SCHEDULE OF SUPPLIES/SERVICES FOR USCGC KODIAK ISLAND
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF300002KODIAK ISLANDDD.doc | DOC document | |
| RFQ KODIAK ISLAND DD 11-23-09.doc | DOC document | |
| 1341_DD_JLW_10R0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| SUPPLIES/SERVICES AND PRICES/COSTS FOR: | |||||
| USCGC KODIAK ISLAND (WPB-1341) DRYDOCK AVAILABILITY 2010 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 1-D | Routine Drydocking | JOB | 1 | ||
| 2-D | Provide Temporary Logistics | JOB | 1 | ||
| 3-D | Clean and Inspect Fuel Service Tanks | JOB | 1 | ||
| 4-D | Clean and Inspect Fuel Stowage and Overflow Tanks | JOB | 1 | ||
| 5-D | Clean and Inspect Oil and Oily Waste Tanks | JOB | 1 | ||
| 6-D | Clean and Inspect Sewage Collection and Holding Tanks | JOB | 1 | ||
| 7-D | Clean and Inspect Grey Water Collection and Holding Tanks | JOB | 1 | ||
| 8-D | Perform Air Test of Interior Compartments | JOB | 1 | ||
| 9-D | Clean Sewage Piping System | JOB | 1 | ||
| 10-D | Clean Grey Water Piping System | JOB | 1 | ||
| 11-D | Clean and Disinfect Potable Water Tanks | JOB | 1 | ||
| 12-D | Preserve and Disinfect Potable Water Tanks - 100% | JOB | 1 | ||
| 13-D | Preserve Sewage Collection and Holding Tanks - 100% | JOB | 1 | ||
| 14-D | Preserve Grey Water Collection and Holding Tanks - 100% | JOB | 1 | ||
| 15-D | Preserve Oil and Oily Water Tanks – 100% | JOB | 1 | ||
| 16-D | Inspect MDE Exhaust System | JOB | 1 | ||
| 17-D | Remove, Inspect, and Reinstall Propellers | JOB | 1 | ||
| 18-O | Repair Propeller Root Erosion | 1 CUIN | 60 | ||
| 19-D | Remove, Inspect, and Reinstall Propeller Shafts | JOB | 1 | ||
| 20-D | Overhaul Mechanical Shaft Seal Assemblies | JOB | 1 | ||
| 21-D | Renew Water-Lubricated Propeller Shaft Bearings | JOB | 1 | ||
| 22-D | Clean and Inspect Heat Exchangers | JOB | 1 | ||
| 23-D | Overhaul and Renew Sea Valves | JOB | 1 | ||
| 24-D | Overhaul and Renew Firemain Valves | JOB | 1 | ||
| 25-D | Overhaul and Renew Bilge and Ballast Valves | JOB | 1 | ||
| 26-D | Overhaul Duplex Sea Strainers | JOB | 1 | ||
| 27-D | Overhaul Stabilizing Fins | JOB | 1 | ||
| 28-D | Overhaul Steering Gear Components | JOB | 1 | ||
| 29-D | Remove, Inspect and Reinstall Rudder Assemblies | JOB | 1 | ||
| 30-D | Inspect and Maintain Cathodic Protection System | JOB | 1 | ||
| 31-O | Renew CAPAC Anode Assembly | JOB | 2 | ||
| 32-D | Renew Speed Doppler and Overhaul Doppler Valve | JOB | 1 | ||
| 33-O | Renew Depth Indicating Transducer | JOB | 1 | ||
| 34-O | Preserve Underwater Body – “Partial” | JOB | 1 | NSP | |
| 35-O | Preserve Underwater Body – “100%” | JOB | 1 | ||
| 36-O | Preserve Stern Tubes | JOB | 1 | ||
| 37-O | Perform Ultrasonic Thickness Measurements | 500 Shots | 10 | ||
| 38-O | Perform Aluminum Hull and Structural Repairs - 1/4" Plate | 4 SQFT | 50 | ||
| 39-O | Perform Aluminum Hull and Structural Repairs - 3/16" Plate | 4 SQFT | 25 | ||
| 40-O | Perform Aluminum Hull and Structural Repairs - 5/16" Plate | 4 SQFT | 25 | ||
| 41-O | Perform Hull and Structural Plating Repairs -Crack (Aluminum) | 1 LF | 50 | ||
| 42-O | Perform Hull and Structural Plating Repairs - Eroded Weld (Aluminum) | 1 LF | 50 | ||
| 43-O | Perform Hull and Structural Plating Repairs - Overlay Welding (Aluminum) | 6 SQIN | 100 | ||
| 44-O | Perform Steel Hull and Structural Plating Repairs (5-Pound) | 4 SQFT | 50 | ||
| 45-O | Perform Steel Hull and Structural Plating Repairs (7.5-Pound or 7.65-Pound) | 4 SQFT | 50 | ||
| 46-O | Perform Hull and Structural Plating Repairs - Crack (Steel) | 1 LF | 50 | ||
| 47-O | Perform Hull and Structural Plating Repairs - Eroded Welds (Steel) | 1 LF | 50 | ||
| 48-O | Perform Hull and Structural Plating Repairs - Overlay Welding (Steel) | 8 SQIN | 100 | ||
| 49-D | Renew Main Diesel Engine | JOB | 1 | ||
| 50-D | Remove, Reinstall and Realign Main Diesel Engine | JOB | 1 | ||
| 51-D | Remove, Reinstall and Realign Reduction Gear Assembly | JOB | 1 | ||
| 52-D | Perform Full Propulsion System Alignment Check | JOB | 1 | ||
| 53-D | Perform Full Propulsion System Alignment | JOB | 2 | ||
| 54-D | Renew No. 1 Reduction Gear | JOB | 1 | ||
| 55-D | Remove and Reinstall Both Ship Service Generators | JOB | 1 | ||
| 56-D | Renew Fuel Oil Valve Reach Rod Assemblies | JOB | 1 | ||
| 57-D | Modify and Renew R/O Water Piping and Foundation | JOB | 1 | ||
| 58-D | Modify and Renew P-100 Suction Piping and Associated Structure | JOB | 1 | ||
| 59-D | Modify and Renew OWS Piping | JOB | 1 | ||
| 60-D | Modify HVAC System and Associated Piping | JOB | 1 | ||
| 61-D | Renew Sounding Tube | JOB | 1 | ||
| 62-D | Renew Magazine Deck Drain and Associated Piping | JOB | 1 | ||
| 63-D | Renew Fuel Piping | JOB | 1 | ||
| 64-D | Perform Structural Repairs – Battery Compartment | JOB | 1 | ||
| 65-D | Perform Structural Repairs – Sewage Tank | JOB | 1 | ||
| 66-D | Perform Structural Repairs – Aft Steering Compartment | JOB | 1 | ||
| 67-D | Perform Structural Repairs – Aft Grey Water Tank | JOB | 1 | ||
| 68-D | Perform Structural Repairs – Potable Water Tank | JOB | 1 | ||
| 69-D | Perform Structural Repairs –Modify Deck Grating System in Forepeak and Renew Deck Drain Cup Assembly | JOB | 1 | ||
| 70-D | Perform Structural Repairs –Bridge Windows, Main Deck BHDs and Deck | JOB | 1 | ||
| 71-D | Perform Structural Repairs –Engine Room Aft Hatch | JOB | 1 | ||
| 72-D | Renew Transom Ladder | JOB | 1 | ||
| 73-D | Preserve And Repair Surfaces In Engine Room | JOB | 1 | ||
| 74-D | Preserve and Insulate Aft Steering Compartment | JOB | 1 | ||
| 75-D | Preserve Freeboard - 100% | JOB | 1 | ||
| 76-D | Preserve Superstructure | JOB | 1 | ||
| 77-D | Preserve Forward Void | JOB | 1 | ||
| 78-D | Preserve Battery Space Bilges | JOB | 1 | ||
| 79-D | Preserve Forward Auxiliary Machinery Space | JOB | 1 | ||
| 80-D | Preserve Port & Starboard Strut Cofferdams – 100% | JOB | 1 | ||
| 81-D | Renew Floating Deck System in Galley and Mess Deck | JOB | 1 | ||
| 82-D | Perform Structural Repairs – Port Cofferdam | JOB | 1 | ||
| A-O | Composite Labor Rate | Hour | 1110 | ||
| B-D | GFP Report | NSP | EA | 1 | NSP |
| Z-O | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |