SCHEDULE OF SUPPLIES SERVICES_BLANK SEC B.xls
XLS spreadsheet 32 KB Posted
- Solicitation number
- HSCG80-08-Q-3FAE90
About this file
SCHEDULE OF SUPPLIES/SERVICES
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPEC FOR BRISTOL BAY REV4.doc | DOC document | |
| Amendment to Solicitation A00003 Page 1.doc | DOC document | |
| Amendment to Solicitation A00002 Page 1.doc | DOC document | |
| SPEC FOR BRISTOL BAY REV3.doc | DOC document | |
| Amendment to Solicitation A00001 Page 1.doc | DOC document | |
| SOLICITATION BRISTOL BAY.DOC | DOC document | |
| SCHEDULE OF SUPPLIES SERVICES_BLANK SEC B.xls | XLS spreadsheet | |
| SPEC FOR BRISTOL BAY REV2_WTGB-102.doc | DOC document | |
| SPEC FOR OSAGE 65505 REV0 DRYDOCK.doc | DOC document | |
| SOLICITATION FOR OSAGE.DOC | DOC document | |
| SCHEDULE B FOR OSAGE WLR 65505 REV0.xls | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B
| HSCG80-08-Q-3FAE90 | Page___of___ | ||||||
| USCGC BRISTOL BAY (WTGB_102) | |||||||
| DRYDOCKING AVAILABILITY | |||||||
| SUPPLIES OR SERVICES AND PRICES/COSTS | |||||||
| CLIN Type | WORK ITEM | CLIN | WORK ITEM TITLE | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| BASE | 1 | 0001 | PROVIDE ACCESS TO VARIOUS COMPARTMENTS FOR SHIP'S STRUCTURE AND MACHINERY EVALUATION BOARD INSPECTION | JOB | 1 | ||
| 2 | 0002 | WELDING REPAIRS | NSP | NSP | NSP | NSP | |
| OPT | 2 | 0002AA | WELDING REPAIRS, Crack Repair (Steel) | 1 foot | 8 | ||
| OPT | 2 | 0002AB | WELDING REPAIR, Structural Steel Plate (10.2#) | 4 sqft | 4 | ||
| OPT | 2 | 0002AC | WELDING REPAIR, Structural Steel Plate (12.75#) | 4 sqft | 4 | ||
| OPT | 2 | 0002AD | WELDING REPAIR, Structural Steel Plate (15.3#) | 4 sqft | 4 | ||
| OPT | 2 | 0002AE | WELDING REPAIRS, Overlay Welding (Steel) | 8 sqin | 6 | ||
| OPT | 2 | 0002AF | WELDING REPAIRS, Eroded Weld Renewal | 1 ft | 6 | ||
| OPT | 2 | 0002AG | STUD RENEWAL | EA | 10 | ||
| BASE | 3 | 0003 | CLEAN AND DISINFECT POTABLE WATER TANKS | JOB | 1 | ||
| BASE | 4 | 0004 | CLEAN AND INSPECT CHAIN LOCKER | JOB | 1 | ||
| BASE | 5 | 0005 | CLEAN AND INSPECT SEWAGE AND GRAY WATER COLLECTION AND HOLDING TANKS | JOB | 1 | ||
| BASE | 6 | 0006 | REMOVE INSPECT AND REINSTALL PROPELLER SHAFT | JOB | 1 | ||
| BASE | 7 | 0007 | OVERHAUL SHAFT SEAL ASSEMBLY | JOB | 1 | ||
| BASE | 8 | 0008 | REMOVE, INSPECT, AND REINSTALL PROPELLER | JOB | 1 | ||
| BASE | 9 | 0009 | RENEW DEPTH INDICATING TRANSDUCER | JOB | 1 | ||
| BASE | 10 | 0010 | OVERHAUL VANEAXIAL FAN AND MOTOR ASSEMBLIES | JOB | 1 | ||
| BASE | 11 | 0011 | OVERHAUL MAIN MOTOR BLOWER ASSEMBLY | JOB | 1 | ||
| BASE | 12 | 0012 | OVERHAUL VALVES | JOB | 1 | ||
| BASE | 13 | 0013 | Remove Inspect and Reinstall Rudder Assembly | JOB | 1 | ||
| OPT | 13 | 0013AA | Inspect Government-furnished Rudder Assembly | JOB | 1 | ||
| BASE | 14 | 0014 | PERFORM BOAT BOOM MAINTENANCE | JOB | 1 | ||
| BASE | 15 | 0015 | PERFORM ANCHOR WINDLASS MAINTENANCE | JOB | 1 | ||
| BASE | 16 | 0016 | MODIFY GREY WATER TANK SYSTEM | JOB | 1 | ||
| BASE | 17 | 0017 | CLEAN SEWAGE AND GREY WATER PIPING SYSTEMS | JOB | 1 | ||
| BASE | 18 | 0018 | INSPECT CHOCKS AND TOW BITTS | JOB | 1 | ||
| BASE | 19 | 0019 | INSPECT HYDRAULIC PELICAN HOOKS | JOB | 1 | ||
| BASE | 20 | 0020 | PRESERVE WEATHER DECKS | JOB | 1 | ||
| BASE | 21 | 0021 | PRESERVE UNDERWATER BODY | JOB | 1 | ||
| BASE | 22 | 0022 | RENEW NO. 1 & 2 MAIN DIESEL ENGINE RESILIENT MOUNTS | JOB | 1 | ||
| BASE | 23 | 0023 | INSTALL NEW DECK COVERING SYSTEM | JOB | 1 | ||
| BASE | 24 | 0024 | SERVICE 25-MAN LIFERAFTS AND ASSOCIATED HYDROSTATIC RELEASES(BARGE & TENDER) | JOB | 1 | ||
| BASE | 25 | 0025 | ROUTINE DRYDOCKING | JOB | 1 | ||
| BASE | 26 | 0026 | PROVIDE TEMPORARY LOGISTICS | JOB | 1 | ||
| BASE | 27 | 0027 | RENEW SECTIONS OF BUOY DECK PLATING (BARGE) | JOB | 1 | ||
| BASE | 28 | 0028 | CLEAN AND DISINFECT POTABLE WATER TANKS (BARGE) | JOB | 1 | ||
| BASE | 29 | 0029 | PERFORM ANCHOR WINDLASS MAINTENANCE (Barge) | JOB | 1 | ||
| BASE | 30 | 0030 | PERFORM ANCHOR AND ANCHOR CHAIN MAINTENANCE (BARGE) | JOB | 1 | ||
| BASE | 31 | 0031 | INSPECT AND TEST AIR RECEIVERS AND RELIEF VALVES (TUG) | JOB | 1 | ||
| OPT | A | Composite Labor Rate | Hour | 1,130 | |||
| BASE | B | GFP report in accordance with solicitation Section H. | NSP | EA | 1 | NSP | |
| OPT | Z | Laydays | DAY | 5 | |||
| Subtotal BASE and OPTION Items: | |||||||
| Total of all Items: |
File details come from the government source that posted it. Updated .