SPECIFICATION REV-4 DATED 4/29/08 SEE REVISION PAGE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment to Solicitation A00003 Page 1.doc | DOC document | |
| SCHEDULE OF SUPPLIES SERVICES_BLANK SEC B.xls | XLS spreadsheet | |
| Amendment to Solicitation A00002 Page 1.doc | DOC document | |
| SPEC FOR BRISTOL BAY REV3.doc | DOC document | |
| Amendment to Solicitation A00001 Page 1.doc | DOC document | |
| SOLICITATION BRISTOL BAY.DOC | DOC document | |
| SCHEDULE OF SUPPLIES SERVICES_BLANK SEC B.xls | XLS spreadsheet | |
| SPEC FOR BRISTOL BAY REV2_WTGB-102.doc | DOC document | |
| SPEC FOR OSAGE 65505 REV0 DRYDOCK.doc | DOC document | |
| SOLICITATION FOR OSAGE.DOC | DOC document | |
| SCHEDULE B FOR OSAGE WLR 65505 REV0.xls | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC BRISTOL BAY (WTGB-102)
140 FOOT ICEBREAKING TUG
AND 120 FOOT BARGE (CGB 12001)
SPECIFICATIONS FOR DRYDOCK REPAIRS
Developed By:
Louis Mikedis
Commander (v) Maintenance and Logistics Command, Atlantic 300 E. Main Street, Suite (600) Norfolk, VA 23510-9102
TABLE OF CONTENTS
Work Item Title Page iiiList of Sketches
Revisions Record iv List of Applicable References v List of Government-furnished Property xi List of Critical Inspection Items xii Specification Feedback xiii Principal Characteristics xiv General Requirements Provide Access to Various Compartments for Ship's Structure and Machinery Evaluation Board Inspection Welding Repairs Clean and Disinfect Potable Water Tanks Clean and Inspect Chain Locker Clean and Inspect Sewage and Grey Water Collection and Holding Tanks Remove, Inspect, and Reinstall Propeller Shaft Overhaul Shaft Seal Assembly Remove, Inspect, and Reinstall Propeller Renew Depth Indicating Transducer Overhaul Vaneaxial Fan and Motor Assemblies Overhaul Main Motor Blower Assembly Overhaul Valves Remove, Inspect, and Reinstall Rudder Assembly Perform Boat Boom Maintenance Perform Anchor Windlass Maintenance Modify Grey Water Tank System Clean Sewage and Grey Water Piping Systems Inspect Chocks and Tow Bitts Inspect Hydraulic Pelican Hooks Preserve Weather Decks Preserve Underwater Body - Complete Renew No. 1 & 2 Main Diesel Engine Resilient Mounts Install New Deck Covering System Service 25-Man Liferafts and Associated Hydrostatic Releases (Tender & Barge) Routine Drydocking Provide Temporary Logistics Renew Sections of Buoy Deck Plating (Barge) Clean and Disinfect Potable Water Tanks (Barge) Perform Anchor Windlass Maintenance (Barge) Perform Anchor and Anchor Chain Maintenance (Barge) Inspect and Test Air Receivers and Relief Valves (Tug)
List of Sketches
Work
Item Sketch Number Page
This section is not applicable to this package.
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
| 3/17/2008 |
| 1 |
| 18 |
| Deleted the word Barge from title |
| 3/17/2008 |
| 1 |
| 19 |
| Deleted the word Barge from title |
| 3/17/2008 |
| 1 |
| 20 |
| Deleted the 02 Deck for Preservation |
| 3/17/2008 |
| 1 |
| 4 |
| Sect 3.1 Deleted first sentence and last sentence. |
| 3/17/2008 |
| 1 |
| 9 |
| Sect 4.2.2 Replaced the word each with “the”. |
| 3/17/2008 |
| 1 |
| 11 |
| Deleted 3.1.1 Related W/I. |
| 3/17/2008 |
| 1 |
| 14 |
| Sect 3.2.1 Added Notice to perform weight test upon completion of all Level 2 work. |
| 3/17/2008 |
| 1 |
| 16 |
| Sect 3.5.3 Deleted mounting brackets. |
| 3/17/2008 |
| 1 |
| 12 |
| Renamed - From Overhaul to just Renew |
| 3/17/2008 |
| 1 |
| 24 |
| Sect 3.2 Renamed section name to renew. |
| 3/17/2008 |
| 1 |
| 27 |
| Sect 3.1.1 Deleted related W/I reference. |
| 3/17/2008 |
| 1 |
| 29 |
| Deleted W/I |
| 3/17/2008 |
| 1 |
| 30 |
| Table Level 2 Added section 3.2.2.4 as a reference to preservation of anchor windlass. |
| 3/17/2008 |
| 1 |
| 1 |
| Added Underwater Body Preservation. |
| 3/17/2008 |
| 1 |
| 20 |
| Sect 3.7 Changed F/O disposal fro 15K to 18K gal. |
| 3/17/2008 |
| 1 |
| 32 |
| Warning Notice – Deleted reference to Nitrogen Bottle. |
| 3/17/2008 |
| 1 |
| 31 |
| Task #5 – 500 feet of 1-inch rope. |
| 3/17/2008 |
| 1 |
| 30 |
| Task #4 – Deleted Electric Brake Assembly |
| 3/31/2008 |
| 2 |
| List Of Critical Inspect |
| Deleted a listed work item |
| 3/31/2008 |
| 2 |
| 29 |
| Added Date & changed tech Pub number. |
| 4/17/2008 |
| 3 |
| 13 |
| Deleted Sect 3.4.6 renewal of coupling body bound bolts & nuts |
| 4/17/2008 |
| 3 |
| 24 |
| Sect 3.1 added manufacturer’s names for liferafts. |
| 4/17/2008 |
| 3 |
| 25 |
| Sect 1.1 Tender implies Tug |
| 4/17/2008 |
| 3 |
| 26 |
| Added (Tug & Barge to sections 3.2.3, 3.2.5 & 3.2.11 |
| 4/29/2008 |
| 4 |
| 12 |
| Changed scope from Renew to Overhaul |
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
List of Applicable References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution. Electronic copies of the latest Editions of MLCA Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address: http://www.uscg.mil/mlclant/vdiv/specs/default.htm . Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.
Order of precedence. In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with MLCA Standard Specification 0000_STD, paragraph 3.2 (Order of precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.
FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS
A-A-59588, 12 Jan 2001, Rubber Silicone DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems
MIL-PRF-16173, 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application
MIL-DTL-24643, Aug 2002, Cable and Cord, Electrical, Low Smoke, for Shipboard Use, Specification for
MIL-STD-1623, Dec 1981, Fire Performance Requirements and Approved Specifications for Interior Finish Materials and Furnishings
OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS
DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 3141_STD, 2004 Edition, Overhaul Electrical Rotating Machines Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 5000_STD, 2004 Edition, Auxiliary Machinery Systems
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 6341_STD, 2004 Edition, Renew Deck Covering Systems
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8635_STD, 2004 Edition, Provide Temporary Logistics
Code of Federal Regulations (CFR) Title 46, Part 160, Oct 2003, Lifesaving Equipment
DRAWINGS
Coast Guard Drawing 101 WTGB 114-002, Rev L, Bubbler Structure (All) Coast Guard Drawing 101 WTGB 171-002, Rev T, Mast and Boom
Coast Guard Drawing 101 WTGB 201-001, Rev H, Machinery Arrangement
Coast Guard Drawing 101 WTGB 243-001, Rev S, Shafting and Bearing Arrangement and Details
Coast Guard Drawing 101 WTGB 245-001, Rev B, Propeller and Offsets
Coast Guard Drawing 101 WTGB 245-002, Rev B, Aluminum Pattern One Single Blade
Coast Guard Drawing 101 WTGB 256-001, Rev H, S/W Circulating Cooling System Diagram
Coast Guard Drawing 101 WTGB 256-002, Rev F, S/W Circulating Cooling System, Arrang & Det
Coast Guard Drawing 101 WTGB 262-001, Rev H, Lube Oil System Arrangement and Details
Coast Guard Drawing 101 WTGB 262-002, Rev D, Lube Oil System Arrangement and Details
Coast Guard Drawing 101 WTGB 514-002, Rev X, Ventilation and Air Condition A & D, (All) Coast Guard Drawing 101 WTGB 528-001, Rev L, Sanitary & Deck Drain System Diagram
Coast Guard Drawing 101 WTGB 528-003, Rev C, Grey Water Mods and Transition
Coast Guard Drawing 101 WTGB 562-001, Rev N, Rudder
Coast Guard Drawing 101 WTGB 562-002, Rev Q, Rudder Stock Bearing Details Coast Guard Drawing 101 WTGB 581-001, Rev T, Anchor Handling A & D Coast Guard Drawing 101 WTGB 801-003, Rev C, Docking Plan Coast Guard Drawing 101 WTGB 801-005, Rev H, General Arrangement, Main Deck and Above Coast Guard Drawing FL 6713-201, Rev B, CRP-V850 Transducer (B-14) Adapter Assembly
Coast Guard Drawing 120 BARGE 130-001, Rev D, Main and Foc’sle decks Coast Guard Drawing 120 BARGE 581-001, Rev C, Anchor Handling Arrangement NAVSEA Drawing 803-1385866, Rev E, 12 Apr 1984, Penetration, Bulkhead and Deck
NAVSEA Drawing 804-1385781, Rev E, 26 Sep 1977, Hangers, Pipe, for Surface Ships
PUBLICATIONS
DOD-STD-2003-4, Dec 1990, Electric Plant Installations, Standard Methods FOR surface Ships and Submarines, Fig 1B3-1B5, Fig.3B10 through 3B18
WYTM Lineshaft Alignment Analysis, Report No. 7715, 12/27/77
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series) Jun 2006, Coatings and Color Manual Coast Guard Commandant Instruction (COMDTINST) M9000.6, Oct 2004, Naval Engineering Manual, Chapter 583, Tests and Inspection of Boats, Boat Hoisting Equipment and Fittings
Main Engine Resilient Mount Replacement Procedures, Bay Class Tug (WTGB 140), Handbook 1988 Technical Manual for Partially Split EL Stern Tube Seal, John Crane-Houdaille, Inc., Aug 22, 1986
Raytheon V850 Color Echosounder, 2nd Edition, Mar 1993, Operation Manual Coast Guard Technical Publication (TP) 3386, Nov 13 1998, Installation, Operation, and Maintenance Manual for Anchor Winch, Model AMD-863
Coast Guard Technical Publication (TP) 088, Aug 1991, Installation, Operation, and Maintenance Manual for Traction Winch, Model AMD-855
Coast Guard Technical Publication (TP) 865, Feb 24 1978, Installation, Operation and Maintenance fro Gypsy Winch, Model AMD-865
Coast Guard Technical Publication (TP) 3366, Section 583-A, Dec 2005, Boat Davit Hydraulic System
Coast Guard Technical Publication (TP) 3385, Nov 13,1998, Manufacturer’s Instruction Book, SWBS Group (S)568-573, 120 ATON Barge Cargo Handling System, Sections A through S
Coast Guard Technical Publication (TP) 3483, Section 580-A, April 2001, Manufacturer's Instruction Book-SWBS Groups 580-583, Anchor Windlass - Instructions
Coast Guard Technical Publication (TP) 3483, Section 580-B, April 2001, Manufacturer's Instruction Book-SWBS Groups 580-583, Anchor Windlass - Drawings
Coast Guard Technical Publication (TP) 3483, Section 580-C, April 2001, Manufacturer's Instruction Book-SWBS Groups 580-583, Vertical Capstan - Instructions
Coast Guard Technical Publication (TP) 3483, Section 580-D, April 2001, Manufacturer's Instruction Book-SWBS Groups 580-583, Vertical Capstan - Drawings
NAVSEA S9AA0-AB-GOS-010/GSO, Nov 2004, General Specifications for Ships Overhaul of Surface Ships - Section 305, Electrical and Electronic Designating and Marking
Naval Ships' Technical Manual (NSTM) Chapter 593, Sep 1999, Pollution Control, Section 593-4.2.3, Sanitary and Hygienic Procedures
INDUSTRY STANDARDS
American National Standards Institute/NSF International (ANSI/NSF) 61, 2005, Drinking Water System Components - Health Effects
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
American Society of Mechanical Engineers (ASME), PTC 25, 2001, Pressure Relief Devices
ASTM International (ASTM) A36, 2005, Standard Specification for Carbon Structural Steel
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
ASTM International (ASTM) E797, 2001, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive International Standard Organization (ISO) 2953, 1999, Mechanical Vibration, Balancing Machines, Description and Evaluation
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2003 Edition, Bronze Gate, Globe, Angle and Check Valves
List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 6 |
| Y |
| **Propeller shaft |
| NSN: 2010-01-089-8123 |
| 1 ea. |
| 12,750.00 |
| 7 |
| N |
| Body Assembly |
| P/N H49966 |
| 1 ea. |
| 1,000.00 |
| 7 |
| N |
| Face Insert (Split) |
| P/N H49962 |
| 1 ea. |
| 9,00.00 |
| 7 |
| N |
| Face Sealing Strip |
| P/N 70530-4-2 |
| 1 ea. |
| 75.00 |
| 7 |
| N |
| Inflatable Seal |
| P/N 70530 |
| 1 ea. |
| 500.00 |
| 8 |
| Y |
| **Propeller |
| NSN: 2010-01-078-8216 |
| 1 ea. |
| 42,812.00 |
| 9 |
| N |
| ***V850 Color Echo Sounder (Tender) |
| NSN: 5845-01-518-7245 |
| 1 ea. |
| 1,423.41 |
| 13 |
| Y |
| **Rudder |
| NSN: 2040-01-115-3498 |
| 1 ea. |
| 40,000.00 |
| 13 |
| Y |
| **Rudder stock |
| NSN: 2040-01-115-5203 |
| 1 ea. |
| 5,000.00 |
| 16 |
| N |
| Centrifugal Pump |
| NSN: 4320-01-118-2005 |
| 1 ea. |
| 2,350.00 |
| 16 |
| N |
| Tank Level Indicator (TLI) Receiver w/enclosure |
| GEMS RE-163000 |
| 2 ea. |
| 2,850.00 |
| 16 |
| N |
| TLI Transmitter |
| GEMS 309760 |
| 2 ea. |
| 350.00 |
| 16 |
| N |
| Calibration Chip |
| N/A |
| 2 ea. |
| 1,500.00 |
| 22 |
| N |
| Resilient Mount |
| NSN: 5340-00-543-3864 |
| 24 |
| 3,200.00 |
| 22 |
| N |
| Auxiliary Snubbers |
| NSN: 5340-00-653-3518 |
| 16 |
| 2,400.00 |
| 25 |
| N |
| *Transducer cover plate |
| N/A |
| 1 ea. |
| 500.00 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel, Electronic Systems Support Unit (ESU) or local Electronic Support Detachment (ESD).
List of Critical Inspection Items
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see Std Spec 0000_STD, paragraph 3.6.2 (Inspection report particulars)):
Work Item Title
6 Remove, Inspect and Reinstall Propeller Shaft 13 Remove, Inspect and reinstall Rudder Assembly
14 Perform Boat Boom Maintenance
15 Perform Anchor Windlass Maintenance
29 Perform Anchor Windlass Maintenance (Barge)
30 Perform Anchor and Anchor Chain Maintenance (Barge)
Specification Feedback
The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities. All feedback will be reviewed, evaluated, and responded to in a timely manner.
If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:
http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:
http://www.uscg.mil/mlclant/VDiv/specs/specfeedback.htm Principal Characteristics
Tug
| Length overall |
| 140' 0" |
| Length between Perpendiculars |
| 130' 0" |
| Breadth, Extreme |
| 37' 7-1/4" |
| Depth, Molded |
| 18' 2-3/8" |
| Frame Spacing |
| 1' 6" |
| Full Load (Winter) Draft (at ) |
| 12' 1-1/2" |
| Full Load (Winter) Displacement |
| 687 Long tons (LT) |
Full Load (Winter) Center of Gravity
| Above Base (KG) |
| 13' 1" |
| Full Load Trimming Moment (Forward) |
| 75.6 Ft-LT |
| Minimum Operating Condition Draft (at ) |
| 11' 6-3/8" |
| Minimum Operating Condition Displacement |
| 640 Long tons |
Minimum Operating Condition Center of Gravity
| Above Base (KG) |
| 13' 4-1/4" |
Minimum Operating Condition Trimming Moment
| (Forward) |
| 76.8 Ft-LT |
| Height of Vessel Above DWL |
| Approx. 62' 0" |
NOTE: Values above are for representative tug. Draft and longitudinal lever values provided above are for tugs in fresh water. Longitudinal lever values are provided to adjust tug's design drag of 1.0 feet by the stern.
PROPULSION
| Type |
| Diesel-electric |
| Number of Units |
| 2 |
| Total Shaft Horsepower |
| 2500 |
PROPELLERS
| Number of Propellers |
| 1 |
| Number of Blades |
| 4 |
| Diameter |
| 8' 6" |
| Pitch |
| Fixed |
| Revolutions per Minute |
| 305 |
Principal Characteristics – Barge
USCG 120 FOOT BARGE
| Length overall |
| 125' 0" |
| Breadth, Extreme |
| 52' 0" |
| Frame Spacing |
| 1' 0" |
| Full Load Draft |
| 5' 7" |
| Full Load Displacement |
| 690 Long tons |
DIESEL GENERATORS
| Number of Units |
| 2 |
| Rated power |
| 75 kw, 450 V, 3 Ph |
DIESEL HYDRAULIC POWER UNIT
| Number of Units |
| 2 |
| Rated power |
| 75 kw, 450 V, 3 Ph |
BOW THRUSTER
| Number of Units |
| 1 |
PROPELLERS
| Type |
| Vertical Mount in Recessed Tunnel |
| Number |
| 1 |
| Number of Blades |
| 3 |
| Diameter |
| 12" |
00000N_FLT (20 Apr 2007)
General Requirements
1. SCOPE
1.1 Scope. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series) Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.
NOTICE!
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and nondestructive inspection (NDI), in accordance with Std Spec 0740_STD.
4. QUALITY ASSURANCE
No additional requirements.
5. NOTES
5.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/ccs/cit/cim/directives/cim/cim_10360_3c.pdf.
5.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in Std Spec 0000_STD to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this item.
QA-1: QUALITY ASSURANCE INSPECTION FORM - PRESERVATION CHECKLIST
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 –2.5 for surfaces to be coated w/single coat of inorganic zinc).
Measure soluble salt conductivity (5 measurements per 1000 sqft) – maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the Coating Manufacturer(s).
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness.
Verify system cure for service resumption - U/W Body surfaces: 5-8 hours @ 77 degrees F; Potable water tanks: 7 days @ 77 degrees F.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure (minimum 7 days @ 77 degrees F.), to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Signature of Inspector:______________________________________________________Date:____________
QA-2. QUALITY ASSURANCE INSPECTION FORM
ENVIRONMENTAL READINGS
(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
| DATE |
| TIME |
| ENTER ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION |
| DEW POINT |
| SURFACE TEMP. |
| % REL. HUMIDITY |
| SIGNATURE OF INSPECTOR |
.Signature of Inspector:__________________________________________________Date:____________
QA-3 QUALITY ASSURANCE INSPECTION FORM
SURFACE PROFILE LOG
Vessel Name And Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location Of Work (Including Frame Numbers):_____________________________________
Area (Square Feet):_____________
Surface Preparation Method:_____________________________________________________
Abrasive Manufacturer And Size:_________________________________________________
Degreasing Method Used:________________________________________________________
Number Of Hours Surfaces (Steel Only) Left Unpainted:______________________________
Sweep blasting performed to remove flash rusting (steel)? Yes/No:_____________________
Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record.
Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
AVERAGE MILS
(IAW ASTM D4417, METHOD C)
Place Surface Profile Replica Tape Here
Reading:__________ mils
· Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Date and Time:__________________________________________________
Location of Surface Profile Measurements:___________________________________________________________
Signature of Inspector:____________________________________________________________________________
QA-4. QUALITY ASSURANCE INSPECTION FORM
SURFACE SOLUBLE SALT CONDUCTIVITY LOG
Vessel Name and Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________ Location of Work (including frame numbers):_______________________________________
Area (square feet):____________
| DATE |
| TEST LOCATIONS |
| CONDUCTIVITY |
(microsiemens/cm)
Date and Time:_________________________________________
Signature of Inspector:___________________________________
QA-5. QUALITY ASSURANCE DATA FORM
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2
(Use one sheet for each sequence)
Vessel Name and Hull Number:__________________________________________________
Work Item Title:______________________________________________________________
Coating Manufacturer:_________________________________________________________
Product Name:________________________________________________________________
Batch Number:________________________________________________________________
Induction Time:_______________________________________________________________
Coating System Sequence (Indicate whether: primer, touch-up primer, barrier coat, 3rd coat…):__________________
DFT
MEASUREMENT NUMBER
| LOCATION OF READINGS |
| MEASURED DFT |
Application Method (Airless, Conventional Spray, Rolled):____________________
Average DFT: __________________________________________________________
Date and Time: _________________________________________________________
Signature of Inspector: ___________________________________ S06100N_SWIT (02 Apr 2006)
WORK ITEM 1: Provide Access to Various Compartments for Ship's Structure and Machinery Evaluation Board Inspection
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to provide access to various compartments and locations throughout the vessel, to allow Coast Guard personnel to conduct a Ship's Structure and Machinery Evaluation Board (SSMEB) Inspection; and close compartments and restore removed components to original configurations, after the Coast Guard inspections have been completed.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Coatings and Color Manual
ASTM International (ASTM) E797, 2001, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
3. REQUIREMENTS
3.1 General.
3.1.1 SSMEB work scheduling. The Contractor shall be aware that all work specified herein, including the Coast Guard Inspections, shall be completed within the first 25% of the original contract period. Consequently, the Contractor shall determine when the SSMEB fits best into the first 25% of the contract period's production schedule, and allot on the planning document the necessary time for the completion of the tasks specified herein. The time allotted shall include an additional three full days for the SSMEB inspections. Notify the COR of the allotted time frames at the Arrival Conference. When the board is working in a compartment, ensure that no other work goes on inside or on the boundaries of that compartment.
3.1.2 Joint inspection. On the day of the Arrival Conference, the Contractor, accompanied by Coast Guard Inspector, shall conduct an inspection of all spaces affected by this work item. This inspection shall identify specific vessel components to be removed and reinstalled, as specified herein. The Contractor shall document, with photographic equipment or some other method, the locations and configurations of interferences to be removed and reinstalled.
3.2 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the following:
· Wiring.
· Piping.
· Deck Plates.
3.3 SSMEB work requirements. The Contractor shall accomplish the following, to facilitate the SSMEB inspections:
Tug.
· Fuel Tank 2-76-0-F. The vessel will transfer fuel oil to another tank, and the Contractor shall & clean Fuel Tank 2-76-0-F.
· Compartment 2-8-0-Q, The Contractor shall remove sheathing and insulation @ Fr 6 to aft. Upon completion of inspection by the SSMEB the Contractor shall renew sheathing and insulation in kind.
· Main Motor Foundation.
· Thrust Bearing Forward Foundation.
· Ballast tanks 4-32-1 and 4-32-2 (Part of Modify Sewage & Grey Water Piping System).
· Compartment 4-52-0-Q, The Contractor shall remove 2,000 pounds of pig iron from keel to second longitudinal for inspection by the SSMEB. Upon completion of all inspection the Contractor shall reinstall all removed pig iron.
· Sea Chest.
· Bubbler Pocket. The Contractor shall cut an access large enough to conduct a visual inspection at frame 20 portside, and frame 59 starboard using Coast Guard Drawing 101 WTGB 114-002 as guidance. Upon completion of all inspections by the SSMEB reinstall and weld inspection plates.
· Preserve Underwater Body. Allow for SSMEB inspections.
Barge.
· Ballast Tanks 2-100-1-W & 2-100-2-W. Dispose of all fluids in ballast tanks in accordance with Federal, State and local regulations. Clean Ballast Tanks.
· Crane Pedestal.
· Voids 2-0-1-V & 2-0-2-V. Clean voids.
· Tank 2-15-1-F. The vessel will transfer any fuel to another tank, and the Contractor shall clean fuel tank 2-15-1-F.
· Compartment 1-3-1-A. The Contractor shall remove sheathing and insulation from frame 18 to aft for inspection of structure by the SSMEB. Upon completion of all inspections the Contractor shall renew sheathing and insulation in kind.
3.4 Ultrasonic thickness measurement. The Contractor shall perform a total of 500 thickness measurements of ship’s structure, in locations designated by the Coast Guard Inspector. Within 24 hours after completing the measurements, furnish to the COR a written report. The ultrasonic apparatus, procedure requirements, and report shall be in accordance with ASTM E797. The report results shall additionally include, for each test point:
· Location.
· Original metal thickness.
· Measured metal thickness.
· Percent deterioration (calculation is based on the original metal thickness).
3.5 Restorations. Upon completion of the SSMEB, the Contractor shall accomplish the following:
3.5.1 Renew all removed bulkhead and overhead insulation materials.
3.5.2 Reinstall all removed joiner bulkhead sections.
3.6 Touch-up preservation. The Contractor shall prepare and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with Std Spec 0000_STD, paragraph titled “General preservation requirements”; and in accordance with COMDTINST M10360.3, Appendix B (Cutters and Boats Interior Painting Systems).
4. QUALITY ASSURANCE
4.1 Apparatus standardization. The Contractor shall perform ultrasonic equipment standardization in accordance with ASTM E797, Section 7 (Standardization of Apparatus) and Section 8 (Technical Hazards).
5. NOTES
5.1 Purpose of the SSMEB. The objective of a SSMEB is to determine the condition and estimate the remaining service life of the vessel and its component systems. This is accomplished by close visual inspection of various compartments and locations and use of non-destructive tests. The visual inspections are conducted exclusively by the Coast Guard.
5.2 Board-Contractor cooperation. The Board Chairmen will work closely with the contractor to ensure successful and timely completion of the work specified herein.
5.3 Unit responsibility. The vessel’s crew will remove and reinstall all loose gear in way of work.
07400D_FLT (25 Apr 2006) FLT (05 Jan 2004) WORK ITEM 2: Welding Repairs
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to perform welding repairs.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
3. REQUIREMENTS
3.1 General. The Contractor shall perform all welding and nondestructive inspection (NDI) in accordance with Std Spec 0740_STD. This work item includes all welding related activities only and does not include interference removal.
4. QUALITY ASSURANCE
No additional requirements.
5. NOTES
This section is not applicable to this work item 12314A_FLT (09 Nov 2007) 140 WTGB (20 Oct 2003) WORK ITEM 3: Clean and Disinfect Potable Water Tanks
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to clean and disinfect the following tank(s):
| TYPE OF TANK |
| LOCATION |
| CAPACITY (gallons) |
| Potable Water |
| 4-19-3-W, Tender |
| 3,367 |
| Potable Water |
| 4-19-4-W, Tender |
| 3,367 |
2. APPLICABLE DOCUMENTS
American National Standards Institute/NSF International (ANSI/NSF) 61, 2005, Drinking Water System Components - Health Effects
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities
3. REQUIREMENTS
3.1 General. The Contractor shall do the following for the designated tank(s):
3.1.1 Operational test – initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs to demonstrate existing operational condition. Submit a CFR.
3.1.2 Tank content removal. Remove and dispose of all fluids and/or residues in accordance with all applicable Federal, state, and local regulations.
3.1.3 Cleaning requirements. Remove tank covers; clean tank interior surfaces free of all foreign materials, such as sediment or sludge. Remove all persistent residues, taking care not to damage the tank coating system. Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.
3.1.4 Inspection. Visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
· Tank structural condition.
· Inaccessible areas, if any.
· Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
· Tank level indicator (TLI) and/or float switch condition (if applicable).
· Sounding tube and striker plate condition.
· Suction and discharge piping condition.
· Fastener material and condition (correct fastener material is stainless steel).
3.2 Tank closing. After satisfactory inspection by the Coast Guard Inspector, and completion of any authorized repairs, close tank manhole covers with new gasket material conforming to ANSI/NSF 61.
3.3 Tank disinfecting. After all other work involving the potable water system and tank closing have been completed, the Contractor shall disinfect and treat the affected potable water tanks, as necessary to meet or exceed the requirements of AWWA C652. After tank disinfecting pump, all treated water and dispose of in accordance with all Federal, state and local regulations.
WARNING!
Ensure that no one enters the tanks once disinfection is completed.
4. QUALITY ASSURANCE
4.1 Operational test – final. In the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the TLIs to be in satisfactory operating condition (see 5.1 (Equipment operation)). Submit a CFR.
5. NOTES
5.1 Equipment operation. Coast Guard personnel will operate all shipboard machinery and equipment during all operational tests.
12316_102(11 Jan 2008)
140 WTGB (16 Oct 2003) WORK ITEM 4: Clean and Inspect Chain Locker
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to clean and inspect the chain locker.
2. APPLICABLE DOCUMENTS
NONE
3. REQUIREMENTS
3.1 General. The Contractor shall do the following for the designated structures:
3.1.1 Content removal. Remove and dispose of any fluid contents, in accordance with all applicable Federal, state, and local regulations.
3.1.2 Cleaning requirements. Clean the designated structure’s interior surfaces free of all foreign materials, such as sediment or sludge. Remove all persistent residues, taking care not to damage the tank coating system. Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.
3.1.3 Inspection. Visually inspect all chain locker surfaces; including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
· Structural condition including padeyes.
· Inaccessible areas.
· Condition of coating, including measurements taken, percentage, location, and type of coating failure.
· Fastener material and condition (correct fastener material is stainless steel).
· Ensure chain locker access is left uncovered for the purposes of allowing the ship’s force to preserve anchor and anchor chain.
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the following:
· Anchor and Anchor Chain.
3.2 Closing. Notify the COR at least 24 hours prior to closing the chain locker. Notice; Chain Locker has a four dog WTH.
4. QUALITY ASSURANCE
No additional requirements.
5. NOTES
This section is not applicable to this work item.
12319A_FLT (09 Nov 2007)
140 WTGB (03 Nov 2003) WORK ITEM 5: Clean and Inspect Sewage and Grey Water Collection and Holding Tanks
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to clean the below designated tank(s):
| TYPE OF TANK |
| LOCATION |
| CAPACITY (gallons) |
| Holding Tank |
| 2-19-0-E |
| 900 |
| Seal Water Tank |
| 2-19-0-E |
| 100 |
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 Related work items. The Contractor shall accomplish this work item in conjunction with the following, which is a separate work item in this specification package:
· “Modify Grey Water Tank System”.
· “Clean Sewage and Grey Water Piping System”.
3.2 Cleaning requirements. The Contractor shall do the following for the designated tank(s) listed in paragraph 1.1:
3.2.1 Operational test – initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs to demonstrate existing operational condition. Submit a CFR.
3.2.2 Content removal. Remove and dispose of all contents, fluids, and/or residues in accordance with all applicable Federal, state, and local regulations.
3.2.3 Cleaning requirements. Remove manhole cover(s). Clean the designated structure’s interior surfaces free of all foreign materials, sediment, and sludge. Remove all persistent residues, taking care not to damage the tank coating system. Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.
3.2.4 Inspection. Visually inspect all interior surfaces; including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
· Tank structural condition.
· Inaccessible areas.
· Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
· Tank level indicator (TLI) and/or float switch condition.
· Suction and discharge piping condition.
· Fastener material and condition (correct fastener material is stainless steel).
3.3 Closing. The Contractor shall ensure that the tanks remain open for approximately 24 hours after completion of the tasks specified above. Notify the COR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and after authorized repairs, if any, reinstall manhole cover(s) with new gasket material conforming to ASTM D1330. The Contractor shall clean and reseal all tank sight glasses, if applicable, prior to reinstallation.
4. QUALITY ASSURANCE
4.1 Operational test – final. In the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the TLIs to be in satisfactory operating condition (see 5.1 (Equipment operation)). Submit a CFR.
5. NOTES
5.1 Equipment operation. Coast Guard personnel will operate all shipboard machinery and equipment during all operational tests.
24310L_FLT (12 Apr 2007) 140 WTGB (26 Oct 2007) WORK ITEM 6: Remove, Inspect, and Reinstall Propeller Shaft
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to remove, inspect, and reinstall the propeller shaft.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Coast Guard Drawing 101 WTGB 243-001, Rev S, Shafting and Bearing Arrangement and Details
WYTM Lineshaft Alignment Analysis, Report No. 7715, 12/27/77
ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging
3. REQUIREMENTS
3.1 General.
3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s):
· 3.2.2 (Inspections).
3.1.2 Related work item. The Contractor shall accomplish this work item in conjunction with "Remove, Inspect and Reinstall Propeller” and “Overhaul Shaft Seal Assembly” which are separate work item of this specification.
3.1.3 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the following:
· Deck plates.
· Cat walk over the shaft.
· Rope guard.
· Fairwater.
· Stern tube seal system.
3.2 Work to be accomplished. Prior to shaft removal and inspections, the Contractor shall obtain and record gap and offset readings using the Data provided in section 5.3 while the vessel is water-borne and submit CIR. Using Coast Guard Drawing 101 WTGB 243-001 as guidance, as applicable, the Contractor shall accomplish the following for the propeller shaft:
NOTICE
Do not use aft pedestal bearing housing as a strong back for removal of coupling bolts.
3.2.1 Removals.
· Mark existing shaft position, and match-mark shaft coupling bolts to their respective holes, to facilitate reinstallation procedures.
· Remove the shaft and attached components to a suitable repair facility. Ensure shaft is properly protected and supported at all bearing journals, at all times, until reinstallation.
3.2.2 Inspections. Clean the shaft free of all marine growth, and accomplish the following inspections (Submit CIR):
3.2.2.1 Visually inspect the following components, as applicable, for excessive wear and other mechanical defects such as nicks, cracks, and corrosion, as applicable:
· Shaft surfaces.
· Bearing surfaces.
· All shaft and propeller associated fasteners.
· Couplings.
· Stern tube/shaft sealing systems.
· Packing ring and glands.
NOTICE
Before taking shaft runout readings, spin the shaft on a lathe for approximately two hours at the vessel’s maximum rated RPM to eliminate any sagging that may have occurred during handling and storage.
3.2.2.2 Accomplish the following measurements:
· Measure keys and keyways.
· Measure all bearing sleeve or journal diameters.
· Measure runouts for shaft taper, shaft straightness, and coupling end diameters.
· With the key in-place, fit the shaft coupling to the shaft in shop and check the contact percentage by bluing. If the contact is less than 80%, the Contractor shall grind and hand stone the coupling hub to achieve a minimum of 80 percent contact, and verify by bluing again. Make a small inscription on the shaft to mark the coupling hub location and use it as a reference in final assembly. Measure and record the coupling face and bore runouts.
3.2.2.3 Perform nondestructive inspection of all bearing sleeves, shaft tapers, coupling bolts, keyways, and welded repair surfaces, in accordance with Std Spec 0740_STD, Appendix C.
3.2.2.4 Inspect the shaft fiberglass covering for porosity as follows:
3.2.2.4.1 Visually inspect the plastic covering for evidence of lack of adhesion, and other defects.
3.2.2.4.2 Conduct a high voltage spark test of the covering at 250 to 300 volts per mil of glass reinforcement (approximately 15,000 volts for a four-ply covering). Pay particular attention to the joining line between sleeves, couplings, and shafts.
3.2.3 Stern tube preservation. Prepare and coat the interior stern tube surfaces in accordance with COMDTINST M10360.3, using the system specified for “Bilges, Cofferdams, and Forepeaks, Steel, Option III”, in Appendix B (Cutter and Boat Interior Paint System). After surface preparation and before coating application, do the following:
3.2.3.1 Perform a visual inspection of the prepared stern tube surfaces.
3.2.3.2 Submit a CFR.
3.2.4 Reinstallation. Reinstall the propeller shaft to its original configuration and accomplish the following, using Coast Guard Drawing 101 WTGB 243-001, as applicable.
3.2.4.1 Machine, grind, or hand-stone couplings, if necessary, to achieve an 80 percent contact.
3.3 Government-furnished shaft. The Contractor shall be aware that the Government reserves the right to furnish a spare propeller shaft to be installed in lieu of the one removed. After a Change Request has been released and authorized by the KO, the Contractor shall transport the spare shaft to a suitable inspection facility, perform the inspections specified in paragraph 3.2.2 (Inspections), and submit a CFR.
4. QUALITY ASSURANCE
4.1 Post-repair operational testing. In the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the shafting system to be in satisfactory operating condition. Conduct a sea trial to test the propeller shaft in all modes of operation for a minimum of 4 hours. Inspect and correct any excessive leakage, abnormal noise and excessive vibration.
5. NOTES
5.1 Government-furnished property.
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/UNIT)
| Y |
| **Propeller shaft |
| NSN: 2010-01-089-8123 |
| 1 ea. |
| 12,750.00 |
5.2 A temporary support of 600 lbs +/-30 lbs is required at Frame 73, approximately 7 inches from the shaft coupling flange in accordance with the WYTM Motor Alignment Report (Figure 5).
5.3 From paragraph 3.3 of the WYTM Motor Alignment Report:
| Case |
| Optimum |
| 1 |
| 2 |
| Gap |
| 0.007 @ bottom |
| 0.003 @ bottom |
| 0.010 @ bottom |
| Offset |
| 0.003 @ motor high |
| 0.019 @ motor high |
| 0.010 motor low |
24330L_140 (04 Apr 2007)
WORK ITEM 7: Overhaul Shaft Seal Assembly
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to overhaul the shaft seal assembly.
2. APPLICABLE DOCUMENTS
Coast Guard Drawing 101 WTGB 243-001, Rev S, Shafting and Bearing Arrangement and Details
Technical Manual for Partially Split EL Stern Tube Seal, John Crane-Houdaille, Inc., Aug 22, 1986
3. REQUIREMENTS
3.1 General.
3.1.1 Technical representative services. The Contractor shall provide an on-site qualified technical representative, familiar with the John Crane Type EL face seal assembly, who shall advise on manufacturer's proprietary information, dimensions, and clearances associated with the system, assist with proper repair methods, and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, and reassembly of the John Crane Type EL face seal assembly. The technical representative shall be a Warsila-Lipps, Inc. technical representative or its licensee.
3.1.2 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the following:
· Propeller shaft.
· Propeller shaft coupling.
· Propeller shaft guard.
· Coupling shaft guard.
3.2 Seal overhaul particulars. The Contractor shall accomplish the following tasks, using Coast Guard Drawing 101 WTGB 243-001 and the John Crane Stern Tube Seal Technical Manual as guidance:
3.2.1 Removal. Disassemble and remove the existing shaft seal from the propeller shaft.
3.2.2 Inspections. Accomplish the following inspections, and submit a CFR for each inspection:
3.2.2.1 Coupling. While water-borne and prior to sliding back the propeller shaft perform face to face coupling alignment for bench mark purposes.
3.2.2.2 Float. Measure the total float (thrust).
NOTICES!
1. Fabrication of temporary strong backs maybe required in order to measure the total float (thrust).
2.The maximum allowable float (thrust) should be 0.040 inches.
3.2.2.3 Shaft sleeves. After removal of all the seal components, visually inspect the shaft sleeve surfaces and all the removed seal components for wear, defects and deterioration.
3.2.2.4 Replacement shaft seal kit. Under the supervision of the technical representative, visually inspect the new Government-furnished seal kit for any defects.
3.2.3 Seal component renewal. Refurbish the shaft seal with Government-furnished seal components, under the supervision of the Tech Rep. Ensure the following:
· The compression adapter-tool holes are plugged with renewed plugs, as required.
· The seal is installed with motor armature located in the center of its float (thrust) range.
3.2.4 Seal air test. Do the following:
· Operate the inflatable seal and increase pressure to the manufacturer's recommended pressure.
· Visually inspect all pipe joints, to ensure they are tight.
· With seal inflated, shut off all supply valves, and monitor air leakage. Correct any discrepancy noted.
· Deflate the seal.
3.2.5 Seal water leakage test. After the vessel is waterborne, do the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .