Key Largo Estimate FY13 DD Blank xls.xls
XLS spreadsheet 36 KB Posted
- Attached to
- DRYDOCK AND REPAIR, USCGC FARALLON (WPB-1301), USCGC HAWK (WPB-87355) AND USCGC KEY LARGO (WPB-1324).
- Solicitation number
- HSCG80-13-R-P45010
About this file
Blank Schedule of Supplies and Services for USCGC KEY LARGO.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Two Boat D-7 Project 07-19-12.doc | DOC document | |
| FARALLON FY13 DD SPECIFICATION.pdf | ||
| Farallon Estimate FY13 DD 13 June 2012 Blank xls.xls | XLS spreadsheet | |
| SF1449 Two | — | |
| KEY LARGO FY13 DD SPECIFICATION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| 06/13/2012 Rev-0GOVERNMENT ESTIMATE FOR: | |||||
| USCGC KEY LARGO (WPB-1324) DRYDOCK AVAILABILITY 2013 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating, U/W Body, Inspect (D) | JB | 1 | ||
| D-002 | Hull Plating (U/W Body), Ultrasonic Testing (D) | JB | 1 | ||
| O-003 | Aluminum Hull and Structural Repairs - 1/4" Plate (O) | JB | 1 | ||
| O-004 | Aluminum Hull and Structural Repairs - 3/16" Plate (O) | JB | 1 | ||
| O-005 | Aluminum Hull and Structural Repairs - 5/16" Plate (O) | JB | 1 | ||
| O-006 | Hull and Structural Plating Repairs -Crack (Aluminum) (O) | JB | 1 | ||
| O-007 | Hull and Structural Plating Repairs - Crack (Steel) (O) | JB | 1 | ||
| O-008 | Hull and Structural Plating Repairs - Eroded Weld (Aluminum) (O) | JB | 1 | ||
| O-009 | Steel Hull and Structural Plating Repairs (5-Pound) | JB | 1 | ||
| O-010 | Steel Hull and Structural Plating Repairs ( 7.0 Pound, 7.5-Pound or 7.65-Pound) (O) | JB | 1 | ||
| O-011 | Steel Hull and Structural Plating Repair s , Corrugated Plate (4.0-Pound) (O) | JB | 1 | ||
| O-012 | Hull and Structural Plating Repairs (6.0-Pound or 5.63-Pound) (O) | JB | 1 | ||
| O-013 | Hull and Structural Plating – 10 .0 -Pound Steel, Repair (O) | JB | 1 | ||
| D-014 | Appendages (U/W), Leak Test (D) | JB | 1 | ||
| D-015 | Appendages (U/W) - Internal, Preserve (D) | JB | 1 | ||
| D-016 | Tanks ( Fuel Service), Clean and Inspect (D) | JB | 1 | ||
| D-017 | Voids (Non-Accessible), Leak Test (D) | JB | 1 | ||
| D-018 | Tanks (Fuel Stowage and Overflow), Clean and Inspect (D) | JB | 1 | ||
| D-019 | Voids (Non-Accessible), Preserve Internal Surfaces (D) | JB | 1 | ||
| D-020 | Tanks (Potable Water), Clean and Inspect (D) | JB | 1 | ||
| D-021 | Tanks (Dirty Oil and Waste), Clean and Inspect (D) | JB | 1 | ||
| D-022 | Propulsion System , Alignment Check (D) | JB | 1 | ||
| D-023 | Propulsion Shafting, Remove, Inspect, and Reinstall (D) | JB | 1 | ||
| O-024 | Propulsion Shafting, Renew (O) | JB | 1 | ||
| D-025 | Mechanical Shaft Seal Assemblies, Overhaul (D) | JB | 1 | ||
| D-026 | Propulsion Shaft Bearings (External) , Renew (D) | JB | 1 | ||
| D-027 | Prop ulsion Shaft , Stern Tube Forward Bearing , Renew (D) | JB | 1 | ||
| D-028 | Propellers ; Remove, Inspect, and Reinstall (D) | JB | 1 | ||
| D-029 | Exhaust System , MDE , Inspect (D) | JB | 1 | ||
| D-030 | SW Heat Exchangers ; Clean , Inspect and Hydro (D) | JB | 1 | ||
| D-031 | Fathometer Transducer, Renew (D) | JB | 1 | ||
| D-032 | Speed Doppler, Renew, Doppler Valve, Overhaul (D) | JB | 1 | ||
| D-033 | Sea Valves and Waster Pieces , Overhaul or Renew (D) | JB | 1 | ||
| D-034 | Sea Strainers (All Sizes), Renew (D) | JB | 1 | ||
| D-035 | Sea Strainers - Duplex (All Sizes), Overhaul (D) | JB | 1 | ||
| O-036 | Steering Gear (General) , Overhaul (O) | JB | 1 | ||
| D-037 | Rudder Assembly, Remove, Inspect and Reinstall (D) | JB | 1 | ||
| D-038 | Fin Stabilizers (General), Overhaul (D) | JB | 1 | ||
| D-039 | Tanks, (Grey Water) Clean and Inspect (D) | JB | 1 | ||
| D-040 | Tanks, (Sewage Holding) Clean and Inspect (D) | JB | 1 | ||
| D-041 | Grey Water Piping , Clean and Flush (D) | JB | 1 | ||
| D-042 | Sewage Piping , Clean and Flush (D) | JB | 1 | ||
| D-043 | Tanks (Sewage Holding) , Preserve “ Partial ” (D) | JB | 1 | ||
| D-044 | Tanks (Aft Grey Water ), Preserve “Partial ” (D) | JB | 1 | ||
| O-045 | Tanks (Dirty Oil ) , Preserve “ Partial ” (O) | JB | 1 | ||
| O-046 | Tanks (Oily Water) , Preserve “ Partial ” (O) | JB | 1 | ||
| D-047 | Tanks (Potable Water), Preserve “ Partial ” (D) | JB | 1 | ||
| D-048 | Bilge Surfaces, Preserve (D) | JB | 1 | ||
| O-049 | U/W Body, Preserve “100%” (O) | JB | 1 | ||
| D-050 | U/W Body, Preserve “Partial – Condition A ” (D) | JB | 1 | ||
| O-051 | Stern Tube Interior Surfaces , Preserve 100% (O) | JB | 1 | ||
| O-052 | Hull Plating Freeboard , Preserve - Partial (O) | JB | 1 | ||
| D-053 | Cathodic Protection System (Bilge and Sea Chest), Renew (D) | JB | 1 | ||
| D-054 | Cathodic Protection System, Inspect and Maintain (D) | JB | 1 | ||
| O-055 | CAPAC Anode Assembly Renew (O) | JB | 1 | ||
| D-056 | Drydocking (D) | JB | 1 | ||
| D-057 | Temporary Services, Provide (D) | JB | 1 | ||
| D-058 | Data Service , Provide (D) | JB | 1 | ||
| D-059 | Deck Covering (Wet/Dry), Seal (D) | JB | 1 | ||
| A-O | Composite Labor Rate | Hour | 460 | ||
| B-D | GFP Report | NSP | EA | 1 | NSP |
| Z-O | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .