1_SectionBCHEYENNE08DDrev2.xls
XLS spreadsheet 39 KB Posted
- Attached to
- USCGC CHEYENNE (WLR-75405) 08 DRYDOCK REPAIR
- Solicitation number
- HSCG80-08-Q-3FAA85
About this file
CGC CHEYENNE 2008 DD Schedule of Prices/Costs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SectionBCHEYENNE08DDrev2.xls | XLS spreadsheet | |
| 1_RFQCHEYENNE2008DD.doc | DOC document | |
| SPECCHEYENNEDD08REV3.doc | DOC document | |
| RFQCHEYENNE2008DD.doc | DOC document | |
| 1_SPECCHEYENNEDD08REV3.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B
| HSCG80-08-__-3FA___ | Page___of___ | ||||||
| USCGC CHEYENNE (WLR 75405) | |||||||
| DRYDOCKING AVAILABILITY | |||||||
| SUPPLIES OR SERVICES AND PRICES/COSTS | |||||||
| CLIN Type | WORK ITEM | CLIN | WORK ITEM TITLE | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| OPT | 1 | 0001 | WELDING REPAIRS: Crack Repair (Steel) | 1 foot | 8 | ||
| OPT | 1 | 0001AA | WELDING REPAIRS: Structural Steel Plate (10.2# Steel) | 4 sqft | 2 | ||
| OPT | 1 | 0001AB | WELDING REPAIRS: Structural Steel Plate (12.75# Steel) | 3 sqft | 2 | ||
| OPT | 1 | 0001AC | WELDING REPAIRS: Overlay Welding (Steel) | 8 sqin | 4 | ||
| OPT | 1 | 0001AD | WELDING REPAIRS: Eroded Weld Renewal (Steel) | 1 foot | 6 | ||
| OPT | 1 | 0001AE | WELDING REPAIRS: Stud Renewal (Steel) | EA | 8 | ||
| BASE | 2 | 0002 | REMOVE, INSPECT, AND REINSTALL PROPELLER SHAFTS | JOB | 1 | ||
| BASE | 3 | 0003 | REMOVE, INSPECT, AND REINSTALL INTERMEDIATE SHAFTS | JOB | 1 | ||
| OPT | 4 | 0004 | FABRICATE SHAFT | JOB | 2 | ||
| OPT | 5 | 0005 | STRAIGHTEN SHAFT | EA | 2 | ||
| BASE | 6 | 0006 | RENEW WATER-LUBRICATED SHAFT BEARINGS | JOB | 1 | ||
| OPT | 7 | 0007 | RENEW PROPELLER SHAFT SLEEVES | JOB | 1 | ||
| OPT | 8 | 0008 | RENEW SHAFT STRUT BARREL | JOB | 2 | ||
| BASE | 9 | 0009 | REMOVE, INSPECT, AND REINSTALL PROPELLERS | JOB | 1 | ||
| OPT | 10 | 0010 | PERFORM MINOR REPAIRS AND RECONDITIONING OF PROPELLER | EA | 2 | ||
| BASE | 11 | 0011 | CLEAN, INSPECT, AND TEST GRID COOLERS | JOB | 1 | ||
| BASE | 12 | 0012 | REMOVE, INSPECT AND REINSTALL RUDDER ASSEMBLIES FOR STEERING AND FLANKING SYSTEMS | JOB | 1 | ||
| OPT | 13 | 0013 | RENEW RUDDER LOWER BEARING TRUNK | JOB | 1 | ||
| OPT | 14 | 0014 | RENEW UPPER BEARING HOUSING AND UPPER BEARING HOUSING SUPPORT | JOB | 1 | ||
| BASE | 15 | 0015 | PRESERVE SPUD AND SPUD WELL SURFACES AND RENEW SPUD WELL LINERS | JOB | 1 | ||
| OPT | 15 | 0015AA | Renew Brackets | JOB | 1 | ||
| OPT | 15 | 0015AB | Renew Spud Well Liners | JOB | 1 | ||
| BASE | 16 | 0016 | SHRINK WRAP CRANE | JOB | 1 | ||
| BASE | 17 | 0017 | CLEAN AND DISINFECT POTABLE WATER TANKS | JOB | 1 | ||
| 18 | 0018 | PRESERVE AND DISINFECT POTABLE WATER TANKS | NSP | NSP | NSP | NSP | |
| OPT | 18 | 0018AA | Tender - Potable Water Tank (2-15-1-W), up to 40% | JOB | 1 | ||
| OPT | 18 | 0018AB | Tender - Potable Water Tank (2-15-1-W), 100% | JOB | 1 | ||
| OPT | 18 | 0018AC | Tender - Potable Water Tank (2-15-2-W), up to30% | JOB | 1 | ||
| OPT | 18 | 0018AD | Tender- Potable Water Tank (2-15-2-W), 100% | JOB | 1 | ||
| OPT | 18 | 0018AE | Barge - Potable Water Tank (Fr 67-77), up to 40% | JOB | 1 | ||
| OPT | 18 | 0018AF | Barge- Potable Water Tank (Fr 67-77), 100% | JOB | 1 | ||
| OPT | 18 | 0018AG | Preserve Barge Potable Water Tank (Fr 97.3), up to 40% | JOB | 1 | ||
| OPT | 18 | 0018AH | Preserve Barge Potable Water Tank (Fr 97.3) 100% | JOB | 1 | ||
| BASE | 19 | 0019 | PRESERVE BARGE BUOY DECK | JOB | 1 | ||
| 20 | 0020 | PRESERVE COMPLETE UNDERWATER BODY | NSP | NSP | NSP | NSP | |
| BASE | 20 | 0020AA | Preserve Complete Underwater Body (Tender) | JOB | 1 | ||
| BASE | 20 | 0020AB | Preserve Complete Underwater Body (Barge) | JOB | 1 | ||
| 21 | 0021 | ROUTINE DRYDOCKING | NSP | NSP | NSP | NSP | |
| BASE | 21 | 0021AA | Routine Drydocking of Barge | JOB | 1 | ||
| BASE | 21 | 0021AB | Routine Drydocking of Tender | JOB | 1 | ||
| BASE | 21 | 0021AC | Remove and dispose 1800 gallons of fuel (Tender & Barge) | JOB | 1 | ||
| OPT | 21 | 0021AD | Remove and dispose of additional fuel (up to 1000 gallons) | JOB | 3 | ||
| OPT | 21 | 0021AE | Renew Zinc Anodes | EA | 25 | ||
| BASE | 22 | 0022 | PROVIDE TEMPORARY LOGISTICS | JOB | 1 | ||
| OPT | 22 | 0022AA | Provide Additional Temporary Logistics | DAY | 5 | ||
| 23 | 0023 | PERFORM ULTRASONIC THICKNESS MEASUREMENTS | NSP | NSP | NSP | NSP | |
| BASE | 23 | 0023AA | 200 UT Measurements | JOB | 1 | ||
| OPT | 23 | 0023AB | Additional 25 UT Measurements | EA | 8 | ||
| BASE | 24 | 0024 | RENEW DECK AND BULKHEAD METAL IN CREWS HEAD | JOB | 1 | ||
| BASE | 25 | 0025 | PRESERVE FREEBORAD: Preserve Barge Freeboard | JOB | 1 | ||
| BASE | 25 | 0025AA | PRESERVE FREEBOARD: Preserve Tender Freeboard | JOB | 1 | ||
| OPT | A | Composite Labor Rate | HOUR | 300 | |||
| BASE | B | GFP report in accordance with solicitation. | NSP | EA | 1 | NSP | |
| OPT | Z | Laydays | DAY | 5 | |||
| Subtotal BASE and OPTION Items: | |||||||
| Total of all Items: |
File details come from the government source that posted it. Updated .