ISAAC_MAYO_(WPC_1112)_DS_FQ2_KWR_18R0_Amend.doc
DOC document 3 MB Posted
- Attached to
- USCG ISAAC MAYO DOCKSIDE REPAIRS FY18
- Solicitation number
- HSCG80-18-QP45009
About this file
Rev-1 dated 11 October 2017, SPECIFICATION for DOCKSIDE REPAIRS FY 18
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ISAAC_MAYO_BLANK_SoSS_(2).xlsx | XLSX spreadsheet | |
| USCGC_ISAAC_MAYO_DSFY18_-_Amendment-SF_30_1.pdf | ||
| NASKW_Base_Access_for_Contractors.pdf | ||
| Combined_Synopsis_Solicitation_Dockside_-_ISSAC_MAYO_FY18.pdf | ||
| ISAAC_MAYO_BLANK_SoSS_(2).xlsx | XLSX spreadsheet | |
| ISAACMAYO_WPC154_DS_FQ2_KWR_18R0_(4).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC ISAAC MAYO (WPC 1112)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2018
Developed By: Kent W Ross (Rev-1, 11 October 2017)
TABLE OF CONTENTS
iiiRevisions Record ivConsolidated List of References viConsolidated List of Government-furnished Property viiConsolidated List of Critical Inspection Items viiiPrincipal Characteristics
1General Requirements
11WORK ITEM 1: Interior Wet Deck Coverings, Reseal
14WORK ITEM 2: BHD Penetrations and Brackets, Remove
17WORK ITEM 3: New Capstan Control Pendants, Install
26WORK ITEM 4: HVAC Duct System, Clean
29WORK ITEM 5: Exterior Deck Drains, Repair
33WORK ITEM 6: Topside Exterior Surfaces, Preserve (Partial, Opt)
35WORK ITEM 7: Tanks, Clean and Inspect
39WORK ITEM 8: Machinery Ventilation System, Clean
42WORK ITEM 9: Sewage and Grey Water System, Clean and Inspect
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
| 10/11/2017 |
| 1 |
| 4 |
| Deleted Paragraph 3.4.1: Dissuser Renewal |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 154 WPC 127-302, Rev B, Potable Water & Sewage Tank Fabrication Details
Coast Guard Drawing 154 WPC 180-601, Rev 3, Foundation Pre-Fab Module 00
Coast Guard Drawing 154 WPC 320-301, Rev C, 450V System Deck Plan
Coast Guard Drawing 154 WPC 320-302, Rev B, Motor Controller Diagrams
Coast Guard Drawing 154 WPC 506-201, Rev A, Fills Vents, Sounds, and Overflows
Coast Guard Drawing 154 WPC 506-301, Rev -, Fills, Vents, Sounds and Overflows Diagram
Coast Guard Drawing 154 WPC 512-201, Rev -, HVAC Arrangement
Coast Guard Drawing 154 WPC 512-301, Rev A, HVAC System Diagram
Coast Guard Drawing 154 WPC 512-305, Rev 8, HVAC Equipment List
Coast Guard Drawing 154 WPC 513-201, Rev 1, Machinery Ventilation Arrangement
Coast Guard Drawing 154 WPC 513-301, Rev C, Machinery Ventilation Diagram
Coast Guard Drawing 154 WPC 526-201, Rev A, Weather Deck Drains Arrangement
Coast Guard Drawing 154 WPC 526-301, Rev A, Weather Deck Drain Diagram
Coast Guard Drawing 154 WPC 528-301, Rev -, Grey Water System Diagram
Coast Guard Drawing 154 WPC 593-201, Rev D, Sewage System Diagram
Coast Guard Drawing 154 WPC 593-301, Rev A, Sewage System Diagram
Coast Guard Drawing 154 WPC 593-303, Rev -, Sewage Control System
Coast Guard Drawing 154 WPC 601-302, Rev C, General Arrangement
Coast Guard Drawing 154 WPC 612-201, Rev C, Lifelines, Liferails, & Stanchions A&D
Coast Guard Drawing 154 WPC 631-301, Rev A, Paint and Preservation Schedule
Coast Guard Drawing 154 WPC 633-301, Rev B, Cathodic Protection System
Coast Guard Drawing 154WPC 634-301, Rev A, Deck Covering Schedule
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 8123, 15 SEP 2015, Preliminary - Heating, Ventilation, and Air Conditioning System - Frc-514-P1
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of Reliability Is Required
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 9 |
| N |
| Sewage Tank Zinc Anode |
| NIIN: 014474686 |
| 2 |
| 142.19 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
This section is not applicable to this package.
Principal Characteristics
154' WPC (Sentinel Class)
Physical
| Anchor |
| ROCNA, anchor, 150 KG/ 331 LB, Stainless Steel, NACM ¾” Industrial Chain 18’, 743 double braided 4.5 Nylon Line |
| Bulkheads |
| (7), Watertight Bulkheads located below the Main Deck |
| Displacement, delivery, light ship |
| 302 Metric Tons |
| Draft, full load |
| 2.58 Meters (8.46 Feet) |
| End of service life displacement |
| 353 Metric Tons |
| Framing |
| Longitudinal |
| Full load displacement |
| 353 Metric Tons |
| Height of highest projection |
| 17.22 Meters (56.5 Feet) |
| Length overall (loa) |
| 46.80 Meters (153.5 Feet) |
| Maximum beam |
| 7.75 Meters (25.43 Feet) |
| Minimum operating displacement |
| 314 Metric Tons |
| Waterline length (lwl) |
| 44.35 Meters (145.5 Feet) |
Hull
| Hull/main weatherdeck material |
| AH-36 Steel |
| Superstructure |
| 5456-H1111 Aluminum |
Machinery
| Bow thruster |
| Schottel STT 60 LK |
| Diameter of propeller |
| 1900 mm |
| Emergency service generator (edg) |
| Cummins 6BTA5.9-DM Diesel with Stanford 93KW Generator |
| Fin stabilizer |
| (2), Quantum QC1500 |
| Main propulsion |
| (2), MTU 20V4000 M93L, Sequential Turbo-Charged Diesels |
| Number of blades |
| 6 |
| Number of propellers |
| (2) Michigan Wheel Marine |
| Propeller pitch capability |
| Fixed |
| Propulsion shafts |
| (2), Electralloy Nitronic 50HS (9430mm) Shafts |
| Reduction gears |
| (2), ZF 23560C/D Series |
| Rudders |
| (2), 316L Stainless Steel |
| Shaft rotations per minute |
| 478 |
| Shaft(s) bearing, aft |
| (2), Duramax Bearings |
| Shaft(s) bearing, intermediate |
| (2), Duramax Bearings |
| Shaft(s) diameter |
| 8 Inches |
| Shaft(s) Seal |
| (2), Wartsila Mechanical Seals |
| Ship service generators |
| (2), Cummins QSM11-DM Diesels with Stanford 317KW Generator |
Tank Capacities at 95% LIQUID LOAD (22,958 total Gallons)
| Fresh water tank, port (3-38-2-w) |
| 708 gal |
| Fresh water tank, stbd (3-38-1-w) |
| 756 gal |
| Fuel oil edg day tank (1-10-1-f) |
| 134 gal |
| Fuel oil gen. ovrflw tnk, ctr. (3-40-0-f) |
| 1,159 gal |
| Fuel oil overflow tank, center (3-10-0-f) |
| 616 gal |
| Fuel oil service tank, #1 port (3-17-2-f) |
| 1,750 gal |
| Fuel oil service tank, #1 stbd (3-17-1-f) |
| 1,750 gal |
| Fuel oil service tank, #2 port (3-40-2-f) |
| 890 gal |
| Fuel oil service tank, #2 stbd (3-40-1-f) |
| 890 gal |
| Fuel oil storage tank, #1 center (3-11-0-f) |
| 5,040 gal |
| Fuel oil storage tank, #2 center (3-23-0-f) |
| 5,350 gal |
Tank Capacities at 95% LIQUID LOAD (22,958 total Gallons)
| Grey water tank, (3-17-0-w) |
| 2,668 gal. |
| Lube oil storage tank, (2-35-2-f) |
| 146 gal. |
| Oily water tank, (3-34-1-w) |
| 336 gal. |
| Sewage collection tank, (3-6-0-w) |
| 429 gal. |
| Waste oil tank, (3-34-2-f) |
| 336 gal. |
00000_1216_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
Coast Guard Drawings
None
Coast Guard Publications
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
· Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is small.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
· Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
· National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
· Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.
3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".
3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”
3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED-STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.
3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3: SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".
3.7.2 SFLC Standard Specification 0000 General Requirements.
3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer:
Abrasive Sieve Size:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer:
Abrasive Sieve Size:
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.
| Date |
| Test Locations |
| Conductivity (Microsiemens/CM) |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
63410_JLW_0617_154WPC
WORK ITEM 1: Interior Wet Deck Coverings, Reseal
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to reseal the deck coverings described in Table 1.
Table 1 - Deck Covering Locations to be Sealed
LOCATION
Name, Space
APPROX. SURFACE AREA
(SqfT)
| COVE BASE |
| Repairs, in addition to resealing, required to complete the reseal |
| Head (1-12-0-L) |
| 12 |
| YES |
| N/A |
| Passage (1-15-0-L) |
| 30 |
| YES |
| N/A |
| Head (1-15-1-L) |
| 15 |
| YES |
| N/A |
| Mess Deck (1-17-0-Q) |
| 105 |
| YES |
| N/A |
| Galley (1-18-2-Q) |
| 80 |
| YES |
| N/A |
| Head (1-23-1-L) |
| 20 |
| YES |
| N/A |
| Passage (1-23-0-L) |
| 130 |
| YES |
| N/A |
| Passage (2-10-0-L) |
| 70 |
| YES |
| N/A |
| Shower (2-12-1-L) |
| 15 |
| YES |
| N/A |
| Head (2-12-2-L) |
| 15 |
| YES |
| N/A |
| Shower (2-13-1-L) |
| 15 |
| YES |
| N/A |
| Head (2-13-2-L) |
| 15 |
| YES |
| N/A |
| Shower (2-14-1-L) |
| 15 |
| YES |
| N/A |
| Head (2-14-2-L) |
| 15 |
| YES |
| N/A |
| Passage (2-17-0-L) |
| 15 |
| YES |
| N/A |
| Head (2-23-1-L) |
| 30 |
| YES |
| N/A |
| Passage (2-23-0-L) |
| 50 |
| YES |
| N/A |
| Climate Controlled Store Room (2-23-4-A) |
| 60 |
| YES |
| N/A |
| Passage (2-25-0-L) |
| 20 |
| YES |
| N/A |
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 154WPC 634-301, Rev A, Deck Covering Schedule
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Inspection and Report. The Contractor shall inspect all deck areas being resealed as specified in Table 1, and all other affected components (e.g. cove base PC 7 of Coast Guard Drawing 154 WPC 634-001, non-skid slip resistant tread stickers PC 6 of Coast Guard Drawing 154 WPC 634-001, etc.). Determine if repairs in addition to those already specified in Table 1 will be required to complete the scope of work specified herein. Submit a CFR detailing findings and recommended additional repairs. Perform those repairs after the KO releases a modification or change request authorizing those growth repairs.
3.3 Epoxy flake system resealing. The Contractor shall reseal the deck areas specified. Sand down the existing deck covering to the color layer to remove all discolorations and damage. Reapply color coat to obtain uniform color. Reapply sealers. Renew pc 6 of Coast Guard Drawing 154 WPC 634-001 (slip-resistant treads) where disturbed. Do not apply more material than removed. Allow sealer to cure for the manufacturer recommended times.
CAUTION
Epoxy flake system is applied over delicate joiner deck on most of the 2nd deck areas. Do not damage joiner deck during removal of top layer of existing deck material.
To minimize impact on cutter weight & moment, do not add excessive deck covering material, beyond what was removed. Make new deck covering thickness as close as practicable to the original, pre-resealed thickness.
3.4 Cove Base. The Contractor shall renew all associated cove base (PC 7 on Coast Guard Drawing 154WPC 634-301) for each compartment listed in Table 1 if the associated Cove Base column is marked “YES”.
4. NOTES
None.
40000_JLW_0617_154WPC
WORK ITEM 2: BHD Penetrations and Brackets, Remove
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to remove brackets and bhd penetration pipes left behind from electrical equipment already removed.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 154 WPC 631-301, Rev A, Paint and Preservation Schedule
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Removals . The Contractor shall per form the following
3.2.1 Pilot House Brackets and BHD Penetrations. Grind off two brackets, one on each side of the pilot house, flush with exterior bhd. Grind off two associated BHD penetrations flush with exterior bhd, fill and dress holes with MIL-PRF-24176 Cement, Epoxy, Metal Repair and Hull Smoothing (e.g. Belzona, etc.) to leave final appearance as unnoticeable as practicable. Touch-up preserve in accordance with requirements below.
3.2.2 Main Deck BHD Penetrations. Grind off the following 8 empty/unused BHD penetrations flush with interior/exterior bhd, fill and dress holes with a plug and MIL-PRF-24176 Cement, Epoxy, Metal Repair and Hull Smoothing (e.g. Belzona, etc.) to leave appearance as unnoticeable as practicable. Touch-up preserve in accordance with requirements below.
· STBD side of AFT DC locker 1-34-1-E, QTY:3
· PORT side above Engine Room Hatch 1-34-2, QTY:3
· Port side taffrail next to Aft port Capstan, QTY:2
3.3 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures). Abide by the exception cited below.
3.3.1 Exception to coating systems specified in SFLC 6310. All preservation coating systems used shall be in accordance with Coast Guard Drawing 154 WPC 631-301, do not use the coating systems specified in SFLC Std Spec 6310.
4. NOTES
4.1 Images of brackets/BHD Pens.
58200_JLW_0617_154WPC
WORK ITEM 3: New Capstan Control Pendants, Install
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to remove (3) each existing capstan control station assemblies (pendant switch, cable, enclosure, foundation plate), and install (3) each new capstan control station assemblies.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 154 WPC 180-601, Rev 3, Foundation Pre-Fab Module 00
Coast Guard Drawing 154 WPC 320-301, Rev C, 450V System Deck Plan
Coast Guard Drawing 154 WPC 320-302, Rev B, Motor Controller Diagrams
Coast Guard Drawing 154 WPC 612-201, Rev C, Lifelines, Liferails, & Stanchions A&D
Coast Guard Drawing 154 WPC 631-301, Rev A, Paint and Preservation Schedule
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard Personnel perform an initial operational test of the capstan systems to demonstrate existing operational condition. Submit a CFR.
NOTE
Revision C parts of the 320-001 dwg, and Revision B parts of the 320-002 dwg show the modification.
3.3 Capstan Control Station Modifications . The Contractor shall remove (3) ea. existing capstan control stations and install 3 new capstan control stations (e.g. new hand-held pendant controller station, new cable, new enclosure box, new aluminum foundation plate for enclosure box, etc.) in accordance with Coast Guard Drawings154 WPC 180-220, 154 WPC 320-301, 154 WPC 320-302, 154 WPC 612-601.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.4 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the capstan systems to be in satisfactory operating condition. Submit a CFR.
3.5 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures). Abide by the exception cited below.
3.5.1 Exception to coating systems specified in SFLC 6310. All preservation coating systems used shall be in accordance with Coast Guard Drawing 154 WPC 631-301, do not use the coating systems specified in SFLC Std Spec 6310.
4.1 Below images are excerpts from the 612-601 dwg. “Was” images denote the existing configuration and “Is” images denote the configuration after modifications have been made.
4.2 Image of new control pendant.
WORK ITEM 4: HVAC Duct System, Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the interior of the following ventilation system components and ducts.
TABLE 1 – Areas with HVAC duct or components to be cleaned
| Compartment |
| Items To Be Cleaned. |
| Pilot House (01-19-0-C) |
| All supply and return ducting and associated grating/louvers, etc. |
Main Deck
| HVAC Equipment Room (1-24-1-Q) |
| All supply and return ducting and associated grating/louvers, etc. All surfaces inside of air handler assembly that contact air going out to supply ducts (e.g. coils, filters, plenums, etc.) |
| Passage (1-23-0-L) |
| All supply and return ducting and associated grating/louvers, etc. |
| Mess Deck (1-17-0-Q) |
| All supply and return ducting and associated grating/louvers, etc. |
| Galley (1-18-2-Q) |
| All supply and return ducting and associated grating/louvers, etc. |
| Office (1-16-1-A) |
| All supply and return ducting and associated grating/louvers, etc. |
| CO Cabin (1-12-1-L) |
| All supply and return ducting and associated grating/louvers, etc. |
| XO Stateroom (1-12-2-L) |
| All supply and return ducting and associated grating/louvers, etc. |
| OPS CPO Stateroom (1-15-2-L) |
| All supply and return ducting and associated grating/louvers, etc. |
Second Deck
| Climate Controlled Store Room (2-23-4-A) |
| All supply and return ducting and associated grating/louvers, etc. |
| C4ISR Equipment RM (2-23-3-Q) |
| All supply and return ducting and associated grating/louvers, etc. |
| ENG CPO Stateroom (2-32-2-L) |
| All supply and return ducting and associated grating/louvers, etc. |
| 2 Person Stateroom (2-21-2-L) |
| All supply and return ducting and associated grating/louvers, etc. |
| 4 Person Stateroom (2-20-1-L) |
| All supply and return ducting and associated grating/louvers, etc. |
| 4 Person Stateroom (2-17-2-L) |
| All supply and return ducting and associated grating/louvers, etc. |
| 2 Person Stateroom (2-17-1-L) |
| All supply and return ducting and associated grating/louvers, etc. |
| 2 Person Stateroom (2-15-2-L) |
| All supply and return ducting and associated grating/louvers, etc. |
| 2 Person Stateroom (2-15-1-L) |
| All supply and return ducting and associated grating/louvers, etc. |
| 1 Person Stateroom (2-10-2-L) |
| All supply and return ducting and associated grating/louvers, etc. |
| 1 Person Stateroom (2-10-1-L) |
| All supply and return ducting and associated grating/louvers, etc. |
| Passage (2-10-0-L) |
| All supply and return ducting and associated grating/louvers, etc. |
TABLE 2 – CONTRACTOR FURNISHED TEMP HVAC (para 3.3)
YES
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 154 WPC 512-201, Rev -, HVAC Arrangement Coast Guard Drawing 154 WPC 512-301, Rev A, HVAC System Diagram Coast Guard Drawing 154 WPC 512-305, Rev 8, HVAC Equipment List Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean Shipboard Ventilation Systems
Coast Guard Technical Publication (TP) 8123, 15 SEP 2015, Preliminary - Heating, Ventilation, and Air Conditioning System - Frc-514-P1
Other References
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
note
Coast Guard personnel will operate all shipboard machinery and equipment.
The Contractor is reminded to comply with ALL requirements invoked by this work item, such as SFLC Std Spec 0000 and SFLC Std Spec 5100 (e.g. mark and restore damper positions; remove all intake and exhaust screens, clean vent systems in their entirety from the point where the air enters the system to the point where the air is discharged from the system; restore, renew, or repair all articles or component removed or disturbed to their original condition if damaged or modified during contract work etc).
3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard Personnel perform an initial operational test of the ventilation systems included in this work item, to demonstrate the existing operational condition. Document all modifications to the system (e.g. new holes in existing duct, etc.) that will be required to perform the cleaning work, do not perform modifications without Coast Guard authorization. Submit a CFR.
3.3 Temporary HVAC. If “YES” is denoted in Table 2 then the Contractor shall provide temporary ventilation to all impacted areas equivalent to the normal zonal ventilation rating for those spaces (i.e. maintain existing climate control) for the duration of work as described in SFLC Std Spec 0000, otherwise the Coast Guard will furnish any required temporary ventilation.
3.4 Cleaning requirements. The Contractor shall clean and inspect the interior surfaces of ventilation system ducting runs and components listed in the table beneath paragraph 1.1 above, shown on the Coast Guard drawings and TPs listed in Section 2, in accordance with SFLC Std Spec 5100. Submit a CFR.
3.4.1 Duct Interior Images for Final Report. After gaining access to duct interiors, take a digital photo of each duct interior surfaces at the opening created to show the condition of the duct work prior to cleaning. Then prior to closing the duct work accesses take a final image of the same area post-cleaning. Add these images to the final report submitted in paragraph 3.6 below.
3.5 Notification. The Contractor shall give written notification to the COR, 48 hours before starting ventilation cleaning work.
Note
Coast Guard personnel will operate all shipboard machinery and equipment.
3.6 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the ventilation systems included in this work item to be in satisfactory operating condition. Submit a CFR.
4. NOTES
This section is not applicable to this work item.
63410_JLW_0417_154WPC
WORK ITEM 5: Exterior Deck Drains, Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to repair various exterior deck drains as described in Tables 1.
Table 1 - Deck Drains In scope
| Drain # (see Image 1, 2 & 3 below for location) |
| repair description |
| 1 |
| Renew all piping associated with Drain 1. Renew covers on top and renew the pipe fitting and below it that they are bolted to and seated in. Renew covers on top and renew the pipe fitting and below it that they are bolted to and seated in. |
| 2 |
| Renew the clogged piping run between Drain 2 and the larger ID pipe leaving Drain 1. Renew covers on top and renew the pipe fitting and below it that they are bolted to and seated in. |
| 3 |
| Renew the piping run between Drain 3 the larger ID pipe leaving Drain 4. Renew covers on top and renew the pipe fitting and below it that they are bolted to and seated in. |
| 4 |
| Renew all piping associated with Drain 4. Renew covers on top and renew the pipe fitting and below it that they are bolted to and seated in. |
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 154 WPC 526-201, Rev A, Weather Deck Drains Arrangement
Coast Guard Drawing 154 WPC 526-301, Rev A, Weather Deck Drain Diagram
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Inspection and Repairs. The Contractor shall perform the following:
3.2.1 Inspection. Inspect all “in-scope” deck drains and associated piping designated for repair in Table 1 above. Determine if there are any additional repairs required, other than those specified in the “Repair Description”. Submit a CFR detailing any recommended additional repairs that may be required to complete the work specified herein, and to bring the those drains back into proper working order. Pending the inspection perform those additional repairs after the KO releases a modification or change request authorizing those growth repairs.
3.2.2 Repairs. Perform the repairs described in Table 1 in the “Repair Description” column. Refer to Coast Guard Drawings 154 WPC 526-201 and 154 WPC 526-301.
3.2.2.1 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures). Abide by the exception cited below.
3.2.2.1.1 Exception to coating systems specified in SFLC 6310. All coating systems used shall be in accordance with Coast Guard Drawing 154 WPC 631-301, do not use the coating systems specified in SFLC Std Spec 6310.
Image 1 – 01 LVL Deck
Image 2 – Main Deck
Image 3 – Pilot house top
None.
63130_JLW_0717_154WPC
WORK ITEM 6: Topside Exterior Surfaces, Preserve (Partial, Opt)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect various topside surfaces that have known coatings discrepancies, as identified by the COR, that require partial repairs to the coating system (up to a total of 180 sqft of topside and bos’n stowage surface touch-up coating renewal). After the Contractor and the COR together conduct inspections of the discrepant topside surfaces, the Contractor shall propose repairs to correct the discrepancies. Then after contract modification, the Contractor shall prepare and preserve those discrepancies.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 154 WPC 601-302, Rev C, General Arrangement
Coast Guard Drawing 154 WPC 631-301, Rev A, Paint and Preservation Schedule
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000,…