Oily_Bilge_Solicitation_Revised_Pages_3_and_4.docx

DOCX document 25 KB Posted

Attached to
225' WLB OILY WATER BILGE PUMPS
Solicitation number
HSCG40-16-R-60022
Issued by

About this file

REVISED SOLICITATION PAGES 3 AND 4

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG40-16-R-60022

Amendment Number A00001 Revised 2/17/2016

SCHEDULE OF SUPPLIES AND SERVICES AND PRICE/COST

BASE YEAR

CLIN 0001 Oily Bilge Pump System, Contractor shall manufacture, test, preserve, package and mark - Oily Bilge Water Transfer pump in accordance with the Procurement Specification – Oily Bilge Pump 225’ WLB MMA, Attachment 1. Each system consists of two (2) pump assemblies, motor and mounting structure.

EST. QUANTITY 1 SYSTEM @ $_________ = $_________

*CLIN 0002 On-Board Repair Parts Kit– Contractor shall provide a list of recommended onboard repair parts as outlined in Section 3.6.2 of the Specification. This list shall include item name, part number, quantity, unit and total prices.

1 Kit = Not Separately Priced

*CLIN 0003 System Stock Parts- Contractor shall provide a list of recommended system stock parts as outlined in Section 3.6.3 of Specification. Upon approval, the list of parts shall be incorporated into this CLIN via a modification to the contract. This list shall include item name, part number, quantity, unit and total prices.

1 Kit = Not Separately Priced

CLIN 0004 Data for Provisioning (DFP), for Approval – Contractor shall provide DFP for all components being supplied in accordance with Section 3.6.1 of the Specification. This CLIN is required for the base year only.

Quantity 1 Each = Not Separately Priced

FIRST OPTION YEAR

CLIN 1001 Oily Bilge Pump System, Cost to supply each Oily Bilge pump assembly as outlined in the Procurement Specification – Oily Bilge Pump 225’ WLB MMA. Each system consists of two (2) pump assemblies, motor and mounting structure.

EST. QUANTITY 2 SYSTEMS @ $_________ = $_________

*CLIN 1002 On-Board Repair Parts Kit

Est. Qty 2 Kits

*CLIN 1003 System Stock Parts

EST. QUANTITY 1 EACH @$_________ = $_________

*Note: Cost of kit shall be incorporated by modification after approval by Government

HSCG40-16-R-60022

Amendment Number A00001 Revised 2/17/2016

SECOND OPTION YEAR

CLIN 2001 Oily Bilge Pump System, Cost to supply each Oily Bilge pump assembly as outlined in the Procurement Specification – Oily Bilge Pump 225’ WLB MMA. Each system consists of two (2) pump assemblies, motor and mounting structure.

EST. QUANTITY 2 SYSTEMS@ $_________ = $_________

*CLIN 2002 On-Board Repair Parts Kit

2 Kits = Not Separately Priced

*CLIN 2003 System Stock Parts.

List Only - As Required = Not Separately Priced

THIRD OPTION YEAR

CLIN 3001 Oily Bilge Pump System, Cost to supply each Oily Bilge pump assembly as outlined in the Procurement Specification – Oily Bilge Pump 225’ WLB MMA. Each system consists of two (2) pump assemblies, motor and mounting structure.

EST. QUANTITY 2 SYSTEMS @ $_________ = $_________

*CLIN 3002 On-Board Repair Parts Kit 2 Kits = Not Separately Priced

*CLIN 3003 System Stock Parts.

1 Set = Not Separately Priced

FOURTH OPTION YEAR

CLIN 4001 Oily Bilge Pump System, Cost to supply each Oily Bilge pump assembly as outlined in the Procurement Specification – Oily Bilge Pump 225’. Each system consists of two (2) pump assemblies, motor and mounting structure.

EST. QUANTITY 2 SYSTEMS @ $_________ = $_________

*CLIN 4002 On-Board Repair Parts Kit

2 Kits = Not Separately Priced

*CLIN 4003 System Stock

1 Set = Not Separately Priced

*Note: Cost of kit shall be incorporated by modification after approval by Government

File details come from the government source that posted it. Updated .