SCHEDULE OF SUPPLIES SERVICES FOR COMORANT_DD_FY12_Blank.xls
XLS spreadsheet 35 KB Posted
- Attached to
- DRY-DOCK FOR CGC CORMORANT
- Solicitation number
- HSCG80-12-Q-P45006
About this file
SCHEDULE OF SUPPLIES / SERVICES
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOLICITATION FOR CORMORANT.doc | DOC document | |
| SPECIFICATION FOR CGC CORMORANT_DD_FY12 R0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| USCGC CORMORANT (WPB-87313) DRYDOCK AVAILABILITY 2012 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Perform Ultrasonic Thickness Measurements | JOB | 1 | $0 | |
| O-002 | Perform Ultrasonic Thickness Measurements | 25 SHOTS | 10 | $0 | |
| D-003 | Modify and Preserve the Forepeak (EC 087-A-033) | JOB | 1 | $0 | |
| D-004 | Dirty Oil Tank, Clean and Inspect | JOB | 1 | $0 | |
| D-005 | Oily Water Tank, Clean and Inspect | JOB | 1 | $0 | |
| D-006 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | $0 | |
| D-007 | Decks-Exterior (Main Deck), Preserve | JOB | 1 | $0 | |
| D-008 | Pilothouse Deck (Aluminum), Inspect, Preserve and Renew Electrical Matting | JOB | 1 | $0 | |
| O-009 | Depth Sounder, Capastic Fairing, Renew | JOB | 1 | $0 | |
| O-010 | Main Engine/Reduction Gear, Realign | EA | 2 | $0 | |
| D-011 | Propulsion Shafts, Remove, Inspect and Reinstall | JOB | 1 | $0 | |
| O-012 | Propulsion Shaft, Repair | EA | 2 | $0 | |
| O-013 | Propulsion Shaft, Straighten | EA | 2 | $0 | |
| O-014 | Intermediate Water-Lubricated Shaft Bearing, Renew | EA | 2 | $0 | |
| O-015 | Aft Water-Lubricated Shaft Bearing, Renew | EA | 2 | $0 | |
| O-016 | Intermediate Bearing Carrier, Renew | EA | 2 | $0 | |
| O-017 | Aft Bearing Carrier, Renew | EA | 2 | $0 | |
| O-018 | Stern Tubes, Interior Surfaces, Preserve 100% | JOB | 1 | $0 | |
| O-019 | Stern Tubes, Interior Surfaces, Repair | JOB | 1 | $0 | |
| D-020 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | $0 | |
| O-021 | Propeller, Minor Repair and Recondition, Perform | EA | 2 | $0 | |
| D-022 | Fathometer Transducer, Renew | JOB | 1 | $0 | |
| O-023 | Speed Log, Transducer and Skin Valve, Clean and Inspect | JOB | 1 | $0 | |
| D-024 | Sea Water System (Valves, Strainers, Piping), Clean, Inspect and Repair | JOB | 1 | $0 | |
| D-025 | Rudder Assemblies, Remove, Inspect, and Reinstall | JOB | 1 | $0 | |
| D-026 | Mooring Bits, Renew (EC 087-B-037) | JOB | 1 | $0 | |
| D-027 | RHIB Notch Skid Pads, Inspect | JOB | 1 | $0 | |
| O-028 | RHIB Notch Skid Pad Studs, Renew | 10 STUDS | 5 | $0 | |
| D-029 | Stern Launch Door, Remove, Inspect and Reinstall | JOB | 1 | $0 | |
| D-030 | Grey Water Holding Tank, Clean and Inspect | JOB | 1 | $0 | |
| D-031 | Sewage Holding Tank, Clean and Inspect | JOB | 1 | $0 | |
| D-032 | Grey Water Piping, Clean and Flush | JOB | 1 | $0 | |
| D-033 | Sewage Piping, Clean and Flush | JOB | 1 | $0 | |
| O-034 | U/W Body, Preserve (Partial-33%) | JOB | 1 | NSP | |
| O-035 | U/W Body, Preserve (100%) | JOB | 1 | $0 | |
| D-036 | Cathodic Protection / Zincs, Renew | JOB | 1 | $0 | |
| D-037 | Drydocking | JOB | 1 | $0 | |
| D-038 | Temporary Services, Provide | JOB | 1 | $0 | |
| D-039 | Telephone Service, Provide | JOB | 1 | $0 | |
| D-040 | Install Dirty Oil Tank Level Indicator (EC 087-B-039) | JOB | 1 | $0 | |
| D-041 | Placeholder for Main Deck Lighting & Flood Light Stand-off, Renew | JOB | 1 | $0 | |
| A-O | Composite Labor Rate | Hour | 290 | $0 | |
| B-D | GFP Report | NSP | EA | 1 | NSP |
| Z-O | Laydays | Day | 5 | $0 | |
| Total Price of Definite Items | $0 | ||||
| Total Price of Option Items | $0 | ||||
| Total Price of Definite and Optional Items | $0 |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .