WI_26_Gyrocompass_Procurement_Specification(REV_A).pdf
PDF 385 KB Posted
- Solicitation number
- HSCG40-14-R-60666
About this file
GYROCOMPASS SPECIFICATION
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDENDUM_TO_FAR_52.212-1_-_Replacement_Page_36.pdf | ||
| Amendment_00005.pdf | ||
| WI_26_Gyrocompass_Procurement_Specification_(REV_B _c1).pdf | ||
| GyroAmend0004.pdf | ||
| Amendment0003.pdf | ||
| Drawings.zip | ZIP file | |
| Tech_Pubs.zip | ZIP file | |
| WI_26_Gyrocompass_Procurement_Specification(REV_B).pdf | ||
| GyroAmend0002.pdf | ||
| GyroAmend0001.pdf | ||
| RFPGyrocompass_.pdf | ||
| D-084-0481_AMS_Packaging_StandardAttchII.pdf | ||
| PP_QuestionnaireGyrocompassAttch3.pdf | ||
| Reference_Data.zip | ZIP file |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISION NO. A . CHANGE NO. - .
Attachment 1
225 WLB MMA
PROCUREMENT SPECIFICATION
GYROCOMPASS SYSTEM
ORGINATED BY: Jim Calvert (CG YARD) DATE: 12/12/2013
ORIGINATOR’S COMMAND: Coast Guard YARD
DEPARTMENT / DIVISION: Engineering - Machinery Branch
ISVS REVIEWER: Andrew Dize DATE: 05/13/2014
REVISION A BY: T. Garland (ISVS) DATE: 08/25/2014
USCG SFLC – Gyrocompass System
REVISION: A
Contents
1.0 SCOPE
2.0 APPLICABLE DOCUMENTS
2.1 Government Documents
2.1.1 Specifications, Milita ry
2.1.2 Standards, Military
2.2 Other Government Documents
2.2.1 Code of Federal Regulations (CFR)
2.2.2 USCG Surface Forces Logistics Center (SFLC) Drawings
2.2.3 USCG Surface Forces Logistics Center (SFLC) Documents USCG Surfa ce Forces Logistics
Center (SFLC) Documents
2.2.4 USCG Commandant Instruction (COMDTINST)
2.3 Commercial Documents
2.3.1 American National Standards Insti tute (ANSI)
2.3.2 American Society of Quality Control (ASQC)
2.3.3 Institute of Electrical and Electronic Engineers (IEEE)
2.3.4 International Ma ritime Organization (IMO)
2.3.5 National Electrical Manufacturers Association (NEMA)
2.3.6 National Marine Electronics Association (NMEA)
2.3.7 National Conference of Standards Laboratories (NCSL)
2.3.8 Society of Na val Architects and Marine Engineers (SNAME)
2.3.9 Telcordia
2.4 Order of Precedence
3.0 REQUIREMENTS
3.1 General
3.2 Equipment Compliance
3.3 Environmental Chara cteristics
3.4 Master Gyrocompass Physical Cha racteristics
3.5 Interface Requirements
3.6 Input Power
3.7 Self-Diagnostics/Built-In Tests (BIT)
3.8 Configuration Software
3.9 Performance Requirements
3.10 Identification and Labeling
3.11 Data Requirements
3.11.1 Technical Data (TD)
3.11.2 Data for Provisioning (DFP)
3.11.3 Data Submission Format
3.12 Technical Support
3.12.1 Training
3.12.2 Field Services – Installation and Testing Assistance
3.13 Onboard Repair Pa rts Kit
3.14 System Stock Pa rts
3.15 Deviation from Specification
3.16 Provisioning Quality Control
3.17 Provisioning Conferences
3.18 Tests, Inspections, and Reports
3.18.1 Fi rst Article Testing (FAT)
3.18.2 Fa ctory Testing (FT)
3.18.3 Shipboard Test Plan
3.19 Workmanship
4.0 QUALITY ASSURANCE
4.1 General
4.2 Records
4.3 Calibration System
4.4 Quality Assurance Plan
4.5 Tests and Inspections
4.6 Responsibility for Tests and Inspections
4.7 Responsibility for Compliance
4.8 Failure Responsibility
4.8.1 Test Failure
4.8.2 Corrective Action Remedies
4.9 Test and Inspection Reports
5.0 PRESERVATION, PACKING, AND MARKING
6.0 NOTES
6.1 Potential Sources
6.2 Government and Commercial Document Sources
6.2.1 Government Documents
6.2.2 Commercial Documents
1.0 SCOPE
This specification describes the requirements for the procurement of a Gyrocompass System, technical documentation and supporting equipment for the 225’ WLB Class Cutters . The current gyrocompass system, Sperry MK 27 Mod 1, will be replaced with a gyrocompass with increased performance for high latitude (above 70° N) operation. This specification DOES NOT include integration or installation of the equipment by the Vendor, but DOES include on-site technical support by the Vendor to ensure proper functionality and commissioning of the gyrocompass system. Repeaters and other ancillary equipment will be purchased separately by USCG under another contract.
