RFQ4 Circuit Breakers P45KT6.doc

DOC document 478 KB Posted

Attached to
SWITCHBOARD CURCUIT BREAKERS
Solicitation number
HSCG80-11-Q-P45KT6
Issued by

About this file

Revised RFQ Schedule of Supplies/Services

View the file

Other files

File Type Posted
Amendment 00006.doc DOC document
210 —
Amendment 00005.doc DOC document
Amendment 00004.doc DOC document
RFQ3 Circuit Breakers P45KT6.doc DOC document
210 —
Amendment 00003.doc DOC document
Blank Schedule Circuit Breakers-Revised.doc DOC document
210 —
Amendment 00002.doc DOC document
SF30.pdf PDF
RFQ1 Circuit Breakers P45KT6.doc DOC document
Blank Schedule Circuit Breakers.doc DOC document
210 —
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG80-11-Q-P45KT6 PAGE 7 OF 55

USCGC 210 FOOT MEDUIM ENDURANCE CUTTERS

EMERGENCY SWITCHBOARD CIRCUIT BREAKER, UPGRADE

NOTICE FOR FILING AGENCY PROTESTS

It is the policy of the Coast Guard to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accounting Office (GAO).

Interested parties are encouraged to seek resolution of their concerns within the Coast Guard as an Alternative Dispute Resolution (ADR) forum, rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the contracting officer or Ombudsman.

Informal forum with the Ombudsman. Interested parties who believe that a Coast Guard procurement is unfair or otherwise defective should first direct their concerns to the cognizant contracting officer. If the contracting officer is unable to satisfy the concerns, the interested party is encouraged to contact the Coast Guard Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, contracting officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the contracting officer through open and frank discussions. If the protester’s concerns are unresolved, an independent review is available by the Ombudsman. The protester may file a formal agency protest to either the contracting officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth at FAR 33.103(d)(2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. This will not preclude re-filing of the protest to meet the requirement. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be forwarded to the address below:

Commandant (CG-9131) U.S. Coast Guard Headquarters Procurement Planning & Oversight Division 1900 Half St. SW, JR11-0203 Washington, DC 20593 Telephone: (202) 372-3692

Fax: (202) 475-3904

Commander

U.S. Coast Guard

Surface Forces Logistics Center

CPD-C&P1-MECPL

300 East Main Street, Suite 550 Norfolk, VA 23510

REQUEST FOR QUOTATION

HSCG80-11-Q-P45KT6

USCGC 210 MEDIUM ENDURANCE CUTTERS (WMEC A & B CLASS) EMERGENCY SWITCHBOARD CIRCUIT BREAKER UPGRADE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

21-11-801P45KT6

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION NUMBER

HSCG80-Q-P45KT6

6. SOLICITATION

ISSUE DATE

July 27, 2011

7. FOR SOLICITATION INFORMATION CALL:
a. NAME

Maria “Helen” Chapa-Johnson

b. TELEPHONE NUMBER (no collect calls)

(757) 628-4597

8. OFFER DUE DATE/ LOCAL TIME

August 31, 2011 2PM E.S.T.

9. ISSUED BY CODE 75174

USCG Surface Forces Logistics Center

Attn: Maria “Helen” Chapa-Johnson 300 E Main Street, Suite 550

Norfolk, VA 23510

E-mail: maria.e.chapa-johnson@uscg.mil

10. THIS ACQUISITION IS FORMCHECKBOX

UNRESTRICTED OR

FORMCHECKBOX

SET ASIDE: 100 % FOR:

FORMCHECKBOX

SMALL BUSINESS

FORMCHECKBOX

WOMEN-OWNED SMALL

BUSINESS (WOSB)

HUBZONE SMALL

NAICS:

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SIZE STANDARD:

SMALL BUSINESS

8(A)

11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED

FORMCHECKBOX

SEE SCHEDULE

12. DISCOUNT

TERMS

FORMCHECKBOX

13a. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700) 13b. RATING DO-A3

14. METHOD OF SOLICITATION

RFQ FORMCHECKBOX

IFB FORMCHECKBOX

RFP

15. DELIVER TO CODE

See Description of Supplies/Services

16. ADMINISTERED BY CODE

Same as block 9

17a. CONTRACTOR/ CAGE CODE FACILITY

OFFEROR CODE

DUNS No.

