OFFEROR’S PROPOSED DELIVERY SCHEDULE
**OPTIONAL**
| CLIN |
| DESCRIPTION |
| WITHIN DAYS AFTER |
| 1-O |
| -Receive Engine, Prepare Reports: |
Prepare a receiving inspection report with photographs (including Appendix A)
-Clean, disassemble engine and all accessories and prepare and submit a Condition Found Report (including Appendix B) showing conditions of items, all contingency parts and labor needed to accomplish remanufacture.
-Prepare and submit a Reassembly Critical Dimensions Report (including Appendix C) while assembling the engine.
Appendix A within _____ days after receipt of engine
Appendix B within _____ days of receiving written approval of Appendix A
Appendix C within ______ days of receiving written approval of Appendix B.
| 2-O |
| Return of F Condition Engine |
| AS REQUIRED |
| 3-O |
| Complete Engine Overhaul, including testing, painting, preservation, and packing. |
| Within ______ days of receiving written approval of Appendix B. |
| 4A-0 |
| Overhaul Fuel Injectors |
| AS REQUIRED |
| 4B-0 |
| Overhaul Cylinder Heads |
| AS REQUIRED |
| 4C-0 |
| Overhaul Fuel Injection Pump |
| AS REQUIRED |
| 4D-0 |
| Overhaul Starter Motor |
| AS REQUIRED |
| 4E-0 |
| Magna Flux and Polish Crankshaft |
| AS REQUIRED |
| 4F-0 |
| Flush and Re-Plug Crankshaft |
| AS REQUIRED |
| 4G-0 |
| Magna Flux and Polish Camshaft |
| AS REQUIRED |
| 4H-0 |
| Overhaul A Bank Turbocharger |
| AS REQUIRED |
| 4I-0 |
| Overhaul B Bank Turbocharger |
| AS REQUIRED |
| 4J-0 |
| Overhaul Raw Water Pump |
| AS REQUIRED |
| 4K-0 |
| Overhaul Fresh Water Pump |
| AS REQUIRED |
| 4L-0 |
| Overhaul Charge Air Cooler |
| AS REQUIRED |
| 4M-0 |
| Overhaul Oil Cooler |
| AS REQUIRED |
| 4N-0 |
| Overhaul Oil Pump |
| AS REQUIRED |
| 4O-0 |
| Overhaul Fuel Hand Pump |
| AS REQUIRED |
| 4P-0 |
| Measure Connecting Rods |
| AS REQUIRED |
| 4Q-0 |
| Magna Flux Connecting Rods |
| AS REQUIRED |
| 4R-0 |
| Magna Flux Counterweights and Connecting Bolts |
| AS REQUIRED |
| 4S-0 |
| Remove Geislinger Coupling |
| AS REQUIRED |
| 4T-0 |
| Geislinger Coupling Inspection and Report |
| Within _______ days of removal of Geislinger Coupling |
| 4U-0 |
| Overhaul Geislinger Coupling |
| AS REQUIRED |
| 4V-0 |
| Geislinger Coupling Installation |
| AS REQUIRED |
| 5-0 |
| Engine Warranty |
| AS REQUIRED |
| 6-0 |
| Mandatory Parts |
| AS REQUIRED |
| 7-0 |
| Shipping Crate |
| AS REQUIRED |
| 8-0 |
| Contingency Parts |
| AS REQUIRED |
| 9-0 |
| Failure Analysis |
| Within _______ days of receipt of failed engine |
| 10-0 |
| Commissioning of Engine |
| Within ______ days of notification |
| 11-0 |
| Engine Testing Including Appendix D |
| AS REQUIRED |
| 14-0 |
| Government Property Report |
| AS REQUIRED |
| 15-0 |
| Cumulative Tracking Report |
| AS REQUIRED |
| 16-0 |
| Removal of Reduction Gear |
| AS REQUIRED |
| 17-0 |
| Installation of Reduction Gear |
| AS REQUIRED |
| 18-0 |
| Technical Representative Services |
| AS REQUIRED |