AMENDMENT_NO._0002__-_HSCG82-16-B-PMV012.pdf
PDF 419 KB Posted
- Solicitation number
- HSCG82-16-B-PMV012
About this file
AMENDMENT NO. 0002 - SOLICITATION NO. HSCG82-16-B-PMV012
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I 8
2. AMENDMENT/MODIFICATION NO. 02/24/2016 4 REQUISITION/PURCHASE REQ NO 5 PROJECT NO (If applicable)
0002 5093679 6 ISSUED BY CODE 7 ADMINISTERED BY (If other than Item 6) CODE
CONTRACTING OFFICER CONTRACTING OFFICER
USCG, CIVIL ENGINEERING UNIT MIAMI USCG, CIVIL ENGINEERING UNIT MIAMI
15608 Sw I 17TH AVENUE 15608 Sw i 17TII AVENUE
MIAMI, FL 33177-1630 MIAMI, FL 33177-1630
B NAME AND ADDRESS OF CONTRACTOR (NO. STREET. COUNTY, STATE AND ZIP CODE) 9A AMENDMENT OF SOLICITATION NO
HSCG82- 1 6-B-PMVO 12
PROSPECTIVE BIDDERS
9B DATED (SEE ITEM 11)
02/02/2016
1OA MODIFICATION OF CONTRACT/ORDER NO
lOB DATED (SEE ITEM /3)
CODE FACILITY CODE I
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitalion is amended as set forth in Item 14 The hour and dale specified for receipt of Offers is extended is not eatended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods
(a) By completing Items B and 15. and returning 1 copies of the amendment, )b) By acknowledging receipt of this amendment on each copy of the offer submitted or )c( By separate letler or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER If by virtue of this amendment you desire to change an offer aiready submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment. and is received prior to the opening hour and date specified
12 ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authonfy) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO IN ITEM iDA
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43 103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)
AMENDMENT REASON: PROVIDE CLARIFICATION AND REVISED SECTION B
A. CLARIFICATIONS AND RESPONSES TO REQUEST FOR INFORMATION (RFI’s) ARE ATTACHED.
B. A REVISED SECTION B IS PROVIDED FOR USE FOR THIS SOLICITATION. ALSO AS A RESULT OF THE
ORGANIZED SITE VISIT, A COPY OF THE ATTENDANCE LIST IS ATTACHED.
C. BID OPENING DATE REMAINS MARCH 3, 2016 AT 2:00PM (EST) AT THE PLACE OF BID OPENING, MIAMI, FL.
PLEASE PROVIDE A SIGNED AND DATED COPY OF AMENDMNET ALONG WITH YOUR BID.
iSA NAME AND TITLE OF SIGNER (Type orPnnf) lEA NAME AND TITLE OF CONTRACTING OFFICER (Type orpnnt)
ODALYS MCGEE, CONTRACT G I R, USCG
15B CONTRACTOR/OFFEROR 15C DATE SIGNED 16B UNITED STATES OF AMERICA 16C DATE SIGNED
BY
(Signature of person authonzed to sign) (Signature of Contracting Officer)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR( 53243
AMENDMENT NO. 0002
REVISED SECTION B - SUPPLIES OR SERVICES AND PRICES
**ALL ITEMS ARE TO BE PRICED SEPARATELY**
BASE BID ITEM: Contractor shall provide all tools, equipment, materials, labor and supervision necessary to perform select demolition and repairs to existing concrete structure at U.S. Coast Guard Sector San Juan, PR. Work shall be performed in strict accordance with the Specifications (PNUM 5093679), Drawings No. M2048-D, and the contract.
ONE JOB COMPLETE
UNIT PRICE ITEMS: Provide all labor, materials, tools, equipment and supervision necessary to perform the following unit price items. Actual quantities shall be determined by the government and adjusted accordingly. All work shall be performed in accordance with the specifications and drawings.
UNIT PRICE ITEM 1: Perform concrete spall repairs type SPI. No additional time shall be added to the performance period if this item is exercised.