TELEPHONE NO:

FAX NO:

18a. PAYMENT WILL BE MADE BY CODE USCG Finance Center

1430A Kristina Way

Chesapeake, VA 23326

FORMCHECKBOX

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED FORMCHECKBOX

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

USCGC 210 FOOT MEDIUM ENDURANCE CUTTERS, EMERGENCY SWITCHBOARD CIRCUIT BREAKER, UPGRADES.

In accordance with this solicitation and attached specification

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (FOR GOVT USE ONLY)

FORMCHECKBOX

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 & 52.212-5 ARE ATTACHED. ADDENDA FORMCHECKBOX

ARE FORMCHECKBOX

ARE NOT ATTACHED.

FORMCHECKBOX

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, FAR 52.212-5 IS ATTACHED. ADDENDA FORMCHECKBOX

ARE FORMCHECKBOX

ARE NOT ATTACHED.

FORMCHECKBOX

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

FORMCHECKBOX

29. AWARD OF CONTRACT: REFERENCE

OFFER DATED . YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

31a. UNITED STATES OF AMERICA (SINGATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER

31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

STANDARD FORM 1449 (Rev. 3/2011)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA – FAR (48 CFR) 53.212

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

SEE PAGES 4 THRU 55

32a. QUANTITY IN COLUMN 21 HAS BEEN

FORMCHECKBOX

RECEIVED

FORMCHECKBOX

INSPECTED

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER

34. VOUCHER NUMBER

35. AMOUNT VERIFIED CORRECT FOR

36. PAYMENT

FORMCHECKBOX

COMPLETE

FORMCHECKBOX

PARTIAL

FORMCHECKBOX

FINAL

37. CHECK NUMBER

FORMCHECKBOX

PARTIAL FORMCHECKBOX

FINAL

38. S/R ACCOUNT NUMBER

39. S/R VOUCHER NUMBER

40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

42 a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MM/DD)

42d. TOTAL CONTAINERS

AUTHORIZED FOR LOCAL REPRODUCTION

STANDARD FORM 1449 (Rev. 3/2011)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA – FAR (48 CFR) 53.212

CONTINUATION OF SF 1449 – BLOCKS 17a - 25

(1) Block 17a: Contractor shall include DUNS number.

(2) Block 17b: REMITTANCE ADDRESS: Payment will be made to the Financial Institution listed in Central Contractor Registration (CCR). To receive award Contractor must be registered in Central Contract Registration (CCR) http://www.ccr.gov.

(3) Block 19 through 24: SEE SCHEDULE OF SUPPLIES/SERVICES BELOW.

(4) Block 25: ACCOUNTING AND APPROPRIATION DATA: To be included on contract award document.

DESCRIPTION OF WORK:(a) The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified, to perform dockside (circuit breaker upgrades) repairs, and alterations to the vessel, in accordance with this solicitation and attached specifications.

(b) Failure to read the specifications in their entirety will not relieve the quoter from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the quoter 's risk.

ALL CONTRACTORS ARE RESPONSIBLE FOR VERIFYING THE RECEIPT OF THEIR QUOTES/PROPOSALS.

REQUIRED DOCUMENTS:

Each quoter shall furnish the information required by the solicitation, which includes:

1. Signed 1449 with offeror’s address, DUNS and other information completed.

2. Price Schedule filled out with a cost associated with each CLIN

3. Past Performance Documentation

4. Small Business Self Certification for applicable set-asides (i.e. XXXXX)

5. Proof of Insurance (Statement of Coverage from current Insurance carrier)

Mailed and e-mailed quotes will be accepted. Faxed quotes will not be accepted. E-mailed quotes may be sent to (Contract Specialist) at maria.e.chapa-johnson@uscg.mil.

PLEASE NOTE: QUOTES THAT DO NOT INCLUDE ALL REQUIRED DOCUMENTS MAY BE CONSIDERED INCOMPLETE AND MAY NOT BE CONSIDERED

NO GEOGRAPHIC RESTRICTION.

ALL WORK WILL BE PERFORMED AT:

USCGC Confidence Patrick AFB, Florida USCGC Alert Warrenton, Oregon USCGC Dauntless Galveston, TX USCGC Decisive Pascagoula, MS USCGC Dependable Cape May, NJ USCGC Reliance Kittery, Maine USCGC Venturous Saint Petersburg, Florida USCGC Active Port Angeles, WA USCGC Diligence Wilmington, NC USCGC Resolute Saint Petersburg, Florida USCGC Steadfast Warrenton, Oregon USCGC Valiant Miami Beach, Florida USCGC Vigilant Patrick AFB, Florida USCGC Vigorous Cape May, NJ ANTICIPATED AWARD DATE: The contract is expected to be awarded on or about September 15, 2011. Work covered by this solicitation shall be completed within 5 calendar days per vessel, from the date the vessel becomes available to the Contractor. The performance period is from September 15, 2011 to August 14, 2012 for the Base Year. The first availability is scheduled to start on or about October 24, 2011. An arrival conference normally will be held within 48 hours of the scheduled start date.

QUESTIONS AND REQUEST FOR DRAWINGS: The deadline to request drawings or ask questions regarding this solicitation is August 17, 2011. After this date no further requests will be accepted.

Contract Type: This solicitation will result in the award of a Firm Fixed Price Requirements Contract. Under that contract, the Coast Guard will issue Delivery Orders to the contractor. Orders may be issued by mail, e-mail, facsimile, and orally (followed up in writing).

Performance Period: The performance period for this requirement includes one base year and four option years. The base period of this contract will begin on September 15, 2011 for twelve months. The first year option period, if exercised by the Government, is a 12-month period that will occur consecutively following the base year. The second year option period, if exercised by the Government, is a 12-month period that will occur consecutively following the first option year. The third year option period, if exercised by the Government, is a 12-month period that will occur consecutively following the second option year. The fourth year option period, if exercised by the Government, is a 12-month period that will occur consecutively following the third option year.

SCHEDULE OF SUPPLIES/SERVICES: SCHEDULE OF SUPPLIES/SERVICES: See Schedule of Supplies and Services. Insert unit prices in all CLINs listed in the Schedule unless “NSP” or “TBD” is printed in the Unit Price column for any CLIN. “NSP” in the section means “Not Separately Priced.” “TBD” in the section mean “To be Determined”.

TRAVEL AND PER DIEM: As stated, place of performance for work items covered by this solicitation will be done at the vessel’s homeport. In order to accomplish these work items, travel and per diem will be determined per delivery order for all personnel required to accomplish work items covered by this solicitation. The proposed travel and per diem for each delivery order shall represent total compensation for employees’ transportation, lodgings, meals, and incidentals and shall not exceed on a daily basis the maximum rates as set forth in the Federal Travel Regulations, the Joint Travel Regulation, and in the case of Foreign travel, the Standardized Regulations.

(i) Federal Travel Regulations, prescribed by the General Services Administration, for travel in the conterminous 48 United States, is available on a subscription basis from the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402.

(ii) (ii) Joint Travel Regulation, Volume 2, DoD Civilian Personnel, Appendix A, prescribed by the Department of Defense, for travel in Alaska, Hawaii, The Commonwealth of Puerto Rico, and territories and possessions of the United States, is available on a subscription basis from the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402.

(iii) (iii) Standardized Regulations (Government Civilians, Foreign Areas), Section 925, "Maximum Travel Per Diem Allowances for Foreign Areas," prescribed by the Department of State, for travel in areas not covered in by (i) and (ii) of this paragraph, is available on a subscription basis from the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402.

SCHEDULE OF SUPPLIES/SERVICES

BASE YEAR: September 15, 2011 – August 14, 2012

ITEM

DESCRIPTION

BASE YEAR UNIT PRICE

UNIT

EST QTY

BASE YEAR EXTENDED PRICE

CLIN 00001
EMERGENCY SWITCHBOARD CIRCUIT BREAKER, UPGRADE (See Spec, Work Item 1)
$
JOB
CLIN 00002
TRAVEL TO CUTTER’S HOMEPIER & INITIAL SITE VISITS (See cutter’s home pier list, 3.5 and 3.5.1)
NSP
NSP
9
$20,200.00
CLIN 00003
SPARE CIRCUIT BREAKER –not inclusive of Warranty (See 3.2.2.1)
$
EA
2

CLIN 00004

WARRANTY EDG C/B (See 3.2.2.1)
$
EA
7
$
CLIN 00005
SPARE PARTS FOR CIRCUIT BREAKERS (See 3.2.2.1) *
TBD
TBD
TBD
$5,000.00
CLIN 00006
COMPOSITE LABOR RATE
$
HR
97
$

Total Price

//////////////
////////////////
//////
$

* As part of your proposal, please provide your list of spare parts for the Circuit Breakers, including price and delivery times. The spare parts list shall be evaluated and upon award, included as part of this schedule.

SCHEDULE OF SUPPLIES/SERVICES

OPTION YEAR 1: September 15, 2012 – August 14, 2013

ITEM

DESCRIPTION

OPTION YEAR 1 UNIT PRICE

UNIT

EST QTY

OPTION YEAR 1 EXTENDED PRICE

CLIN 10001

EMERGENCY SWITCHBOARD CIRCUIT BREAKER, UPGRADE (See Spec, Work Item 1)

JOB

CLIN 10002

TRAVEL TO CUTTER’S HOMEPIER ( See cutter’s home pier listing, 3.5 and 3.5.1)

NSP

NSP

$18,200.00

CLIN 10003

SPARE CIRCUIT BREAKER-Not inclusive of Warranty (See 3.2.2.1)

EA

CLIN 10004

WARRANTY EDG C/B (See 3.2.2.1)

EA

CLIN 10005

SPARE PARTS FOR CIRCUIT BREAKERS (See 3.2.2.1)*

TBD

TBD

TBD

$5,000.00

CLIN 10006

COMPOSITE LABOR RATE

HR

Total Price

* As part of your proposal, please provide your list of spare parts for the Circuit Breakers, including price and delivery times. The spare parts list shall be evaluated and upon award, included as part of this schedule.

SCHEDULE OF SUPPLIES/SERVICES

OPTION YEAR 2: September 15, 2013 – August 14, 2014

ITEM

DESCRIPTION

OPTION YEAR 2 UNIT PRICE

UNIT

EST QTY

OPTION YEAR 2 EXTENDED PRICE

CLIN 20005

SPARE PARTS FOR CURCUIT BREAKER (See 3.2.2.1)*

TBD

TBD

TBD

$10,000.00

CLIN 20006

COMPOSITE LABOR RATE

HR

Total Price

* As part of your proposal, please provide your list of spare parts for the Circuit Breakers, including price and delivery times. The spare parts list shall be evaluated and upon award, included as part of this schedule.

SCHEDULE OF SUPPLIES/SERVICES

OPTION YEAR 3: September 15, 2014 – August 14, 2015

ITEM

DESCRIPTION

OPTION YEAR 3 UNIT PRICE

UNIT

EST QTY

OPTION YEAR 3 EXTENDED PRICE

CLIN 30005

SPARE PARTS FOR CURCUIT BREAKER (See 3.2.2.1)*

TBD

TBD

TBD

$7,500.00

CLIN 30006

COMPOSITE LABOR RATE

HR

* As part of your proposal, please provide your list of spare parts for the Circuit Breakers, including price and delivery times. The spare parts list shall be evaluated and upon award, included as part of this schedule.

SCHEDULE OF SUPPLIES/SERVICES

OPTION YEAR 4: September 15, 2015 – August 14, 2016

ITEM

DESCRIPTION

OPTION YEAR 4 UNIT PRICE

UNIT

EST QTY

OPTION YEAR 4 EXTENDED PRICE

CLIN 40005

SPARE PARTS FOR CURCUIT BREAKER (See 3.2.2.1)*

TBD

TBD

TBD

$7,500.00

CLIN 40006

COMPOSITE LABOR RATE

HR

Total Price of Base Year and all Option Years

* As part of your proposal, please provide your list of spare parts for the Circuit Breakers, including price and delivery times. The spare parts list shall be evaluated and upon award, included as part of this schedule.

CONTRACT CLAUSES

(1) FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (Jun 2010)

ADDENDUM

FAR 52.204-1 APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of the Branch Chief, CPD, C&P1 and shall not be binding until so approved.

FAR.52.209-7 Information Regarding Responsibility Matters (APR 2010)

a) Definitions. As used in this provision—

“Administrative proceeding” means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceeding at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.

“Federal contracts and grants with total value greater than $10,000,000” means—

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

(b) The offeror [_] has [_] does not have current active Federal contracts and grants with total value greater than $10,000,000.

(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:

(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.

(iii) In an administrative proceeding, a finding of fault and liability that results in—

(A) The payment of a monetary fine or penalty of $5,000 or more; or

(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.

(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.

(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.

(d) The offeror shall enter the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the Central Contractor Registration database at http://www.ccr.gov (see 52.204-7).

“Principal” means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).

(End of provision)

52.209-9 – Updates of Publicly Available Information Regarding Responsibility Matters (Jan 2011)

(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the Central Contractor Registration database at http://www.ccr.gov .

(b)

(1) The Contractor will receive notification when the Government posts new information to the Contractor’s record.

(2) The Contractor will have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.

(3)

(i) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.

(ii) As required by section 3010 of Public Law 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.

(End of clause) 52.216-18 – Ordering (Oct 1995)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from September 15, 2011.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.

(End of Clause)

52.216-19 -- Order Limitations (Oct 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 1 CLIN, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor --

(1) Any order for a single item in excess of (10) CLINS.

(2) Any order for a combination of items in excess of (10) CLINS or

(3) A series of orders from the same ordering office within _30_days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 30 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of Clause) 52.216-21 – Requirements (Oct 1995) Alternate I

(a) This is a requirements contract for the supplies or services specified and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as “estimated’’ or “maximum” in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(c) The estimated quantities are not the total requirements of the Government activity specified in the Schedule, but are estimates of requirements in excess of the quantities that the activity may itself furnish within its own capabilities. Except as this contract otherwise provides, the Government shall order from the Contractor all of that activity’s requirements for supplies and services specified in the Schedule that exceed the quantities that the activity may furnish within its own capabilities.

(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.

(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.

(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 30 September 2015.

(End of Clause) 52.217-9 -- Option to Extend the Term of the Contract (Mar 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.

(End of Clause)

52.246-2 -- Inspection of Supplies -- Fixed-Price (Aug. 1996)

(a) Definition. “Supplies,” as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.

(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.

(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor’s or subcontractor’s premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.

(e)

(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.

(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.

(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.

(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.

(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either

(1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or

(2) terminate the contract for default.

Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.

(i)

(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time --

(i) When Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract; and

(ii) When the supplies will be ready for Government inspection.

(2) The Government’s request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor’s plant, nor more than 7 workdays in other instances.

(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.

(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.

(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor

(1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor’s plant at the Contracting Officer’s election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or

(2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor’s plant and return to the original point when that point is not the Contractor’s plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.

(End of Clause) 52.246-4 -- Inspection of Services -- Fixed-Price. (Aug. 1996)

(a) Definition: “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may --

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may --

(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

(2) Terminate the contract for default.

(End of Clause)

52.247-34 F.o.b. Destination (Nov 1991)

(a) The term “f.o.b. destination,” as used in this clause, means --

(1) Free of expense to the Government, on board the carrier’s conveyance, at a specified delivery point where the consignee’s facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and

(2) Supplies shall be delivered to the destination consignee’s wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or “constructive placement” as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including “piggyback”) is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for “heavy or bulky freight.” When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.

(b) The Contractor shall --

(1)

(i) Pack and mark the shipment to comply with contract specifications; or

(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;

(2) Prepare and distribute commercial bills of lading;

(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;

(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;

(5) Furnish a delivery schedule and designate the mode of delivering carrier; and

(6) Pay and bear all charges to the specified point of delivery.

(End of Clause)

52.211-8 Time of Delivery (Jun 1997)

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

CLIN
QUANTITY
WITHIN DAYS AFTER DATE OF CONTRACT
00001 & 10001
As shown on schedule of Supplies/Services
5 days
00003 & 10003
As shown on schedule of Supplies/Services
IAW Contractor provided delivery time
00005, 10005, 20005, 30005 & 40005
As shown on schedule of Supplies/Services
IAW Contractor provided parts list and delivery time

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR’S PROPOSED DELIVERY SCHEDULE

ITEM NO.
QUANTITY
WITHIN DAYS AFTER DATE OF CONTRACT

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor’s date of receipt of the contract or notice of award by adding

(1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term “working day” excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of Clause)

52.211-17 Delivery of Excess Quantities (Sep 1989) The Contractor is responsible for the delivery of each item quantity within allowable variations, if any. If the Contractor delivers and the Government receives quantities of any item in excess of the quantity called for (after considering any allowable variation in quantity), such excess quantities will be treated as being delivered for the convenience of the Contractor. The Government may retain such excess quantities up to $250 in value without compensating the Contractor therefore, and the Contractor waives all right, title, or interests therein. Quantities in excess of $250 will, at the option of the Government, either be returned at the Contractor’s expense or retained and paid for by the Government at the contract unit price.

(End of Clause)

(2) FAR 52.232-19 Availability of Funds for the Next Fiscal Year.

Availability of Funds for the Next Fiscal Year (Apr 1984)

Funds are not presently available for performance under this contract beyond _September 30th of the current calendar year_. The Government’s obligation for performance of this contract beyond that date is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond September 30th of the current calendar year_, until funds are made available to the Contracting Officer for performance and until the Contractor receives notice of availability, to be confirmed in writing by the Contracting Officer.

(End of clause)

(3) FAR 52.217-7 OPTION FOR INCREASED QUANTITY – SEPARATELY PRICED LINE ITEM (MAR 1989) - VARIATION The Government may require the performance of the numbered line items, identified in the Schedule as option items, at the unit prices stated in the Schedule. The option quantities shown in the Schedule are estimates only. The Government has the right to require performance of these items at the quantities deemed necessary. Therefore, the Government may exercise an option item on more than one occasion during the contract performance period. The Contracting Officer will provide initial notification of the exercise of an option either verbally, by facsimile, or both. When time is of essence initial notification will be provided verbally followed within 24 hours by a facsimile of confirmation. A contract modification will be executed shortly thereafter to include those options wherein exercise notification was provided. Such options may be exercised at any phase during the contract performance period as stated herein, or any extension of the performance period. To maintain the contract performance period the Contractor shall commence performance of an option item immediately upon receiving initial notification; but, not later than 24 hours thereafter, unless proper sequencing of the work requires a delay in beginning performance of the option. In that case, the option item shall be commenced as soon as proper sequencing permits. The exercise of any option item listed in the Schedule will not normally extend the contract performance period. However, the Contracting Officer may consider a request by the Contractor for contract extension if an option is exercised after 50% of the contract performance period has expired.

(End of Clause)

(4) FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.arnet.gov/far/index.html

FAR 52.211-15
Defense Priority and Allocation Requirements (APR 2008) DO A3 Rating
FAR 52.217-8
Option to Extend Services (NOV 1999) The Contracting Officer may exercise the option by written notice to the Contractor within __7_days__.
FAR 52.223-3
Hazardous Material Identification and Material Safety Data (JAN 1997)

Alternate I (JUL 1995)

