Amendment_001_16-B-PMV012.pdf
PDF 90 KB Posted
- Solicitation number
- HSCG82-16-B-PMV012
About this file
AMENDMENT NO 0001 - HSCG82-16-B-PMV012
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO.
02/03/2016 4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
5093679
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
CONTRACTING OFFICER
USCG, CIVIL ENGINEERING UNIT MIAMI
15608 SW 117TH AVENUE
MIAMI, FL 33177-1630
CONTRACTING OFFICER
USCG, CIVIL ENGINEERING UNIT MIAMI
15608 SW 117TH AVENUE
MIAMI, FL 33177-1630
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
PROSPECTIVE BIDDERS
9A. AMENDMENT OF SOLICITATION NO.
HSCG82-16-B-PMV012
9B. DATED (SEE ITEM 11)
02/02/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)
AMENDMENT REASON: REVISED SECTION B
A. A Revised Section B is provided for use for this Solicitation.
B. Bid Opening date remains March 3, 2016 at 2:00PM (EST).
PLEASE PROVIDE A SIGNED AND DATED COPY OF AMENDMNET ALONG WITH YOUR BID.
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
ODALYS MCGEE, CONTRACTING OFFICER, USCG
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
REVISED SECTION B - SUPPLIES OR SERVICES AND PRICES
**ALL ITEMS ARE TO BE PRICED SEPARATELY**
Amendment No. 0001
BASE BID ITEM: Contractor shall provide all tools, equipment, materials, labor and supervision necessary to perform select demolition and repairs to existing concrete structure at U.S. Coast Guard Sector San Juan, PR. Work shall be performed in strict accordance with the Specifications (PNUM 5093679), Drawings No. M2048-D, and the contract.
ONE JOB COMPLETE $
UNIT PRICE ITEMS: Provide all labor, materials, tools, equipment and supervision necessary to perform the following unit price items. Actual quantities shall be determined by the government and adjusted accordingly. All work shall be performed in accordance with the specifications and drawings.
UNIT PRICE ITEM 1: Perform concrete spall repairs type SP1. No additional time shall be added to the performance period if this item is exercised.
ESTIMATED QUANTITY: 10 CF UNIT PRICE: $________ ITEM TOTAL: $________
UNIT PRICE ITEM 2: Perform concrete spall repairs type SP2. No additional time shall be added to the performance period
ESTIMATED QUANTITY: 10 CF UNIT PRICE: $________ ITEM TOTAL: $________
UNIT PRICE ITEM 3: Perform concrete spall repairs type SP3. No additional time shall be added to the performance period
ESTIMATED QUANTITY: 10 CF UNIT PRICE: $_________ ITEM TOTAL: $________
UNIT PRICE ITEM 4: Perform concrete spall repairs type CR1. No additional time shall be added to the performance period if this item is exercised.
ESTIMATED QUANTITY: 10 LF UNIT PRICE: $_________ ITEM TOTAL: $________
UNIT PRICE ITEM 5: Perform concrete spall repairs type CR2. No additional time shall be added to the performance
ESTIMATED QUANTITY: 10 LF UNIT PRICE: $_________ ITEM TOTAL: $________
CONT. REVISED SECTION B - SUPPLIES OR SERVICES AND PRICES
UNIT PRICE ITEM 6: Provide all tools, labor, equipment, materials and supervision to perform full depth concrete repair of the 14” thick Echo Pier deck. No additional time shall be added to the performance period if this item is exercised.
ESTIMATED QUANTITY: 1 CY UNIT PRICE: $________ ITEM TOTAL: $___________
UNIT PRICE ITEM 7: Provide all tools, labor, equipment, materials and supervision to install one new concrete pile jacket as per the concrete pile jacket installation details in the drawing S-05. No additional time shall be added to the performance
ESTIMATED QUANTITY: 1 EA UNIT PRICE: $________ ITEM TOTAL: $___________
UNIT PRICE ITEM 8: Provide all tools, labor, equipment, materials and supervision to install one new concrete pile jacket as per the concrete pile jacket installation details in the drawing S-05. No additional time shall be added to the performance
ESTIMATED QUANTITY: 25 SF UNIT PRICE: $_________ ITEM TOTAL: $__________
UNIT PRICE ITEM 9: Provide all tools, labor, equipment, materials and supervision to demolishes existing 12” concrete slab on grade, excavate and construct a new reinforced concrete slab eon grade over new 12” granular base for an estimated quantity of 25 square feet as per the details included in sheet S-02, detail A/S-02. No additional time shall be added to the performance period if this item is exercised.
ESTIMATED QUANTITY: 10 CY UNIT PRICE: $_________ ITEM TOTAL: $_________
TOTAL BID PRICE (BASE AND UNIT PRICE ITEMS): $______________________
| 2016-02-03T09:58:23-0500 | |
| MCGEE.ODALYS.Q.1027114705 |
File details come from the government source that posted it. Updated .