Amendment 0004

View the file

Other files

File Type Posted
Amendment_0003.docx DOCX document
Amendment_0002.docx DOCX document
Amendment_0001.docx DOCX document
Solicitation_Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0004 Solicitation HSCG50-14-R-PXA701– IDIQ Contract for Environmental Regulatory Services to the USCG – FDCC DET Seattle in the State of Alaska

Date: 9 June 2014

A. CHANGES TO THE SOLICITATION:

1. Revise the following paragraphs (changes indicated in red):

Section B Supplies or Services and Prices

Supplies or Services and Prices/Costs

Item No.
Supplies/Services
Quantity
Unit
Unit Price
Amount

Non-Wage Determination Labor Rates for Ordering Period 1

*This discipline is considered Key Personnel and shall comply with the requirements as stated in Section 3.0 of the Statement of Services.

0001
*IDERS Program Manager
150
Est. HR
$____________
$____________
0002
*Project Manager
250
Est. HR
$____________
$____________
0003
Engineer – Multi-discipline (Includes* Environmental Scientist/Engineer, Mechanical, Electrical, etc)
500
Est. HR
$____________
$____________
0003a
Senior Level
200
Est. HR
$____________
$____________
0003b
Junior Level
300
Est. HR
$____________
$____________
0004
Technician - Multi-discipline (Environmental, Mechanical, Electrical, etc)
500
Est. HR
$____________
$____________
0004a
Senior Level
200
Est. HR
$____________
$____________
0004b
Junior Level
300
Est. HR
$____________
$____________
0005
*Regulatory Specialist, Chemist, or Environmental Protection Specialist
300
Est. HR
$____________
$____________
0006
Technical Writer, Scheduler, Cost Estimator
300
Est. HR
$____________
$____________
0007
*Industrial Hygienist/Safety and Health Manager
150
Est. HR
$____________
$____________
0008
*Site Superintendent
1000
Est. HR
$____________
$____________
0009
*Site Safety & Health Manager
750
Est. HR
$____________
$____________
0010
Field Technician/Specialty – Multi-discipline (Environmental, Mechanical, Electrical, etc)
300
Est. HR
$____________
$____________
0010a
Senior Level
100
Est. HR
$____________
$____________
0010b
Junior Level
200
Est. HR
$____________
$___________
0011
QA/QC Manager (Site or office)
500
Est. HR
$____________
$____________
0012
Clerical Support
200
Est. HR
$____________
$____________
0013
Other Direct Cost (ODC) Markup:
1
JB
$300,000(estimate)
$___________
0014
Subcontractor Markup:
1
JB
$250,000(estimate)
$____________

^Line Items 0015-0021 apply to Davis Bacon Wage Rate Determination No. AK140001, dated 4/25/2014 and are for evaluation purposes only. The provided rate is derived from adding the base rate plus fringe for the appropriate category from this wage determination. If these rates require any additional markup, it should be applied as a percentage in the space provided. These rates should be fully burdened rates. Once the contract is awarded and task orders are placed, the most current Davis Bacon Wage Rate will be used for that time period in addition to the negotiated markup percentage as indicated below for the appropriate labor category as applicable. See Clause H.5.

0015^
Asbestos Worker:

$53.55 x ____% x 400 Est. HR = $_________

1
JB
$____________
$____________
0016^
Hazardous Materials Handler: $53.55 x ____% x 400 Est. HR = $_________
1
JB
$____________
$____________
0017^
Laborer; Group 1: $51.57 x ____% x 400 Est. HR = $_________
1
JB
$____________
$____________
0018^
Laborer; Group 2: $52.57 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________
0019^
Power Equipment Operator; Group 1: $59.63 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________
0020^
Electrician; Technician: $62.19 x ____% x 300 Est. HR = $_________
1
JB
$____________
$____________
0021^
Carpenter $59.18 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________

Total

Supplies or Services and Prices/Costs

Item No.
Supplies/Services
Quantity
Unit
Unit Price
Amount

Non-Wage Determination Labor Rates for Ordering Period 2

**This discipline is considered Key Personnel and shall comply with the requirements as stated in Section 3.0 of the Statement of Services.

0022
*IDERS Program Manager
150
Est. HR
$____________
$____________
0023
*Project Manager
250
Est. HR
$____________
$____________
0024
Engineer – Multi-discipline (Includes* Environmental Scientist/Engineer, Mechanical, Electrical, etc)
500
Est. HR
$____________
$____________
0024a
Senior Level
200
Est. HR
$____________
$____________
0024b
Junior Level
300
Est. HR
$____________
$____________
0025
Technician – Multi-discipline (Environmental, Mechanical, Electrical, etc)
500
Est. HR
$____________
$____________
0025a
Senior Level
200
Est. HR
$____________
$____________
0025b
Junior Level
300
Est. HR
$____________
$____________
0026
*Regulatory Specialist, Chemist, or Environmental Protection Specialist
300
Est. HR
$____________
$____________
0027
Technical Writer, Scheduler, Cost Estimator
300
Est. HR
$____________
$____________
0028
*Industrial Hygienist/Safety and Health Manager
150
Est. HR
$____________
$____________
0029
*Site Superintendent
1000
Est. HR
$____________
$____________
0030
*Site Safety & Health Manager
750
Est. HR
$____________
$____________
0031
Field Technician/Specialty – Multi-discipline (Environmental, Mechanical, Electrical, etc)
300
Est. HR
$____________
$____________
0031a
Senior Level
100
Est. HR
$____________
$____________
0031b
Junior Level
200
Est. HR
$____________
0032
QA/QC Manager (Site or office)
500
Est. HR
$____________
$____________
0033
Clerical Support
200
Est. HR
$____________
$____________
0034
Other Direct Cost (ODC) Markup:
1
JB
$300,000(estimate)
$___________
0035
Subcontractor Markup:
1
JB
$250,000(estimate)
$____________

^Line Items 0036-0042 apply to Davis Bacon Wage Rate Determination No. AK140001, dated 4/25/2014 and are for evaluation purposes only. The provided rate is derived from adding the base rate plus fringe for the appropriate category from this wage determination. If these rates require any additional markup, it should be applied as a percentage in the space provided. These rates should be fully burdened rates. Once the contract is awarded and task orders are placed, the most current Davis Bacon Wage Rate will be used for that time period in addition to the negotiated markup percentage as indicated below for the appropriate labor category as applicable. See Clause H.5.

0036^
Asbestos Worker:

$53.55 x ____% x 400 Est. HR = $_________

1
JB
$____________
$____________
0037^
Hazardous Material Handler: $53.55 x ____% x 400 Est. HR = $_________
1
JB
$____________
$____________
0038^
Laborer; Group 1: $51.57 x ____% x 400 Est. HR = $_________
1
JB
$____________
$____________
0039^
Laborer; Group 2: $52.57 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________
0040^
Power Equipment Operator; Group 1: $59.63 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________
0041^
Electrician; Technician: $62.19 x ____% x 300 Est. HR = $_________
1
JB
$____________
$____________
0042^
Carpenter $59.18 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________

Total

Supplies or Services and Prices/Costs

Item No.
Supplies/Services
Quantity
Unit
Unit Price
Amount

Non-Wage Determination Labor Rates for Ordering Period 3

**This discipline is considered Key Personnel and shall comply with the requirements as stated in Section 3.0 of the Statement of Services.

0043
*IDERS Program Manager
150
Est. HR
$____________
$____________
0044
*Project Manager
250
Est. HR
$____________
$____________
0045
Engineer – Multi-discipline (Includes* Environmental Scientist/Engineer, Mechanical, Electrical, etc)
500
Est. HR
$____________
$____________
0045a
Senior Level
200
Est. HR
$____________
$____________
0045b
Junior Level
300
Est. HR
$____________
$____________
0046
Technician - Multi-discipline (Environmental, Mechanical, Electrical, etc)
500
Est. HR
$____________
$____________
0046a
Senior Level
200
Est. HR
$____________
$____________
0046b
Junior Level
300
Est. HR
$____________
$____________
0047
*Regulatory Specialist, Chemist, or Environmental Protection Specialist
300
Est. HR
$____________
$____________
0048
Technical Writer, Scheduler, Cost Estimator
300
Est. HR
$____________
$____________
0049
*Industrial Hygienist/Safety and Health Manager
150
Est. HR
$____________
$____________
0050
*Site Superintendent
1000
Est. HR
$____________
$____________
0051
*Site Safety & Health Manager
750
Est. HR
$____________
$____________
0052
Field Technician/Specialty – Multi-discipline (Environmental, Mechanical, Electrical, etc)
300
Est. HR
$____________
$____________
0052a
Senior Level
100
Est. HR
$____________
$____________
0052b
Junior Level
200
Est. HR
$____________
$____________
0053
QA/QC Manager (Site or office)
500
Est. HR
$____________
$____________
0054
Clerical Support
200
Est. HR
$____________
$____________
0055
Other Direct Cost (ODC) Markup:
1
JB
$300,000(estimate)
$___________
0056
Subcontractor Markup:
1
JB
$250,000(estimate)
$____________

^Line Items 0057-0063 apply to Davis Bacon Wage Rate Determination No. AK140001, dated 4/25/2014 and are for evaluation purposes only. The provided rate is derived from adding the base rate plus fringe for the appropriate category from this wage determination. If these rates require any additional markup, it should be applied as a percentage in the space provided. These rates should be fully burdened rates. Once the contract is awarded and task orders are placed, the most current Davis Bacon Wage Rate will be used for that time period in addition to the negotiated markup percentage as indicated below for the appropriate labor category as applicable. See Clause H.5.

0057^
Asbestos Worker:

$53.55 x ____% x 400 Est. HR = $_________

1
JB
$____________
$____________
0058^
Hazardous Materials Handler: $53.55 x ____% x 400 Est. HR = $_________
1
JB
$____________
$____________
0059^
Laborer; Group 1: $51.57 x ____% x 400 Est. HR = $_________
1
JB
$____________
$____________
0060^
Laborer; Group 2: $52.57 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________
0061^
Power Equipment Operator; Group 1: $59.63 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________
0062^
Electrician; Technician: $62.19 x ____% x 300 Est. HR = $_________
1
JB
$____________
$____________
0063^
Carpenter $59.18 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________

Total

Supplies or Services and Prices/Costs

Item No.
Supplies/Services
Quantity
Unit
Unit Price
Amount

Non-Wage Determination Labor Rates for Ordering Period 4

**This discipline is considered Key Personnel and shall comply with the requirements as stated in Section 3.0 of the Statement of Services.

0064
*IDERS Program Manager
150
Est. HR
$____________
$____________
0065
*Project Manager
250
Est. HR
$____________
$____________
0066
Engineer – Multi-discipline (Includes* Environmental Scientist/Engineer, Mechanical, Electrical, etc)
500
Est. HR
$____________
$____________
0066a
Senior Level
200
Est. HR
$____________
$____________
0066b
Junior Level
300
Est. HR
$____________
$____________
0067
Technician - Multi-discipline (Environmental, Mechanical, Electrical, etc)
500
Est. HR
$____________
$____________
0067a
Senior Level
200
Est. HR
$____________
$____________
0067b
Junior Level
300
Est. HR
$____________
$____________
0068
*Regulatory Specialist, Chemist, or Environmental Protection Specialist
300
Est. HR
$____________
$____________
0069
Technical Writer, Scheduler, Cost Estimator
300
Est. HR
$____________
$____________
0070
*Industrial Hygienist/Safety and Health Manager
150
Est. HR
$____________
$____________
0071
*Site Superintendent
1000
Est. HR
$____________
$____________
0072
*Site Safety & Health Manager
750
Est. HR
$____________
$____________
0073
Field Technician/Specialty – Multi-discipline (Environmental, Mechanical, Electrical, etc)
300
Est. HR
$____________
$____________
0073a
Senior Level
100
Est. HR
$____________
$____________
0073b
Junior Level
200
Est. HR
$____________
$____________
0074
QA/QC Manager (Site or office)
500
Est. HR
$____________
$____________
0075
Clerical Support
200
Est. HR
$____________
$____________
0076
Other Direct Cost (ODC) Markup:
1
JB
$300,000(estimate)
$___________
0077
Subcontractor Markup:
1
JB
$250,000(estimate)
$____________

^Line Items 0078-0084 apply to Davis Bacon Wage Rate Determination No. AK140001, dated 4/25/2014 and are for evaluation purposes only. The provided rate is derived from adding the base rate plus fringe for the appropriate category from this wage determination. If these rates require any additional markup, it should be applied as a percentage in the space provided. These rates should be fully burdened rates. Once the contract is awarded and task orders are placed, the most current Davis Bacon Wage Rate will be used for that time period in addition to the negotiated markup percentage as indicated below for the appropriate labor category as applicable. See Clause H.5.

0078^
Asbestos Worker:

$53.55 x ____% x 400 Est. HR = $_________

1
JB
$____________
$____________
0079^
Hazardous Materials Handler: $53.55 x ____% x 400 Est. HR = $_________
1
JB
$____________
$____________
0080^
Laborer; Group 1: $51.57 x ____% x 400 Est. HR = $_________
1
JB
$____________
$____________
0081^
Laborer; Group 2: $52.57 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________
0082^
Power Equipment Operator; Group 1: $59.63 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________
0083^
Electrician; Technician: $62.19 x ____% x 300 Est. HR = $_________
1
JB
$____________
$____________
0084^
Carpenter $59.18 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________

Total

Supplies or Services and Prices/Costs

Item No.
Supplies/Services
Quantity
Unit
Unit Price
Amount

Non-Wage Determination Labor Rates for Ordering Period 5

**This discipline is considered Key Personnel and shall comply with the requirements as stated in Section 3.0 of the Statement of Services.

0085
*IDERS Program Manager
150
Est. HR
$____________
$____________
0086
*Project Manager
250
Est. HR
$____________
$____________
0087
Engineer – Multi-discipline (Includes* Environmental Scientist/Engineer, Mechanical, Electrical, etc)
500
Est. HR
$____________
$____________
0087a
Senior Level
200
Est. HR
$____________
$____________
0087b
Junior Level
300
Est. HR
$____________
$____________
0088
Technician – Multi-discipline (Environmental, Mechanical, Electrical, etc)
500
Est. HR
$____________
$____________
0088a
Senior Level
200
Est. HR
$____________
$____________
0088b
Junior Level
300
Est. HR
$____________
$____________
0089
*Regulatory Specialist, Chemist, or Environmental Protection Specialist
300
Est. HR
$____________
$____________
0090
Technical Writer, Scheduler, Cost Estimator
300
Est. HR
$____________
$____________
0091
*Industrial Hygienist/Safety and Health Manager
150
Est. HR
$____________
$____________
0092
*Site Superintendent
1000
Est. HR
$____________
$____________
0093
*Site Safety & Health Manager
750
Est. HR
$____________
$____________
0094
Field Technician/Specialty - Multi-discipline (Environmental, Mechanical, Electrical, etc)
300
Est. HR
$____________
$____________
0094a
Senior Level
100
Est. HR
$____________
$____________
0094b
Junior Level
200
Est. HR
$____________
$____________
0095
QA/QC Manager (Site or office)
500
Est. HR
$____________
$____________
0096
Clerical Support
200
Est. HR
$____________
$____________
0097
Other Direct Cost (ODC) Markup:
1
JB
$300,000(estimate)
$___________
0098
Subcontractor Markup:
1
JB
$250,000(estimate)
$____________

^Line Items 0099-0105 apply to Davis Bacon Wage Rate Determination No. AK140001, dated 4/25/2014 and are for evaluation purposes only. The provided rate is derived from adding the base rate plus fringe for the appropriate category from this wage determination. If these rates require any additional markup, it should be applied as a percentage in the space provided. These rates should be fully burdened rates. Once the contract is awarded and task orders are placed, the most current Davis Bacon Wage Rate will be used for that time period in addition to the negotiated markup percentage as indicated below for the appropriate labor category as applicable. See Clause H.5.

0099^
Asbestos Worker:

$53.55 x ____% x 400 Est. HR = $_________

1
JB
$____________
$____________
0100^
Hazardous Materials Handler: $53.55 x ____% x 400 Est. HR = $_________
1
JB
$____________
$____________
0101^
Laborer; Group 1: $51.57 x ____% x 400 Est. HR = $_________
1
JB
$____________
$____________
0102^
Laborer; Group 2: $52.57 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________
0103^
Power Equipment Operator; Group 1: $59.63 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________
0104^
Electrician; Technician: $62.19 x ____% x 300 Est. HR = $_________
1
JB
$____________
$____________
0105^
Carpenter $59.18 x ____% x 200 Est. HR = $_________
1
JB
$____________
$____________

Total

Grand Total (Line Items 0001-0110)

Notes:

a. All labor rates set forth in the Supplies or Services and Prices/Cost schedule above shall be fully burdened rates, and shall include all elements of cost, including hourly direct labor charges, overheads, and G&A expenses, as applicable and consistent with the contractor’s accounting system, plus a proposed profit rate.

b. Each ordering period will be 365 calendar days in duration. Ordering Period 1 will start from day of contract award.

c. No mark-up shall apply to per diem/travel costs.

d. Mileage costs will be charged at the prevailing federal rate, currently at $0.56 per mile.

e. Other Direct Costs (ODCs) as called out in Line Items 0013, 0034, 0055, 0076, 0097: includes, but is not limited to, items such as material, equipment, printing costs, and shipping.

B. ANSWERS TO PROPOSER QUESTIONS:

- Amendment 2 states in part: “Upon award of the resultant contract, the Contractor shall provide documentation illustrating how the proposed Key Personnel meet the minimum requirements as stated in Section 3.0 of the Statement of Work.”

1) Does this exclude resumes from being submitted with the proposal?

Answer: You are not precluded from including resumes as part of your proposal; however, they are not required.

2) Because there may be multiple Task Orders going on, there may need to be personnel hired that are not designated in the proposal. Will this be allowed by contract?

Answer: Yes, that would be allowed. Our understanding is that the same individual may not be available to participate on each and every task order, which is why we ask for documentation (could be in the form of a resume, but is not a required form) after award of the contract to illustrate that the proposed individual on any given task order meets the minimum requirements as stated in Section 3.0 of the Statement of Work. If you've already proposed said individual in the past, documentation would not be required.

3) Capacity is based on being able to respond with adequate resources to “multiple emergent, multi-discipline task orders…” This implies there may be more than one project that will require more than one project manager, more than one Site Superintendent, more than one SSHO. However, the pricing form in Volume II, only allows for one billing rate for each of the key personnel, and typically, not all personnel have the same wages, e.g. there are Project Managers that may have 5 years experience and others that have 20 years experience and that normally have associated billing rates in alignment with their experience. After award, will there be allowance for a variation in the billing rates based on their salaries/cost?

Answer: No, after award there will not be allowance for variation in the billing rates. The proposed rates will stand through the life of the contract and it will be a business decision on the part of the offeror as to how they propose these rates.

See above changes to Bid Schedule for inclusion of some Senior/Junior level Line Items. For those Junior/Senior level personnel that are considered Key Personnel per Section 3.0 of the Statement of Work, please note that both Junior and Senior level personnel must meet the stated minimum requirements in Section 3.0 of the Statement of Work.

4) Are there facilities in Kodiak that can be used by the Contractor as an office area or storage for materials or equipment?

Answer: There is a location on the base where a contractor could set up a semi-permanent, long-term office trailer/storage area however; it is subject to availability and convenience of the government. It is more likely that availability for an area for office space/storage will be assessed on a Task Order basis dependent on the nature of the work.

All other terms and conditions remain unchanged. Offerors are reminded to acknowledge receipt of amendments along with proposal submission.

END OF AMENDMENT