1_SPECCHEYENNEDD08REV3.doc
DOC document 541 KB Posted
- Attached to
- USCGC CHEYENNE (WLR-75405) 08 DRYDOCK REPAIR
- Solicitation number
- HSCG80-08-Q-3FAA85
About this file
CGC CHEYENNE 2008 DRYDOCK SPEC REV 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SectionBCHEYENNE08DDrev2.xls | XLS spreadsheet | |
| 1_RFQCHEYENNE2008DD.doc | DOC document | |
| SPECCHEYENNEDD08REV3.doc | DOC document | |
| RFQCHEYENNE2008DD.doc | DOC document | |
| 1_SectionBCHEYENNE08DDrev2.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC CHEYENNE (WLR-75405)
75 FOOT C CLASS RIVER BUOY TENDER
SPECIFICATIONS FOR DRYDOCK REPAIRS
Developed By:
LTJG Karima Greenaway, TDM LTJG Ricardo Lopez, PE CWO2 Andrew Vandewarker, Sec EO MKC Shawn Haynie, EPO Alex Lin, Specifications
Commander (v) Maintenance and Logistics Command, Atlantic 300 E. Main Street, Suite (600) Norfolk, VA 23510-9102
TABLE OF CONTENTS
Work Item Title Page iiiList of Sketches
Revisions Record iv List of Applicable References v List of Government-furnished Property ix List of Critical Inspection Items x Principal Characteristics xii General Requirements Welding Repairs Remove, Inspect, and Reinstall Propeller Shafts Remove, Inspect, and Reinstall Intermediate Shafts Fabricate Shaft Straighten Shaft Renew Water-Lubricated Shaft Bearings Renew Propeller Shaft Sleeves Renew Shaft Strut Barrel Remove, Inspect, and Reinstall Propellers Perform Minor Repairs and Reconditioning of Propeller Clean, Inspect, and Test Grid Coolers Remove, Inspect, and Reinstall Rudder Assembly Renew Rudder Lower Bearing Trunk Renew Upper Bearing Housing and Upper Bearing Housing Support Preserve Spud and Spud Well Surfaces Shrink Wrap Crane Clean and Disinfect Potable Water Tanks Preserve and Disinfect Potable Water Tanks Preserve Barge Buoy Deck Preserve Underwater Body Routine Drydocking Provide Temporary Logistics Perform Ultrasonic Thickness Measurements Renew Deck and Bulkhead Metal in Crews Head Preserve Freeboard
List of Sketches
Work
Item Sketch Number Page
This section is not applicable to this package.
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
| Feb 26, 2008 |
| 1 |
| 11 |
| Deleted reference to ethylene glycol and “CAT extended life 50/50 PREMIX.” Added the coolant to be GFP. |
| 12 |
| Added a NOTICE to identify that four rudders exist. |
| 18 |
| Delete requirement to “pump all treated overboard” and replaced it with “dispose.” |
| 22 |
| Modified the potable water requirement to “22,000 gallons” in lieu of “2,000 gallons.” |
| 25 |
| Added a new work item to preserve the barge and tender freeboard. |
| Feb 28, 2008 |
| 2 |
| All |
| Deleted all tracked changes |
| App Docs |
| Associated a revision with every CG Drawing. |
| March 10, 2008 |
| 3 |
| All |
| Updated drawings. |
| 21 |
| Modified the vessel conditions (paragraph 3.2) to apply “for drydocking” only. |
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
List of Applicable References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution. Electronic copies of the latest Editions of MLCA Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address: http://www.uscg.mil/mlclant/vdiv/specs/default.htm . Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.
Order of precedence. In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with MLCA Standard Specification 0000_STD, paragraph 3.2 (Order of precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.
FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS
MIL-PRF-18458, May 2003, Grease, Wire Rope-Exposed Gear
MIL-PRF-24647, Feb 2005, Paint System, Anticorrosive And Antifouling, Ship Hull MIL-PRF-16173, 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application
MIL-PRF-83483, Feb 1998, Thread Compound, Antiseize, Molybdenum Disulfide Petrolatum
MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited)
MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS
DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 1001_STD, 2004 Edition, Temporary Hull Accesses
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8634_STD, 2004 Edition, Drydocking
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8635_STD, 2004 Edition, Provide Temporary Logistics
DRAWINGS
Coast Guard Drawing 100B CGB 0700-1, Rev 1, Barge Docking Plan
Coast Guard Drawing 100B CGB 2602-1, Rev 2, Spud and Spudwell
Coast Guard Drawing 100B CGB 4103-001, Rev 3, Engine Cooling System
Coast Guard Drawing 75 WAGL 0700-3, Rev-, Docking Block Arrangement
Coast Guard Drawing 75C WAGL 0700-21, Rev-, Docking Plan
Coast Guard Drawing 75C WAGL 1103-027, Rev 2, TRANSV FRS #23-28
Coast Guard Drawing 75C WAGL 1107-001, Rev 4, Lower Deckhouse
Coast Guard Drawing 75C WAGL 1107-002, Rev 4, Lower Deckhouse Section
Coast Guard Drawing 75C-WAGL 2200-022, Rev-, Steering Rudder Trunk Dets (75401-75405)
Coast Guard Drawing 75C WAGL 2200-023, Rev 1, Backing Rudder Trunk Dets (75401-75405)
Coast Guard Drawing 75C WAGL 2200-024, Rev 1, Rudder Dets (75401-75405) Coast Guard Drawing 75C WAGL 2602-22, Rev 2, Towing Knees and Spudwell (75402, 03, 05)
Coast Guard Drawing 75C WAGL 2602-25, Rev-, Towing Knees and Spudwell (75405)
Coast Guard Drawing 75C WAGL 4103-023, Rev 2, Engine Cooling Water Piping Arrangement (75402-75405)
Coast Guard Drawing 75C WAGL 4103-024, Rev-, Mn Eng Cntrl Pip Arrgt (75402-05)
Coast Guard Drawing 75C WAGL 4301-022, Rev-, Stern Strut, Shaft Log, Stern Tube and Bulkhead Stuffing Box (75402-05)
Coast Guard Drawing 75C WAGL 4301-023, Rev 1, Prop Shaft Dets (75402-05)
Coast Guard Drawing 75C WAGL 4301-024, Rev-, Prop Shaft Couplings (75402-05)
Coast Guard Drawing 75C WAGL 4301-025, Rev-, Shaft Brake & Steady Rest Bearing Support for Prop Shafting (75402-05) Coast Guard Drawing 75C WAGL 4301-026, Rev-, Prop Shft Layout & Rud Arrgt (75405)
NAVSEA Drawing 803-2145807, Rev C, Propulsion Shafting and Components
PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series) Jun 2006, Coatings and Color Manual Fernstrum Gridcooler Installation and Maintenance Manual, 2006, Form 165
INDUSTRY STANDARDS
ASTM International (ASTM) E797, 2001, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
ASTM International (ASTM) D882, 2002, Standard Test Method for Tensile Properties of Thin Plastic Sheeting
ASTM International (ASTM), D1709, 2001, Standard Test Methods for Impact Resistance of Plastic Film by the Free-Falling Dart Method
ASTM International (ASTM), D1922, 2000, Standard Test Method for Propagation Tear Resistance of Plastic Film and Thin Sheeting by the Pendulum Method
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2005, Drinking Water System Components - Health Effects
American Water Works Association (AWWA) C652, 2002, Disinfection of Water-Storage Facilities
ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging
American Bureau of Shipping (ABS) 2, Rule Requirements for Survey After Construction, 2007, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive
List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 9 |
| Y |
| Propeller (Left) |
| Michigan Wheel #531603 |
| 1 ea. |
| 8,800.00 |
| Y |
| Propeller (right) |
| Michigan Wheel #531602 |
| 1 ea. |
| 8,800.00 |
| 11 |
| Y |
| 50/50 pre-mixed coolant |
| N/A |
| 1 ea. |
| 500.00 |
List of Critical Inspection Items
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see Std Spec 0000_STD, paragraph 3.6.2 (Inspection report particulars)):
Work Item Title
Remove, Inspect, and Reinstall Propeller Shafts
Remove, Inspect, and Reinstall Intermediate Shafts
Clean, Inspect, and Test Grid Coolers
Remove, Inspect, and Reinstall Rudder Assembly
Preserve Spud and Spud Well Surfaces
Perform Ultrasonic Thickness Measurements
Specification Feedback The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities. All feedback will be reviewed, evaluated, and responded to in a timely manner.
If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:
http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:
http://www.uscg.mil/mlclant/VDiv/specs/specfeedback.htm PC_75C_WLR_Cheyenne_Barge (09 Jan 2004)
75C WLR
Principal Characteristics
75' WLR (C Class) "Cheyenne" Small Buoy River Tender
| Length Overall |
| 75' 5-1/2" |
| Depth (main deck at side to baseline) |
| 7' 8-1/2" |
| Maximum Beam |
| 22' 5" |
| Height of Highest Projection (above DWL) |
| N/A |
| Frame Spacing |
| 1' 6" |
| Full Load Draft |
| 4' 2" |
| Full Load Displacement |
| 136.1 short tons |
| Shore Tie Voltage Requirements |
| N/A |
PROPELLERS / SHAFT
| Number of Propellers |
| 2 |
| Number of Blades per Propeller |
| 4 |
| Diameter of Propeller |
| 48" |
| Pitch |
| 47" fixed |
| Revolutions per Minute (RPM) |
| 410 |
| Shaft Diameter |
| N/A |
CG BARGE
| Length Overall (LOA) |
| 100' 0" |
| Depth (main deck at side to baseline) |
| 7' 0" |
| Maximum Beam |
| 30' 0" |
| Height Of Highest Projection (Above DWL) |
| N/A |
| Frame Spacing |
| 1' 6" |
| Full Load Draft |
| 4' 0" |
| Full Load Displacement |
| 237 short tons |
| Shore Tie Voltage Requirements |
| N/A |
00000N_FLT (20 Apr 2007)
General Requirements
1. SCOPE
1.1 Scope. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series) Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.
NOTICE!
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and nondestructive inspection (NDI), in accordance with Std Spec 0740_STD.
4. QUALITY ASSURANCE
No additional requirements.
5. NOTES
5.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/ccs/cit/cim/directives/cim/cim_10360_3c.pdf.
5.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in Std Spec 0000_STD to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this item.
QA-1: QUALITY ASSURANCE INSPECTION FORM - PRESERVATION CHECKLIST
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 –2.5 for surfaces to be coated w/single coat of inorganic zinc).
Measure soluble salt conductivity (5 measurements per 1000 sqft) – maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the Coating Manufacturer(s).
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness.
Verify system cure for service resumption - U/W Body surfaces: 5-8 hours @ 77 degrees F; Potable water tanks: 7 days @ 77 degrees F.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure (minimum 7 days @ 77 degrees F.), to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Signature of Inspector:______________________________________________________Date:____________
QA-2. QUALITY ASSURANCE INSPECTION FORM
ENVIRONMENTAL READINGS
(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
| DATE |
| TIME |
| ENTER ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION |
| DEW POINT |
| SURFACE TEMP. |
| % REL. HUMIDITY |
| SIGNATURE OF INSPECTOR |
.Signature of Inspector:__________________________________________________Date:____________
QA-3 QUALITY ASSURANCE INSPECTION FORM
SURFACE PROFILE LOG
Vessel Name And Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location Of Work (Including Frame Numbers):_____________________________________
Area (Square Feet):_____________
Surface Preparation Method:_____________________________________________________
Abrasive Manufacturer And Size:_________________________________________________
Degreasing Method Used:________________________________________________________
Number Of Hours Surfaces (Steel Only) Left Unpainted:______________________________
Sweep blasting performed to remove flash rusting (steel)? Yes/No:_____________________
Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record.
Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
AVERAGE MILS
(IAW ASTM D4417, METHOD C)
Place Surface Profile Replica Tape Here
Reading:__________ mils
· Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Date and Time:__________________________________________________
Location of Surface Profile Measurements:___________________________________________________________
Signature of Inspector:____________________________________________________________________________
QA-4. QUALITY ASSURANCE INSPECTION FORM
SURFACE SOLUBLE SALT CONDUCTIVITY LOG
Vessel Name and Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________ Location of Work (including frame numbers):_______________________________________
Area (square feet):____________
| DATE |
| TEST LOCATIONS |
| CONDUCTIVITY |
(microsiemens/cm)
Date and Time:_________________________________________
Signature of Inspector:___________________________________
QA-5. QUALITY ASSURANCE DATA FORM
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2
(Use one sheet for each sequence)
Vessel Name and Hull Number:__________________________________________________
Work Item Title:______________________________________________________________
Coating Manufacturer:_________________________________________________________
Product Name:________________________________________________________________
Batch Number:________________________________________________________________
Induction Time:_______________________________________________________________
Coating System Sequence (Indicate whether: primer, touch-up primer, barrier coat, 3rd coat…):__________________
DFT
MEASUREMENT NUMBER
| LOCATION OF READINGS |
| MEASURED DFT |
Application Method (Airless, Conventional Spray, Rolled):____________________
Average DFT: __________________________________________________________
Date and Time: _________________________________________________________
Signature of Inspector: ___________________________________ 07400D_FLT (25 Apr 2006) FLT (05 Jan 2004) WORK ITEM 1: Welding Repairs
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to perform welding repairs.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
3. REQUIREMENTS
3.1 General. The Contractor shall perform all welding and nondestructive inspection (NDI) in accordance with Std Spec 0740_STD. This work item includes all welding related activities only and does not include interference removal.
4. QUALITY ASSURANCE
No additional requirements.
5. NOTES
This section is not applicable to this work item
24310L_FLT (12 Apr 2007) 75402-05 WLR (14 Feb 2007) WORK ITEM 2: Remove, Inspect, and Reinstall Propeller Shafts
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to remove, inspect, and reinstall the port and starboard propeller shafts.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Coast Guard Drawing 75C WAGL 4301-022, Rev-, Stern Strut, Shaft Log, Stern Tube and Bulkhead Stuffing Box (75402-05)
Coast Guard Drawing 75C WAGL 4301-023, Rev 1, Prop Shaft Dets (75402-05)
Coast Guard Drawing 75C WAGL 4301-024, Rev-, Prop Shaft Couplings (75402-05)
Coast Guard Drawing 75C WAGL 4301-025, Rev-, Shaft Brake & Steady Rest Bearing Support for Prop Shafting (75402-05) Coast Guard Drawing 75C WAGL 4301-026, Rev-, Prop Shft Layout & Rud Arrgt (75405)
3. REQUIREMENTS
3.1 General.
3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s):
· 3.2.2 (Inspections).
3.1.2 Related work item. The Contractor shall accomplish this work item in conjunction with "Remove, Inspect and Reinstall Propellers" which is separate work item of this specification.
3.1.3 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the following:
· Rope guard.
· Fairwater.
3.2 Work to be accomplished. Using Coast Guard Drawings 75C WAGL 4301-022, 75C WAGL 4301-023, 75C WAGL 4301-024, 75C WAGL 4301-025, and 75C WAGL 4301-026 as guidance, as applicable, the Contractor shall accomplish the following for each designated propeller shaft:
3.2.1 Removals.
3.2.1.1 Mark existing shaft position, and match-mark shaft coupling bolts to their respective holes, to facilitate reinstallation procedures.
3.2.1.2 Remove the shaft and attached components to a suitable repair facility. Ensure shaft is properly protected and supported at all bearing journals, at all times, until reinstallation.
3.2.2 Inspections. Clean the shaft free of all marine growth, and accomplish the following inspections (Submit CIR):
3.2.2.1 Visually inspect the following components, as applicable, for excessive wear and other mechanical defects such as nicks, cracks, and corrosion, as applicable:
· Shaft surfaces.
· Bearing surfaces.
· All shaft and propeller associated fasteners.
· Couplings.
· Stern tube/shaft sealing systems.
· Packing ring and glands.
NOTICE!
Before taking shaft runout readings, spin the shaft on a lathe for approximately two hours at the vessel's maximum rated RPM to eliminate any sagging that may have occurred during handling and storage.
3.2.2.2 Accomplish the following measurements:
· Measure keys and keyways.
· Measure all bearing sleeve or journal diameters.
· Measure runouts for shaft taper, shaft straightness, and coupling end diameters.
· With the key in-place, fit the shaft coupling to the shaft in shop and check the contact percentage by bluing. If the contact is less than 80%, the Contractor shall grind and hand stone the coupling hub to achieve a minimum of 80 percent contact, and verify by bluing again. Make a small inscription on the shaft to mark the coupling hub location and use it as a reference in final assembly. Measure and record the coupling face and bore runouts.
3.2.2.3 Perform nondestructive inspection of all bearing sleeves, shaft tapers, coupling bolts, keyways, and welded repair surfaces, in accordance with Std Spec 0740_STD, Appendix C.
3.2.3 Stern tube preservation. Prepare and coat the interior stern tube surfaces in accordance with COMDTINST M10360.3, using the system specified for "U/W Body and Boot-Top, Steel Hulls, in Fresh Water" in Appendix A (Cutter and Boat Exterior Paint System). After surface preparation and before coating application, do the following:
3.2.3.1 Perform a visual inspection of the prepared stern tube surfaces.
3.2.3.2 Submit a CFR.
3.2.4 Reinstallation. Reinstall the propeller shaft to its original configuration and accomplish the following, using Coast Guard Drawings 75C WAGL 4301-022, 75C WAGL 4301-023, 75C WAGL 4301-024, 75C WAGL 4301-025, and 75C WAGL 4301-026, as applicable.
3.2.4.1 Machine, grind, or hand-stone couplings, if necessary, to achieve an 80 percent contact. True couplings to shaft by cutting coupling faces and land area.
3.2.4.2 Renew all stainless steel self-locking nuts for packing glands.
3.2.4.3 Renew all packing materials.
4. QUALITY ASSURANCE
4.1 Post-repair operational testing. In the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the shafting system to be in satisfactory operating condition. Conduct a sea trial to test the propeller shaft in all modes of operation for a minimum of 4 hours. Inspect and correct any excessive leakage, abnormal noise and excessive vibration. Submit a CFR,
5. NOTES
This section is not applicable to this work item.
24320L_FLT (04 Nov 2004) 75402-05_ C WLR (04 Nov 2006) WORK ITEM 3: Remove, Inspect, and Reinstall Intermediate Shafts
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to remove, inspect, and reinstall the port and starboard intermediate shafts.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes Coast Guard Drawing 75C WAGL 4301-022, Rev-, Stern Strut, Shaft Log, Stern Tube and Bulkhead Stuffing Box (75402-05)
Coast Guard Drawing 75C WAGL 4301-023, Rev 1, Prop Shaft Dets (75402-05)
Coast Guard Drawing 75C WAGL 4301-024, Rev-, Prop Shaft Couplings (75402-05)
Coast Guard Drawing 75C WAGL 4301-025, Rev-, Shaft Brake & Steady Rest Bearing Support for Prop Shafting (75402-05) Coast Guard Drawing 75C WAGL 4301-026, Rev-, Prop Shft Layout & Rud Arrgt (75405)
3. REQUIREMENTS
3.1 General. The Contractor shall:
3.1.1 Critical Inspection Report. Submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s):
· 3.4 (Inspections)
3.1.2 Related work item. Accomplish this work in conjunction with "Remove, Inspect, and Reinstall Propeller Shafts", which is a separate work item in this specification package.
3.2 Removals. Using Coast Guard Drawings 75C WAGL 4301-22, 75C WAGL 4301-23, 75C WAGL 4301-24, 75C WAGL 4301-25, and 75C WAGL 4301-26 as guidance, the Contractor shall accomplish the following tasks, for each of the designated intermediate shafts:
3.2.1 Mark existing shaft position, and match-mark shaft coupling bolts to their respective holes, to facilitate reinstallation procedures.
3.2.2 Remove the shaft and attached components, including cooper bearing, to a suitable repair facility. Ensure shaft is properly protected and supported at all bearing journals, at all times, until reinstallation.
3.3 Protective measures. The Contractor shall protect the shafts from weather and damage during removal, storage, and reinstallation. Ensure the shaft is properly supported at all bearing journals, at all times, until reinstallation.
3.4 Inspections. The Contractor shall clean each shaft of all marine growth, set up the shaft in a lathe, providing supports at each bearing surface, and accomplish the following inspections (Submit CIR):
3.4.1 Visual inspection. Visually inspect all bearing components and shaft surfaces for excessive wear and other defects..
