SF300002KODIAK ISLANDDD.doc
DOC document 41 KB Posted
- Solicitation number
- HSCG80-10-Q-PHMC79
About this file
Amendment 0002 to Slicitation HSCG80-10-Q-PHMC79 Drydock and Repairs to USCGC KODIAK ISLAND (WPB-1341).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ KODIAK ISLAND DD 11-23-09.doc | DOC document | |
| 1341_DD_JLW_10R0.pdf | ||
| 1341_DD_JLW_10ER0_BLANK.12-21-09.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
DO-A3
PAGE
OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
14 JANUARY 10
4. REQUISITION/PURCHASE REQ. NO.
24-10-800PHMC79
5. PROJECT NO.
CGC KODIAK ISLAND DRY DOCK
6. ISSUED BY CODE: CPD-C&P1-PBPL
SURFACE FORCES LOGISTICS CENTER
300 E. MAIN STREET, SUITE 600
NORFOLK, VA 23510-9102
POC: MR. LOUIS ROMANO (757) 628-4651
E-mail: Louis.J.Romano@uscg.mil
7. ADMINISTERED BY CODE:
8. NAME AND ADDRESS OF CONTRACTOR (No, street, county, state and Zip Code)
CODE: FACILITY CODE:
| X |
| 9a. AMENDMENT OF SOLICITATION NO. |
HSCG80-10-Q-PHMC79_____________
9b. DATED (SEE ITEM 11)
23 DECEMBER 09 ________________________
10a. MODIFICATION OF CONTRACT NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of offers XX IS NOT extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning one copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (IF REQUIRED)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to: (Specify authority) The changes set forth in Item 14 are made in the contract order no in item 10A.
B. The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data, etc.) set forth in Item 14 pursuant to the authority of FAR 43.103(b).
C. This supplemental agreement is entered into in pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor ( is not, ( is required to sign this document and return _1____ copies to the issuing office.
14. Description of amendment/modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
HSCG80-10-Q-PHMC79
DRYDOCK REPAIRS, USCGC KODIAK ISLAND (WPB-1341)
Subject solicitation is amended as follows due to questions received and the following information is provided to all offerors:
1A. Work Item # 62, the common rail of the piping system is chiefly constructed of copper-nickel 90/10. The branch of piping from the common rail up to the magazine is constructed of mild steel. The transition point occurs at the threaded connection of the station isolation valve which is marked for renewal under paragraph 3.2.2 of work item #62.
1B. Work Item 63, the hydrostatic test pressure to be used is derived by multiplying the 135% cited in paragraph 20.1.5.1 of Appendix C-3 by the 45-PSI of the design system pressure relief valve in the fuel oil transfer pump, or 60PSIG.
2. The correct drawing required to price Work Item 69 is 110C WPB 581-00 2, Anchor Handling & Hawser Pipe Details. Disregard the drawing listed in the specification and refer to the drawing listed herein when preparing their offer for this work item.
3. The due date for offers remains unchanged at January 21, 2010, at 2:00 PM, EST.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type/Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type/Print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
BY_LR_________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
01/14/10___________
STANDARD FORM 30