BLANK_PELICAN_SCHEDULE_OF_SUPPLIES__SERVICES_DATED_11_21_12.xls

XLS spreadsheet 34 KB Posted

Attached to
DRYDOCK CGC PELICAN
Solicitation number
HSCG80-13-R-P45039
Issued by

About this file

SCHEDULE OF SUPPLIES/SERVICES dated 11/21/12

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

USCGC PELICAN (WPB-87327) DRYDOCK AVAILABILITY 2013
11/21/12
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001PERFORM ULTRASONIC THICKNESS MEASUREMENTS (D)JB1$0
O-002PERFORM ULTRASONIC THICKNESS MEASUREMENTS (O)25 SHOTS10$0
D-003DIRTY OIL TANK, CLEAN AND INSPECT (D)JB1$0
D-004OILY WATER TANK, CLEAN AND INSPECT (D)JB1$0
D-005TANKS (MP FUEL SERVICE), CLEAN & INSPECT (D)JB1$0
D-006PILOTOUSE DECK (ALUM.), INSPECT, PRESERVE, & RENEW ELECTRICAL MATTING (D)JB1$0
O-007DEPTH SOUNDER, CAPASTIC FAIRING, RENEW (O)JB1$0
O-008MAIN ENGINE/REDUCTION GEAR, REALIGN (O)JB1$0
D-009PROPULSION SHAFTS, REMOVE, INSPECT, AND REINSTALL (D)JB1$0
O-010PROPULSION SHAFT, REPAIR (O)JB1$0
O-011PROPULSION SHAFT, STRAIGHTEN (O)JB1$0
O-012AFT WATER-LUBRICATED SHAFT BEARING, RENEW (O)JB1$0
O-013AFT BEARING CARRIER, RENEW (O)JB1$0
O-014STERN TUBES, INTERIOR SURFACES, PRESERVE 100% (O)JB1$0
O-015STERN TUBES, INTERIOR SURFACES, REPAIR (O)JB1$0
D-016PROPELLERS, REMOVE, INSPECT, AND REINSTALL (D)JB1$0
O-017PROPELLER, MINOR RECONDITIONING AND REPAIR, PERFORM (O)JB1$0
D-018FATHOMETER TRANSDUCER, RENEW (D)JB1$0
D-019SPEED LOG, SKIN VALVE ASSEMBLY, CLEAN AND INSPECT (D)JB1$0
D-020SEA WATER SYSTEM (SEA VALVES, STRAINERS, PIPING), CLEAN, INSPECT, AND REPAIR (D)JB1$0
D-021RUDDER ASSEMBLIES, REMOVE, INSPECT, AND REINSTALL (D)JB1$0
D-022RHIB NOTCH SKID PADS, INSPECT (D)JB1$0
O-023RHIB NOTCH SKID PADS STUDS, RENEW (O)05 STUDS10$0
D-024STERN LAUNCH DOOR, REMOVE, INSPECT, AND REINSTALL (D)JB1$0
D-025GREY WATER HOLDING TANK, CLEAN AND INSPECT (D)JB1$0
D-026SEWAGE HOLDING TANK, CLEAN AND INSPECT (D)JB1$0
D-027GREY WATER PIPING, CLEAN AND FLUSH (D)JB1$0
D-028SEWAGE PIPING, CLEAN AND FLUSH (D)JB1$0
O-029U/W BODY, PRESERVE ("100%")(O)JB1$0
D-030CATHODIC PROTECTION/ZINCS, RENEW (D)JB1$0
D-031DRYDOCKING (D)JB1$0
D-032TEMPORARY SERVICES, PROVIDE (D)JB1$0
D-033TELEPHONE SERVICE, PROVIDE (D)JB1$0
D-034OILY WATER TANK, PRESERVE (D)JB1$0
D-035MAST, PRESERVE (D)JB1
D-036SHIPS SERVICE DIESEL GENERATOR ASSEMBLY, STBD RENEW (D)JB1
D-037REDUCTION GEAR SEA WATER CHECK VALVES, RENEW (D)JB1
O-038INTERMEDIATE WATER-LUBRICATED PROPULSION SHAFT BEARINGS, RENEW (O)JB1
O-039INTERMEDIATE BEARINGS CARRIER, RENEW (O)JB1
D-040MAIN DIESEL ENGINES, PORT AND STARBOARD,RENEW (D)JB1
D-041FOREPEAK COMPARTMENT, PRESERVE (100%)(D)JB1
D-042HULL PLATING (SIDE SCAN), ULTRASONIC TESTING 87' WPB (D)JB1
D-043HULL PLATING FREEBOARD, PRESERVE 100 % (D)JB1
A-OComposite Labor RateHour460$0
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

Sheet2

Sheet3

File details come from the government source that posted it. Updated .