FAR 52.223-12
Refrigeration Equipment and Air Conditioners (MAY 1995)
FAR 52.225-25
Prohibition on Engaging in Sanctioned Activities Relating to Iran—Certification (Sep 2010)
FAR 52.228-5
Insurance – Work on a Government Installation (JAN 1997)
FAR 52.232-18
Availability of Funds (APR 1984)
FAR 52.242-2
Production Progress Reports (APR 1991)
FAR 52.245-1
Government Property (AUG 2010)
FAR 52.245-9
Use and Charges (AUG 2010)
HSAR 3052.211-70
Index for Specifications (AUG 2008)
HSAR 3052.217-91
Performance (DEC 2003)
HSAR 3052.217-92
Inspection and Manner of Doing Work (DEC 2003)
HSAR 3052.217-93
Subcontracts (DEC 2003)
HSAR 3052.217-95
Liability and Insurance (DEC 2003)
HSAR 3052.217-96
Title (DEC 2003)
HSAR 3052.217-97
Discharge of liens (DEC 2003)
HSAR 3052.217-98
Delays (DEC 2003)
HSAR 3052.217-99
Department of Labor Safety and Health Regulations for Ship Repair (DEC 2003)
HSAR 3052.217-100
Guarantee (JUN 2006)
HSAR 3052.222-70
Strikes or Picketing Affecting Timely Completion of the Contract Work (DEC 2003)
HSAR 3052.222-71
Strikes or Picketing Affecting Access to a DHS Facility (DEC 2003)
HSAR 3052.223-90
Accident and Fire Reporting (DEC 2003)
HSAR 3052.242-71
Dissemination of Contract Information (DEC 2003)
HSAR 3052.242-72
Contracting Officer’s Technical Representative (DEC 2003)
HSAR 3052.245-70
Government Property Reports (AUG 2008) [Deviation])

(5) HSAR 3052.223-70 REMOVAL OR DISPOSAL OF HAZARDOUS SUBSTANCES – APPLICABLE LICENSES AND PERMITS (JUN 2006)

The Contractor shall have all licenses and permits required by Federal, state, and local laws to perform hazardous substance(s) removal or disposal services. If the Contractor does not currently possess these documents, it shall obtain all requisite licenses and permits within [“insert days”] days after date of award. The Contractor shall provide evidence of said documents to the Contracting Officer or designated Government representative prior to commencement of work under the contract.

(End of clause)

(6) HAZARDOUS WASTE

Contractors performing dockside ship repair work at Government facilities are required to comply with FAR 52.223-3, Hazardous Material Identification and Material Safety Data (JAN 1997) Alt I, the U.S. Coast Guard shipboard hazardous waste policy, as prescribed in COMDINST M16478.1B, and MLCA standard specifications. Disposal of all hazardous wastes shall be performed by the Contractor and the Contractor shall meet all federal and state requirements. The Contractor is also required to submit an acceptable hazardous waste management plan to the Port Engineer at the Arrival Conference. The plan will be reviewed by the facility hazardous waste manager. An acceptable plan must address, at a minimum, the following requirements:

(a) EPA and local authority hazardous waste generator ID numbers or registration of the Contractors, his transporters, and disposal facilities (TSDFs);

(b) An inventory of all hazardous chemicals, compounds and other agents brought aboard the facility accompanied by their respective Material Safety Data Sheets;

(c) A list of all anticipated hazardous wastes to be generated and a federal/state/local regulation cross reference list for those wastes;

(d) Waste collection and containment procedures;

(e) A hazardous material spill and cleanup plan including tools and materials that will be on hand and readily available to facility containment and cleanup;

(f) Training certification for the Contractor's hazardous waste manager.

The Contractor shall note the local environmental regulations in Boston, and for Boston Harbor, are more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with, the local and state regulations.

All waste generated under the performance of this contract shall be disposed under ISC Boston's EPA hazardous waste generator ID number. The Contractor shall notify the Contracting Officer's Technical Representative (COTR) 24 hours prior to any waste removals, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays). All hazardous waste manifests shall be reviewed and signed by ISC Boston hazardous waste personnel. The point of contact for environmental issues is the Environmental Protection Specialist at ISC Boston (617)223-3387.

(7) VOLATILE ORGANIC COMPOUNDS (VOC) REGULATIONS

(a) Contractors are required to comply with federal, state and local VOC compliance laws and regulations. Among other requirements, certain Contractors may also be required to operate pursuant to a Title V permit.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .