Oily_Bilge_Solicitation_Revised_Pages_3_and_4.docx
DOCX document 25 KB Posted
- Attached to
- 225' WLB OILY WATER BILGE PUMPS
- Solicitation number
- HSCG40-16-R-60022
About this file
REVISED SOLICITATION PAGES 3 AND 4
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSCG40-16-R-60022
Amendment Number A00001 Revised 2/17/2016
SCHEDULE OF SUPPLIES AND SERVICES AND PRICE/COST
BASE YEAR
CLIN 0001 Oily Bilge Pump System, Contractor shall manufacture, test, preserve, package and mark - Oily Bilge Water Transfer pump in accordance with the Procurement Specification – Oily Bilge Pump 225’ WLB MMA, Attachment 1. Each system consists of two (2) pump assemblies, motor and mounting structure.
EST. QUANTITY 1 SYSTEM @ $_________ = $_________
*CLIN 0002 On-Board Repair Parts Kit– Contractor shall provide a list of recommended onboard repair parts as outlined in Section 3.6.2 of the Specification. This list shall include item name, part number, quantity, unit and total prices.
1 Kit = Not Separately Priced
*CLIN 0003 System Stock Parts- Contractor shall provide a list of recommended system stock parts as outlined in Section 3.6.3 of Specification. Upon approval, the list of parts shall be incorporated into this CLIN via a modification to the contract. This list shall include item name, part number, quantity, unit and total prices.
1 Kit = Not Separately Priced
CLIN 0004 Data for Provisioning (DFP), for Approval – Contractor shall provide DFP for all components being supplied in accordance with Section 3.6.1 of the Specification. This CLIN is required for the base year only.
Quantity 1 Each = Not Separately Priced
FIRST OPTION YEAR
CLIN 1001 Oily Bilge Pump System, Cost to supply each Oily Bilge pump assembly as outlined in the Procurement Specification – Oily Bilge Pump 225’ WLB MMA. Each system consists of two (2) pump assemblies, motor and mounting structure.
EST. QUANTITY 2 SYSTEMS @ $_________ = $_________
*CLIN 1002 On-Board Repair Parts Kit
Est. Qty 2 Kits
*CLIN 1003 System Stock Parts
EST. QUANTITY 1 EACH @$_________ = $_________
*Note: Cost of kit shall be incorporated by modification after approval by Government
HSCG40-16-R-60022
Amendment Number A00001 Revised 2/17/2016
SECOND OPTION YEAR
CLIN 2001 Oily Bilge Pump System, Cost to supply each Oily Bilge pump assembly as outlined in the Procurement Specification – Oily Bilge Pump 225’ WLB MMA. Each system consists of two (2) pump assemblies, motor and mounting structure.
EST. QUANTITY 2 SYSTEMS@ $_________ = $_________
*CLIN 2002 On-Board Repair Parts Kit
2 Kits = Not Separately Priced
*CLIN 2003 System Stock Parts.
List Only - As Required = Not Separately Priced
THIRD OPTION YEAR
CLIN 3001 Oily Bilge Pump System, Cost to supply each Oily Bilge pump assembly as outlined in the Procurement Specification – Oily Bilge Pump 225’ WLB MMA. Each system consists of two (2) pump assemblies, motor and mounting structure.
EST. QUANTITY 2 SYSTEMS @ $_________ = $_________
*CLIN 3002 On-Board Repair Parts Kit 2 Kits = Not Separately Priced
*CLIN 3003 System Stock Parts.
1 Set = Not Separately Priced
FOURTH OPTION YEAR
CLIN 4001 Oily Bilge Pump System, Cost to supply each Oily Bilge pump assembly as outlined in the Procurement Specification – Oily Bilge Pump 225’. Each system consists of two (2) pump assemblies, motor and mounting structure.
EST. QUANTITY 2 SYSTEMS @ $_________ = $_________
*CLIN 4002 On-Board Repair Parts Kit
2 Kits = Not Separately Priced
*CLIN 4003 System Stock
1 Set = Not Separately Priced
*Note: Cost of kit shall be incorporated by modification after approval by Government
File details come from the government source that posted it. Updated .