PELICAN_SCHEDULE_OF_SUPPLIES_SERVICES.xls
XLS spreadsheet 28 KB Posted
- Attached to
- DRYDOCK CGC PELICAN
- Solicitation number
- HSCG80-13-R-P45039
About this file
SCHEDULE OF SUPPLIES / SERVICE CGC PELICAN
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BLANK_PELICAN_SCHEDULE_OF_SUPPLIES__SERVICES_DATED_11_21_12.xls | XLS spreadsheet | |
| SF30_Amendment_05_CGC_Pelican_dtd_11_21_12.pdf | ||
| SF30_Amendment_03_CGC_Pelican_dyd_11_19_12.pdf | ||
| BLANK_PELICAN_SCHEDULE_OF_SUPPLIES__SERVICES_DATED_11_19_12.xls | XLS spreadsheet | |
| SF30_Amendment_02_CGC_Pelican.pdf | ||
| SOLICITATION_for_CGC_PELICAN.doc | DOC document | |
| SOLICITATION_for_CGC_PELICAN.doc | DOC document | |
| PELICAN_REV0_dtd_3_OCT_12_DD_MW_FY13.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| 26 JUN 2012 REV 2 GOVERNMENT ESTIMATE FOR PELICAN: | ||||||||
| USCGC PELICAN (WPB-87327) DRYDOCK AVAILABILITY 2013 | ||||||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE | AFC 30 | AFC 42 | AFC 45 |
| D-001 | PERFORM ULTRASONIC THICKNESS MEASUREMENTS (D) | JB | 1 | $0 | $0 | $0 | $0 | |
| D-002 | PERFORM ULTRASONIC THICKNESS MEASUREMENTS (O) | JB | 1 | $0 | ||||
| D-003 | DIRTY OIL TANK, CLEAN AND INSPECT (D) | JB | 1 | $0 | ||||
| D-004 | OILY WATER TANK, CLEAN AND INSPECT (D) | JB | 1 | $0 | ||||
| D-005 | TANKS (MP FUEL SERVICE), CLEAN & INSPECT (D) | JB | 1 | $0 | ||||
| D-006 | PILOTOUSE DECK (ALUM.), INSPECT, PRESERVE, & RENEW ELECTRICAL MATTING (D) | JB | 1 | $0 | ||||
| D-007 | DEPTH SOUNDER, CAPASTIC FAIRING, RENEW (O) | JB | 1 | $0 | ||||
| D-008 | MAIN ENGINE/REDUCTION GEAR, REALIGN (O) | JB | 1 | $0 | ||||
| D-009 | PROPULSION SHAFTS, REMOVE, INSPECT, AND REINSTALL (D) | JB | 1 | $0 | ||||
| D-010 | PROPULSION SHAFT, REPAIR (O) | JB | 1 | $0 | ||||
| D-011 | PROPULSION SHAFT, STRAIGHTEN (O) | JB | 1 | $0 | ||||
| D-012 | AFT WATER-LUBRICATED SHAFT BEARING, RENEW (O) | JB | 1 | $0 | ||||
| D-013 | AFT BEARING CARRIER, RENEW (O) | JB | 1 | $0 | ||||
| D-014 | STERN TUBES, INTERIOR SURFACES, PRESERVE 100% (O) | JB | 1 | $0 | ||||
| D-015 | STERN TUBES, INTERIOR SURFACES, REPAIR (O) | JB | 1 | $0 | ||||
| D-016 | PROPELLERS, REMOVE, INSPECT, AND REINSTALL (D) | JB | 1 | $0 | ||||
| D-017 | PROPELLER, MINOR RECONDITIONING AND REPAIR, PERFORM (O) | JB | 1 | $0 | ||||
| D-018 | FATHOMETER TRANSDUCER, RENEW (D) | JB | 1 | $0 | ||||
| D-019 | SPEED LOG, TRANSDUCER AND SKIN VALVE, CLEAN AND INSPECT (D) | JB | 1 | $0 | ||||
| D-020 | SEA WATER (VALVES, STRAINERS, PIPING), CLEAN, INSPECT, AND REPAIR (D) | JB | 1 | $0 | ||||
| D-021 | RUDDER ASSEMBLIES, REMOVE, INSPECT, AND REINSTALL (D) | JB | 1 | $0 | ||||
| D-022 | RHIB NOTCH SKID PADS, INSPECT (D) | JB | 1 | $0 | ||||
| D-023 | RHIB NOTCH SKID PADS STUDS, RENEW (O) | JB | 1 | $0 | ||||
| D-024 | STERN LAUNCH DOOR, REMOVE, INSPECT, AND REINSTALL (D) | JB | 1 | $0 | ||||
| D-025 | GREY WATER HOLDING TANK, CLEAN AND INSPECT (D) | JB | 1 | $0 | ||||
| D-026 | SEWAGE HOLDING TANK, CLEAN AND INSPECT (D) | JB | 1 | $0 | ||||
| D-027 | GREY WATER PIPING, CLEAN AND FLUSH (D) | JB | 1 | $0 | ||||
| D-028 | SEWAGE PIPING, CLEAN AND FLUSH (D) | JB | 1 | $0 | ||||
| D-029 | U/W BODY, PRESERVE ("100%")(O) | JB | 1 | $0 | ||||
| D-030 | CATHODIC PROTECTION/ZINCS, RENEW (D) | JB | 1 | $0 | ||||
| D-031 | DRYDOCKING (D) | JB | 1 | $0 | ||||
| D-032 | TEMPORARY SERVICES, PROVIDE (D) | JB | 1 | $0 | ||||
| D-033 | TELEPHONE SERVICE, PROVIDE (D) | JB | 1 | $0 | ||||
| D-034 | OILY WATER TANK, PRESERVE (D) | JB | 1 | $0 | ||||
| D-035 | MAST, PRESERVE (D) | JB | 1 | $0 | ||||
| D-036 | SHIPS SERVICE DIESEL GENERATOR ASSEMBLY, STBD RENEW | JB | 1 | $0 | ||||
| D-037 | REDUCTION GEAR SEA WATER CHECK VALVE, RENEW (D) | JB | 1 | $0 | ||||
| D-038 | INTERMEDIATE WATER-LUBRICATED SHAFT BEARINGS, RENEW (O) | JB | 1 | $0 | ||||
| D-039 | INTERMEDIATE BEARINGS CARRIER, RENEW (O) | JB | 1 | |||||
| D-040 | MAIN DIESEL ENGINES, PORT AND STARBOARD,RENEW (D) | JB | 1 | |||||
| D-041 | DOOR(S) RENEW (D) | JB | 1 | |||||
| D-042 | FOREPEAK COMPARTMENT, PRESERVE | JB | 1 | |||||
| O-A | Composite Labor Rate | Hour | 460 | $0 | ||||
| D-B | GFP Report | NSP | EA | 1 | NSP | |||
| O-Z | Laydays | Day | 5 | $0 | ||||
| Total Price of Definite Items | ||||||||
| Total Price of Option Items | ||||||||
| Total Price of Definite and Optional Items |
MJWatson:
Sheet2
Sheet3
File details come from the government source that posted it. Updated .