1341_DD_JLW_10ER0_BLANK.12-21-09.xls

XLS spreadsheet 51 KB Posted

Attached to
USCGC KODIAK ISLAND (WPB-1341) 10 DRYDOCK REPAIRS
Solicitation number
HSCG80-10-Q-PHMC79
Issued by

About this file

SCHEDULE OF SUPPLIES/SERVICES FOR USCGC KODIAK ISLAND

View the file

Other files

File Type Posted
SF300002KODIAK ISLANDDD.doc DOC document
RFQ KODIAK ISLAND DD 11-23-09.doc DOC document
1341_DD_JLW_10R0.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
USCGC KODIAK ISLAND (WPB-1341) DRYDOCK AVAILABILITY 2010
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
1-DRoutine DrydockingJOB1
2-DProvide Temporary LogisticsJOB1
3-DClean and Inspect Fuel Service TanksJOB1
4-DClean and Inspect Fuel Stowage and Overflow TanksJOB1
5-DClean and Inspect Oil and Oily Waste TanksJOB1
6-DClean and Inspect Sewage Collection and Holding TanksJOB1
7-DClean and Inspect Grey Water Collection and Holding TanksJOB1
8-DPerform Air Test of Interior CompartmentsJOB1
9-DClean Sewage Piping SystemJOB1
10-DClean Grey Water Piping SystemJOB1
11-DClean and Disinfect Potable Water TanksJOB1
12-DPreserve and Disinfect Potable Water Tanks - 100%JOB1
13-DPreserve Sewage Collection and Holding Tanks - 100%JOB1
14-DPreserve Grey Water Collection and Holding Tanks - 100%JOB1
15-DPreserve Oil and Oily Water Tanks – 100%JOB1
16-DInspect MDE Exhaust SystemJOB1
17-DRemove, Inspect, and Reinstall PropellersJOB1
18-ORepair Propeller Root Erosion1 CUIN60
19-DRemove, Inspect, and Reinstall Propeller ShaftsJOB1
20-DOverhaul Mechanical Shaft Seal AssembliesJOB1
21-DRenew Water-Lubricated Propeller Shaft BearingsJOB1
22-DClean and Inspect Heat ExchangersJOB1
23-DOverhaul and Renew Sea ValvesJOB1
24-DOverhaul and Renew Firemain ValvesJOB1
25-DOverhaul and Renew Bilge and Ballast ValvesJOB1
26-DOverhaul Duplex Sea StrainersJOB1
27-DOverhaul Stabilizing FinsJOB1
28-DOverhaul Steering Gear ComponentsJOB1
29-DRemove, Inspect and Reinstall Rudder AssembliesJOB1
30-DInspect and Maintain Cathodic Protection SystemJOB1
31-ORenew CAPAC Anode AssemblyJOB2
32-DRenew Speed Doppler and Overhaul Doppler ValveJOB1
33-ORenew Depth Indicating TransducerJOB1
34-OPreserve Underwater Body – “Partial”JOB1NSP
35-OPreserve Underwater Body – “100%”JOB1
36-OPreserve Stern TubesJOB1
37-OPerform Ultrasonic Thickness Measurements500 Shots10
38-OPerform Aluminum Hull and Structural Repairs - 1/4" Plate4 SQFT50
39-OPerform Aluminum Hull and Structural Repairs - 3/16" Plate4 SQFT25
40-OPerform Aluminum Hull and Structural Repairs - 5/16" Plate4 SQFT25
41-OPerform Hull and Structural Plating Repairs -Crack (Aluminum)1 LF50
42-OPerform Hull and Structural Plating Repairs - Eroded Weld (Aluminum)1 LF50
43-OPerform Hull and Structural Plating Repairs - Overlay Welding (Aluminum)6 SQIN100
44-OPerform Steel Hull and Structural Plating Repairs (5-Pound)4 SQFT50
45-OPerform Steel Hull and Structural Plating Repairs (7.5-Pound or 7.65-Pound)4 SQFT50
46-OPerform Hull and Structural Plating Repairs - Crack (Steel)1 LF50
47-OPerform Hull and Structural Plating Repairs - Eroded Welds (Steel)1 LF50
48-OPerform Hull and Structural Plating Repairs - Overlay Welding (Steel)8 SQIN100
49-DRenew Main Diesel EngineJOB1
50-DRemove, Reinstall and Realign Main Diesel EngineJOB1
51-DRemove, Reinstall and Realign Reduction Gear AssemblyJOB1
52-DPerform Full Propulsion System Alignment CheckJOB1
53-DPerform Full Propulsion System AlignmentJOB2
54-DRenew No. 1 Reduction GearJOB1
55-DRemove and Reinstall Both Ship Service GeneratorsJOB1
56-DRenew Fuel Oil Valve Reach Rod AssembliesJOB1
57-DModify and Renew R/O Water Piping and FoundationJOB1
58-DModify and Renew P-100 Suction Piping and Associated StructureJOB1
59-DModify and Renew OWS PipingJOB1
60-DModify HVAC System and Associated PipingJOB1
61-DRenew Sounding TubeJOB1
62-DRenew Magazine Deck Drain and Associated PipingJOB1
63-DRenew Fuel PipingJOB1
64-DPerform Structural Repairs – Battery CompartmentJOB1
65-DPerform Structural Repairs – Sewage TankJOB1
66-DPerform Structural Repairs – Aft Steering CompartmentJOB1
67-DPerform Structural Repairs – Aft Grey Water TankJOB1
68-DPerform Structural Repairs – Potable Water TankJOB1
69-DPerform Structural Repairs –Modify Deck Grating System in Forepeak and Renew Deck Drain Cup AssemblyJOB1
70-DPerform Structural Repairs –Bridge Windows, Main Deck BHDs and DeckJOB1
71-DPerform Structural Repairs –Engine Room Aft HatchJOB1
72-DRenew Transom LadderJOB1
73-DPreserve And Repair Surfaces In Engine RoomJOB1
74-DPreserve and Insulate Aft Steering CompartmentJOB1
75-DPreserve Freeboard - 100%JOB1
76-DPreserve SuperstructureJOB1
77-DPreserve Forward VoidJOB1
78-DPreserve Battery Space BilgesJOB1
79-DPreserve Forward Auxiliary Machinery SpaceJOB1
80-DPreserve Port & Starboard Strut Cofferdams – 100%JOB1
81-DRenew Floating Deck System in Galley and Mess DeckJOB1
82-DPerform Structural Repairs – Port CofferdamJOB1
A-OComposite Labor RateHour1110
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

&C(&D)

Page &P of &N

File details come from the government source that posted it. Updated .