Component, documentation, and technical support items covered under this Procurement Specification are as follows:
a. Gyrocompass Assembly
b. Configuration / Set-up Software
c. Technical Data (TD)
d. Data for Provisioning (DFP)
e. Technical Support
f. Onboard Repair Parts Kit
g. System Stock Parts Set
2.0 APPLICABLE DOCUMENTS
The following documents form a part of this Specification to the extent specified herein. The documents listed ARE by title and effective date, unless otherwise documented. Commercial documents may be listed in the Department of Defense Index of Specifications and Standards
(DODISS). To obtain the referenced documents, see Section 6.2.
2.1 Government Documents
2.1.1 Specifications, Military
a. MIL-DTL-15024F, Detail Specification: Plates, Tags and Bands for Identification of Equipment, General Specification for 1997.
2.1.2 Standards, Military
a. MIL-STD-167-1, Mechanical Vibration of Shipboard Equipment (Type I Environment).
b. MIL-STD-740, Airborne and Structureborne Noise Measurements and Acceptance Criteria of Shipboard Equipment.
2.2 Other Government Documents
2.2.1 Code of Federal Regulations (CFR)
a. CFR, Title 46, Chapter I, Subchapter J - ELECTRICAL ENGINEERING
2.2.2 USCG Surface Forces Logistics Center (SFLC) Drawings
Drawing No. Rev. Title
a. 225-WLB-437-005 F Gyrocompass & Magnetic Compass Sys Block, WDP & EWD
b. 225B-WLB-437-005 D Gyrocompass & Magnetic Compass
Sys Block, WDP & EWD
c. 225-WLB-401-003 G Elec, IC & Gyro Room Arrangement
d. 225B-WLB-401-002 C Elec, IC & Gyro Room Arrangement
2.2.3 USCG Surface Forces Logistics Center (SFLC) Documents USCG Surface Forces Logistics Center (SFLC) Documents
a. D-084-0481 REVA, Preservation, Packaging, and Marking
2.2.4 USCG Commandant Instruction (COMDTINST)
a. COMDTINST M10360.3C, Coatings and Color Manual
2.3 Commercial Documents
2.3.1 American National Standards Institute (ANSI)
a. ANSI/TIA/EIA-422-B-1994, EIA Standard RS-422A, Electrical Characteristics of Balanced Voltage Digital Interface Circuits.
2.3.2 American Society of Quality Control (ASQC)
a. ANSI/ASQC 9001-2008, Quality Management Systems – Model for Quality Assurance in Design, Development, Production, Installation, and Servicing
Requirements.
2.3.3 Institute of Electrical and Electronic Engineers (IEEE)
a. IEEE Standard 45, Recommended Practice and Electrical Installation on Shipboard, 2002
2.3.4 International Maritime Organization (IMO)
a. IMO Resolution A.424(XI), Performance Standards for Gyro-Compasses
b. IMO Resolution A.821(19), Performance Standards for Gyro-Compasses for High
Speed Craft
2.3.5 National Electrical Manufacturers Association (NEMA)
a. NEMA 250-2008, Enclosures for Electrical Equipment
2.3.6 National Marine Electronics Association (NMEA)
a. NMEA 0183, National Marine Electronics Association NMEA-0183 Standard for
Interfacing Marine Electronic Devices.
2.3.7 National Conference of Standards Laboratories (NCSL)
a. ANSI/NCSL Z540.3-2006, Requirements for the Calibration of Measuring and
Test Equipment
2.3.8 Society of Naval Architects and Marine Engineers (SNAME)
a. T&R Bulletin 3-47, Guide for Sea Trials
b. T&R Bulletin 3-39, Guide for Shop and Installation Tests
2.3.9 Telcordia
a. Bellcore/Telcordia Predictive Method SR-332 Issue 2, “Reliability Prediction Procedure for Electronic Equipment”, (January 2011)
2.4 Order of Precedence
In the event of a conflict between the text of this Specification and the references cited herein, this Specification takes precedence. The Vendor must notify the Contracting Officer (KO) in writing for a resolution of any ambiguity or conflict found in these Specifications prior to proceeding with any work.
3.0 REQUIREMENTS
The Vendor must provide all labor and material to provide an AHRS (Attitude and Heading
Reference System) Gyrocompass system. The US Coast Guard will install the new gyrocompass system and integrate with the existing shipboard systems. Any materials, components, and labor sub-contracted in meeting the requirements herein are the responsibility of the Vendor.
3.1 General
3.1.1 The new gyrocompass system at a minimum shall perform the same functions and meet the performance of the existing gyrocompass unless otherwise specified herein. The operator interface may be a computer system or touch screen, selector switches, pushbuttons and indicator lights, or any combination. Indicator lights, if used, shall be a high efficiency and long life type.
3.1.2 The Vendor shall provide a reliability prediction and service life with their proposal to ensure the design of the gyrocompass system is adequate to meet USCG needs. The gyrocompass reliability shall be presented in terms of Mean
Time between Failures (MTBF). The Vendor shall provide the environmental conditions and factors under which the MTBF is defined. Calculations shall be based on Bellcore/Telcordia Predictive Method SR-332 Issue 2, “Reliability
Prediction Procedure for Electronic Equipment”, (January 2011).
3.1.3 The gyrocompass shall be Fiber Optic Gyrocompass (FOG) or other comparable non-mechanical gyrocompass technology. The gyrocompass shall not utilize rotating or moving parts. The replacement gyrocompass system shall be maintenance-free and require no maintenance or periodic calibration.
3.2 Equipment Compliance
3.2.1 The new gyrocompass system shall be IMO (International Maritime Organization) compliance for gyrocompasses and meet the applicable requirements of IEEE STD 45 and 46 CFR Chapter I, Subchapter J - Electrical Engineering. IMO compliance certificates, EU “Wheelmark” certificates and any other classification society approvals shall be submitted with proposal.
3.3 Environmental Characteristics
3.3.1 The gyrocompass at a minimum shall meet the following environmental conditions:
a. Operating Temperature: -20°C to +55°C (-4°F to +131°F)
b. Storage Temperature: -40°C to +80°C (-40°F to +176°F)
c. Humidity 0% to 90%, relative, non-condensing
d. Vibration: MIL-STD-167, type I
e. Noise: MIL-STD-740-1 Grade C Airborne MIL-STD-740-2 Type 3 Structureborne
3.3.2 Enclosures for all equipment items shall be at least NEMA 4 or IP66.
3.3.3 The vendor shall provide equipment that is resistant to the marine environment.
Any equipment or portion of equipment that requires painting shall be preserved per COMDTINST M10360.3C, Coatings and Color Manual unless the original coating treatment is specifically accepted by the Contracting Officer in advance.
3.3.4 The gyrocompass shall be insensitive to environmental factors such as vibration, temperature changes, electric and magnetic fields. The vendor shall include supporting data with submittal.
3.4 Master Gyrocompass Physical Characteristics
3.4.1 The new gyrocompass dimensions & weight shall not exceed the following:
a. Height: 762 mm (30 in) Maximum
b. Width: 508 mm (20 in) Maximum
c. Depth: 355 mm (14 in) Maximum
3.4.2 Gyrocompass system controls, conversion and data distribution equipment & weight shall not exceed the following:
a. Height: 508 mm (20 in) Maximum
b. Width: 508 mm (20 in) Maximum
c. Depth: 355 mm (14 in) Maximum
3.4.3 The gyrocompass system including gyrocompass, controls, converters and data distribution equipment can be the aggregate of the dimensions stacked on top of one other added together with the values given above. If all equipment can not fit within the dimensions given above, submit a notional arrangement sketch showing where the new equipment may fit using drawings 225-WLB-401-003 and 225B- WLB-401-002. Submit arrangement sketch with proposal.
3.4.4 The gyrocompass shall be provided with a means to permanently attach to the ship’s structure and properly orient to a fixed platform that will provide an accurate (referenced) mounting surface. The gyrocompass shall include all necessary hold down hardware required to permanently attach it to the ship’s structure.
3.5 Interface Requirements
3.5.1 For reference purposes, the existing gyrocompass system interfaces can be seen in the block diagrams of drawings 225-WLB437-005 and 225B-WLB-437-005. The following systems use the gyrocompass data:
a. CGDDS (Coast Guard Digital Data System) interface comprised of:
1. SPS-50 Radar
2. Electronic Charting Display and Information System (ECDIS)
3. Autopilot
4. DPS (Dynamic Positioning System) (L3/Nautronix - NMS6000)
b. SINS-2 (Scalable Integrated Navigation System) interface.
c. 4, Heading Repeater interfaces.
3.5.2 The new gyrocompass system shall provide isolated inputs and outputs as required by NMEA-0183 and TIA-422.
3.5.3 Output. The new gyrocompass system shall be provided with 6 independent serial output connections using an EIA-422 serial interface and NMEA-0183 protocol sentences that includes at least the following messages: HDT, ROT, VTG and OSC. At least one of the 6 outputs shall be capable of an update rate of 0.5 seconds for the DPS (Dynamic Positioning System) interface. NMEA preambles and baud rates shall be user selectable though the configuration software.
3.5.4 Input. The new gyrocompass system shall be provided with 2 independent serial input connections using an EIA-422 serial interface and NMEA-0183 protocol sentences that accept at least the following messages: GGA, VTG, VHW, GLL and OSD.
3.5.5 The proposed gyrocompass shall accept data from the ship’s speed log (OSS, Own
Ship’s Speed) and GPS (latitude and longitude) data.
3.5.6 The proposed AHRS gyrocompass shall provide attitude (Pitch & Roll) information.
3.5.7 All connections to the gyrocompass controls, converters and data distribution equipment shall be provided with mating connectors, pins, cabling and other hardware needed to interface the system elements.
