. THIS IS A PROTECTED FIELD:
SIGNATURE. THIS IS A PROTECTED FIELD:
CORPORATE SURETY(IES), SURETY A NAME AND ADDRESS:
STATE OF INC.:
CORPORATE SURETY(IES), SURETY A 1.NAME(S) AND TITLE(S):
CORPORATE SURETY(IES), SURETY A 2.NAME(S) AND TITLE(S):
CORPORATE SURETY(IES), SURETY A 1.SIGNATURES:
CORPORATE SURETY(IES), SURETY A 2.SIGNATURES:
CORPORATE SURETY(IES) LIABILITY LIMIT(S):
PENAL SUM OF BOND. AMOUNT NOT TO EXCEED. MILLION(S):
PENAL SUM OF BOND. AMOUNT NOT TO EXCEED. CENTS:
CORPORATE SURETY(IES), SURETY B 2.SIGNATURES:
CORPORATE SURETY(IES), SURETY B NAME AND ADDRESS:
CORPORATE SURETY(IES), SURETY B STATE OF INC.:
CORPORATE SURETY(IES), SURETY B 1.NAME(S) AND TITLE(S):
CORPORATE SURETY(IES), SURETY E 2.NAME(S) AND TITLE(S):
CORPORATE SURETY(IES), SURETY B 1.SIGNATURES:
CORPORATE SURETY(IES), SURETY E 2.SIGNATURES:
CORPORATE SURETY(IES), SURETY C 2.NAME(S) AND TITLE(S):
CORPORATE SURETY(IES), SURETY C 2.SIGNATURES:
CORPORATE SURETY(IES), SURETY C STATE OF INC.:
CORPORATE SURETY(IES), SURETY C 1.NAME(S) AND TITLE(S):
CORPORATE SURETY(IES), SURETY C 1.SIGNATURES:
CORPORATE SURETY(IES), SURETY C NAME AND ADDRESS:
CORPORATE SURETY(IES), SURETY D 2.NAME(S) AND TITLE(S):
CORPORATE SURETY(IES), SURETY D 2.SIGNATURES:
CORPORATE SURETY(IES), SURETY D STATE OF INC.:
CORPORATE SURETY(IES), SURETY D 1.NAME(S) AND TITLE(S):
CORPORATE SURETY(IES), SURETY D 1.SIGNATURES:
CORPORATE SURETY(IES), SURETY D NAME AND ADDRESS:
CORPORATE SURETY(IES), SURETY E STATE OF INC.:
CORPORATE SURETY(IES), SURETY E 1.NAME(S) AND TITLE(S):
CORPORATE SURETY(IES), SURETY E 1.SIGNATURES:
CORPORATE SURETY(IES), SURETY E NAME AND ADDRESS:
CORPORATE SURETY(IES), SURETY F 2.NAME(S) AND TITLE(S):
CORPORATE SURETY(IES), SURETY F STATE OF INC.:
CORPORATE SURETY(IES), SURETY F 1.NAME(S) AND TITLE(S):
CORPORATE SURETY(IES), SURETY F 1.SIGNATURES:
CORPORATE SURETY(IES), SURETY F NAME AND ADDRESS:
CORPORATE SURETY(IES), SURETY G 2.NAME(S) AND TITLE(S):
CORPORATE SURETY(IES), SURETY G 2.SIGNATURES:
CORPORATE SURETY(IES), SURETY G STATE OF INC.:
CORPORATE SURETY(IES), SURETY G 1.NAME(S) AND TITLE(S):
CORPORATE SURETY(IES), SURETY G 1.SIGNATURES:
CORPORATE SURETY(IES), SURETY G NAME AND ADDRESS:
CORPORATE SURETY(IES) B LIABILITY LIMIT(S):
CORPORATE SURETY(IES) C LIABILITY LIMIT(S):
CORPORATE SURETY(IES) D LIABILITY LIMIT(S):
CORPORATE SURETY(IES) E LIABILITY LIMIT(S):
CORPORATE SURETY(IES) F LIABILITY LIMIT(S):
CORPORATE SURETY(IES) G LIABILITY LIMIT(S):
3. The bond may express penal sun as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).: