1344_DD_EDV_10ER2_BLANK.xls

XLS spreadsheet 35 KB Posted

Attached to
USCGC BLOCK ISLAND (WPB-1344) 10 DRYDOCK REPAIRS
Solicitation number
HSCG80-10-Q-P45D25
Issued by

About this file

Schedule of Supplies/Services REV-3 01/13/09 for USCGC BLOCK ISLAND (WPB-1344) Drydock Repairs

View the file

Other files

File Type Posted
SF300004BLOCK ISLANDDD.doc DOC document
SF300003BLOCK ISLANDDD.doc DOC document
SF300002BLOCK ISLANDDD.doc DOC document
SF300001BLOCK ISLANDDD.doc DOC document
Block_Island_dd_edv_10R1.pdf PDF
1344_DD_EDV_10R0 —
RFQ BLOCK ISLAND DD 12-18-09.doc DOC document
1344_DD_EDV_10ER2_BLANK.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
USCGC BLOCK ISLAND (WPB-1344) DRYDOCK AVAILABILITY 2009
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
1-OPerform Aluminum Hull and Structural Repairs - 1/4" Plate4 sqft1
2-OPerform Aluminum Hull and Structural Repairs - 5/16" Plate4 sqft1
3-OPerform Hull and Structural Plating Repairs - Overlay Welding (Aluminum)6 sqin8
4-OPerform Hull and Structural Plating Repairs - Overlay Welding (Steel)6 sqin8
5-OPerform Steel Hull and Structural Plating Repairs (5-Pound)4 sqft1
6-OPerform Steel Hull and Structural Plating Repairs (6.0-Pound or 5.63-Pound)4 sqft1
7-OPerform Steel Hull and Structural Plating Repairs (7.5-Pound or 7.65-Pound)4 sqft1
8-OPerform Hull and Structural Plating Repairs -Corrugated Plate (4.0-Pound)4 sqft1
9-OPerform Hull and Structural Plating Repairs – Eroded Weld (Aluminum)Lin ft10
10-OPerform Hull and Structural Plating Repairs – Eroded Welds (Steel)Lin ft10
11-OPerform Hull and Structural Plating Repairs – Crack (Steel)Lin ft10
12-OPerform Hull and Structural Plating Repairs –Crack (Aluminum)Lin ft10
13-OPerform Steel Structural Member Repairs -1” x 3” Steel T-Bar Framing10 Lin ft1
14-DClean and Disinfect Potable Water TanksJOB1
15-DClean and Inspect Fuel Service TanksJOB1
16-DClean and Inspect Fuel Stowage and Overflow TanksJOB1
17-DClean and Inspect Grey Water Collection and Holding TanksJOB1
18-OPreserve Grey Water Collection and Holding Tank - PartialJOB1
19-DClean and Inspect Sewage Collection and Holding TankJOB1
20-OPreserve Sewage Collection and Holding Tank - PartialJOB1NSP
21-OPreserve Sewage Collection and Holding Tanks - 100%JOB1
22-DClean Grey Water Piping SystemJOB1
23-DClean Sewage Piping SystemJOB1
24-DClean and Inspect Oil and Oily Waste TanksJOB1
25-OPreserve Oil and Oily Water Tanks - PartialJOB1NSP
26-OPreserve Oil and Oily Water Tanks – 100%JOB1
27-DOverhaul Duplex Sea StrainersJOB1
28-DRenew Sea Valves and PumpsJOB1
29-DOverhaul Stabilizing FinsJOB1
30-DRemove, Inspect, and Reinstall Propeller ShaftsJOB1
31-DRemove, Inspect, and Reinstall PropellersJOB1
32-ORepair Propeller Root ErosionCubic In60
33-DOverhaul Mechanical Shaft Seal AssembliesJOB1
34-DInspect and Maintain Cathodic Protection SystemJOB1
35-DRenew Capastic FairingJOB1
36-DRenew Water-Lubricated Propeller Shaft BearingsJOB1
37-DRemove, Inspect and Reinstall Rudder AssembliesJOB1
38-DOverhaul Steering Gear ComponentsJOB1
39-DRenew Doppler Speed Log and Overhaul Doppler ValveJOB1
40-ORenew Depth Indicating TransducerJOB1
41-OPreserve Underwater Body – “Partial”JOB1NSP
42-OPreserve Underwater Body – “100%”JOB1
43-DPreserve Forward Peak CompartmentJOB1
44-DPreserve Forward VoidJOB1
45-DPreserve Forward Auxiliary Machinery SpaceJOB1
46-DRoutine DrydockingJOB1
47-DProvide Temporary LogisticsJOB1
48-DInspect MDE Exhaust SystemJOB1
49-DInstall New Grey Water Pumps and PipingJOB1
50-DImprove Ship’s VentilationJOB1
51-DInstall Hot Water-On-Demand UnitJOB1
52-DInstall New Life RaftsJOB1
53-DInstall New SearchlightJOB1
54-DReplace Reverse Osmosis WatermakersJOB1
55-DModify Oily Water Separator PipingJOB1
56-DUltrasonic Thickness MeasurementsJOB1
57-DPreserve Weather DecksJOB1
58-DRenew Structural ClosuresJOB1
59-DRenew Pilothouse WindowsJOB1
60-DRenew Various Interior Deck DrainsJOB1
61-DReseal Cosmetic Polymeric Deck Covering SystemsJOB1
62-DInstall New Deck Covering SystemsJOB1
63-DFabricate and Install New CanopyJOB1
64-DRenew Fuel Transfer PipingJOB1
A-OComposite Labor RateHour450
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

&C([01/13/2009] REV-3)

Page &P of &N

Sheet1

File details come from the government source that posted it. Updated .