3.5.8 The new gyrocompass shall be provided with a PC connection for monitoring and configuration of the gyrocompass. Output and Input interfaces shall be user configured with software installed on a PC and connected to the system.
3.5.9 Alarm Output. The gyrocompass system shall provide an alarm malfunction alarm when the gyrocompass power fails, accuracy/outputs may have become degraded or non-functional. Local visual / audio alarm indication and remote alarm indication shall be provided. The gyrocompass shall be provided with a dry set of Form C, SPDT relay contacts rated for 3A resistive for interface to the supervised input of the cutter’s MPCMS (Main Propulsion Control and Monitoring
System).
3.5.10 The following HMI equipment, as a minimum, shall be provided at the gyrocompass unit:
a. Visual indication of system status (Ready or Malfunction).
b. Power switch for application to the ship’s DC power system.
c. Elapsed time meter that indicates cumulative hours in service.
d. Manual or Automatic Latitude Correction feature.
3.6 Input Power
3.6.1 The gyrocompass and data distribution shall be capable of operation from a nominal 24VDC source.
3.6.2 The gyrocompass and data distribution shall operate satisfactory from a range of
20-32 VDC.
3.6.3 The gyrocompass and data distribution shall have a maximum operational power consumption of 60 W / 75VA.
3.6.4 The gyrocompass and data distribution shall be capable of satisfactory operation from a DC source with a ripple of less than 100mV (RMS).
3.7 Self-Diagnostics/Built-In Tests (BIT)
3.7.1 The gyrocompass system shall have built-in test (BIT) capability. Self-test shall be automatically performed each time the system is turned on. System shall perform continuous fault detection during normal operation. The system shall permit an operator-initiated test to be performed at any time to check system performance via the operator interface or operator supplied interface. Fault isolation shall be performed by the BIT to the Lowest Replaceable Unit (LRU) level. An LRU shall be defined as the lowest subassembly of any component of the system which can be replaced in the field (shipboard) in order to affect complete system repair (i.e., restore normal system operation).
3.8 Configuration Software
3.8.1 The vendor shall provide new gyrocompass configuration software that can be installed on a MS Windows® PC for selection of at least the following parameters:
baud rates, frequency, data frame protocols, multiple level arms and filtering parameters.
3.9 Performance Requirements
3.9.1 The new gyrocompass system shall at least meet the following performance requirements. The terminology and test methods shall be in accordance with IMO
A.424(XI) and A.821(19).
a. Accuracy: Heading 0.1° deg x Secant Latitude
b. Roll/Pitch Range: ± 180°
c. Dynamic Motion: Roll - ± 45°
Pitch - ± 45°
d. Speed: -10 to 90 Knots
e. Settling Time: < 30 minutes (full accuracy), unaided. As defined in IMO . A.424(X1) and A.821(19) resolutions.
f. Rate < 90 degrees/second
3.10 Identification and Labeling
3.10.1 Equipment shall be identified and labeled using guidance of MIL-DTL-15024F.
3.11 Data Requirements
3.11.1 Technical Data (TD)
This section defines the requirements for the Vendor to provide TD necessary to integrate the Vendor’s equipment into the design of Coast Guard Cutters and to begin logistical support documentation. The TD identified herein must be provided with the Vendors proposal submission.
The Vendor’s TD must include as applicable minimum the following:
a. A unique assembly part number, nomenclature, and original equipment manufacturer (OEM) Commercial and Government Entity Code (CAGE) Code.
b. General arrangement drawings detailing overall dimensions; required maintenance area dimensions; locations, size and type of all mechanical, electrical, electronic, and other shipboard installation and operating interface requirements.
c. Overall component and system weight.
d. Electrical schematic of each circuit detailing the voltage, amperage and other electrical parameter requirements.
e. Manual, technical publication, and/or catalogue data detailing the installation requirements for each piece of equipment.
f. Operator’s Manual.
g. Gyrocompass Software Configuration Manual.
h. Troubleshooting Manual / Guide.
3.11.2 Data for Provisioning (DFP)
The Vendor must provide DFP for all components being supplied. DFP must be provided after contract award as defined herein. DFP includes drawings, technical manuals, catalog data and product specification sheets to allow the provisioning of a system or piece o f equipment. The DFP for the base year end item shall include all items listed below. The
Vendor must provide addendums to the DFP for each item during the option years.
The prime Vendor must require compliance with this Specification in lower-tier subcontracts and supply agreements. The prime Vendor must provide all DFP that the
Coast Guard requires; either from the Vendor’s subcontractors or provided by the Vendor.
DFP supplied must include as a minimum:
a. A hierarchical listing of all components which can be assembled, re-assembled, and/or replaced. The listing must identify primary components and all supporting components/parts. Figure 1 provides an example of how to list information.
b. General arrangement and system diagrams.
c. Technical Manuals/Publications that completely describe the end item, end item’s equipment and/or piece parts; material, mechanical, electrical, dimensional characteristics, location, and their function within the assembly. The technical publications must include theory of operation, equipment and component set points and related technical information, disassembly procedures, recommended maintenance, maintenance and lay-up procedures, component repair and maintenance instructions, trouble shooting guide, parts schematic/line diagrams, and complete drawings and diagrams.
d. Illustrated Parts Breakdown- Identify parts associated with the equipment. An exploded illustrated parts breakdown must show the location of the parts. The parts list must identify the piece part of the illustration, quantity installed, nomenclature, designation, original manufacturer and manufacturer’s part number.
Part numbers are not required for common hardware available from multiple sources, if adequate descriptive data is provided. Parts data listed in the technical manual must be the same as listed on the hierarchical listing. If metric system components are provided, they must be so noted.
e. All special tools and test equipment required to maintain the end item.
f. A list of all software/licenses needed to accomplish diagnostic testing.
Delivery of preliminary DFP must be no later than sixty (60) days after contract award. The
Coast Guard requires twenty-one (21) days to review DFP. The Contracting Officer, or his
Hierarchy # Major Components Quantity OEM OEM CAGE Part # Estimated Retail Cost Description
Number identifying the hierarchy of the components and sub-components.
Name of major components of the system. Should include at a minimum the items outlined in Spec Section 3.2 but may include additional items per your design. Should not include items such as valves, foundations, hardware, etc. Sub-components should be listed beneath and indented from their main assembly.
Number of each component.
Original Equipment
Manufacturer that
USCG would contact to purchase a direct replacement part.
The Commercial and
Government Entity (CAGE)
Code of the OEM.
Identifying number used by the vendor.
Estimated Retail Cost for purposes of planning maintenance and repairs.
Brief description of the component including purpose, interfaces and other information to assist with understanding the configuration of the system
Service Filter Assembly 2 Company X K1234 12345-AB-6 $17,000 Main assembly that filters the fuel service system.
1.1 Filter Separator 1 1 Company Y B5432 12345-AB-7A $4,300
One of two separators used in parallel as part of the service filter assembly
1.2 Filter Separator 2 1 Company Y B5432 12345-AB-7B $4,300
One of two separators used in parallel as part of the service filter assembly
Figure 1: Example submission of DFP data for component hierarchy.
representative, will provide written approval or recommendations for improvement. The Vendor will have forty-five (45) days to correct and resubmit if the initial delivery is disapproved.
Delivery of final DFP must be no later than concurrent with the delivery of the end item.
3.11.3 Data Submission Format
Drawings must be submitted as electronic media. Electronic media must be in AutoCAD and at least Version 2009 or later. Where electronic media is submitted, it must be with the manufacturer’s permission to use the data on Coast Guard drawings. Text files must be provided in MICROSOFT WORD. Spreadsheets must be provided in MICROSOFT
EXCEL. Documentation supplied as electronic media must be one (1) copy.
3.12 Technical Support
3.12.1 Training
The Vendor must provide onboard training of Cutter personnel for the first system installed. Training may be performed during the support of other Field Services. Training must comprise operation and maintenance of the new equipment. The training must include but not be limited to:
a. Review of maintenance documentation
b. Review of start-up and operational procedures
c. Safety
d. Settings and adjustments
e. Interpretation of displayed sensor data
f. Emergency procedures
g. Troubleshooting
The Vendor must specify in the proposal a fixed daily rate for all labor and materials associated with providing training, along with the expected number o f days to complete.
Other associated travel costs (air travel, car rental, etc) are not to be included in this rate.
Training materials must include the onboard technical documentation provided for the new equipment plus any additional training documents which must be provided by the Vendor and included in the training.
Representatives provided under this contract shall be regularly in the business of providing training services to system users and operators. The Contractor shall warrant and certify that all Technical Representatives are fully qualified and have experience working on this or similar type systems.
The Vendor must prepare and sign a statement regarding the completion or waiver of training services. The Contracting Officers Representative (COR) or his representative must obtain a release signature before departure of the Vendor or his representative. The Vendor must forward a copy of the signed release document to the Contracting Officer
(KO), with a Commissioning Technical Report.
3.12.2 Field Services – Installation and Testing Assistance
The vendor must provide the services of a field service engineer/technician to assist during set-up, testing, commissioning, light-off, and adjustment for optimum performance of the equipment and system. Future warranty work will be performed as needed in accordance with the Contract.
Field service support will be performed at the U.S. Coast Guard Yard at Curtis Bay, Baltimore, MD.
The Vendor must specify in the proposal:
a. A fixed daily rate for all labor and materials associated with providing field services, along with the expected number of days to complete. Other associated travel costs (air travel, car rental, etc) are not to be included in this rate.
b. An additional day rate for any potential future field service support required outside of any required warranty work. The quoted rate must be good for one year after installation of the first system.
Representatives provided under this contract shall be regularly in the business of providing training services to system users and operators. The Contractor shall warrant and certify that all Technical Representatives are fully qualified and have experience working on this or similar type systems.
The Vendor must prepare and sign a statement regarding the completion or waiver of commissioning services. The COR must obtain a release signature before departure of the Vendor or his representative from the field service site. The Vendor must forward a copy of the signed release document to the Contracting Officer (KO), with a Commissioning
Technical Report.
A Technical Representative shall be available for response to questions by telephone within
24 hours of being contracted by the Contracting Officer or Contracting Officer’s Technical Representative. The Technical Representative shall also be available to attend vessels and provide casualty response services in any port in the continental United States within 72 hours of a request by the Contracting Officer. Routine technical support services shall be scheduled at least 14 days in advance.
3.13 Onboard Repair Parts Kit
To allow the Government the opportunity to procure Onboard Repair Parts for the Gyrocompass System, the Vendor must provide a recommended onboard repair parts (OBRP) kit list. OBRP consist of items required to conduct 1 year’s worth of OEM recommended maintenance parts that unit personnel can perform without additional special tools or technical support. Typical onboard spare parts include filters, bulbs, belts, and other general consumable items. The recommended OBRP kit list must be provided with the proposal submission and must include the following data:
OBRP Kit part number, CAGE Code, and complete kit cost.
The Vendor must supply for each item in the OBRP kit, the OEM part number, CAGE Code, part description, National Stock Numbers for parts already identified in the Federal Stock System, shelf life, special material/operating requirements, quantity, estimated retail cost.
3.14 System Stock Parts
The Vendor must provide a recommended system stock parts list spreadsheet. System stock parts are defined as material with delivery lead times over 45 days and manufacturer designated critical items. The system stock parts list must be provided with DFP after contract award and must include the OEM part number, CAGE Code, part description, National Stock Numbers for parts already identified in the Federal Stock System, shelf life, special material/operating requirements, quantity, individual part retail cost and complete list cost. The Government reserves the right to order part quantities less than or greater than the Vendor provided parts list.
3.15 Deviation from Specification
Deviation from the Specifications will only be allowed if there is a direct benefit to the Government and the change has been authorized in writing, by the Contracting Officer.
After contract award, if the Vendor finds it necessary to change or depart from the applicable requirements of this Specification, he must request permission to do so from the Contracting Officer (KO) within five (5) working days of any changes effecting equipment or part configurations. If the proposed change involves the substitution of another material or method for one specifically required, the complete Specification(s) covering the requested method or material must be submitted.
3.16 Requests by Vendors for changes, either with their proposal submission as exceptions to the S pecification or after contract award, must clearly describe the proposed changesand the reason for and the advantages of the proposed changes.. Details of the proposed changes should include a clear description of the design improvements to equipment or assembly process to simplify or improve reliability and/or maintainability, and/or to improve performance. A detailed list of cost savings that would result shall also be provided.Provisioning Quality Control
The Vendor is responsible for the completeness and accuracy of all items provided under this Contract. The Government reserves the right to implement provisioning quality control which may include, but not be limited to:
a. Selective review of Vendor purchase orders and quotations to assure compliance with provisioning procedures.
b. Physical validation of installed components and equipments nameplate characteristics data against Vendor purchase orders, DFP, construction or equipment drawings, labels and markings of equipments or components validated.
3.17 Provisioning Conferences
Provisioning Conferences, if required, will be organized at the Contracting Officer’s discretion.
These conferences will only be called after normal attempts to resolve DFP discrepancies have been exhausted. The Vendor and his/her subcontractors as required must participate in these conferences. The Vendor must make complete technical data and the specific equipment being provisioned available for inspection.
During Provisioning Conferences held at the Vendor’s facilities, the Vendor must make all DFP available to a Government On-Site Provisioning Team in a centralized location. The centralized location must accommodate up to six (6) Government On-Site Provisioning Team members during normal business hours for a period of five (5) working days.
3.18 Tests, Inspections, and Reports
The Coast Guard reserves the right to witness any or all of tests performed. The Vendor must retain records of all tests and submit them to the Contracting Officers Representative (COR).
The performance of tests and the preparation of reports must follow the guidance of SNAME
T&R Bulletin 3-39, Guide for Shop and Installation Tests. Equipment supplied by the Vendor that is currently certified to meet the operational and regulatory requirements defined herein is not required to undergo First Article Testing.
3.18.1 First Article Testing (FAT)
If required, the initial ship set that is furnished must undergo First Article Testing (FAT).
The test procedure must be provided to the Contracting Officers Representative for review and approval prior to performing the FAT. A USCG representative may witness the test for First Article unit. A FAT report, including a description of test setup and procedure, photographs from two adjacent sides, logs of times for start and finish and any measurements taken during the test, must be provided.
3.18.2 Factory Testing (FT)
Each complete unit supplied must be factory tested and inspected in accordance with the manufacturer’s quality assurance procedures. The testing and inspection must include but not be limited to the following:
a. Operation of the complete unit for one (1) hour.
b. Operating temperature (F).
c. Factory test procedure key performance parameters must be monitored and recorded.
Factory Test reports, including a description of test setup and procedure, photographs from two adjacent sides, logs of times for start and finish and any measurements taken during the test, must be provided for each unit tested.
3.18.3 Shipboard Test Plan
The Vendor must develop a Shipboard Test Plan for use by the installing activity for
Shipboard Testing. The Shipboard Test Plan must fully address all features and capabilities of the equipment and must fully demonstrate the proper installation, startup, and operation of the equipment. Shipboard testing must include the testing requirements of SNAME T&R 3-47 Guide for Sea Trials and the following:
a. System must be monitored for required operational functions.
b. Demonstration of all control functions.
c. Test Report data for the systems tested.
d. The Government will provide the labor and equipment for performance of the installation tests. Installation testing support by the Vendor must be provided as a part of the Field Services
3.19 Workmanship
All material and components must be of first quality in every respect and of new manufacture. No used materials or components will be permitted.
Work on all critical and or load bearing parts must only be performed by properly certified craftsmen. Certificates must be made available upon request.
3.20 Warranty
The gyrocompass shall be free from defects in materials and workmanship for no less than two (2) years from the date of delivery. The Contractor shall contact the Cutter’s unit to arrange a resolution of a warranty claim within twenty-four (24) hours after receiving notification by the Coast Guard.
The Contractor shall provide Technical Representative Services for both warranty response and for non-warranty technical support. Non-warranty technical support shall be at the government’s expense at rated proposed in the Contractor’s offer. The cost of transportation, lodging, meals and incidental expenses incurred by the Contractor’s personnel shall be in accordance with the Federal Acquisition Regulation FAR Part 31.205-
46.
4.0 QUALITY ASSURANCE
4.1 General
The Vendor must maintain an inspection system which must insure that each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements. The inspection system must be documented and available for review by the Coast Guard.
4.2 Records
The Vendor must maintain records of all tests and inspections. The records as a minimum must indicate the nature and number of observations made, the number and type of deficiencies found, and the corrective action taken. The Vendor must provide the CG Quality Assurance Inspector with completed copies of the certification testing results upon completion of testing. A copy of the test certification, including any tests by outside vendors or tests of subcontracted materials, must be provided to the Contracting Officer Representative (COR) and the quality assurance inspector when issued.
4.3 Calibration System
The Vendor must maintain a test equipment calibration program in compliance with ANSI/NCSL Z540.3-2006. The program must be documented and traceable to the National Institute of Standards (NIST).
4.4 Quality Assurance Plan
The Vendor must maintain a Quality Assurance Plan in accordance with ANSI/ASQC Q9001-
2008 which must insure that each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements. The inspection system must be documented and available for review by the Contracting Officer/Quality Assurance Representative.
4.5 Tests and Inspections
The tests and inspections as defined herein are the minimum required and are not intended to supplant any controls, examination, inspections or tests normally employed by the Vendor to assure the quality of the item in question. USCG Approved and current certified (IMO) equipment listed in the USCG Maritime Information Exchange (CGMIX) http://cgmix.uscg.mil/ are not required to undergo First Article Testing.
4.6 Responsibility for Tests and Inspections
The Vendor is responsible for the performance of all test and inspection requirements as specified herein. The Vendor must provide space, personnel, and test equipment for the conduct of all inspection requirements. All testing and inspections must be performed at the Vendor’s plant or at other facilities acceptable to the Coast Guard. The Vendor must notify the Contracting Officer in writing at least fourteen (14) calendar days prior to the performance of any inspections or testing. The Coast Guard reserves the rights to verify or have performed any of the inspections that are deemed necessary to assure that supplies and services conform to the prescribed requirements.
http://cgmix.uscg.mil/
4.7 Responsibility for Compliance
The tests and inspections identified herein must become part of the Vendor’s overall inspection system or quality program. The absence of any test or inspection requirement in the Specification will not relieve the Vendor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling for quality conformance does not authorize submission of known defective material (either indicated or actual) nor does it commit the government to acceptance of defective material.
4.8 Failure Responsibility
4.8.1 Test Failure
If the specified item fails to pass any inspection/test the Vendor must provide a Corrective Action Report (CAR) to document the failure and the recommended fix to the Contracting
Officer. If approved, the corrective action on the materials or processes must be taken in accordance with this Section.
4.8.2 Corrective Action Remedies
a. The Contracting Officer (KO) reserves the right to totally reject any failed item without considering any suggested corrective action.
b. The inspection/test must be discontinued until all corrective action has been taken.
c. After all corrective actions have been taken the inspection/test must be continued or repeated at the option of the Contracting Officer.
d. Acceptance must be withheld until re-inspection has been shown that the corrective action was successful and the item satisfactorily passes all inspections and tests.
e. All corrective actions must be documented as part of the Vendor’s inspection system and submitted for approval to the Contracting Officer.
f. Each CAR must include, but not be limited to the cause of each defect, corrective action suggested, and the steps taken to prevent a recurrence of each defect.
4.9 Test and Inspection Reports
One (1) electronic copy of any required test, inspection, or tolerance check must be sent to the
Contracting Officers Representative. A copy of any test, inspection or tolerance report must be turned over to the Quality Assurance Representative upon arrival at the Vendor’s plant.
5.0 PRES ERVATION, PACKING, AND MARKING
a. After completion of testing and in preparation for preservation and shipping, all equipment unit internal piping, and fluid connection points must be cleaned, sealed and protected from entry of dirt and moisture.
b. The Vendor must prepare a Preservation, Packaging and Marking Plan in accordance with Section 4 of SFLC-D-084-0481, Equipment Unit Preservation, Packing and
Marking. The plan must be provided to the COR and discussed prior to the preservation, packaging and marking of the first delivery. The plan must describe the proposed preservation and packaging methods for the equipment unit and spare parts. The plan must identify all proposed markings of the packages.
c. The equipment unit and parts must be preserved, packaged and marked for shipping in accordance with sections 3.3-3.4 of SFLC-D-084-0481. The equipment unit and parts must be packaged suitable for shipment, temporary storage uncovered in the weather, and then reshipment by the Government (within CONUS) to the installing activity.
d. The COR reserves the right to inspect or review the preservation, packaging and marking of all units, associated components, and parts, prior to release for shipment.
6.0 NOTES
6.1 Potential Sources
Examples of manufacturers meeting the technical requirements of this Specification are as follows but are not limited to the following:
a. IXSEA, Inc
179 Sidney St.
Cambridge, MA 01239
PH: 781-937-8800
www.ixb lue.com
b. WR Systems
240 Talleyrand Ave.
Jacksonville, FL 32202
PH: 757-858-6000
www.wrsystems.com
c. SAGEM
2902 Safran Dr.
Grand Prairie, TX 75052
PH: 972-314-3600
www.sagem.com
d. SPERRY MARINE 12 Park Street
Cranford, NJ 07016
PH: 757-312-8405
www.sperrymarine.com http://www.ixsea.com/pdf/br-octans-2012-02-web.pdf http://www.ixsea.com/pdf/br-octans-2012-02-web.pdf http://www.sagem.com/ http://www.sperrymarine.com/
6.2 Government and Commercial Document Sources
6.2.1 Government Documents
a. DOD & Navy Publications and Forms (Other Than DODISS) Naval Publication and Forms Center
5801 Tabor Ave.
Philadelphia, PA. 19120 215-697-2000
b. Specification and Standards (DODISS Documents) Standardizations Document Order Desk
700 Robbins Avenue Building #4, Section D Philadelphia, PA. 19111-5094
215-697-1187 http://assist.daps.dla.mil/quicksearch/
c. USCG Surface Forces Logistics Center 2401 Hawkins Point Road Baltimore, MD 21226-5000
ATTN: ISVS Section, code 025 410-762-6905
d. Code of Federal Regulations (CFR) U.S. Government Printing Office 732 N. Capitol Street, NW
Washington, DC 20401 866-512-1800 http://www.gpoaccess.gov/cfr/index.html
6.2.2 Commercial Documents
a. American National Standards Institute (ANSI)
1430 Broadway New York, NY 10018
212-642-4900
b. American Society for Quality Control (ASQC) 600 North Plankinton Avenue
Milwaukee, Wisconsin 53203 800-248-1946
FAX 414-272-1734
c. American Society for Testing & Materials (ASTM) 100 Barr Harbor Drive
West Conshohocken, PA. 19428-2959 610-832-9585
FAX 610-832-9555
http://assist.daps.dla.mil/quicksearch/ http://www.gpoaccess.gov/cfr/index.html
d. American Welding Society (AWS) 550 N. W. Lejeune Road
Miami FL. 33126 305-443-9353
FAX 305-443-7559
e. Institute of Electrical and Electronics Engineers (IEEE) 3 Park Avenue, 17th Floor
New York, NY 10016-5997 212-299-5585
f. International Organization for Standardization (ISO) 1, ch. de la Voie-Creuse, Case postale 56
CH-1211 Geneva 20, Switzerland 41-22-749-01-11
Fax 41-22-733-34-30
g. National Conference of Standards Laboratories (NCSL) 2995 Wilderness Place, Suite 107
Boulder, Colorado 80301-5404 303 - 440-3339
FAX 303 - 440-3384
h. National Electrical Manufacturers Association (NEMA) 1300 North 17th Street
Suite 1847 Rosslyn, Virginia 22209
703-841-3200 Fax: 703-841-5900
i. The Society of Naval Architects and Marine Engineers (SNAME)
601 Pavonia Avenue Jersey City, New Jersey 07306
800-798-2188 Fax 201-798-4975
File details come from the government source that posted it. Updated .