Schedule of Supplies Services Attachment.xls
XLS spreadsheet 31 KB Posted
- Attached to
- DRY DOCK REPAIRS FOR USCGC SANIBEL (WPB-1312)
- Solicitation number
- HSCG80-12-R-P45J94
About this file
Schedule of Supplies and Services for RFP HSCG80-12-R-P45J94
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP-HSCG80-12-R-P45J94.pdf | ||
| USCGC SANIBEL _Specification Rev 0 21 Feb 2012.doc | DOC document | |
| Government Property Report Attachment.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Supplies&Services
| SCHEDULE OF SUPPLIES AND SERVICES for DRYDOCK REPAIRS | |||||
| U.S. COAST GUARD CUTTER (USCGC) SANIBEL (WPB-1312) | |||||
| PERIOD OF PERFORMANCE: AUGUST 1, 2012 THROUGH SEPTEMBER 28, 2012 | |||||
| Please Note: Base Contract Line Item Numbers (CLINs) are marked as “D” for Definitive. Optional CLINS are marked “O” for Optional. Insert unit prices in all CLINs listed in the Schedule unless “NSP” is printed in the Unit Price column for any CLIN. “NSP” in the section means “Not Separately Priced | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating, U/W Body, Inspect | JOB | 1 | ||
| D-002 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | ||
| O-003 | Aluminum Hull and Structural Repairs - 1/4" Plate | JOB | 1 | ||
| O-004 | Aluminum Hull and Structural Repairs - 3/16" Plate | JOB | 1 | ||
| O-005 | Aluminum Hull and Structural Repairs - 5/16" Plate | JOB | 1 | ||
| O-006 | Hull and Structural Plating Repairs -Crack (Aluminum) | JOB | 1 | ||
| O-007 | Hull and Structural Plating Repairs - Crack (Steel) | JOB | 1 | ||
| O-008 | Hull and Structural Plating Repairs - Eroded Weld (Aluminum) | JOB | 1 | ||
| O-009 | Steel Hull and Structural Plating Repairs (5-Pound) | JOB | 1 | ||
| O-010 | Steel Hull and Structural Plating Repairs ( 7.0 Pound, 7.5-Pound or 7.65-Pound) | JOB | 1 | ||
| O-011 | Steel Hull and Structural Plating Repairs, Corrugated Plate (4.0-Pound) | JOB | 1 | ||
| O-012 | Hull and Structural Plating Repairs (6.0-Pound or 5.63-Pound) | JOB | 1 | ||
| D-013 | Appendages (U/W), Leak Test | JOB | 1 | ||
| O-014 | Appendages (U/W) - Internal, Preserve | JOB | 1 | ||
| D-015 | Tanks (Fuel Service), Clean and Inspect | JOB | 1 | ||
| D-016 | Voids (Non-Accessible), Leak Test | JOB | 1 | ||
| D-017 | Tanks (Fuel Stowage and Overflow), Clean and Inspect | JOB | 1 | ||
| O-018 | Voids (Non-Accessible), Preserve Internal Surfaces | JOB | 1 | ||
| D-019 | Tanks (Potable Water), Clean and Inspect | JOB | 1 | ||
| D-020 | Tanks (Dirty Oil and Waste), Clean and Inspect | JOB | 1 | ||
| D-021 | Propulsion System, Alignment Check | JOB | 1 | ||
| D-022 | Propulsion Shafting, Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-023 | Mechanical Shaft Seal Assemblies, Overhaul | JOB | 1 | ||
| O-024 | Propulsion Shaft Bearings (External), Renew | JOB | 1 | ||
| O-025 | Propulsion Shaft Stern Tube Bearings, Renew | JOB | 1 | ||
| D-026 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-027 | Exhaust System, MDE, Inspect | JOB | 1 | ||
| D-028 | SW Heat Exchangers, Clean, Inspect and Hydro | JOB | 1 | ||
| D-029 | Fathometer Transducer, Renew | JOB | 1 | ||
| D-030 | Speed Doppler, Renew, Doppler Valve, Overhaul | JOB | 1 | ||
| O-031 | Sea Strainers (All Sizes), Renew | JOB | 1 | ||
| O-032 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | 1 | ||
| D-033 | Steering Gear (General), Overhaul | JOB | 1 | ||
| D-034 | Rudder Assembly, Remove, Inspect and Reinstall | JOB | 1 | ||
| D-035 | Fin Stabilizers (General), Overhaul | JOB | 1 | ||
| D-036 | Tanks,(Grey Water) Clean and Inspect | JOB | 1 | ||
| D-037 | Tanks, (Sewage Holding) Clean and Inspect | JOB | 1 | ||
| D-038 | Grey Water Piping, Clean and Flush | JOB | 1 | ||
| D-039 | Sewage Piping, Clean and Flush | JOB | 1 | ||
| D-040 | Forward Peak Compartment, Preserve | JOB | 1 | ||
| D-041 | CPO Stateroom, Preserve | JOB | 1 | ||
| D-042 | Aft Steering Compartment, Preserve and Insulate | JOB | 1 | ||
| D-043 | Forward Void, Preserve | JOB | 1 | ||
| O-044 | Tanks (Sewage Holding), Preserve 100% | JOB | 1 | ||
| O-045 | Tanks (Grey Water), Preserve 100% | JOB | 1 | ||
| O-046 | Tanks (Dirty Oil), Preserve 100% | JOB | 1 | ||
| O-047 | Tanks (Potable Water), Preserve 100% | JOB | 1 | ||
| D-048 | Bilge Surfaces, Preserve | JOB | 1 | ||
| D-049 | Battery Space, Preserve and Insulate | JOB | 1 | ||
| O-050 | U/W Body, Preserve 100% | JOB | 1 | ||
| O-051 | U/W Body, Preserve “Partial - Condition A” | JOB | 1 | ||
| O-052 | U/W Body, Preserve “Partial - Condition B” | JOB | 1 | ||
| O-053 | U/W Body, Preserve “Partial - Condition C” | JOB | 1 | ||
| O-054 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | ||
| O-055 | Hull Plating Freeboard, Preserve 100% | JOB | 1 | ||
| O-056 | Hull Plating, Freeboard, Preserve (Partial) | JOB | 1 | ||
| O-057 | Superstructure, Preserve 100% | JOB | 1 | ||
| O-058 | Superstructure, Preserve, Partial | JOB | 1 | ||
| D-059 | Cathodic Protection System, Inspect and Maintain | JOB | 1 | ||
| D-060 | CAPAC Anode Assembly Renew | JOB | 1 | ||
| D-061 | Drydocking | JOB | 1 | ||
| D-062 | Temporary Services, Provide | JOB | 1 | ||
| D-063 | Data Service, Provide | JOB | 1 | ||
| D-064 | Deck Covering (Wet/Dry), Seal | JOB | 1 | ||
| D-065 | Hull Plating (Freeboard), Ultrasonic Testing | JOB | 1 | ||
| D-066 | Pilothouse Deck (Aluminum), Inspect | JOB | 1 | ||
| O-067 | Rudders, Preserve 100% | JOB | 1 | ||
| D-068 | Electro-Hydraulic Crane, Renew | JOB | 1 | ||
| O-069 | Tank (Oily Water), Preserve 100% | JOB | 1 | ||
| D-070 | Watertight Doors and Scuttles (Internal, DC Deck and Below), Renew | JOB | 1 | ||
| O-071 | Sea Valves and Waster Pieces , Overhaul or Renew | JOB | 1 | ||
| D-072 | Deck Covering (Carpeting), Renew | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 500 | ||
| D-00B | GFP Report | NSP | NSF | ||
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Proposal Total to include all Definite and Option Items |
&C(&D)
Page &P of &N
File details come from the government source that posted it. Updated .