Copy of 87346_DD_MWS_09ER2_BLANK.xls
XLS spreadsheet 32 KB Posted
- Attached to
- DRYDOCK AND REPAIR USCGC FLYINGFISH (WPB-87346)
- Solicitation number
- HSCG80-09-Q-3FA003
About this file
SCHEDULE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 87346_DD_MWS_09ER5_BLANK 2 .pdf | ||
| SF300002FLYINGFISHDD.doc | DOC document | |
| SF300001FLYINGFISHDD.doc | DOC document | |
| 87346_DD_MWS_09ER3_BLANK 1 .pdf | ||
| RFQ FLYINGFISH 08 DD 06-30-08.doc | DOC document | |
| 87346_DD_MWS_09R5 2 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B
| HSCG80-09-Q-3FA003 | Page___of___ | ||||||
| USCGC FLYINGFISH (WPB-87346) | |||||||
| DRYDOCKING AVAILABILITY | |||||||
| SUPPLIES OR SERVICES AND PRICES/COSTS | |||||||
| CLIN Type | WORK ITEM | CLIN | WORK ITEM TITLE | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| BASE | 1 | 0001 | RENEW HULL PLATING | 1 sqft | 16 | ||
| BASE | 2 | 0002 | CLEAN AND INSPECT OIL AND OILY WASTE TANK | JOB | 1 | ||
| BASE | 3 | 0003 | CLEAN AND INSPECT FUEL TANKS | JOB | 1 | ||
| BASE | 4 | 0004 | CLEAN AND INSPECT SEWAGE TANK | JOB | 1 | ||
| BASE | 5 | 0005 | CLEAN AND INSPECT GREY WATER TANK | JOB | 1 | ||
| OPT | 6 | 0006 | REALIGN MAIN ENGINE/REDUCTION GEAR | EA | 2 | ||
| BASE | 7 | 0007 | REMOVE, INSPECT, AND REINSTALL PROPELLER SHAFTS | JOB | 1 | ||
| OPT | 8 | 0008 | REPAIR SHAFT | EA | 2 | ||
| OPT | 9 | 0009 | STRAIGHTEN SHAFT | JOB | 2 | ||
| OPT | 10 | 0010 | RENEW INTERMEDIATE WATER-LUBRICATED SHAFT BEARING | EA | 2 | ||
| OPT | 11 | 0011 | RENEW AFT WATER-LUBRICATED SHAFT BEARING | EA | 2 | ||
| OPT | 12 | 0012 | RENEW BEARING CARRIER | EA | 4 | ||
| BASE | 13 | 0013 | REMOVE, INSPECT, AND REINSTALL PROPELLERS | JOB | 1 | ||
| OPT | 14 | 0014 | PERFORM MINOR REPAIR AND RECONDITION OF PROPELLER | EA | 2 | ||
| BASE | 15 | 0015 | RENEW DEPTH INDICATING TRANSDUCER | JOB | 1 | ||
| N/A | 16 | 0016 | CLIN CANCELLED | N/A | N/A | ||
| OPT | 17 | 0017 | OVERHAUL SEA VALVES | EA | 4 | ||
| OPT | 18 | 0018 | RENEW SEA VALVES | EA | 4 | ||
| BASE | 19 | 0019 | CLEAN AND INSPECT SEA STRAINERS | JOB | 1 | ||
| BASE | 20 | 0020 | REMOVE, INSPECT, AND REINSTALL RUDDER ASSEMBLIES | JOB | 1 | ||
| OPT | 21 | 0021 | RENEW RUDDER LOWER BEARING | JOB | 1 | ||
| BASE | 22 | 0022 | PRESERVE FREEBOARD - 100% | JOB | 1 | ||
| BASE | 23 | 0023 | PERFORM ULTRASONIC THICKNESS MEASUREMENTS - FREEBOARD HULL PLATING | JOB | 1 | ||
| BASE | 24 | 0024 | PRESERVE FORWARD PEAK COMPARTMENT | JOB | 1 | ||
| OPT | 25 | 0025 | INSTALL RHIB NOTCH SKID PAD | JOB | 1 | ||
| OPT* | 26 | 0026 | PRESERVE UNDERWATER BODY - "PARTIAL" | JOB | 1 | NSP | |
| OPT | 27 | 0027 | PRESERVE UNDERWATER BODY - "100%" | JOB | 1 | ||
| BASE | 28 | 0028 | ULTRASONIC THICKNESS MEASUREMENTS - UNDERWATER BODY | JOB | 1 | ||
| BASE | 29 | 0029 | RENEW CATHODIC PROTECTION SYSTEM | JOB | 1 | ||
| BASE | 30 | 0030 | ROUTINE DRYDOCKING | JOB | 1 | ||
| OPT | 31 | 0031 | ADDITIONAL FUEL REMOVAL AND DISPOSAL | JOB | 4 | ||
| BASE | 32 | 0032 | PROVIDE TEMPORARY LOGISTICS | JOB | 1 | ||
| BASE | 33 | 0033 | INSTALL NEW DECK COVERING SYSTEM | JOB | 1 | ||
| BASE | 34 | 0034 | CLEAN GREY WATER PIPING SYSTEM | JOB | 1 | ||
| BASE | 35 | 0035 | CLEAN SEWAGE PIPING SYSTEM | JOB | 1 | ||
| BASE | 36 | 0036 | RENEW HATCH COAMINGS | JOB | 1 | ||
| BASE | 37 | 0037 | INSPECT SEA CHEST RISER PIPING AND FLANGES | JOB | 1 | ||
| OPT | 38 | 0038 | PRESERVE STERN TUBES | JOB | 1 | ||
| OPT | A | Composite Labor Rate | Hour | 110 | |||
| BASE | B | GFP report in accordance with solicitation. | NSP | EA | 1 | NSP | |
| OPT | Z | Laydays | DAY | 5 | |||
| Subtotal BASE and OPTION Items: | |||||||
| Total of all Items: |
File details come from the government source that posted it. Updated .