ESTIMATED QUANTITY: 10 CF UNIT PRICE: $______ ITEM TOTAL: $
UNIT PRICE ITEM 2: Perform concrete spall repairs type SP2. No additional time shall be added to the performance period if this item is exercised.
ESTIMATED QUANTITY: 10 CF UNIT PRICE: $ ITEM TOTAL: $______
UNIT PRICE ITEM 3: Perform concrete spall repairs type SP3. No additional time shall be added to the performance period if this item is exercised.
ESTIMATED QUANTITY: 10 CF UNIT PRICE: $ ITEM TOTAL: $
UNIT PRICE ITEM 4: Perform concrete spall repairs type CR1. No additional time shall be added to the performance period if this item is exercised.
ESTIMATED QUANTITY: 10 LF UNIT PRICE: $_______ ITEM TOTAL: $______
UNIT PRICE ITEM 5: Perform concrete spall repairs type CR2. No additional time shall be added to the performance period if this item is exercised.
ESTIMATED QUANTITY: 10 LF UNIT PRICE: $_______ ITEM TOTAL: $_____
AMENDMENT NO. 0002
CONT. REVISED SECTION B - SUPPLIES OR SERVICES AND PRICES
UNIT PRICE ITEM 6: Provide all tools, labor, equipment, materials and supervision to perform full depth concrete repair of the 14” thick Echo Pier deck. No additional time shall be added to the performance period if this item is exercised.
ESTIMATED QUANTITY: I CV UNIT PRICE: $______ ITEM TOTAL: $______
UNIT PRICE ITEM 7: Provide all tools, labor, equipment, materials and supervision to install one new concrete pile jacket as per the concrete pile jacket installation details in the drawing S-05. No additional time shall be added to the performance period if this item is exercised.
ESTIMATED QUANTITY: 1 EA UNIT PRICE: $______ ITEM TOTAL: S______
UNIT PRICE ITEM 8: Provide all tools, labor, equipment, materials and supervision do demolish existing 12” concrete slab on grade. excavate and construct a new reinforced concrete slab on grade over new 12” granular base for an estimated quantity of 25 square feet as per the details included in sheet S-02, detail A/S-02. No additional time shall be added to the performance period if this item is exercised.
ESTIMATED QUANTITY: 25 SF UNIT PRICE: $_______ ITEM TOTAL: $______
UNIT PRICE ITEM 9: Provide all tools, labor, equipment, materials and supervision to provide a unit price per cubic yard for an estimated quantity of 10, to inject hydrophilic concrete at existing sheet pile joint location. No additional time shall be added to the performance period if this item is exercised.
ESTIMATED QUANTITY: 10 CV UNIT PRICE: $_______ ITEM TOTAL: $______
TOTAL BID PRICE (BASE AND UNIT PRICE ITEMS):
A M
EN
D
M
EN
T N
O .0
SO
LI
C
IT
A
TI
O
N N
O
H
SC
G
-1 6-
B -P
M V
O I2
U
SC
G
SE
C
TO
R
SA
N
JU
A N
R
EP
A
IR
B
U
LK
H
EA
D
W H
A R
F
PI
ER
EC
H O
-P N
U M
RF
I
CO
M
PA
N
Y
RE
CE
IV
ED
QU
ES
TI
ON
C
L A
R
IF
IC
A
T
IO
N
RE
SP
O N
SE
S
TO
RE
Q U
ES
T
FO
R
IN
FO
RM
AT
IO
N
(R
FI
A m en dm en t# un it pr ic e
Ite m
#7 “p ro vi de a un it pr ic e to in sta ll on e ne w co nc re te
RA
G Pl ea se se e
R ev is ed
Se ct io n
B A m en dm en t No
.0
A nt on io
M pi le ja ck et as pe rc on cr et e pi le ja ck et in sta lla tio n de ta ils in th e dr aw in g
S-is
C on st ru ct io n re pe at ed as un it pr ic e ite m
#8 wi th a di ff er en ce in th e qu an tit ie s.
I- Sh ou ld th e un it pr ic e Ite m #8 de sc rib ed in A m en dm en t# be th e sa m e as th e or ig in al
RA
G Y es it sh ou ld
Pl ea se se e re vi se d
Se ct io n
B A m en dm en tN o.
bi d do cu m en tp ro po sa l“ pr ov id e a un it pr ic e ite m to de m ol is h ex ist in g co nc re te sl ab on gr ad e, ex ca va te an d co ns tru ct a ne w re in fo rc ed co nc re te sl ab on gr ad e ov er ne w gr an ul ar ba se fo ra n es tim at ed qu an tit y of sf as pe r de ta ils in cl ud ed in sh ee t S
,d et ai l N S-
II-
Sh ou ld un it pr ic e Ite m #9 de sc rib ed in A m en dm en t# be th e sa m e as th e or ig in al
RA
G Y es it sh ou ld
Pl ea se se e
R ev is ed
Se ct io n
B.
A m en dm en tN o.
bi d do cu m en t pr op os al un it pr ic e
#9 “p ro vi de a un it pr ic e pe r c ub ic fe et fo r a n es tim at ed qu an tit y of to in je ct hy dr op hi lic co nc re te at ex ist in g sh ee t pi le jo in tl oc at io ns
Ill -P le as e in di ca te if th e sc op e of w or k of th e un it pr ic e ite m #9 ex cl ud es ex ca va tio n
RA
G Un it pr ic e ite m
#9 ex cl ud es ex ca va tio n an d ba ck fil l.
Th is un it pr ic e ite m co nt em pl at es an d ba ck fil l s in ce it is in cl ud ed in th e un it pr ic e ite m
#8 on ly in je ct io n of hy dr of ili c co nc re te
IV
-T he sc op e of w or k de sc rib ed in th e or ig in al bi d do cu m en t un it pr ic e ite m #9
RA
G
Pl ea se pr ov id e a un it pr ic e ite m ba se d on a qu an tit y of
CY
in di ca te s to pr ov id e a un it pr ic e pe rc ub ic fe et fo r an es tim at ed qu an tit y of to in je ct hy dr op hi lic co nc re te at ex is tin g sh ee t pi le jo in tl oc at io ns
H ow ev er ite m
#9 de sc rib ed in am en dm en t# in di ca te s an es tim at ed qu an tit y if
CY
A nt on io
M
.C on st ru ct io n In c.
co rd ia lly re qu es ts th at th is un it pr ic e be ba se d on th e fu ll de pt h of th e pi le jo in t
V- Pl ea se pr ov id e a m or e sp ec ifi c sc op e of w or k fo rt he or ig in al bi d do cu m en tu ni tp ric e
RA
G Un it pr ic e
Ite m
#8 is pr ov id ed fo r u se on ly in th e ev en tt ha ta dd iti on al ar ea s of ite m s #8
#9 in or de r f or so m e ac tiv iti es no tt o be re pe at ed
Fo re xa m pl e, in or de rf or th k co nc re te sl ab in ad di tio n to th e ar ea s in di ca te d in sh ee t
S-ne ed to be th e sh ee t pi le jo in ts to be re pa ire d it is ne ce ss ar y to de m ol is h a po rti on of th e ex ist in g re pl ac ed
It is no tt o be us ed in co nj uc tio n w ith un it pr ic e ite m N o.
9.
co nc re te sl ab an d ex ca va te th e ex ist in g su bb as e an d ba se m at er ia l in or de r t o in sta ll th e pv c pi pe
.A fte ri nj ec tin g th e hy dr op ho lic gr ou t in sid e th e pv c pi pe th e ge ot ex til e fa br ic sh al l be pl ac ed al on g th e fa ce of th e sh ee t pi le, th e ex ca va te d ar ea sh al l be pr op er ly ba ck fil le d an d th e de m ol is he d co nc re te sl ab sh al l be re co ns tru ct ed
VI
-S ho ul d th e ne w ge ot ex til e fa br ic on ly be co ns id er ed in un it pr ic e ite m #9
RA
G N o.
G eo te xt ile fa br ic pl ac em en t is on ly co ns id er ed un de r th e ba se bi d
Pa ge of
2- B as e bi d ite m s A-
C, or ig in al pr op os al ite m #8 am en dm en t# un it pr ic e ite m
#9 co nc re te sh ee t pi le bu lk he ad
D em ol ish ex ist in g th ic k sl ab on gr ad e be hi nd ex ist in g sh ee tp ile bu lk he ad re pa ir in sid e fa ce of co nc re te sh ee t pi le bu lk he ad by ex ca va tin g fill be hi nd bu lk he ad in sta lli ng ne w ge ot ex til e fa br ic an d in je ct in g hy dr op hi lic co nc re te al on g th e le ng th of all sh ee t pi le jo in ts, fill all vo id s to be hi nd sh ee t pi le bu lk he ad an d co ns tru ct ne w co m pa ct ed gr an ul ar fill ba se an d ne w th ic k re in fo rc ed co nc re te sl ab on gr ad e.
A s pa rt of th e sc op e of w or k de sc rib ed in sh ee t
S-th e co nt ra ct or sh al lf ill all vo id ar ea s un de rt he ne w sl ab wi th ne w m ed iu m de ns e sa nd ba ck fil lc om pa ct ed to m ax dr y de ns ity
,c om pa ct in 6” lif ts.
RF
I
CO
M
PA
NY
RE
CE
IV
ED
Q U
ES
TI
O N
CL
A
RI
FI
CA
TI
O N
R
ES
PO
N
SE
S
TO
RE
Q
U
ES
T
FO
R
IN
FO
RM
AT
IO
N (R
FI
BY
PM
VI
I-
A nt on io
M
.C on st ru ct io n In c.
co rd ia lly re co m m en ds th at un it pr ic e ite m
#8 sh al l
RA
G
Pl ea se se e re sp on se to qu es tio n
1- V ab ov e.
in cl ud e th e fo llo wi ng :1
.D em ol iti on of th e ex ist in g th ick co nc re te sla b
(1 0’ be hi nd th e bu lk he ad wi th an es ta bl ish ed wi dt h x.
2.
Re pa ir in sid e fa ce of co nc re te sh ee t p ile bu lk he ad by ex ca va tin g fill be hi nd bu lk he ad wi th an es ta bl is he d de pt h an d wi dt h)
3.
Fil la ll vo id s to fe et be hi nd sh ee t p ile bu lk he ad
(w ith an es ta bl is he d wi dt h an d de pt h or vo lu m e)
4.
C on st ru ct ne w co m pa ct ed gr an ul ar fill ba se
5.
C on st ru ct ne w th ic k re in fo rc ed co nc re te sl ab on gr ad e in cl ud in g ex pa ns io n an d co nt ra ct io n jo in ts.
VI
II-
A nt on io
M
.C on st ru ct io n In c.
co rd ia lly re co m m en ds th at un it pr ic e ite m
#9 sh al l
RA
G
Pl ea se se e re sp on se to qu es tio n
1- Ill ab ov e.
in cl ud e th e fo llo w in g:
1.
Ex ca va tio n of fill be hi nd bu lk he ad
(w ith th e sa m e es ta bl is he d w id th as th e on e pr ov id ed fo ru ni tp ric e ite m #8
(th e de pt h sh al l be es ta bl is he d sta rti ng be lo w th e de pt h lim it pr ov id ed fo ru ni tp ric e #8 un til th e bo tto m of th e pr ec as tc on cr et e sh ee t pi
le) 2.
In sta lla tio n of ha lf di am sc h pv c pi pe at sh ee t pi le pa ne lj oi nt .3
In je ct io n of hy dr op hi lic gr ou ta tp an el jo in t.
4.
In sta lla tio n of ne w ge ot ex til e fa br ic
.5
Ba ck fil lo f n ew m ed iu m de ns e sa nd ba ck fil lt o an es ta bl is he d he ig ht be lo w th e de pt h lim it pr ov id ed fo ru ni tp ric e ite m
#8
I- A nt on io
M .C on st ru ct io n, In c.
co rd ia lly re qu es ts th at an al lo w an ce or de pt h be
RA
G Th is qu an tit y sh ou ld be ca lc ul at ed ba se d on th e ho riz on ta l an d ve rti ca l di m en si on s pr ov id ed fo rb ot h th e ba se bi d ite m un it pr ic e ite m s sc op e of w or k in or de rf or all th e pr ov id ed in th e dr aw in gs co nt ra ct or s to co ns id er th e sa m e am ou nt of m ed iu m de ns e sa nd ba ck fil l.
II-
Th e sc op e of wo rk de sc rib ed in am en dm en t# un it pr ic e ite m #9 in di ca te s to pr ov id e
RA
G
P le as e se e re vi se d
Se ct io n
8, A m en dm en t N o.
an d re pi on se to qu es tio n
-V an es tim at ed qu an tit y of
SF
be lo w it in di ca te d an es tim at ed qu an tit y of cy an d I-I ll ab ov e.
T he se qu an tit ie s do no tm at ch si nc e
SF
wi th de pt h is
.9
CY
A nt on io
M
C on st ru ct io n
In c.
co rd ia lly re qu es ts th at th is un it pr ic e be ba se d on an es ta bl is he d am ou nt of lin ea rf ee ti n or de rf or all co nt ra ct or s to co ns id er all th e ac tiv iti es in cl ud ed in th e
’w id e sp an as pe rt he w or k to be pe rf or m ed in th e ba se bi d sc op e of w or k.
Ill -T he de ta il on dr aw in g S-de m on st ra te s th e ne w fil te rf ab ric to be pl ac ed al on g th e
RA
G N o.
Th e ge ot ex til e fa br ic is on ly to be pl ac ed as sh ow n on dr aw in g sh ee t S-fa ce of th e sh ee t pi le.
Sh ou ld th e ge ot ex til e fil te r f ab ric al so be pl ac ed un de rn ea th th e ne w th ic k lim e ro ck or w et te d sh el l sa nd ba se
P ag e
RF
I
JCO
M
PA
N
Y
RE
CE
IV
ED
QU
ES
TI
ON
IV
-S ho ul d a va po r ba rr ie r be in st al le d un de rn ea th th e th ic k co nc re te sl ab on gr ad e?
If so pl ea se pr ov id e sp ec ifi ca tio ns
V- Pl ea se pr ov id e an ex ist in g co nd iti on s dr aw in g of th e ut ili ty m an ho le s th at ar e lo ca te d in th e ar ea w he re th e co nc re te sl ab wi ll be re pa ire d.
CL
AR
IF
IC
AT
IO
N
RE
SP
O N
SE
S
TO
RE
Q U
ES
T
Th er e is no va po r ba rr ie r re qu ire d.
A s-
Bu ilt ut ili ty in fo rm at io n ar e no ta va ila bl e, Pl ea se re fe r to
Sp ec ifi ca tio n
Se ct io n, pa ge
3, pa ra gr ah p
1.
5”
Ut ili ty Lo ca tio n”
P ag e
Department of Homeland Security U.S. Coast Guard Civil Engineering Unit Miami
15608 SW
117TE Avenue, Miami. FL 33 166-1630
(305) 278-6700 Fax (305) 278-6696
ATTENDANCE LOG
PROJECT:
PIJRPOSE OF MEETING
LOCATION
SOLICITATION NO.
Organized Site Visit
U.S. Coast Guard Sector San Juan. Puerto Rico
IISCG82-16-B-PMVO12 DATE 02/11)2016
, NAMB TITL CoMPANY TEL NO.
rE b.
/44/
M-c cZPmcc-L
J:i44si Jic± . ?.
Li i? --.—“-
— -_) / / i3’-%rt
VM”/2f I4 /A1T/ /9i/24 7 7- qQ7k’&T a5 ?d
Sa gAo)
NAME TITLE COMPANY TEL NO.
5c ve 47r1-s-4L
.AQ&
Pfj4c .5 LE.’- - -
- 1S.- . Z. 7S5-i’- J Ft9i (2rsrk i’tJ t,/r6,A/(O 72- sJ-
Z. .2Lz tjit..J .
c...... ., ...o .c
7-
ML
t/7
-‘SI’
File details come from the government source that posted it. Updated .