HSCG80-15-Q-P45002.pdf
PDF 339 KB Posted
- Attached to
- USCGC HALIBUT - Dry Dock Repairs Federal contract opportunity
- Solicitation number
- HSCG80-15-Q-P45002
About this file
RFQ for USCGC HALIBUT DD FY15
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Govt_Property_Report.pdf | ||
| HALIBUT__WPB_87__DD_FQ1_PMG_15R0.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE TO VENDORS
SOLICITATION NUMBER: HSCG80-15-Q-P45002
The U.S. Department of Homeland Security, U.S. Coast Guard Surfaces Forces Logistics Center (SFLC) will acquired the work outlined in the solicitation utilizing procedures in FAR Part 12, Acquisition of Commercial Items and FAR Subpart 13.5, Test Program for Certain Commercial Items.
THE FOLLOWING INFORMATION IS HIGHLIGHTED FOR YOUR ATTENTION:
1. This cover sheet is not intended to be all-inclusive. Please read the entire solicitation including any attachments, to ensure completion of all required representations, certifications, and submissions.
Acknowledge all Solicitation Amendments (SF-30) issued by the Government.
2. Your offer shall include all of the documents and information listed in FAR Provision 52.212-1 (b)
Submission of Offers and your offer shall be received by our office at or before the exact date and time specified on page 1 of the SF 1449, Block 8 to be eligible for award. Also, see FAR Provision 52.212-2 for Evaluation Factors.
3. Submit your offer, with all required documentation via one of the following methods:
Mail to:
United States Coast Guard Surface Forces Logistics Center Attn: Bernie Caguiat 1301 Clay Street, Suite 800N Oakland, CA 94612
Email to:
Attn: Bernie Caguiat
Email: Bernie.c.caguiat@uscg.mil
4. QUESTIONS/CONCERNS/REQUEST FOR DRAWINGS: It shall be the obligation of the vendor to exercise due diligence to discover and to bring to the attention of the Government any ambiguities, inconsistencies or concerns regarding the information in this solicitation. All questions/concerns/request for drawings regarding this solicitation shall be submitted in writing to the Contract Specialist at bernie.c.caguiat@uscg.mil no later than (24 September 2014 at 10:00AM Pacific Time). Follow-up/ additional questions will not be accepted after this date and time due to time constraints. Vendors shall reference the solicitation number and provide enough information in their email so the Government can easily respond to their questions/concerns. Questions/concerns will be compiled and addressed on an Amendment of Solicitation (SF-30) and will be posted on the FedBizOpps website for viewing by all potential vendors. Answers to questions will be available after the due date for questions/concerns has past.
NOTICE FOR FILING AGENCY PROTESTS
United States Coast Guard Ombudsman Program
It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government Accountability Office (GAO). Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum, rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the contracting officer or Ombudsman.
Informal forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the cognizant contracting officer. If the contracting officer is unable to satisfy the concerns, the interested party is encouraged to contact the USCG Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman:
solicitation/contract number, contracting office, contracting officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the contracting officer through open and frank discussions. If the protester's concerns are unresolved, an independent review is available by the Ombudsman. The protester may file a formal agency protest to either the contracting officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency's goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103. If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. This will not preclude re-filing of the protest to meet the requirement. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted to:
Department of Homeland Security United States Coast Guard (CG-91)
Ombudsman Program for Agency Protests Email: OPAP@uscg.mil
Fax: 202-372-8447 Phone: 202-475-5786
More information about the Ombudsman Program for Agency Protests (OPAP) can be found at http://www.uscg.mil/acquisition/business/ombudsman.asp
Commander U.S. Coast Guard
Surface Forces Logistics Center
CPD-C&P1-PBPL
300 East Main Street, Suite 600 Norfolk, VA 23510
REQUEST FOR QUOTATION
HSCG80-15-Q–P45002
USCGC HALIBUT (WPB-87340)
DRY DOCK REPAIRS
TABLE OF CONTENTS
DESCRIPTION PAGE NUMBER
SF 1449, Solicitation/Contract/Order for Commercial Items 1 Continuation of SF 1449 3
Contract Clauses FAR 52.212-4 Contract Terms and Conditions 10 FAR 52.212-4, Addendum 15 FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes and Executive Orders 23
Contract Documents/Exhibits and/or Attachments USCGC HALIBUT (WPB 87340) Specification for See Separate Attachment Dry Dock Repairs Rev-0, dated 31 July 2014 Government Property Report See Separate Attachment Past Performance Questionnaire See Separate Attachment
Solicitation Provisions FAR 52.212-1 Instructions to Offerors, Addendum 28 FAR 52.212-2 Evaluation Commercial Items, or other Evaluation Factors for Award 31 FAR 52.212-3 Representations and Certifications-Commercial Items 34
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
2. CONTRACT NO.
3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER
HSCG80-15-Q-P45002
6. SOLICITATION ISSUE
DATE
September 11, 2014
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
BERNIE CAGUIAT, CONTRACT SPECIALIST
b. TELEPHONE NUMBER (No collect calls)
510-637-5887
8. OFFER DUE DATE/
LOCAL TIME
October 10, 2014 10:00AM Pacific Time
9. ISSUED BY CODE 75174
USCG SURFACE FORCES LOGISTICS CENTER
Attn: ANDREW NORTHCUTT, Contracting Officer 300 E Main Street, Suite 600 Norfolk, VA 23510
E-mail: andrew.j.northcutt@uscg.mil
10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR:
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
HUB ZONE SMALL SMALL BUSINESS PROGRAM NAICS:
BUSINESS 336611
EDWOSB SIZE STANDARD:
SERVICE-DISABLED 1000
VETERAN-OWNED
SMALL BUSINESS 8(A)
11. DELIVERY FOR FOB
DESTINATION UNLESS
BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
Net 30
13a. THIS CONTRACT IS A
RATED ORDER UNDER DPAS
(15 CFR 700)
13b. RATING
DO-N5
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE
CONTINUED ON PAGE 3 of 49
16. ADMINISTERED BY CODE
USCG Surfaces Forces Logistics Command
CONTINUED ON PAGES 3 of 49
17a. CONTRACTOR/ CODE FACILITY
OFFEROR CODE
DUNS:
TELEPHONE NO:
18a. PAYMENT WILL BE MADE BY CODE
USCG Finance Center 1430A Kristina Way Chesapeake, VA 23326
CONTINUED ON PAGES 3-6 of 49
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH
ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
The Contractor shall furnish all necessary labor, material services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified to perform dry docking repairs and alternations to the vessel, in accordance with this solicitation and attached specifications.
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (FOR GOVT USE ONLY)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 & 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT
AND RETURN COPIES TO ISSUING OFFICE. CONTRACTOR
AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR
OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REFERENCE
OFFER DATED . YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING
ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED
AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER
31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (Rev. 2/2012) PREVIOUS EDITION IS NOT USABLE Prescribed by GSA – FAR (48 CFR) 53.212
CONTINUATION SHEET FOR:
STANDARD FORM 1449
REFERENCE NO / VESSELS NAME
HSCG80-15-Q-P45002 / CGC HALIBUT (WPB-87340)
PAGE
19.
ITEM
NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
All work is to be performed in accordance with USCGC HALIBUT (WPB 87340) Specification, for Dry Dock Repairs FY 2014 dated 31 July 2014, Rev -0 Work covered by this specification shall be completed within fifty-eight (58) calendar days from the date the vessel becomes available to the Contractor.
This availability is scheduled to start on or about 12 November 2014 and end on or about 09 January 2015.
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
32d. PRINTED NAME AND TITLE OF AUTHORIZED
GOVERNMENT REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER
34. VOUCHER NUMBER
35. AMOUNT VERIFIED
CORRECT FOR
36. PAYMENT
COMPLETE PARTIAL FINAL
37. CHECK
NUMBER
PARTIAL FINAL
38. S/R ACCOUNT
39. S/R VOUCHER
40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
42 a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42b. RECEIVED AT (Location)
42c. DATE REC’D (YY/MM/DD)
42d. TOTAL
CONTAINERS
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (Rev. 2/2012 PREVIOUS EDITION IS NOT USABLE Prescribed by GSA – FAR (48 CFR) 53.212
Continuation of SF 1449 – BLOCKS 15 - 26
(1) Block 15: Deliver To Place of Performance: Contractor’s Facility (to be incorporated at time of award).
Place of Acceptance on behalf of the Government: U.S. Coast Guard Cutter HALIBUT (WPB-87340), GEOGRAPHIC RESTRICTION: Per U. S. Coast Guard Pacific Area Instruction 3100.1G, this vessel is geographically restricted to United States West Coast San Francisco Bay and South.
(2) Block 16: Administered By (Contract Management)
Notwithstanding the Contractor’s responsibility for total management during the performance of the contract, the administration of the contract will require maximum coordination between the Government and the Contractor. The individuals listed below will be the Government points of contact during the performance period.
Contract Administration: The U.S. Department of Homeland Security, U.S. Coast Guard, Surface Forces Logistic Command, CPD, 300 East Main Street, Suite 600, Norfolk, VA 23510-9112 will perform all contract administration.
Communications pertaining to contractual administrative matters shall be addressed to one of the Contracting Officers (KO) listed below. Changes in, or deviations from, the specification or terms and conditions of the contract shall not be effected without written modification to the contract as executed by a USCG SFLC CPD Contracting Officer.
Contracting Officer: Andrew Northcutt Telephone #: 757-441-7032 E-Mail: andrew.j.northcutt@uscg.mil Fax #: 757-628-4628 Alternate Contracting Officer(s): Any warranted USCG SFLC CPD Contracting Officer
Contract Administrator (Contract Specialist): Serves as the point of contact between the Contractor and the Contracting Officer(s); however, this person does not have a warrant that provides the authority to contractually commit the government.
Contract Specialist: Bernie Caguiat Telephone #: 510-637-5887 E-Mail: Bernie.c.caguiat@uscg.mil
The Contracting Officer’s Representative (COR): Is a Government employee designated in writing by the Contracting Officer to act as a technical advisor for the Contracting Officer for services/items within the scope of the contract. The COR performs functions such as review and/or inspection and acceptance of supplies and services and of a technical nature. A designation letter will set forth the name of the COR and the authorities and limitations of the COR under the contract. This person does not have a warrant that provides the authority to contractually commit the Government or to modify any terms and conditions of a contract.
COR: LTJG Lars Bouge Telephone #: 510-460-8188
E-Mail: Lars.J.Bouge@uscg.mil
(3) Block 17a: Contractor shall include company’s DUNS number
Block 17b: Remittance Address Payment will be made by Electronic Funds Transfer (EFT) to the Financial Institution listed in the System for Award Management (SAM). To receive an award the Contractor must be registered in the System for Award Management (SAM) http://www.sam.gov.
(4) Blocks 18a and 18b: Invoice Procedures
INVOICE SUBMISSION PROCESS:
1. The Contractor shall prepare a proper invoice IAW FAR clause 52.212-4, and in addition to the information required by FAR 52.212-4(g) as cited in the contract. All invoices shall be itemized to correlate to the Schedule of Supplies/Services.
(A) The Government will make payment under this contract based on a percentage or stage of completion. The Contractor may invoice each contract line item (CLIN) as work progresses. The amount invoiced shall be calculated based on those prices stipulated in the contract Schedule of Supplies/Services as follows:
(B) A CLIN may not be invoiced until the percentage complete reaches 25 percent. Future invoices for that CLIN have no limitation as to the percentage of completion required before invoicing. (The minimum percentage of completion (25%) to be reached prior to billing each CLIN may be waived by the Contracting Officer on a case by case basis for large dollar CLINS.)
(C) In addition to the information required by FAR 52.212-4 (g) Invoices shall include:
1) Contract Number, Delivery Order/Task Order Number, Requisition Number
2) Name and Address of the Contractor
3) Invoice Number and Invoice Date
4) DUNS Number
5) Name of the Contract Specialist and Contracting Officer’s
6) Invoice Routing Code (IRC): SFLC -1
7) Indicate Small Business Status
8) Indicate if Final Invoice, the Contractor’s final invoice submitted under the contract must be marked as follows: ″THIS INVOICE CONSTITUTES THE FINAL INVOICE – UPON
PAYMENT OF THIS INVOICE NO OTHER MONIES ARE DUE UNDER CONTRACT
NUMBER (to be assigned upon contract award).
9) The percentage of completion for each CLIN identified;
10) Vessel name
11) The overall percentage and dollar amount previously billed, currently billed and unbilled,
12) Shipping and Payment Terms
13) Name, title, phone number, and mailing address of person to be notified in the event of a defective invoice.
All information must be included in an invoice for it to constitute a proper invoice. All improper invoices will be rejected which could delay payment.
2. The Contractor shall forward invoices to the Contracting Officer Representative (COR) via e-mail at lars.j.bouge@uscg.mil or in person.
3. The COR shall review and verify invoices, sign the invoice and return the invoice to the Contractor.
4. The Contractor shall complete the Contractor Invoice Submission Form (listed below).
5. The Contractor shall submit the Contractor Invoice Submission Form, a PDF file of the invoice, and any necessary documents for supplies or services via the U.S. Coast Guard Finance Center website at:
http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm
Contractor Invoice Submission Form Directions: Please complete as much information as possible. All blocks in red text are required entries.
Note: Web-Invoices are accepted only for Coast Guard Contracts over the Simplified Acquisition Threshold (Document Type 24).
THIS WEB FORM IS NOT AN OFFICIAL INVOICE. THE OFFICIAL INVOICE MUST BE ATTACHED
Invoice Information Invoice Routing Code:
SFLC-1
(help) Invoice Number: (help)
Contract Number: (help) Invoice Date:
MM/DD/YY
(help)
BPA Number: (help) Invoice Amount:
0.00
(help)
Delivery/Task Order Number: (help) Discount Terms:
00.00
Discount Days:
Net Days:
(help) Company Information Attachment of Official Invoice
Company Name: (help)
DUNS: Plus 4: (help)
Point of Contact Name: (help)
Point of Contact Email: (help)
Phone: (help) Fax: (help)
Please verify your entry on the next page. Attach invoice and any supporting documentation after verification.
• Attachment must be a single PDF file no larger than 3 MB. Grey-scale PDFs are not compatible. This will be our official invoice. Supporting documentation must be combined in the single PDF file or submitted to your contracting office separately via email.
• Need help creating a PDF file? Click here for instructions.
Verify
Reset
6. The Contractor must select the correct Invoice Routing Code for timely invoice processing. The Invoice Routing Code for this contract is SFLC-1.
7. Visit the U.S. Coast Guard Finance Center Website for instructions regarding invoice attachments.
http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm
8. A copy of the invoice and any supporting documentation shall also be e-mailed to the Contract Specialist at Bernie.c.caguiat@uscg.mil.
Additional work verbally agreed to by the parties that has not yet been incorporated into the contract by modification shall not be included in an invoice. Payments will not be made for any work to which a modification has not been properly executed. Invoices submitted for payment that includes such a request will be reduced by the unmodified amount.
NOTE: 10% OF THE TOTAL CONTRACT PRICE WILL BE WITHHELD UNTIL ALL
DELIVERABLES, REQUIRED BY THE CONTRACT, ARE RECEIVED AND ACCEPTED.
FURTHER CONSIDERATIONS WITH INVOICING:
In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received:
(1) On the later of:
(i) For invoices that are mailed the date a proper invoice is actually received by the designated billing office and annotates the invoice with date of receipt at the time of receipt.
(ii) For invoices electronically transmitted by the Contractor via web based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient; or
(iii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless—
a) The agency has actually accepted the property or services before the seventh day in which case the acceptance date shall substitute for the seventh day after the delivery date;
or
b) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date;
(2) On the date placed on the invoice by the Contractor, when the agency fails to annotate the invoice with date of receipt of the invoice at the time of receipt (such invoice must be a proper invoice);
or
(3) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice.
(4) Web based submission by the Contractor and receipt confirmation does not reflect Government review or acceptance of the invoice.
(5) For inquiries and payment status please visit: https://fincen.uscg.mil/secure/payment.htm
The Data Universal Numbering System (DUNS) number is the primary identifier in System for Award Management (SAM), formally known as Central Contractor Registration (CCR), (see FAR 52.232-33, Payment by Electronic Funds Transfer – System for Award Management (Jul 2013)). Contractors are located and identified in SAM by their DUNS number. Therefore, to facilitate payment, the DUNS number shall be recorded on every invoice submitted to the U.S. Coast Guard.
All payments for partial performance rendered by the Government under this contract are based on the assumption that the Contractor will, in good faith, execute and honor all payment terms entered into between it, the Prime Contractor, and any subcontractor thereof in the performance of this contract. The Contractor hereby acknowledges the Government’s right to reduce or suspend progress payments based on non-payment in accordance with any payment terms of the subcontract agreement.
Any amount deemed not payable will be deducted from the Contractor’s invoice. Deducted amounts may be resubmitted on the next invoice for reconsideration.
(5) Blocks 19-24: Schedule of Supplies/Services
CONTRACT TYPE:
This solicitation is issued in accordance with FAR 12, Acquisition of Commercial Items in conjunction with FAR 13.5, Test Program for Certain Commercial Items. The Government intends to award a single firm fixed price contract award as a result of this solicitation.
CONTRACT PERIOD OF PERFORMANCE:
Work covered by this solicitation shall be completed within fifty-eight (58) calendar days from the date the vessel becomes available to the Contractor. The availability is scheduled to start on or about 12 November 2014 and end on or about 09 January 2015. An arrival conference normally will be held within 48 hours of the schedule start date.
Vessels being dry docked shall be in dry dock within seventy-two (72) hours of delivery. If a pre-docking shaft alignment is being performed, the vessel shall be dry docked within one-hundred and twenty (120) hours after arrival.
SCHEDULE OF SUPPLIES/SERVICES:
Base Contract Line Item Numbers (CLINs) are marked as “D” for Definite. Optional CLINS are marked “O” for Optional. Insert unit prices in all CLINs listed in the Schedule unless “NSP” is printed in the Unit Price column for any CLIN. “NSP” in the section means “Not Separately Priced.”
SCHEDULE OF SUPPLIES/SERVICES FOR
USCGC HALIBUT (WPB-87340) DRY-DOCK AVAILABILITY
ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED
PRICE
D-001 Perform Ultrasonic Thickness Measurements (D) JOB 1
O-002 Perform Ultrasonic Thickness Measurements (O) JOB 1
D-003 Bilge Surfaces (Lazzarette) Preserve (100%)(D) JOB 1
D-004 Dirty Oil Tank, Clean and Inspect (D) JOB 1
O-005 Voids (Non-Accessible) Internal Surfaces, Preserve (O) JOB 1
O-006 Depth Sounder, Capastic Fairing, Renew (O) JOB 1
O-007 Main Engine/Reduction Gear, Realign (O) JOB 1
O-008 Propulsion Shaft, Repair (O) JOB 1
O-009 Propulsion Shaft, Straighten (O) JOB 1
O-010 Intermediate Water-Lubricated Propulsion Shaft Bearing , Renew (O) JOB 1
O-011 Aft Water-Lubricated Shaft Bearing, Renew (O) JOB 1
O-012 Intermediate Bearing Carrier, Renew (O) JOB 1
O-013 Stern Tube, Interior Surfaces , Preserve 100%
(O) JOB 1
O-014 Stern Tube, Interior Surfaces , Repair (O) JOB 1
D-015 Speed Log, Skin Valve Assembly, Clean and Inspect (D) JOB 1
D-016 HVAC System, Repair (D) JOB 1
D-017 Sea Water System (Valves, Strainers, Piping), Clean, Inspect, and Repair (D) JOB 1
D-018 Rudder Assemblies, Remove, Inspect and Reinstall (D) JOB 1
D-019 RHIB Notch Skid Pads, Inspect (D) JOB 1
O-020 RHIB Notch Skid Pad Studs, Renew (O) JOB 1
D-021 Stern Launch Door, Remove, Inspect and Reinstall (D) JOB 1
D-022 Grey Water Holding Tank, Clean and Inspect (D) JOB 1
D-023 Sewage Holding Tank , Clean and Inspect (D) JOB 1
D-024 Grey Water Piping, Clean and Flush (D) JOB 1
D-025 Sewage Piping, Clean and Flush (D) JOB 1
D-026 U/W Body, Preserve (“100%”) (D) JOB 1
D-027 Main Mast Preserve (100%) (D) JOB 1
D-028 Superstructure Preserve (100%) (D) JOB 1
D-029 Drydocking (D) JOB 1
D-030 Temporary Services, Provide (D) JOB 1
D-031 Ventilation Systems, Commercial Cleaning (D) JOB 1
D-032 Install Stainless Steel Hull Inserts and Renew BMDE Concentric Rings. TCTO (D) JOB 1
D-033 Tanks (MP Fuel Service), Clean and Inspect (D) JOB 1
O-034 Aft Bearing Carrier, Renew (O) JOB 1
D-035 Hull Plating (Side Scan), Ultrasonic Testing
87’ WPB (D) JOB 1
D-036 Decks-Exterior (Main Deck), Preserve (D) JOB 1
D-037 Hull Plating Freeboard, Preserve 100% (D) JOB 1
D-038 Insulation Renew (D) JOB 1
D-039 Interior Deck Covering System, Reseal (D) JOB 1
D-040 Sewage Piping, Repair (D) JOB 1
D-041 Stern Gate Hydraulic Rams, Repair (D) JOB 1
D-042 Tanks, Lube Oil, Clean and Inspect (D) JOB 1
D-043 Propulsion Shafts, Remove, Inspect, and Reinstall (D) JOB 1
D-044 Propellers, Remove, Inspect, and Reinstall (D) JOB 1
D-045 Cathodic Protection / Zincs, Renew (D) JOB 1
A-O Composite Labor Rate Hour 400
B-D GFP Report NSP EA 1 NSP
Z-O Laydays Day 5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
(6) Blocks 25: Accounting and Appropriation Data
ACCOUNTING AND APPROPRIATION DATA: To be included on contract award document.
(7) Blocks 26: Total Award
This contract will obligate all base contract line item numbers (CLINs) marked as “D” for definite. The funding for the optional CLINs will be obligated with a bilateral contract modification as required.
DESCRIPTION OF WORK:
(a) The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified, to perform dry docking repairs, and alterations to the vessel, in accordance with this solicitation and attached specification.
(b) Failure to read the specification and solicitation in their entirety will not relieve the offeror from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the offeror’s risk.
REQUIRED DOCUMENTS:
Each offeror shall furnish the following information as required by the solicitation:
1. Signed 1449 with offeror’s address, DUNS, and other required information.
2. Completed Schedule of Supplies/Services page 7 and 8 of 49
3. Past Performance Documentation as outlined on page 33 and 34 of 49
4. Small Business Self Certification
5. Welding Certifications and Procedures
6. Proof of Insurance (Statement of Coverage from current Insurance carrier)
7. Dry Dock Facility and or Dry Dock Cradle Certification
8. Pre-Award Dry Dock Calculations for US Coast Guard Cutter HALIBUT (WPB 87340)
PLEASE NOTE: QUOTATIONS THAT DO NOT INCLUDE ALL REQUIRED DOCUMENTS MAY BE
CONSIDERED INCOMPLETE AND MAY NOT BE CONSIDERED
DELIVERABLES: Seven (7) days after the contract has been awarded the contractor will generate a legible planning document as outlined in SFLC Standard Specification 0000 (3.2.5) to the KO and COR for a preliminary government review. Fifteen (15) days prior to the start of the performance period three (3) copies of the planning document will be submitted to the KO, and all preceding weekly progress meetings.
ANTICIPATED AWARD DATE: The contract is expected to be awarded on or about 24 October 2014.
QUESTIONS AND REQUEST FOR DRAWINGS: The last day to request drawings or ask questions regarding this solicitation is 24 September 2014 at 1000AM Pacific Time. After this date, further requests may not be accepted due to time constraints.
THIS PAGE WAS LEFT BLANK INTENTIONALLY
CONTRACT CLAUSES
(1) FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (MAY 2014)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, contract line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C.
3903) and prompt payment regulations at 5 CFR Part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected contract line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109 , which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b.
destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t) System for Award Management (SAM).
(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(2)(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to (A) change the name in the SAM database; (B) comply with the requirements of Subpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM database. Information provided to the Contractor’s SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via SAM accessed through https://www.acquisition.gov.
(u) Unauthorized Obligations
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C.
1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures. (End of Clause)
(End of Clause)
(2) ADDENDUM FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS
(MAY 2014)
(a) FAR 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT
TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)
(a) This contract and employees working on this contract will be subject to the whistleblower rights and remedies in the pilot program on Contractor employee whistleblower protections established at 41 U.S.C. 4712 by section 828 of the National Defense Authorization Act for Fiscal Year 2013 (Pub. L. 112-239) and FAR 3.908
(b) The Contractor shall inform its employees in writing, in the predominant language of the workforce, of employee whistleblower rights and protections under 41 U.S.C. 4712, as described in section 3.908 of the Federal Acquisition Regulation.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts over the simplified acquisition threshold.
(b) FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item (Mar 1989) - VARIATION
The Government may require the performance of the numbered line items, identified in the Schedule as option items, at the unit prices stated in the Schedule. The option quantities shown in the Schedule are estimates only. The Government has the right to require performance of these items at the quantities deemed necessary. Therefore, the Government may exercise an option item on more than one occasion during the contract performance period. The Contracting Officer will provide initial notification of the exercise of an option either verbally, by facsimile, or both.
When time is of essence initial notification will be provided verbally followed within 24 hours by a facsimile of confirmation. A contract modification will be executed shortly thereafter to include those options wherein exercise notification was provided. Such options may be exercised at any phase during the contract performance period as stated herein, or any extension of the performance period. To maintain the contract performance period the Contractor shall commence performance of an option item immediately upon receiving initial notification; but, not later than 24 hours thereafter, unless proper sequencing of the work requires a delay in beginning performance of the option. In that case, the option item shall be commenced as soon as proper sequencing permits. The exercise of any option item listed in the Schedule will not normally extend the contract performance period. However, the Contracting Officer may consider a request by the Contractor for contract extension if an option is exercised after 50% of the contract performance period has expired.
(c) FAR 52.232-40 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.
(End of clause)
(d) FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.arnet.gov/far/index.html
FAR 52.211-15 Defense Priority and Allocation Requirements (APR 2008) DO N5 Rating
FAR 52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) Alternate…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .