REVISION M Date: Oct 30, 2013

USCG WPB-110

SPECIFICATION FOR FIN STABILIZER OVERHAUL

R-565-0380

ORGINATED BY: Ed Brubaker DATE: 3/21/2001 .

ORIGINATOR’S COMMAND: Surface Forces Logistics Center (SFLC)

DEPARTMENT / DIVISION: Patrol Boat Product Line (SFLC)

UPDATED BY: Wayne Nickel (Rev. M) DATE: 10/30/2013 .

INTERNAL REVIEW: Jeff, Wong PBPL Engineering DATE: 10/25/2013 __.

SFLC QA REVIEW: Brad Clemons, SFLC QA DATE: 10/30/2013 .

PLSSR REVIEW: DATE: .

1. SCOPE:

1.1 General: The Contractor shall provide all equipment, labor and materials to receive, inspect/report, overhaul, test, inspect, preserve, package, pack, mark and bar-code fin stabilizers in accordance with the referenced drawing(s) and data provided within this statement of work to return the fin stabilizer(s) to a serviceable “A” condition.

NOTE

Serviceable “A” condition is defined as a reconditioned fin stabilizer meeting all required design specifications and design dimensions in accordance with Coast

Guard Drawing: 110C-WPB-565-001 and being capable of functioning and performing in the same manner as an identical new fin stabilizer although it may not have the appearance of a new fin stabilizer.

1.2 Government Furnished Property (GFP): The listed items are property of and managed by the USCG Surface Forces Logistics Center, Baltimore MD and will be issued to the Contractor upon contract award or as issuance of a delivery order.

ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

Fin Stabilizer NSN: 2040-99-726-4768 24 ea $10,000.00

Shipping Crate, Reusable N/A 1 ea $350.00

Nut, Special (Fin Hold

Down)

NSN: 5310-99-538-1442 1 ea $575.00

Nut, Special (Fin Stock) NSN: 5310-99-538-1443 1 ea $401.93

Fin Sealing Kit NSN: 2040-01-566-3198 24 ea $524.85

1.3 ALL GFP MUST BE STORED INDOORS IN A LOCKED, ENVIRONMENTALLY

CONTROLLED LOCATION AT THE CONTRACTORS FACILITY. Any new crates fabricated per this statement of work will be considered GFP and must also be stored.

1.4 All GFP shall be returned to the Coast Guard Surface Forces Logistics Center before contract close out. The address is:

U.S. Coast Guard

Surface Forces Logistics Center

2401 Hawkins Point Rd, Bldg. 88

Baltimore, MD 21226

2. APPLICABLE DOCUMENTS

2.1 The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

2.2 All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

a. MIL/DOD/CID Specifications:

http://www.assistdocs.com/search/search_basic.cfm

b. Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

c. Public Laws, Code of Federal Regulations, U.S Codes, and other Federal

Government laws: www.gpoaccess.gov

2.2.1 The Government is aware of the following internet web links where contractors may procure commercial specifications:

a. American Welding Society (AWS): http://www.awspubs.com/index.php

b. ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

c. NFPA: http://www.nfpa.org

d. SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

2.3 Coast Guard Drawings:

2.3.1 Coast Guard Drawing 110C WPB-565-001, Rev. B & D, Fin Stabilization System

(sheets # 1, 3, 4, 5 & 8)

2.3.2 Coast Guard Publications:

a. Coast Guard Commandant Instruction (COMDTINST) M10360.3, (series) Coatings and Color Manual b.Coast Guard SFLC Specification D-000-0100, Rev. G, Change 1, Bar Coding for

SFLC Stocked Material.

c. Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec

0740), 2012, Welding and Allied Processes d.Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec

6310), 2012, Requirements for Preservation of Ship Structures

2.3.3 Other Government Documents:

a. MIL-PRF-16173E w/ Int. Amendment 1, Sep 2006, Corrosion Preventive http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace

Compound, Solvent Cutback, Cold- Application

b. DOD 4140.01-M-1, Dated 9/7/2007; Compliance for Defense Packaging:

Phytosanitary Requirements for Wood Packaging Material (WPM).

2.3.4 Commercial Documents:

a. SAE International, SAE J 448-2011 Standard, Surface Texture.

b.National Conference of Standards Laboratories NCSL Z540-3, Dated 1/1/2006

Requirements for the Calibration of Measuring and Test Equipment

c. American Society for Quality Control ASQC Q9001, 1/00 Edition, Quality

Management Systems – Requirements d.The Society for Protective Coatings (SSPC)/NACE International (NACE), Joint

Surface Preparation Standard SSPC-SP 10/NACE No 2, 2007, Near-White Blast

Cleaning

e. American Society for Testing and Materials A1011/ A1011M Rev A, 9/07 Edition, Standard Specification for Steel.

2.4 Order of Precedence: In the event of a conflict between the text of this specification and the references cited herein, this specification shall take precedence, unless otherwise specified herein. Nothing in this specification, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

3.0 REQUIREMENTS

3.1 Inspection and Estimate: Contractor shall carefully remove the fin stabilizer from the

GFP crate and conduct a preliminary inspection to determine estimated cost of labor and materials necessary to return the fin stabilizer to a serviceable “A” condition as described above. A Condition Found Report (CFR) and estimated breakdown of all labor, materials and costs required to overhaul, test, preserve, pack, package and mark each fin stabilizer including repair or replacement of the shipping container/skid shall be submitted to the

Coast Guard Contracting Officer (KO) within ten (10) days of receipt of GFP. No further work shall proceed until authorized by the Contracting Officer.

3.1.1 Paint Removal: Abrasive grit blast all coated fin surfaces to SSPC-SP 10/NACE

No. 2 using grit conforming to MIL-A-22262 with a 3.0-4.0 mil profile. All pipe plugs shall be installed prior to grit blasting.

3.1.2 Visually inspect the fin stock for the following:

a. Excessive wear on the stock bearing journal surfaces.

b. Straightness.

c. Key and Keyway defects.

d. Corrosion and other mechanical defects.

3.1.3 Contractor shall perform ultrasonic testing to the fin to measure blade thickness.

Take 20-30 shots on each side and log readings and location on CFR. Degradation in excess of 25% will render the fin stabilizer non-repairable.

3.1.4 Air Pressure Test: Contractor shall conduct an air pressure test on the blade section after all the paint and primer are removed as per 3.1.1. Using a calibrated pressure gauge, test shall be conducted at 1-1/2 PSI for a period of 30 minutes. If any pressure loss is noted, check porosity areas, plug threads, and all welds using a soapy water solution to expose leaky areas. The active formation of air bubbles on the blade surface indicates the presence of cavitation erosion damage. The test result and any recommended repair shall be stated in the CFR. Remove all traces of soapy water solution.

3.1.5 Any fin stabilizer the Contracting Officer deems not repairable shall be returned to the Coast Guard at the address listed in 1.4 and shall be marked in “H” condition as described in 5.5.

3.2 Welding Certifications: The Contractor shall have welders qualified in accordance with American Society of Mechanical Engineers (ASME), Section IX, 2008, Qualifications Standard for Welding and Brazing, and Welding and Brazing Operators per SFLC STD Spec 0740. Certification documentation shall be maintained and available to the Contracting Officer for review at any time during the contract period.

3.3 Fin Stock Repairs

3.3.1 Lower Stock Repair: Starting at the top of the 1” radius where the stock meets the fin stabilizer blade, undercut and clad weld build up in accordance with Coast Guard drawing (note 3 on sheet 5).

3.3.2 Upper Stock Repair: Contractor shall polish the machine surfaces to 125 RMS or smoother.

3.3.3 Keyways: All keyways shall be weld filled using grade 308 stainless steel and re-machined to the original drawing dimensional tolerances.

3.3.4 Thread Replacement: All existing threads shall be machined off to 1/32” under root of threads and built up with grade 308 stainless steel weld and new threads machined.

The nut listed in section 1.2 is available for use by the contractor for the purpose of thread machining and proper fit.

3.3.5 Length Tolerance: The allowed length tolerance for each segment of shaft diameter shall be +/- 1/64” (.0156”).

3.4 Preservation

3.4.1 Flow Coating: The fin stabilizer internal cavity shall be filled and drained (flow coated) with corrosion preventative compound that conforms to MIL-PRF-16173 Grade

3. Replace pipe plugs with new stainless steel plugs in accordance with drawing 110C

WPB 565-001 upon completion of flow coating. Flow coating the internal fin stabilizer blade shall be accomplished after all other repairs are complete.

3.4.2 Final top coat painting of the blade section shall be accomplished after all repair work and internal flow coating is complete. The following procedure shall be used.

3.4.3 Surface Preparation: Fin blades shall be cleaned and readied for coating as described below.

a. Inspect all fins to ensure the surfaces still meet the SSPC-SP 10/NACE as specified in paragraph 3.1.1. Sandsweep the surface as needed to meet the surface preparation standard before applying coating system.

b. Clean entire substrate surface using Salt Away or equal product.

c. After cleaning, test substrate for the presence of any chlorides.

d. Rewash and retest as needed.

3.4.4 Painting Top Coat: A coat of paint shall be applied to the entire blade surface in accordance with the manufactures instructions. Painting of the blade section shall be accomplished after all other repair work and interior flow coating is complete.

a. Apply two (10-11 mils dry film thickness) coats of Ameron Amerlock 400

(black) or equivalent high turbulence paint to achieve a total of not less than 20 mils dry film thickness.

b. Paint shall be applied in the portion of the fin stabilizer stock radius where the stock and blade meet as follows: The paint shall overlap the radius and extend ¼” above the end of the 1” radius where it joins the 6.09” diameter.

3.4.5 Paint Data Sheets: Paint data sheets shall be prepared to certify the paint type and mil thickness used on the fin blade. The paint data sheets shall be provided to the

Contracting Officer and a copy packed with each overhauled fin.

3.5 Final Inspection and Test Report: A detailed final inspection and test report shall be submitted to the Contracting Officer for approval prior to scheduling SFLC Quality

Assurance personnel. The report shall list all defects and the final condition of the Fin after all work has been completed. A copy of the inspection and test report shall be turned over to the Coast Guard Quality Assurance representative upon arrival for final inspecting and testing. The inspection and test report shall contain the following information as a minimum:

a. Contractor name, address and telephone number.

b. Contract number and delivery order number as applicable.

c. Fin serial numbers

d. Inspection sheets showing dimensional data and test results

e. Name of the person conducting the testing.

f. Test equipment used, nomenclature, serial number, and calibration date.

g. Pressure test certification.

h. Float coat application.

i. All required documentation concerning preparation and application of all coatings.

3.6 Notifications and Inspections: The contractor shall be responsible for notifying the

Contracting Officer at least ten (10) calendar days prior the contractor being ready for any Quality Assurance (Q.A.) inspections or testing as required herein. The fin stabilizers require a one hundred percent Coast Guard Quality Assurance inspection.

4.0 INSPECTION AND TESTING

4.1 Inspections & Tests (Completed Units): The inspections & tests required herein are the minimum necessary and are not intended to replace any controls, examinations, or tests normally employed by the Contractor to assure the quality of the product.

4.1.1 Contractor shall have the latest versions of the drawings, specifications, tolerances, approved test procedures and test equipment calibration certificates available for inspection, as necessary.

4.1.2 The following are required and will be monitored by a CG-SFLC Quality

Assurance Representative:

a. Overall dimensional tolerances are in accordance with the drawing.

b. Surface texture (stock section).

c. Weld inspection.

d. Air pressure test.

e. Paint thickness check.

f. Paint data sheet.

g. Flow coat check.

h. Blade straightness in reference to the centerline on the drawing.

i. Slade packing kit secured and marked in crate.

j. Packing, packaging, marking and bar-coding of rudder prior to shipping.

5.0 PACKING, PACKAGING AND MARKING

5.1 Preliminary: Each fin stabilizer shall be individually packaged in its own reusable wood box, or a new reusable shipping container.

5.2 New Reusable Shipping Container: When a change request is authorized by the KO, the Contractor shall construct a new reusable shipping container as follows:

5.2.1 The wooden box shall be constructed using 2” x 8” framing and ¾” plywood top and bottom. Particle board, flake board, OSB etc. will not be acceptable. The box shall be skid mounted and constructed with a removable lid secured with corrosion resistant wood screws to allow easy access and removal of the fin stabilizer without damage to the box. The stock section shall be encased in PVC piping for protection from damage during shipping and handling. Pipe shall be long enough to cover the entire length of the stock and extend approximately one inch beyond the top of the stock. Pipe shall be secured to the stock in such a manner to prevent slipping off. The fin stabilizer stock shall be supported in the box by use of cradles and blocking that will not allow shifting of the fin stabilizer within the box. The lower blade end shall be supported with 2”x6” wood planks covered in ½” minimum thickness resilient rubber or foam to prevent blade paint damage. The box shall be banded in a minimum of two locations. The Contractor shall pack one (1) Fin Sealing Kit (GFM) with installation tool, Ref. 1.2, in the box with each fin stabilizer. The kit shall be secured to prevent movement during handling and multiple shipments. The kit shall be clearly marked in permanent ink with NSN and description.

5.2.2 Newly manufactured shipping containers shall be secured and stored per 1.3.

5.3 Wood Packing Material (WPM) Requirements: The new shipping container shall meet the Phytosanitary Requirements for WPM in accordance with DOD 4140.01-M-1, Compliance for Defense Packaging Ref. 2 paragraph C2.1.1. WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames and cleats. Packaging material exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board (OSB). All new purchases of WPM shall be constructed from heat treated (treated to 56° C. core temperature for 30 Minutes) lumber and certified by an accredited agency recognized by the American Lumber

Standard Committee (ALSC).

5.4 WPM Markings: All shipping containers shall have the appropriate markings in accordance with DOD 4140.01-M-1, Compliance for Defense Packaging Ref. 2 paragraph C2.5.

5.5 Marking: Shipping container shall be stenciled with the information laid out below.

Markings shall be placed on each side of the two longest sides of the container so it will be visible to a forklift driver during storage and shipment. Stencil shall be applied directly on the container and a minimum of ½ inch height black characters on a highly contrasting painted background, using permanent waterproof ink or enamel paint.

Required marking for (ready for issue) “A” Condition fin stabilizers:

National Stock Number: 2040-99-726-4768

Item Name: FIN STABILIZER

Drawing Number: 110C WPB 565-001

Shipping Weight: Contractor Provide

Coast Guard Contract No.: See Contract

Delivery Order No: See Contract

Statement: COAST GUARD SFLC MATERIAL, CONDITION "A", 1 EACH

Required marking for (scrap) “H” Condition fin stabilizers:

National Stock Number: 2040-99-726-4768

Item Name: FIN STABILIZER

Drawing Number: 110C WPB 565-001

Shipping Weight: Contractor Provide

Coast Guard Contract No.: See Contract

Delivery Order No: See Contract

Statement: COAST GUARD SFLC MATERIAL, CONDITION "H", 1 EACH

5.6 Bar Coding: A bar coded label, in accordance with SFLC specification D-000-0100 shall also be applied. The Bar Code Label can be applied separately or as part of the marking required in 5.5 of this specification.

a. The actual labels shall be Type "V", Grade "C" Style "2", Composition "a" with or without plastic laminate.

b. Each label shall contain encoded data for the Stock Number.

6. NOTES

None

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision M (Rev-M) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

NOTE: Revision record is a Coast Guard internal record. The revision will show the weakness of the spec where the change were made, and should not be published.

File details come from the government source that posted it. Updated .