ATTACHMENT_2_CLIN_MTU_W6_engine.xls

XLS spreadsheet 31 KB Posted

Attached to
REMANUFACTURE OF 87' WPB MTU ENGINES
Solicitation number
HSCG40-17-R-19004
Issued by

About this file

ATTACHMENT 2

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CLIN HSCG40-17-R-19004
MTU 8V396TE94 W6 Overhaul
Base Year
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE6% increaseOption 1Option 2Option 3Option 4
1-OReceive Engine, Prepare ReportsJOB22$ - 06%
2-OReturn of F Condition EngineJOB1$ - 06%
3-OComplete Engine OverhaulJOB22$ - 06%
4A-0Overhaul Fuel InjectorsJOB22$ - 06%
4B-0Overhaul Cylinder HeadsJOB22$ - 06%
4C-0Overhaul Fuel Injection PumpJOB22$ - 06%
4D-0Overhaul Starter MotorJOB22$ - 06%
4E-0Magna Flux and Polish CrankshaftJOB22$ - 06%
4F-0Flush and Re-Plug CrankshaftJOB22$ - 06%
4G-0Magna Flux and Polish CamshaftJOB22$ - 06%
4H-0Overhaul A Bank TurbochargerJOB22$ - 06%
4I-0Overhaul B Bank TurbochargerJOB22$ - 06%
4J-0Overhaul Raw Water PumpJOB22$ - 06%
4K-0Overhaul Fresh Water PumpJOB22$ - 06%
4L-0Overhaul Charge Air CoolerJOB22$ - 06%
4M-0Overhaul Oil CoolerJOB22$ - 06%
4N-0Overhaul Oil PumpJOB22$ - 06%
4O-0Overhaul Fuel Hand PumpJOB22$ - 06%
4P-0Measure Connecting RodsJOB22$ - 06%
4Q-0Magna Flux Connecting RodsJOB22$ - 06%
4R-0Magna Flux Counterweights and Connecting BoltsJOB22$ - 06%
4S-0Remove Geislinger CouplingJOB22$ - 06%
4T-0Geislinger Coupling Inspection and ReportJOB22$ - 06%
4U-0Overhaul Geislinger CouplingJOB22$ - 06%
4V-0Geislinger Coupling InstalationJOB22$ - 06%
5-OEngine WarrantyJOB22$ - 06%
6-OMandatory Parts- per the MTU 8V396 TE94 parts catalogJOB22$ - 06%
7-OShipping CrateJOB22$ - 06%
8-OContingency Parts-MTU 8V396 TE94 parts catalogJOB22$ - 06%
9-OFailure AnalysisHR1$ - 06%
10-OCommisioning of EngineJOB22$ - 06%
11-OEngine Testing Including Appendix DJOB22$ - 06%
12-OSF 294JOB22$ - 06%
13-OSF 295JOB22$ - 06%
14-OGovernment Property ReportJOB22$ - 06%
15-OCumulative Tracking ReportJOB4$ - 06%
16-ORemoval and Shipment of Reduction GearJOB22$ - 06%
17-0Installation of Reduction GearJOB22$ - 06%
18-0Technical Represenative ServicesHR1$ - 06%
Total Price$ - 0
TOTAL$ - 0

Sheet2

Sheet3

File details come from the government source that posted it. Updated .