USCGC 210 FOOT MEDIUM ENDURANCE CUTTERS
(WMEC A&B CLASS)
SPECIFICATIONS FOR DOCKSIDE REPAIRS
Developed By Louis Mikedis
(Revision-3, 3 August 2011)
USCGC 210 FOOT MEDIUM ENDURANCE CUTTERS (WMEC-A&B CLASS) DOCKSIDE
AVAILABILITY 2011
TABLE OF CONTENTS
Work Item Title Page
Revisions Record ii
Consolidate List of References iii
Consolidated List of Government-furnished Property v
Consolidated List of Critical Inspection Items vi
Principal Characteristics Principal Characteristics vii
General Requirements 1
Work Item 1: Emergency Switchboard Circuit Breakers, Upgrade 7 i (Revision-3)
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
6 June 2011 1 1 3.2.4.1 Added additional requirements to warranty.
3.5.1 Added Travel to cutter’s home pier.
23 June 2011 2 1 3.2.4.2 Added sentence to provide lead time required to purchase any spare parts. Added Note: CG may decide to purchase spare parts for an undetermined number of vessels.
3 Aug 2011 3 1 Sect 2 Added additional Drawings – 618 WMEC 320-001, 618 WMEC BM 50, 618 WMEC BM 107, 627 WMEC BM 48
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
ii (Revision-3)
Consolidate List of References
The below-listed documents form a part of this specification to the extent specified herein.
Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors, by the Coast Guard at an appropriate time, or upon request, free of charge.
• Other Government documents may be accessed – free of charge – as follows:
• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
• American Welding Society (AWS) http://www.awspubs.com/index.php
• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
• NFPA: http://www.nfpa.org
• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 618 WMEC 311-001, Rev N, Emergency Diesel Generator Arrangement, Details, Schematic & Block Wiring Diagram
Coast Guard Drawing 618 WMEC 311-008, Rev C, CAT 3306B, EDG Installation/Replace, Electrical Wiring Diagram Mods
Coast Guard Drawing 618 WMEC 320-001, Rev AM, Major Maintenance Availability 440 & 115 Power One Line Wiring Diagram and Details
Coast Guard Drawing 618 WMEC BM 50, Bill of Materials
Coast Guard Drawing 618 WMEC BM 107, Bill of Materials
Coast Guard Drawing 627 WMEC 311-001, Rev J, Ship’s Service & Emergency Generator, Arrangements & Details, Block & Schematic Wiring Diagram
Coast Guard Drawing 627 WMEC 311-004, Rev A, Emergency Diesel Generator, Electrical Installation iii (Revision-3) http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace
Coast Guard Drawing 627 WMEC 311-005, Rev A, Emergency Diesel Generator, Electrical Wiring Diagram
Coast Guard Drawing 627 WMEC BM 48, Bill of Materials
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3233A, Aug 2009, Manufacturer’s Instruction Book, SWBS Group(s) 324, Section F, Switchboard, Emergency Generator
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 33 CFR, Jul 2007, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, Jul 2007, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, Jul 2007, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation iv (Revision-3)
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
1 NONE
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center v (Revision-3)
Consolidated List of Critical Inspection Items
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
This section is not applicable to this package.
vi (Revision-3)
Principal Characteristics Principal Characteristics
210' WMEC
PHYSICAL CHARACTERISTICS
Length Overall 210' 6"
Length, Design Waterline 200' 0"
Depth (main deck at side to baseline) 19' 6"
Maximum Beam 34' 0"
Height of Highest Projection 88' 0"
Full Load Draft 4,000 lbs
Height of FM Antenna Above Baseline 90' 0"
Light Ship Displacement 875 long tons
Full Load Displacement 1100 long tons
Shore Tie Voltage Requirements 400A / 440V
Frame Spacing 1' 0"
MACHINERY CHARACTERISTICS
Main Propulsion 2 Alco Model 251B Diesel Engines, 5,000 BHP total
Ship's Service Generators 2 Caterpillar Model 3406B Diesel-driven SR4.
250 KW each @ 0.8 power factor, 440V AV, 3 phase, 60 cycle
Emergency Generator Caterpillar Model D333B Diesel-Driven.
Century Synchronous Model, ACR-507, 100KW
Number of Propellers 2
Number of Blades 4
Diameter 7' 6"
Pitch Controllable vii (Revision-3) viii (Revision-3)
210' WMEC
Shaft RPM 300
Shaft Diameter 8.25"
TANK CAPACITIES
Diesel Fuel (95%) 48,375 gal
Fresh Water (95%) 11, 108 gal
JP-5 Fuel (95%) 4,697 gal
Lube Oil (95%) 1,942 gal
00000_PWB_0209_FLT
Commercial Project @ Contractor’ Facility 0209
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 33 CFR, Jul 2007, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, Jul 2007, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, Jul 2007, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
1 (Revision-3)
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.4 HW disposal. The Contractor is considered as the generator of all contract-generated hazardous wastes and shall use its facility’s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:
• Contractor’s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262.
• All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.
• The designated wastes shall be disposed of at a state or Federally-approved and permitted HW
TSDF.
• Name of destination TSDF shall be submitted to the KO at the Arrival Conference.
3.5 Sewage facilities for vessel personnel – due to disruption of power. The Contractor shall provide vessel-personnel with two portable toilets. Ensure that the toilets are:
• Located as close as possible to the vessel, at a distance not to exceed 100 yards.
• Cleaned and emptied daily, and restocked with consumables.
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
2 (Revision-3) http://www.uscg.mil/directives/cim.asp
3 (Revision-3)
QA-1 - QUALITY ASSURANCE INSPECTION FORM - PRESERVATION CHECKLIST
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces, 1.0 mil (minimum) for power-tool cleaned surfaces, 1.0-1.5 mils for abrasive-blasted aluminum surfaces, and 1.5 –2.5 for surfaces to be coated w/single coat of inorganic zinc).
Measure soluble salt conductivity (5 measurements per 1000 sqft) – maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the Coating Manufacturer(s).
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for coating defects. Perform holiday inspection with a holiday detector for “critical-coated surfaces”.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness.
Verify system cure for service resumption - U/W Body surfaces: 5-8 hours @ 77 degrees F; Potable water tanks: 7 days @ 77 degrees F.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure (minimum 7 days @ 77 degrees F.), to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Signature of Inspector:_______________________________________________Date:____________
QA-2 - QUALITY ASSURANCE INSPECTION FORM
ENVIRONMENTAL READINGS
(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
DATE TIME
ENTER ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION DEW
POINT
SURFACE
TEMP.
% REL.
HUMIDITY
INSPECTOR’S
INTIALS
Signature of Inspector:__________________________________________Date:____________
1 (Revision-3)
QA-3 - QUALITY ASSURANCE INSPECTION FORM - SURFACE PROFILE LOG
Vessel Name And Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location of Work (Including Frame Numbers):______________________________________
Area (Square Feet):_____________
Surface Preparation Method:_____________________________________________________
Abrasive Manufacturer And Size:_________________________________________________
Degreasing Method Used:_______________________________________________________
Number Of Hours Surfaces (Steel Only) Left Unpainted:_______________________________
Sweep blasting performed to remove flash rusting (steel)? Yes/No:______________________
Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record.
Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
AVERAGE
MILS
(IAW ASTM
D4417, METHOD C)
Place Surface Profile Replica Tape Here
Reading:__________ mils
Date and Time:__________________________________________________
2 (Revision-3)
Location of Surface Profile Measurements:___________________________________________________________
Signature of Inspector:____________________________________________________________________________
3 (Revision-3)
QA-4 - QUALITY ASSURANCE INSPECTION FORM - SURFACE SOLUBLE SALT
CONDUCTIVITY LOG
Vessel Name and Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location of Work (including frame numbers):_______________________________________
Area (square feet):____________
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
Date and Time:_________________________________________
Signature of Inspector:___________________________________
4 (Revision-3)
QA-5 - QUALITY ASSURANCE DATA FORM - DRY FILM THICKNESS (DFT)
MEASUREMENTS IAW SSPC PA-2
(Use one sheet for each sequence)
Vessel Name and Hull Number:__________________________________________________
Work Item Title:______________________________________________________________
Coating Manufacturer:_________________________________________________________
Product Name:________________________________________________________________
Batch Number:________________________________________________________________
Induction Time:_______________________________________________________________
Coating System Sequence (Indicate whether: primer, touch-up primer, barrier coat, 3rd coat…):__________________
DFT
MEASUREMENT
NUMBER
LOCATION OF READINGS MEASURED
DFT
Application Method (Airless, Conventional Spray, Rolled):____________________
5 (Revision-3)
Average DFT: __________________________________________________________
Date and Time: _________________________________________________________
Signature of Inspector: ___________________________________
6 (Revision-3)
EC_32410_LNM_0910_210
Work Item 1: Emergency Switchboard Circuit Breakers, Upgrade
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to upgrade the A & B Class 210 Foot WMEC vessel’s emergency switchboard circuit breakers (Qty 2 ea) per vessel.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 618 WMEC 311-001, Rev N, Emergency Diesel Generator Arrangement, Details, Schematic & Block Wiring Diagram
Coast Guard Drawing 618 WMEC 311-008, Rev C, CAT 3306B, EDG Installation/Replace, Electrical Wiring Diagram Modifications
Coast Guard Drawing 618 WMEC 320-001, Rev AM, Major Maintenance Availability 440 & 115 Power One Line Wiring Diagram and Details
Coast Guard Drawing 618 WMEC BM 50, Bill of Materials
Coast Guard Drawing 618 WMEC BM 107, Bill of Materials
Coast Guard Drawing 627 WMEC 311-001, Rev J, Ship’s Service & Emergency Generator, Arrangements & Details, Block & Schematic Wiring Diagram
Coast Guard Drawing 627 WMEC 311-004, Rev A, Emergency Diesel Generator, Electrical Installation
Coast Guard Drawing 627 WMEC 311-005, Rev A, Emergency Diesel Generator, Electrical Wiring Diagram
Coast Guard Drawing 627 WMEC BM 48, Bill of Materials
7 (Revision-3)
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3233A, Aug 2009, Manufacturer’s Instruction Book, SWBS Group(s) 324, Section F, Switchboard, Emergency Generator
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep. The Contractor shall provide the services of qualified Tech Rep, who is familiar with the Switchboard Equipment and the existing Square-D circuit breakers, to accomplish the following tasks
– on site:
• Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system and to the direct replacement of existing circuit breakers with features equal to existing. Ensure the direct replacement circuit breakers are supportable with respect to the availability of spare parts.
• Assist with proper repair methods, and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.
3.1.2.1 The Contractor shall ensure that the Tech Rep is a certified representative of circuit breaker manufacturer.
3.1.2.2 The Contractor shall submit the name of the Tech Rep to the COTR at the Arrival Conference.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences.
• Hatches.
• Vertical ladders.
• Required rigging.
8 (Revision-3)
3.1.5 Coordination of work. The Contractor shall coordinate work with the COTR and the Engineering Officer with regards to power outages which may be necessary for the Emergency Circuit Breaker upgrade installations. The Contractor shall submit a written notice of at least 48 hours prior to requesting the securing of power on the vessel.
NOTE!
Coast Guard personnel will be responsible for the actual act of securing power i.e. line side de-energizing, lock-out, tag-out, and grounding of any equipment.
3.2 Emergency switchboard circuit breaker upgrade. The Contractor shall perform the following:
3.2.1 Initial on-site visit. Using Coast Guard Technical Publication (TP) 3233A and Coast Guard Drawing 627 WMEC 311-001 as guidance perform initial onsite visit for the purpose of conducting pre-engineering which shall include collecting information on existing switchgear construction, bussing configuration, cell and frame dimensions, equipment accessibility necessary for the modifications required for circuit breaker upgrade. An initial installation shall be performed on an “A” Class cutter, namely the Confidence and later a “B” Class, namely the Resolute. Upon successful prototype for each class cutter, the Contractor will be required to install remaining emergency switchboard circuit breakers (Qty 2 ea) per vessel.
3.2.1.1 The Contractor shall have a firm understanding of the voltage systems, wiring drawings, mountings and operating/switching procedures of the vessel’s electrical distribution system which includes Main Generators, Emergency Generator and Shore-Power. The replacement circuit breakers shall be a direct replacement of the existing circuit breakers in terms of operating and protective features and shall be able to interface with the vessels main switchboard as the original design features. The Contractor shall ensure that the direct replacement circuit breakers will be supportable with respect to the availability of spare parts for the purposes of repairs and or maintenance.
3.2.2 Existing emergency breaker removals. Provide all labor to include all rigging to remove the two existing 800 AF circuit breakers and dispose of in accordance with Federal, State and local regulations.
3.2.3 Emergency circuit breaker replacement. Provide all labor and rigging necessary to furnish, fit and install two emergency circuit breakers with the following minimum salient characteristics:
• Voltage - 600 VAC, 3-phase
• Continuous current – 800 Amp Frame w/variable Amp trip setting to be determined
• Interrupting capacity – 85,000 Amps
• Electrically Operated Shunt Trip/Shunt Close/Charging Motor : 24-30 VDC
• Micro-logic Trip unit: 5.0 Amps
• Long term, Short Term & Instantaneous Settings
• Push Button Interlock
• Spring Charge Interlock
• Alarm Switches
• Auxiliary Switches
3.2.3.1 Furnish, fit and install all necessary components to integrate the new 800 AF circuit breakers to the existing Emergency Switchboard which shall include but not limited to new copper bus, front door panel, bus supports, breaker mounting plate and all necessary hardware to make electrical and mechanical connections.
9 (Revision-3)
3.2.3.2 Install all circuit breaker control wiring necessary to make the breaker perform within the vessel’s existing operating configuration and procedures including (a) bus tie breaker should open upon loss of normal power, and (b) Emergency Diesel Generator (EDG) should start and the EDG breaker should close within a pre-determined period (in seconds).
3.2.4 Written proposal. The Contractor shall provide a written proposal prior to the award of contract for approval by the Coast Guard as follows:
3.2.4.1 Warranty. Written warranty terms and conditions with the vendor quotation. A minimum warranty period of five (5) years from the date of installation for each circuit breaker shall be included for the installation of each ship set.
3.2.4.2 Spare parts list. Provide a list of recommended spare parts based on analysis from similar systems on Navy/Coast Guard ships. The list shall include an estimated lead-time for each spare part listed.
NOTE!
The Coast Guard may decide to purchase spare parts for an undetermined number vessels.
3.2.4.3 Catalogue specification sheet. Provide new equipment specification sheets which can be incorporated into existing Coast Guard Technical Publications.
3.3 Electrical isolation plan. The Coast Guard and the Contractor shall be jointly responsible for securing electrical equipment and providing electrical service to vital loads in accordance with the vessel’s Isolation Plan which will be provided by the Coast Guard. The Contractor shall be responsible for verifying total electrical isolation of the work area prior to commencement of work. If total electrical isolation cannot be obtained, it may be necessary for the Contractor to perform the installation with no power to the vessel. In this instance, the Contractor shall be responsible for providing a portable generator, portable lights, and string lights to ensure at a minimum the work area and main passage way are safely illuminated.
3.4 Emergency circuit breaker upgrade, test. The Contractor shall perform the following to demonstrate that the newly installed circuit breakers operate and integrate as per original ship’s design.
3.4.1 Initial testing. Perform visual inspections, insulation resistance testing of new and existing equipment, check for proper phase rotation when the system is energized.
3.4.2 Operational testing. Demonstrate that the newly installed breakers operate in all modes of operation in accordance with Coast Guard Technical Publication (TP) 3233A. Submit CFR.
NOTE!
Coast Guard personnel will operate all equipment.
10 (Revision-3)
11 (Revision-3)
3.5 Cutter’s home pier listing.
Name Location
Active Port Angeles, WA Alert Warrenton, Oregon Confidence Patrick AFB, Florida Dauntless Galveston, TX Decisive Pascagoula, MS Dependable Cape May, NJ Diligence Wilmington, NC Reliance Kittery, Maine Resolute Saint Petersburg, Florida Steadfast Warrenton, Oregon Valiant Miami Beach, Florida Venturous Saint Petersburg, Florida Vigilant Patrick AFB, Florida Vigorous Cape May, NJ
3.5.1 Travel to cutter’s home pier. The Contractor shall perform an initial on-site visit for both A & B Class cutters for the purpose of conducting pre-engineering as stated previously. Additionally it is estimated that five (5) trips to five (5) cutter home piers shall be required during the first Base Year for a total of seven (7). It is also estimated that the Contractor will be required to travel seven (7) times to seven (7) cutter home piers during the first Option Year.
Travel requirements will be subject to the cutter’s schedules and availabilities, and will not be certain at the time of award.
4. NOTES
4.1 Coast Guard responsibilities. The Coast Guard will provide free access to their facilities as appropriate for the work being performed. The Coast Guard will make all equipment available upon arrival of the Contractor’s personnel to permit unimpeded progress of work.
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 00006.doc | DOC document | |
| RFQ4 Circuit Breakers P45KT6.doc | DOC document | |
| 210 | — | |
| Amendment 00005.doc | DOC document | |
| Amendment 00004.doc | DOC document | |
| RFQ3 Circuit Breakers P45KT6.doc | DOC document | |
| 210 | — | |
| Amendment 00003.doc | DOC document | |
| Blank Schedule Circuit Breakers-Revised.doc | DOC document | |
| Amendment 00002.doc | DOC document | |
| SF30.pdf | ||
| RFQ1 Circuit Breakers P45KT6.doc | DOC document | |
| Blank Schedule Circuit Breakers.doc | DOC document | |
| 210 | — |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .