HSCG401-17-Q-P30502 USCG ANT PUGET SOUND (55107) FY 2017 DRYDOCK REPAIRS

SCHEDULE OF SUPPLIES AND SERVICES (Rev-1)

CLIN Description Price Unit Quantity Extended Price

D-001 General Welding, Provide JOB 1

D-002 Hull Plating (Side Scan), Ultrasonic

Testing

JOB 1

D-003 Hull Plating (U/W Body), Inspect JOB 1

D-004 Hull Plating (Freeboard), Ultrasonic

Testing

D-005 Appendages (U/W), Leak Test JOB 1

D-006 Appendages (U/W) - Internal, Preserve JOB 1

D-007 Accessible Spaces, Inspect JOB 1

D-008 Tanks (MP Fuel Service), Clean and

Inspect

D-009 Mast, Inspect JOB 1

D-010 Propeller Shafts, Remove, Inspect, and Install

D-011 Propeller Shaft Packing, Renew JOB 1

D-012 Water Lubricated Shaft Bearings, Renew

D-013 Propellers, Remove, Inspect and

Install

D-014 Exhaust Muffler(s), Clean and Inspect JOB 1

D-015 Fuel Valves, Renew JOB 1

D-016 Standard Hoses, Renew JOB 1

D-017 Sea Valves, Renew JOB 1

D-018 Sea Strainers - Duplex (All Sizes), Overhaul

D-019 Potable Water Tank, Clean and Inspect JOB 1

D-020 Diesel Tank(s), Refuel JOB 1

D-021

Compressed Air Receivers and System

Valves (All), Clean, Inspect, Hydro and Lift

D-022 Steering Hydraulic Oil Tank, Clean and Inspect

D-023 Rudder Assembly, Remove, Inspect and

Reinstall

D-024 Buoy Handling Equipment, Perform

Level II Maintenance

D-025 Grey Water Holding Tank(s), Clean and

Inspect

D-026 Rub Rail, Fendering System, Remove, Inspect, Install

D-027 Decks – Exterior (Buoy), Preserve 100

Percent

D-028 Tanks (Grey Water Holding), Preserve

“100%”

D-029 Tanks (Potable Water), Preserve

“100%”

D-030 Tanks (Sewage Vacuum Collection), Preserve “100%”

D-031 U/W Body, Preserve (100%) JOB 1

D-032 Hull Plating Freeboard, Preserve –

100%

D-033 Cathodic Protection / Zincs, Renew JOB 1

D-034 Interior Hull Insulation, Inspect JOB 1

D-035 Marine Chemist Services, Provide JOB 1

D-036 Drydock JOB 1

D-037 Temporary Services, Provide JOB 1

D-038 Sea Trial Performance, Support, Provide

D-039 Work Platform Hatch (P&S), Renew JOB 1

D-040 Various Piping, Renew JOB 1

D-041 Main Diesel Engine(s), Remove and

Install

D-042 Compartment Interior (bulkhead & overhead surfaces), Preserve

D-043 Buoy Deck Crane and Cross Deck Winch

Overhaul

O-044 Composite Labor Rate Hour 1

D-045 GFP Report NSP EA 1 NSP

0-046 LayDays

DAY 1

Total Price of Definite Clins

Total Price of Option Clins

Total Price of All