AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
8/15/2012
4. REQUISITION/PURCHASE REQ. NO.
21-12-822PMV026
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
CONTRACTING OFFICER
USCG, CIVIL ENGINEERING UNIT MIAMI
15608 SW 117TH AVENUE
MIAMI, FL 33177-1630
SAME AS BLOCK 6.
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
PROSPECTIVE BIDDER
9A. AMENDMENT OF SOLICITATION NO.
HSCG82-12-B-PMV026
9B. DATED (SEE ITEM 11)
7/27/2012
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)
SOLICITATION NO. HSCG82-12-B-PMV026 – DEMOLITION OF THE CARPENTRY BUILDING AND NEW CONSTRUCTION OF WPB STORAGE AND GYM BUILDING AT USCG SECTOR ST. PETERSBURG, FL IS AMENDED AS FOLLOWS:
A. THIS AMENDMENT PROVIDES ANSWERS FROM CONTRACTOR’S REQUEST FOR INFORMATION ON ATTACHED
PAGE 2.
B. PLEASE RETURN A SIGNED COPY OF THIS AMENDMENT WITH YOUR BID.
C. BID OPENING OF AUGUST 28, 2012 REMAINS UNCHANGED.
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
ODALYS MCGEE, CONTRACTING OFFICER, USCG
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
HSCG82-12-B-PMV026
AMENDMENT 002
QUESTION: Plans call for the Fire Alarm devices to be tied into another Fire Panel. This Fire Panel is not shown on any of the sheets. Where is this Fire Panel and what manufacture is it?
ANSWER: Refer to 26 05 00, Article 1.2, D., Work Description #13. “Life Safety system: Disconnect and remove some existing ceiling mounted Fire Alarm System Smoke and heat Detectors, and store in a clean, dry space. Re-install the FA System Smoke and heat Detectors in the new locations as indicated on the drawings, and re-connect into the existing stations Fire Alarm System. Existing Life Safety System is Simplex 4002 hard wired basic system. All fire alarm system renovation work shall be by a Simplex factory authorized/trained agent. Disconnect and relocate one wall mounted audio signal appliance as indicated on the drawings. Prior to demolition perform a detailed site survey to determine the actual FA (Fire Alarm) system existing type and wiring.”
The FACP is a Simplex 4002 and is remote located in the Multi-Purpose Building. See drawing G-01 for the MP-Building location.
QUESTION: With regard to the Fire Alarm System, are there any explosion proof devices needed for the service bay? What is the classification for this area?
ANSWER: The MK Shop (Service Bay) does not contain any existing FA system devices that are listed explosion proof.
QUESTION: With regard to the Fire Alarm System. Is a full raceway or a conduit path required for the Fire Alarm cable?
ANSWER: SEE SPECIFICATION SECTION 26 05 00 Basic Electrical Materials and Methods, Article
2.12 Life Safety System, 2.12.1. All fire alarm system wiring shall be installed within an EMT raceway system. No exposed system wiring shall be permitted.
The drawings and specifications indicate minimum fire alarm system work required on this interior renovation project. Disconnection/Relocation of existing smoke detectors, heat detectors and signal appliance devices are required. Appendix A – Photos Existing Electrical indicates a general condition of the existing fire alarm system devices.