3.4.2 Measurements and machining. Measure the shaft diameters and runouts at the locations of the cooper bearing and bulkhead stuffing box. Measure each shaft taper and shaft runout at the taper. Measure all keyways and keys. Measure coupling end diameters and runout. Measure the boss ring runouts. With keys installed, fit the shaft coupling to the shaft in shop, perform all necessary coupling machining to achieve a minimum of 80 percent contact, and check by bluing. Install couplings and check face and bore runouts on couplings. True couplings to shaft by cutting coupling faces and land area.
3.4.3 Non-destructive inspection. Conduct nondestructive inspection of all shaft tapers, and keyways, in combination, as appropriate, in accordance with Std Spec 0740_STD.
3.5 Bearing reinstallation. Upon completion inspection, the Contractor shall reinstall the cooper bearing assembly. Lubricate the bearing in accordance with manufacturer's recommendation.
3.6 Shaft reinstallation. The Contractor shall reinstall each intermediate shaft to original configuration.
3.6.1 True couplings to shaft by cutting coupling faces and land area, as necessary.
3.6.2 Renew all stainless steel self-locking nuts and new packing materials.
4. QUALITY ASSURANCE
4.1 Post-repair operational testing. In the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the shafting system to be in satisfactory operating condition. Conduct a sea trial to test the propeller shaft in all modes of operation for a minimum of 4 hours. Inspect and correct any excessive leakage, abnormal noise and excessive vibration. Submit a CFR.
5. NOTES
This section is not applicable to this work item.
24340L_WLIC_WLR (15 Apr 5 2005) 75402-05 WLR (12 Jan 2004) WORK ITEM 4: Fabricate Shaft
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to fabricate a designated shaft.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Drawing 75C WAGL 4301-23, Rev 1, Prop Shaft Dets (75402-05)
3. REQUIREMENTS
3.1 Related work item. The Contractor shall accomplish this work in conjunction with "Remove, Inspect, Repair, and Reinstall Propeller Shafts" and "Remove, Inspect, Repair, and Reinstall Intermediate Shafts", which are separate work items in this specification package.
3.2. New propeller shaft. The Contractor shall fabricate a propeller shaft, complete with associated coupling, sleeves, and keys, as shown on Coast Guard Drawing 75C WAGL 4301-23. Ensure that the new sleeves are made of hard steel nickel-chrome-boron.3.3 New intermediate shaft. The Contractor shall fabricate an intermediate shaft and associated coupling, keys, coupling nuts and coupling bolts, as shown on Coast Guard Drawing 75C WAGL 4301-23.
4. QUALITY ASSURANCE
4.1 Inspections. The Contractor shall perform the following inspections on each new shaft assembly in the presence of the Coast Guard Inspector, and submit a CFR:
4.1.1 Visual. Complete a visual inspection for mechanical defects.
4.1.2 Measurements. Perform the following measurement inspections and compare findings to measurements shown on Coast Guard Drawing 75C WAGL 4301-23:
· Measure the bearing sleeves diameters and runouts.
· Measure the shaft taper and shaft runout at the taper.
· Measure all keyways and keys.
4.1.3 Non-destructive inspection. Conduct non-destructive inspection of all shaft tapers and keyways, in accordance with Standard Specification 0740_STD.
5. NOTES
This section is not applicable to this work item.
24350L_FLT (06 Mar 2006) 75402-05_WLR (23 Jan 2004) WORK ITEM 5: Straighten Shaft
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to straighten a designated shaft.
2. APPLICABLE DOCUMENTS
MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Drawing 75C WAGL 4301-023, Rev 1, Prop Shaft Dets (75402-05)
Coast Guard Drawing 75C WAGL 4301-024, Rev-, Prop Shaft Couplings (75402-05)
3. REQUIREMENTS
3.1 Shaft straightening requirements. Based on inspection results obtained from a related shaft work item in this specification package, or provided by the Coast Guard Inspector, the Contractor shall straighten the designated shaft, using Coast Guard Drawings 75C WAGL 4301-23, 75C WAGL 4301-24, and MIL-STD-2191 as guidance and as specified herein.
3.1.1 Pre-straightening inspection. Prior to initiating straightening processes, determine the location, magnitude and type of bend in the shaft, with the entire shaft supported on centers in a lathe, as follows:
· Before taking shaft runout readings, spin the shaft on the lathe for approximately two hours to eliminate any sagging that may have occurred during handling and storage.
· Conduct a dial indicator survey of shaft runout at stations spaced every two feet of shaft length to determine the magnitude and location of the bend.
· At each station, mark the position of maximum runout on the periphery of the shaft.
NOTICE!
Be aware that the marks on the shaft periphery will be in a straight line if the shaft contains a simple bend, and will spiral part way around the shaft, if the shaft is both bent and twisted.
· Plot the maximum runout to an exaggerated scale, in order to locate the center of the bend, and to determine the extent of straightening required.
· Submit a CFR including locations and magnitudes of the bend.
3.1.2 Straightening procedures. Straighten the shaft to equal or less than 0.005" total indicator runout, using the localized heating (hot spotting method for carbon steel shafts, in accordance with MIL-STD-2191, Section 11.2.2.2 and sub-paragraphs).
3.1.3 Post-straightening inspections. After completion of straightening procedures, accomplish inspections, and submit a CFR:
· Conduct non-destructive inspection of all straightened areas in accordance with Std Spec 0740_STD, Appendix C.
· Recheck the shaft surfaces, as specified in paragraph 3.1.1 (Pre-straightening inspection).
4. QUALITY ASSURANCE
No additional requirements.
5. NOTES
This section is not applicable to this work item.
24400L_FLT (01 Aug 2007) 75402-05 (25 May 2004) WORK ITEM 6: Renew Water-Lubricated Shaft Bearings
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to renew the water-lubricated bearings for the port and starboard shafts.
2. APPLICABLE DOCUMENTS
Coast Guard Drawing 75C WAGL 4301-022, Rev-, Stern Strut, Shaft Log, Stern Tube and Bulkhead Stuffing Box (75402-05)
Coast Guard Drawing 75C WAGL 4301-024, Rev-, Prop Shaft Couplings (75402-05)
3. REQUIREMENTS
3.1 Related work item. The Contractor shall perform this work in conjunction with "Remove, Inspect, and Reinstall Propeller Shafts", which is a separate work item in this specification package.
3.2 Bearing renewal. The Contractor shall accomplish the following, using Coast Guard Drawings 75C WAGL 4301-022 and 75C WAGL 4301-024 as guidance:
3.2.1 Removal. Remove the existing water-lubricated bearings; dispose of the removed bearings after visually inspection for any abnormal wear patterns which may indicate misalignment. Submit CFR.
3.2.2 Inspections.
3.2.2.1 Visual. Visually inspect the following:
· Chocking material, if installed in the bearing housings.
· Bearings.
· Bearing housing bores.
· Shaft journal in way of bearings.
3.2.2.2 Measurements. Measure the inner diameter of each bearing housing, at the forward, middle and aft positions.
3.2.2.3 Documentation. Submit a CFR after the inspection and measurements.
3.2.3 New bearing installation. The Contractor shall furnish water-lubricated bearings, and accomplish the following, using Coast Guard Drawings 75C WAGL 4301-022 and 75C WAGL 4301-024 as guidance:
3.2.3.1 In the presence of the Coast Guard Inspector, the Contractor shall check the alignment of the stern tube, forward seal flange, and bearing carriers relative to the shaft centerline including any offsets by running a taut line, using the optical scopes method, or using laser alignment.
3.2.3.2 Machine the new bearings to fit the bearing housing in accordance with the manufacturer's installation recommendations. Drill and tap new bolt holes on the new bearings to match the bearing housings for proper fit.
3.2.3.3 Install the new water-lubricated bearings in accordance with the bearing manufacturer's recommendations, using new monel or type 316 stainless steel fasteners.
3.3 Final measurement. After bearing installation, the Contractor shall:
3.3.1 Measure final bearing clearances at 90-degree intervals around the shaft at forward and aft ends of the bearing: a total of 8 measurements per bearing.
3.3.2 Submit a CFR after taking the measurements.
3.3.3 Minimum operating bearing clearance shall be as follows:
| Diameter of Journal (inches) |
| Minimum operating Clearance of new water-lubricated Bearings (inches) |
| 3 |
| 0.022 |
| 4 |
| 0.025 |
| 5 |
| 0.027 |
| 6 |
| 0.030 |
| 7 |
| 0.032 |
| 8 |
| 0.035 |
| 9 |
| 0.037 |
| 10 |
| 0.040 |
| 11 |
| 0.042 |
| 12 |
| 0.045 |
| 13 |
| 0.047 |
| 14 |
| 0.050 |
4. QUALITY ASSURANCE
4.1 Inspection and operational test. The Contractor shall accomplish the following tasks, and submit a CFR:
4.1.1 Visual inspection. Visually inspect the new bearings and record bearing clearances, after shaft reinstallation.
4.1.2 Operational test. In the presence of the Coast Guard Inspector, conduct an operational test of the shaft during sea trials, to ensure there is no evidence of binding, abnormal vibration, and noise during sea trials.
5. NOTES
This section is not applicable to this work item.
24420L_FLT (15 Dec 2006) 75402-05 (30 Jan 2004) WORK ITEM 7: Renew Propeller Shaft Sleeves
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to renew the sleeves on the port and starboard propeller shafts.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Drawing 75C WAGL 4301-022, Rev-, Stern Strut, Shaft Log, Stern Tube and Bulkhead Stuffing Box (75402-05)
Coast Guard Drawing 75C WAGL 4301-025, Rev-, Shaft Brake & Steady Rest Bearing Support for Prop Shafting (75402-05) NAVSEA Drawing 803-2145807, Rev C, Propulsion Shafting And Components
3. REQUIREMENTS
3.1 Related work item. The Contractor shall perform this work in conjunction with "Remove, Inspect, and Reinstall Propeller Shafts", which is a separate work item in this specification package.
3.2 Sleeve renewal requirements. Using Coast Guard Drawings 75C WAGL 4301-22 and 75C WAGL 4301-25 as guidance, the Contractor shall accomplish the following, for the port and starboard propeller shafts:
3.2.1 Removal. Remove and dispose of the sleeves.
3.2.2 Inspections. Clean all shaft journal surfaces, and accomplish the following:
3.2.2.1 Perform a visual inspection of the shaft journal surfaces for corrosion, deterioration, and other signs of failures.
3.2.2.2 Measure and record in the shaft journal outside diameter and the shaft bearing inside diameter in the following positions:
· Forward.
· Middle.
· Aft.
3.2.2.3 Conduct nondestructive testing of all shaft surfaces in the way of sleeve fit areas, in accordance with Std Spec 0740_STD, Appendix C.
3.2.3 Inspection report. The Contractor shall submit a CFR for the completed inspection and measurements.
3.2.4 New sleeve installation requirements. After the Coast Guard Inspector has reviewed all measurement findings, the Contractor shall furnish new hard steel nickel-chrome-boron shaft sleeves (see 5.1) and accomplish the following:
3.2.4.1 Bore new sleeve ID to the dimensions based on the recorded shaft journal OD readings, to facilitate an interference fit, as specified below.
3.2.4.2 Install the new sleeves onto the shaft with a shrink-fit equal to 0.00075-inch per inch of shaft diameter, in accordance with NAVSEA_Drawing 803-2145807, Table 8-1 (Shaft Sleeve Shrink Fit).
3.2.4.3 After installation, machine new steps at the end of each sleeve where the shaft covering is required.
3.2.5 Concentricity measurement. Check the outside diameter of each shaft sleeve to ensure it is concentric with the axis of rotation within 0.0005 inch (0.001 inch runout).
3.2.6 Polishing. Polish the sleeve surfaces to a 32 micro-inch RMS finish, upon completion of installation and all required machining.
3.3 Final documentation. The Contractor shall provide a complete set of the new sleeve dimensional readings to the COR within 48 hours after completion of sleeve installation. At a minimum, the set of readings shall include the new sleeve length, diameters (inside and outside) at the bearing journals, concentricity, and polish.
4. QUALITY ASSURANCE
No additional requirements.
5. NOTES
5.1 Nickel-chrome-boron shaft sleeve suppliers. Suppliers for the nickel-chrome-boron shaft sleeve include, but are not limited to the following:
National Maintenance and Repair Hartford, Illinois Phone: (618) 254-7451
Dover Corp/Dover Diversified/Waukesha Bearings Corporation Waukesha, Wisconsin Phone: (414) 547-3381 24430L_WLIC_WLR (06 Apr 2006) 75402-05 WLR (09 Aug 2004) WORK ITEM 8: Renew Shaft Strut Barrel
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to renew the strut barrel for a designated shaft.
2. APPLICABLE DOCUMENTS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Coast Guard Drawing 75C WAGL 4301-022, Rev-, Stern Strut, Shaft Log, Stern Tube and Bulkhead Stuffing Box (75402-05)
3. REQUIREMENTS
3.1 Related work item. The Contractor shall perform this work in conjunction with "Remove, Inspect, and Reinstall Propeller Shafts", which is a separate work item in this specification package.
3.2 Strut barrel renewal. The Contractor shall accomplish the following, using Coast Guard Drawing 75C WAGL 4301-22 as guidance:
3.2.1 Removal. Crop, remove, and dispose of the designated shaft strut barrel.
3.2.2 New barrel fabrication, alignment and installation. Fabricate a new shaft strut barrel, using the existing barrel as template. In conjunction with the shaft alignment specified in the "Remove, Inspect, and Reinstall Propeller Shaft" work item, position the new strut barrel to ensure proper alignment to the shaft centerline. Once correct alignment has been established, accomplish the following:
3.2.2.1 Tack-weld the strut barrel to the vertical shaft strut and ensure that proper alignment is maintained between the strut, stern tube and cooper bearing.
3.2.2.2 After proper alignment has been verified, weld the strut barrel in place.
3.2.2.3 Line bore the strut barrel to the shaft centerline, with any proper bearing off-set as required.
3.2.2.4 Conduct a final alignment check; ensure alignment is within 0.005".
3.2.3 Documentation. Submit to the COR a written report of all recorded readings and measurements taken as part of this work item.
3.3 Preservation. The Contractor shall preserve all new and disturbed surfaces, using the system specified "Underwater Water (U/W) Body and Boot-Top (U/W Body and Boot-Top, Steel Hulls, in Fresh Water)" in COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Coating Systems).
3.4 Shaft strut renewal. If a Change Request has been released and authorized by the Contracting Officer (KO), the Contractor shall fabricate and install a new shaft strut, as shown on Coast Guard Drawing 75C WAGL 4301-22. Prepare and paint the new strut, as specified in section 3.3 (Preservation) herein.
4. QUALITY ASSURANCE
No additional requirements.
5. NOTES
This section is not applicable to this work item.
24500L_FLT (20 June 2007) 75402-05 (02 Dec 2005) WORK ITEM 9: Remove, Inspect, and Reinstall Propellers
1. SCOPE
1.1 Scope. This work item describes the requirements for the Contractor to remove, inspect, and reinstall port and starboard propellers.
2. APPLICABLE DOCUMENTS
MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited)
MIL-PRF-16173, 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive
3. REQUIREMENTS
3.1 Protective and safety measures. The Contractor shall accomplish the following:
· Before removing each propeller or propeller nut, fit a shore from the floor of the dock to one propeller blade near the root, to prevent shock transmission to reduction gear, as necessary.
· Protect propeller blade edges and blade roots with suitable covers, at all times until reinstallation, to prevent damage.
3.2 Work to be accomplished. The Contractor shall accomplish the following for each propeller, using drawing provided by the Coast Guard Inspector as guidance.
3.2.1 Removal. Remove the propeller to a suitable repair shop.
NOTICE!
If it becomes necessary to apply heat to facilitate propeller removal, ensure that the hub temperature never exceeds 500 degrees Fahrenheit; in addition, ensure that gland, packing ring, fill and vent plugs are removed, and the adjacent shafting and canvas under the blade edge guards are protected from flame impingement.
3.2.2 Inspection. Visually inspect the propeller for any damage, cracks, and other defects. Examine and record the suction and pressure face thickness, blade tip profiles, leading and trailing edges, contours, track, width, diameter, taper, pitch, and keyway of the propeller in accordance with ISO 484/2, Class I. Submit a written CFR.
3.2.3 Polishing. Polish the propeller to a uniform 63 micro-inch RMS finish.
3.2.4 Propeller hub fitting check. In the presence of the Coast Guard Inspector and with the key in place, carefully check the fit of the propeller hub bore to the shaft taper by applying Prussian blue to the shaft taper.
3.2.4.1 Uniform fit. Obtain a uniform fit of 60 percent contact over the taper, with a slightly heavier fit on the larger end. Do not heat the shaft taper to compensate for a poor fit.
3.2.4.2 Propeller fit. If the fit is less than 60 percent, hand grind/stone the propeller hub bore to achieve the required fit.
WARNING!
Do not machine the shaft taper.
3.2.4.3 Location inscription. When 60 percent fit has been obtained, make a small inscription on the shaft to mark the propeller location. Use this mark as a reference in final assembly.
3.3 Propeller Installation.
3.3.1 Cleaning. For the final assembly, the propeller bore and shaft taper surfaces shall be clean and free of bluing, lubricants, dirt, foreign particles, or any other substance, which would hinder moving the propeller along the taper. Install the propeller with dry metal-to-metal contact to obtain the maximum frictional force for torque transmission. Renew the rubber O-rings and packing before reassembly, if applicable.
3.3.2 Balancing. Perform single-plane balancing of both reconditioned propeller and cap on rotational balancing equipment to ensure freedom from vibration in accordance with MIL-STD-167-1 for Type II (internally excited) vibration; observe the following requirements:
3.3.2.1 Material removal. Remove material as evenly as possible from over the entire blade surface (both suction and pressure faces) but not closer to the blade edges than 10 percent of the blade width, to prevent "thin spots" when balancing the propeller.
3.3.2.2 Addition of weight. Add weight to inside the propeller cap by welding, if necessary, to balance the cap, ensuring that the added material is clear of the propeller nut, the locking key, and the end of the propeller shaft.
3.3.2.3 Restrictions. Ensure that the maximum permissible residual unbalance does not exceed the value determined by the following formulas for the speeds specified in table I below if no specific maximum permissible residual unbalance value provided by the Coast Guard Inspector.
TABLE I. Maximum permissible residual unbalance.
SPEED
(RPM)
FORMULA
| 0 to 149 |
| U = 0.177W |
| 150 to 1,000 |
| U = (400W)/(N x N) |
| 1,000+ |
| U = 4W/N |
Where U = Maximum allowable residual unbalance (ounce-inches) W = Weight of rotating part (pounds) N = Maximum operating speed (revolution/minute)
3.3.3 Assembly. With the propeller installed on the taper in the same position as when fitted, install the propeller nut and drive up the propeller until it is advanced forward about 1/16" beyond the inscribed mark as specified in 3.2.4.3 (Location inscription). Lock the nut in place with an appropriate locking device.
NOTICE!
It is prohibited to use grease, oil, or other substances on the taper to help drive the propeller.
3.3.4 Void filling. When applicable, the Contractor shall fill all internal voids in the propeller hub and cap with rust preventive compound conforming to MIL-PRF-16173. Renew all brass plugs.
3.3.5 Adhere to the following warnings:
· Do not heat the propeller hub, to compensate for a poor fit on the shaft taper.
· Do not machine the shaft taper to achieve the required fit.
3.3.5.1 Lock propeller nut in place with new stainless steel lock washer or monel cap screws.
3.4 Propeller change-out. The Contractor shall be aware that the Government reserves the right to furnish a propeller to be installed in-place of the one removed. When the Government exercises this right, the Contractor shall turn over the removed propeller to the Coast Guard PA as a MTI item. If a Change Request has been authorized and released by the KO, the Contractor shall inspect the Government-furnished propeller, and submit a CFR including any additional work that may be required to install the new propeller to the existing shaft.
4. QUALITY ASSURANCE
No additional requirements.
5. NOTES
5.1 Government-furnished property.
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/UNIT)
| Y |
| Propeller (Left) |
| Michigan Wheel #531603 |
| 1 ea. |
| 8,800 |
| Y |
| Propeller (right) |
| Michigan Wheel #531602 |
| 1 ea. |
| 8,800 |
5.2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .