Specification for CGC CUTTYHUNK DD

View the file

Other files

File Type Posted
Q3_and_Q4.doc DOC document
Amendment_5.pdf PDF
Q3.doc DOC document
question_and_answers_(2).doc DOC document
SF_30-AMEND-CUTTYHUNK3.pdf PDF
question_and_answers.doc DOC document
Amendment_002.pdf PDF
question_and_answers.doc DOC document
SF_30-AMEND-CUTTYHUNK_(2).pdf PDF
GFE.xls XLS spreadsheet
Schedule_B.xls XLS spreadsheet
Solicitation_CGC_cuttyhunk.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC CUTTYHUNK (WPB 1322)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2017

Developed By: James E Beechey (Rev 0, 25 October 2016)

TABLE OF CONTENTS

ivRevisions Record vConsolidated List of References xConsolidated List of Government-furnished Property xiiiConsolidated List of Critical Inspection Items xivPrincipal Characteristics

1General Requirements

11WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing

17WORK ITEM 2: Hull Plating (U/W Body), Inspect

21WORK ITEM 3: Appendages (U/W), Leak Test

24WORK ITEM 4: Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect

28WORK ITEM 5: Tanks (Dirty Oil and Waste), Clean and Inspect

32WORK ITEM 6: Main Mast, Preserve, 100%

39WORK ITEM 7: Exhaust Piping System, Inspect

44WORK ITEM 8: Sw Heat Exchangers; Clean, Inspect And Hydro

49WORK ITEM 9: Speed Doppler, Remove, Inspect, and Reinstall - Doppler Valve, Overhaul

54WORK ITEM 10: Sea Valves and Waster Pieces, Overhaul or Renew

60WORK ITEM 11: Sea Strainers - (All Sizes), Overhaul

64WORK ITEM 12: Steering Gear (General), Overhaul

68WORK ITEM 13: Rudder Assembly, Remove, Inspect and Reinstall

80WORK ITEM 14: Fin Stabilizers (General), Overhaul

86WORK ITEM 15: Aft Steering Compartment, Preserve and Insulate

89WORK ITEM 16: Forward Void, Preserve

91WORK ITEM 17: Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System)

94WORK ITEM 18: Superstructure, Preserve “100%”

97WORK ITEM 19: Cathodic Protection System (Bilge and Sea Chest), Renew

101WORK ITEM 20: Impressed Current Cathodic Protection System, Inspect and Maintain

106WORK ITEM 21: Drydock

111WORK ITEM 22: Temporary Services, Provide - Cutter

114WORK ITEM 23: Sea Trial Performance, Support, Provide

118WORK ITEM 24: Deck Covering, Carpeting, Renew

121WORK ITEM 25: Deck Covering, Wet/ Dry, Seal

124WORK ITEM 26: Deck Covering (Interior Wet/Dry), Renew

127WORK ITEM 27: U/W Body, Preserve (“100%”) Used with Side Scan)

132WORK ITEM 28: Tanks (MP Fuel Service), Clean and Inspect

137WORK ITEM 29: Propellers; Remove, Inspect, and Reinstall

141WORK ITEM 30: Appendages (U/W) - Internal, Preserve

144WORK ITEM 31: Voids (Non-Accessible), Leak Test

147WORK ITEM 32: Voids (Non-Accessible), Internal Surfaces, Preserve

150WORK ITEM 33: Tanks, Air Test

152WORK ITEM 34: Tanks (Potable Water), Clean and Inspect

156WORK ITEM 35: Tanks (Dirty Oil), Preserve “100%”

159WORK ITEM 36: Tank (Oily Water), Preserve “100%”

162WORK ITEM 37: Tanks (Potable Water), Preserve “100%”

166WORK ITEM 38: Hull Plating Freeboard, Preserve “100%” Used with Side Scan

170WORK ITEM 39: Rope Guards, Renew

172WORK ITEM 40: Deck Penetration, Sounding Tube, Renew

174WORK ITEM 41: Propulsion Shafting, Renew

178WORK ITEM 42: Propulsion Shaft Bearings (External), Renew

181WORK ITEM 43: Propulsion Shaft, Stern Tube Forward Bearing, Renew

184WORK ITEM 44: Propulsion Shaft, Forward Bearing Housing, Renew

188WORK ITEM 45: Mechanical Shaft Seal Assemblies, Overhaul

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE
REV#
WORK ITEM#
CHANGES MADE

NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

Consolidated List of References

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:

· American Welding Society (AWS): http://www.awspubs.com/index.php

· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

· NFPA: http://www.nfpa.org

· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 110 WPB 085-002, Rev -, Docking Plan

Coast Guard Drawing 110 WPB 085-007, Rev D, Booklet of General Plans

Coast Guard Drawing 110 WPB 085-010, Rev C, Docking Plan/Lifting Cradle Coast Guard Drawing 110 WPB 111-001, Rev B, Shell Expansion

Coast Guard Drawing 110 WPB 114-001, Rev B, Stern Flap

Coast Guard Drawing 110 WPB 114-002, Rev A, Spray Rail

Coast Guard Drawing 110 WPB 171-001, Rev B, Mast Details

Coast Guard Drawing 110 WPB 171-002, Rev F, Mast Details

Coast Guard Drawing 110 WPB 243-006, Rev C, Propulsion Shaft Details

Coast Guard Drawing 110 WPB 245-004, Rev A, Propeller Details

Coast Guard Drawing 110 WPB 259-005, Rev C, 18” Raw Water Discharge Spray Ring Assembly w/ Companion Flanges & Gaskets

Coast Guard Drawing 110 WPB 259-006, Rev D, MDE 8” Exhaust Flapper Valve Assembly (w/Companion Flanges & Gaskets)

Coast Guard Drawing 110B WPB 085-001, Rev A, Tank Capacity Curves

Coast Guard Drawing 110B WPB 085-010, Rev -, Docking Plan

Coast Guard Drawing 110B WPB 085-012, Rev B, Booklet of General Plans Coast Guard Drawing 110B WPB 111-003, Rev H, Shell Expansion

Coast Guard Drawing 110B WPB 113-001, Rev K, Inner Bottom Plating

Coast Guard Drawing 110B WPB 117-001, Rev H, Transverse Sections (Frames 0 thru 4)

Coast Guard Drawing 110B WPB 121-001, Rev D, Longitudinal Bulkheads

Coast Guard Drawing 110B WPB 161-001, Rev C, Main Shaft Strut Details

Coast Guard Drawing 110B WPB 161-002, Rev D, Main Shaft Strut Installation

Coast Guard Drawing 110B WPB 161-003, Rev C, Intermediate Shaft Strut Details

Coast Guard Drawing 110B WPB 161-004, Rev C, Intermediate Shaft Strut Installation

Coast Guard Drawing 110B WPB 163-002, Rev C, Auxiliary Sea Chest Detail

Coast Guard Drawing 110B WPB 245-002, Rev B, Assembly of Oil Injection Equipment

Coast Guard Drawing 110B WPB 256-001, Rev G, Main Engine SW Cooling System A&D

Coast Guard Drawing 110B WPB 256-003, Rev -, Main Engine Sea Water Cooling

Coast Guard Drawing 110B WPB 256-004, Rev A, Mods to SW Cooling Incidental to Install of Charge Air Cooler Diverter

Coast Guard Drawing 110B WPB 259-001, Rev D, Main Engine Exhaust Piping System

Coast Guard Drawing 110B WPB 259-002, Rev D, Genset Exhaust Piping System

Coast Guard Drawing 110B WPB 501-001, Rev H, Piping System Schematics

Coast Guard Drawing 110B WPB 501-002, Rev -, Piping Standards

Coast Guard Drawing 110B WPB 521-001, Rev H, Firemain Piping Arrg’t & Details

Coast Guard Drawing 110B WPB 558-001, Rev K, Vents, Fills, & Sound Tube Details

Coast Guard Drawing 110B WPB 561-001, Rev A, Steering System Details

Coast Guard Drawing 110B WPB 561-004, Rev B, Steering System Details – Piping

Coast Guard Drawing 110B WPB 565-002, Rev B, Fin Stabilization Dets - Piping

Coast Guard Drawing 110B WPB 601-027, Rev F, Outboard Profile & Weather Deck

Coast Guard Drawing 110B WPB 633-001, Rev A, Cathodic Protection Plan & Details

Coast Guard Drawing 110B WPB 636-001, Rev C, Noise Damping Details

Coast Guard Drawing 110B-WPB 633-002, Rev C, Cathodic Protection Install Schematic & Layout

Coast Guard Drawing 110C WPB 161-005, Rev G, Stern Tube Installation Details

Coast Guard Drawing 110C WPB 243-002, Rev B, Propulsion Shafting & Details

Coast Guard Drawing 110C WPB 562-001, Rev G, Rudder Details (Stock & Blade Details)

Coast Guard Drawing 110C WPB 565-001, Rev D, Fin Stabilizer System (Struct Locs & Dets)

Coast Guard Drawing 110C WPB 635-001, Rev D, Linings and Insulation Plan and Details

Coast Guard Drawing FL 2804-13, Rev G, Visual ID Kit Sched

Coast Guard Drawing FL 2804-15, Rev-, Draft Figs

Coast Guard Drawing FL 2804-11, Rev D, Visual ID Numeral & Letter for Ships

Coast Guard Drawing FL 2804-12, Rev-, U.S.C.G. Emblem

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual

Coast Guard Technical Manual (TP) 3223, May 1985, SWBS 420, Section G, Doppler Service Manual

Coast Guard Technical Publication (TP) 2924, Jun 1990, General Information Book and Operating Manual for USCG 110 Foot Patrol Boat, Annex 1B, Propeller Renewal Procedure

Coast Guard Technical Publication (TP) 3101, Jun 1991, Manufacturer’s Instruction Book-SWBS Group(s) 152-259, SWBS 245, Propulsors (Means Propellers)

Coast Guard Technical Publication (TP) 3495, May 2002, Chapter 243, Installation Duramax Shaft Seal System

Coast Guard Technical Publication (TP) 3906, Oct 2008, Ship's Steering Gear System

Coast Guard Technical Publication (TP) 3907, Feb 2007, SWBS 565, Ship's Fin Stabilizing System

Coast Guard Technical Publication (TP) 4655, Sep 2007, Cathodic Protection System

Coast Guard Technical Publication (TP)-4666, Feb 2008, Steering System

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC Electrical Motors

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior Deck Covering Systems

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary Services

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary Hull Accesses

OTHER REFERENCES

American National Standards Institute/American Society of Mechanical Engineers (ANSI/ASME), B4.1-1967, (reaffirmed 2009), Preferred Limits and Fits for Cylindrical Parts

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities

American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects

American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2006, Recommended Practice for Nondestructive Testing Personnel Qualification and Certification

American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End

ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means

ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives

ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates

ASTM International (ASTM), D3951, Re-approved 2004, Standard Practice for Commercial Packaging

Commercial Item Description (CID) A-A-59316, Abrasive Materials for Blasting

Commercial Item Description (CID) A-A-59588, 2013, Rubber Silicone

Commercial Item Descriptions (CID) A-A-59323 A, 2005, Cloths, Cleaning, Low-Lint

Federal Specification (Fed Spec) DDD-C-95, Mar 1972, Carpets and Rugs, Wool, Nylon, Acrylic, Modacrylic

Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert

Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections

Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement

International Organization for Standardization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive

International Standard Organization (ISO) 4406, 1999, Hydraulic Fluid Power – Fluids – Method for Coding Level of Contamination by Solid Particles

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves

MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application

MIL-A-24456, Jun 1979, Adhesive for Plastic-Vibration Damping Tile

MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic)

MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of Reliability Is Required

MIL-G-6032D(1), Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code #G-636

MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application

MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric

MIL-PRF-24635, 2009, Coating Systems, Weather-Resistant, Exterior Use

MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant

MIL-S-8660C(2), Silicone Compound, NATO Code # S-736

MIL-STD-2148, Oct 1989, Vibration Damping Materials, Procedures for Installation, Maintenance, and Repairs

Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-PRO-160, Jan 2011, Chapter 16, Cofferdams

NAVSEA Drawing 803-921865, Rev P; Cathodic Protection Hull Zinc Anodes

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning

Vosper Thornycroft Technical Bulletin No. 49, Jul 1992, Procedure for Fitting New Tiller Rod Eye Bearings to Actuators and Removing Redundant Grease Hose On BMS Island Class USCG Cutters

Consolidated List of Government-furnished Property

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK ITEM
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/Unit)

7
N
**Port spray ring
NSN: 2990-01-475-9621
1 ea.
1,584.00
7
N
**Starboard spray ring
NSN: 2990-01-475-9620
1 ea.
1,584.00
7
N
**Port 8” flapper valve
NSN: 4810-01-475-8648
1 ea.
2,072.00
7
N
**Starboard 8” flapper valve
NSN: 4810-01-475-8415
1 ea.
2,072.00
7
N
MDE gasket kit
NSN: 5330-01-475-8157
2 ea.
389.45
7
N
MDE gasket kit
NSN: 5330-01-475-8169
2 ea.
312.52
7
N
Exhaust gasket kit
NSN: 5330-01-475-8804
4 ea.
128.24
7
N
Turbo Charger gasket
NSN: 5330-01-424-6806
2 ea
283.01
7
N
Expansion bellows and flower pot to bellows
NSN 5330-01-394-8528
6 ea
96.84
7
N
Softpatch Kit
NSN: 2040-01-469-1629
1 kit
1812.37
9
N
***CELZ-SRD-331 Doppler speed log
NSN: 5845-01-302-4161
1 ea.
3,255.08
10
N
** Magazine sprinkler valve
NSN: 4810-01-220-7415
1 ea.
386.00
10
Y
4” 3-Way Rotary Valve, Port
NSN: 4810-01-540-7200 PN: LESLIE U107963101PORT
1 ea.
14360.83
10
Y
4” 3-Way Rotary Valve, Stbd
NSN: 4810-01-541-0813 PN: LESLIE U107963101STBD
1 ea.
14360.83
11
N
**Kraissl 2 ½” Duplex strainer
NSN: 4730-01-394-9731
4 ea.
3,900.00
11
N
**Kraissl 4” duplex strainer
NSN: 4730-01-173-1413
2 ea.
4,700.00
11
N
**Kraissl 1 ½” Duplex strainer for RO
NSN: 4730-01-600-9049 PN:72-38F
1 ea.
600.00
11
N
**Kraissl 1” Simplex Strainer
NSN:5840-00-732-0829/72-8
1 ea.
195.32
13
Y
**Rudder
NSN: 2040-01-223-2674
2 ea.
25,000.00
13
N
**Lower Rudder Bearing
NSN 3120-01-477-8696
2 ea.
1,364.00
14
N
Spherical Roller Bearing
NSN: 3110-00-902-7288
2 ea.
314.80
14
N
Spherical Roller Bearing
NSN: 3120-99-806-7289
4 ea.
221.07
14
N
Bolt, Trunnion, Special
NSN: 5325-01-394-7933
4 ea.
367.67
14
N
Tiller Pin (Bolt)
NSN: 5306-99-538-1451
4 ea.
145.44
14
N
Tiller Spacer Flange Bush
NSN: 5365-99-807-4040
4 ea.
163.73
14
N
Trunnion Spacer Flange Bush
NSN: 3120-01-396-1724
4 ea.
159.25
14
N
Circlip
NSN: 5365-99-902-2593
8 ea.
2.76
14
N
Fin 25/32 Washer
NSN: 5310-99-538-1450
4 ea.
4.44
14
N
Actuator seals
NSN: 5330-99-729-7570
4 ea.
128.87
14
N
Fin Rod Eye Bearings (Assy)
NSN: 3120-01-377-1940
4 ea.
1,190.95
14
N
Rod Eye Lock nut
NSN: 5310-01-468-7665
4 ea.
23.76
14
N
Tiller Pin nylock nut
NSN: 5315-01-485-3148
4 ea.
20.86
14
Y
**Fin Stabilizer assembly
NSN: 2040-99-726-4768
2 ea.
19,987.00
14
N
**Fin Stabilizer Lower Bearing/Bushing
NSN: 3120-99-726-2345
2 ea.
1,091.25
14
N
Fin Stabilizer Cooler
NSN: 4420-99-820-3141
2 ea.
706.71
14
N
Fin Stabilizer Sealing Kit consists of (5) pre-cut rings of Slade 3300 packing material (DELAMAR)
NSN: 2040-01-566-3198
2 ea.
499.80
15
N
Sound Damping Tiles
NSN: 9330-01-249-8427
4 boxes
446.00
21
Y
*Transducer Cover Plate
N/A
1 ea.
50.00
29
Y
**Propeller, LH
NSN: 2010-01-222-2440
1 ea.
23,445.00
29
Y
**Propeller, RH
NSN: 2010-01-222-2441
1 ea.
22,800.00
41
N
4" Diameter x 28' Long, Aquamet-17 propulsion shaft
NSN: 2010-01-445-7940
2 ea.
41
N
**Forward Bearing Housing
NSN: 3130-01-442-2863
2 ea.
41
N
*Oil Injection Equipment Kit
N/A
1 set
42
N
Main Shaft Strut Bearing, Bronze and rubber cutlass bearing, 4" ID x 5" OD x 16” Long
NSN: 3120-01-222-3927
2 ea.
200.00
42
N
Intermediate Shaft Strut Bearing, Bronze and rubber cutlass bearing, 4" ID x 5" OD x 16” Long
NSN: 3120-01-222-3927
2 ea.
200.00
43
N
Stern Tube Bearing, Bronze and Rubber cutlass bearing,

4" ID x 5" OD x 8” Long

NSN: 3120-01-238-0689
2 ea.
150.00
45
N
Shaft seal assembly kit
NSN: 5330-01-497-8095
2 ea.
859.48
45
N
**Shaft seal assembly
NSN: 4320-01-497-8057
2 ea.
3,111.84
45
N
Emergency shaft Seal Inflator Kit
NSN: 5330-01-497-9866
2 ea.
175.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center

Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars):

Work Item
Title
3
Appendages (U/W), Leak Test
11
Sea Strainers - Duplex (All Sizes), Overhaul
13
Rudder Assembly, Remove, Inspect and Reinstall
14
Fin Stabilizers (General), Overhaul
15
Aft Steering Compartment, Preserve and Insulate
20
Impressed Current Cathodic Protection System, Inspect and Maintain
27
U/W Body, Preserve (“100%”) Used with Side Scan)
29
Propellers; Remove, Inspect, and Reinstall
31
Voids (Non-Accessible), Leak Test
33
Tanks, Air Test

Principal Characteristics

110’ WPB (B-CLASS)

PHysical

Length overall
110' 0" or 113' if stern flap present
Length between perpendiculars
104' 1/2"
Depth
10' 1/2"
Beam, molded
21' 3"
Depth, molded
N/A
Full load draft
6' 5-3/4"
Height of highest projection
55'
Full load displacement
165 long tons
Anchor
150 lb Danforth with 450 ft. 3" nylon rope
Shore tie voltage requirements
450VAC 400A 3PH, 60Hz ungrounded

Hull

Hull
BS-4360, GR 43A Steel
Main weatherdeck & superstructure
5086 Aluminum Alloy
Frame spacing
Various
Bulkheads
Seven watertight transverse
Fin stabilizers
Frame 22-1/2

Machinery

Main propulsion
Two Paxman Type 16 RP200M (Valenta) V-16 Diesel; 2880 BHP each @ 1500 RPM (max)
Reduction gears
Two ZF Model BW 1500 reversible reduction gearboxes; 1.839:1 ratio
Number of propellers
2
Number of blades
5
Diameter of propeller
49.6"
Pitch
61.4"
Rpm
N/A
Shaft
AQUAMET 17
Shaft diameter
4"
Shaft seal
Johnson Duramax split face seal
Shaft bearings
Rubber Cutless or Thordon
Rudders
Twin underslung type, 5 sq ft each
Ship's service generators
Two Northern Lights (John Deere), Type M1066A1.11CGP diesel; 130KW, 460V, 60Hz, 3-phase, 3-wire @ 1800 RPM

Tank

Fuel oil (95%)
9,306 gal.
Fresh water (100%)
940 gal.
Lubricating oil (95%)
109 gal.

00000_0316_FLT

REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

Coast Guard Drawings

None

Coast Guard Publications

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

Other References

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation; National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.

3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".

3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”

3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED-STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.

3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3: SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".

3.7.2 SFLC Standard Specification 0000 General Requirements.

3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Vessel Name
Hull #
Work Item #
Work Item Title

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE & TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION (Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL. HUMID-ITY
DEW PT.
SURFACE
AMBIENT
ΔT

| DP - Surface |

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer:

Abrasive Sieve Size:

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer:

Abrasive Sieve Size:

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.

Date
Test Locations
Conductivity (Microsiemens/CM)
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

Vessel Name
Hull #
Work Item #
Work Item Title
Coating Mfg
Product Name
Batch #
Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.

SPOT
1
2
3
4
5
AVERAGE VALUE

*BASE METAL READING (BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled)
Average DFT
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

11000_Sidescan_ENV_0812_110WPB

REC_11000_Side_Scan_110_110B’ WPB - ALL (0614) WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform thickness measurements of underwater (u/w) hull plating and freeboard up to the data couple by ultrasonic side scan method.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings

Coast Guard Drawing 110B WPB 111-003, Rev H, Shell Expansion Coast Guard Drawing 110B WPB 085-010, Rev -, Docking Plan Coast Guard Publications

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Other References

American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2006, Recommended Practice for Nondestructive Testing Personnel Qualification and Certification

3. REQUIREMENTS

3.1 General. The Contractor shall use drawings listed in Section 2 herein as guidance during the performance of work specified herein.

3.1.1 CIR.

None.

3.1.2 Tech Rep. The Contractor shall provide the services of a qualified ultrasonic testing company, with suitable side scan equipment, to conduct a “Scanning Crawler Automated Test” of the vessel’s u/w hull plating and entire freeboard up to the data couple for the presence of metal corrosion and deterioration. Ensure the following:

· Follow the ASNT Recommended Practice No. SNT-TC-1A 2006 for all personnel qualification and certification.

· All scanning shall be completed by a certified automated scanner with a proven history and certificate of qualifications.

· Provide an ASNT Level III analyst on site during the entire scanning process to oversee the project and evaluate all data obtained during scanning.

· Provide an ASNT Level III or II analyst to verify with a hand held meter all areas on the hull identified as thinner than the criteria for repair defined in paragraph 3.2.3.

· Provide all qualified personnel required to complete the requirements contained herein at an on-site location.

3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

· Docking blocks.

· Capastic fairing.

3.1.5 Work preparations and coordination. The Contractor shall plan and coordinate all specified vessel work detailed in this specification package to ensure the side scan survey does not necessitate a work stoppage. Abide by the following guidance to facilitate the ultrasonic survey:

· Ensure and verify with Coast Guard COR that all u/w body, entire freeboard surface preparation and primer coat application tasks are completed by the prime shipyard Contractor within ten days of lifting the vessel.

· Prior to side-scan survey, inspect interior and bilge plating for the presence of bubbles from rusted metal; break up and remove all rust bubbles with a small hand tool to facilitate accurate survey results.

· Following completion of side scan survey, contractor shall preserve all disturbed interior surfaces and bilge plating rust bubbles that were removed to facilitate accurate survey. Contractor shall preserve disturbed areas in accordance with Surface Forces Logistics Center Std Specification 6310 (SFLC Std Spec 6310) Preservation of Ship Structures.

3.1.6 Coast Guard notification. The Contractor shall normally complete and plan on completing all required work within 7 calendar days, any extension will require a Condition Found Report (CFR) provided to the COR.

3.1.6.1 Provide a daily update to the COR on all areas inspected and potential issues or potential schedule change.

3.1.6.2 Notify the COR at least 3 days prior to completion for an onsite review of readings and repair areas.

3.1.6.3 The Contractor shall not directly cause delays or work stoppages to the drydock work scheduled during the scanning process. The Contractor may be charged for associated cost if they are found to have been the cause for delays in the drydock work schedule.

3.2 Scanning parameters. The Contractor shall follow all recommended guidelines, procedures, and practices as defined by ASNT for Ultrasonic Non-Destructive Testing. Reference Coast Guard Drawing 110B WPB 111-3 and use the following guidelines:

· Scanning resolution shall be set to (.5x .5) inches.

· The automated scanning resolution shall, at a minimum, be calibrated at the beginning and end of each day. The calibration process shall include the comparison of the results of the automated scanner to the results of the calibrated hand held gauge at a specific point on the hull. This shall be done in the presence of the designated Coast Guard Inpsector.

· The waveform for each point collected shall be saved and made available to the US Coast Guard for four years after the inspection.

· The automated scanning machine shall cover all areas of the hull (below the water line and entire freeboard area) up to a maximum of six inches around obstacles. Acceptable obstacles include sea suctions, discharges, rudderposts, anodes, stern tubes, drydock blocks and areas blocked by immovable scaffolding or shipyard activity. The automated scanner shall also be capable of scanning all convex areas with a radius of 8 inches and greater and concave areas with a radius of 12 inches and greater.

· All areas within six inches of obsticles listed above, not covered with the automated scanner, shall be scaned with a hand held meter set to a resolution of 2.0” x 2.0”.

3.2.1 Hand held scanner. Areas that are accessible but cannot be scanned by scanning equipment shall be hand-scanned. Any repair areas found during the hand scan shall be marked on the ship’s hull and their approximate positions recorded on the plate drawings and report summary. All hand held scanning procedures shall follow the following parameters:

· The Contractor shall calibrate the hand held meter each time it is powered up for use using an ASNT certified calibration block made of mild steel.

· The Contractor shall scan all areas within six inches of automated scanning obstacles to include; sea suctions, discharges, rudderposts, anodes, stern tubes, drydock blocks and areas blocked by immovable scaffolding, using a hand held meter set to a resolution of 2.0”x 2.0”.

· The Cotnractor shall provide supplemental hand held readings in accordance with ASNT Recommended Practice No. SNT-TC-1A 2006 on any area of the hull identifed as thinner than the criteria for repair defined in paragraph 3.2.5.

· The Contractor shall scan any areas where the automated scanner lost data due to sharp dents, surface irregularities, roughness, etc. using a hand held meter with a resolution set to 1.0” x 1.0”.

3.2.2 All Under-Water Body and Freeboard plating shall adhere to the following evaluation criteria:

· 4-5 LB plate – C scan data indicating wastage greater than or equal to 15% of nominal plate thickness shall be highlighted in RED and designated a repair area.

· 4-5 LB plate – C scan data indicating wastage greater than or equal to 10% to 14% of nominal plate thickness shall be highlighted in YELLOW.

· 4-5 LB plate – C scan data indicating wastage less than 10% of nominal plate thickness shall be highlighted in DARK GREEN.

· 6 – 10 LB plate – C scan data indicating wastage greater than or equal to 25% of nominal plate thickness shall be highlighted in RED and designated a repair area.

· 6 – 10 LB plate – C scan data indicating wastage greater than or equal to 15% to 24% of nominal plate thickness shall be highlighted in YELLOW.

· 6 – 10 LB plate – C scan data indicating wastage less than 14% of nominal plate thickness shall be highlighted in DARK GREEN.

NOTE

1. Any scanning parameter or scope of work changes shall be approved by the KO.

2. The echo to echo transducer is not authorized due to inconsistent readings and technical difficulties.

3. There shall be no deviation from the color scheme specified above!

3.3 Hull identification and markings.

3.3.1 The Contractor shall label each plate on the hull designated for inspection using Coast Guard Drawing 110B WPB 111-3 as reference.

3.3.2 The Contractor shall label the starting point for each scan on the hull.

3.3.3 The Contractor shall outline the areas measured with the hand held meter on the hull.

3.3.4 The Contractor shall outline in WHITE or YELLOW all areas on the hull identified as thinner than the criteria for repair defined in paragraph 3.2.2. The colors used to label repair areas shall not be used for any other markings on the hull.

3.4 Reports. The Contractor shall measure the average paint thickness in order to provide a more accurate metal thickness at all scanned points. The average paint thickness shall be clearly defined in the reports.

3.4.1 The Contractor shall submit to the COR two hard copies of the final written report within 10 calendar days after the side scan inspection is completed. The written report shall include the following contents (minimum):

· Overview.

· Plate summary – shall be in table format with at minimum a column for plate identification, repair identification, location of repair area, size of repair area, and brief description (i.e. exterior pitting, hole, interior corrosion, etc.).

· A composite of mosaic of the C-Scan images overlaid on Coast Guard Drawing 110B WPB 111-3.

· A separate page for each plate with a C-scan image of that plate only. The upper right or lower right of each page shall contain the plate identification for easy retrieval. Each page shall also contain the following:

· Plate design weight.

· Nominal thickness.

· Criteria thickness for green, yellow and red as listed in paragraph 3.2.5.

· All repair areas shall be outlined in blue in the C-Scan image as they are marked on the hull. Each repair area shall be labeled corresponding to the label on the hull.

· All Unusual areas on the C-scan such as rough surface, etc. shall be called out and noted in blue.

· A separate AutoCAD drawing for each plate with repair area(s) identified. The upper right or lower right of the page shall contain the plate identification for easy retrieval. All repair areas shall be drawn to scale and hatched as they are marked on the hull. The plates shall be drawn to scale and dimensioned. Orientation of the plate to the boat shall be identified. Assume the lower left corner of the plate is a right angle for drawing purposes. Use the left and bottom weld for obtaining dimensions of repair areas. Drawing tolerances can be +/- ½”.

· A minimum of 1 page for digital photos of each plate with repair area(s) identified. The upper right or lower right of the page shall contain the plate identification for easy retrieval.

3.4.2 The written report is to be organized as follows:

· Table of contents.

· Overview.

· Plate Summary.

· Port Side Mosaic.

· Port side C-scan, AutoCAD drawing and digital photos of each plate in sequential order.

· Starboard Side Mosaic.

· Starboard Side C-scan, AutoCAD drawing and digital photos of each plate in sequential order.

· Transom C-Scan, AutoCAD drawing and digital photos.

3.4.3 The Contractor shall submit two copies of the report in electronic format to the COR with two CD’s containing the electronic (raw) data. Ensure that the electronic reports include:

· All items contained in the physical written report as stated above.

· A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .