Amendment0002.pdf
PDF 46 KB Posted
- Attached to
- DRY-DOCK & REPAIR, BUSL 49423, USCG ANT DULUTH
- Solicitation number
- HSCG40-11-R-P30U50
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0001.pdf | ||
| SCHEDULEofITEMS | — | |
| 49423 SPEC 2011 REV 0 | — | |
| HSCG4011QP30U50.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0002 04APR2011 2111401P30U50
6. ISSUED BY CODE HSCG40 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER, USCG
SURFACE FORCES LOGISTICS CENTER
1301 CLAY STREET, SUITE 807N
OAKLAND, CA 94612
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9A AMENDMENT OF SOLICITATION NO.
X HSCG40-11-Q-P30U50
9B. DATE (SEE ITEM 11)
07MAR2011
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
DRYDOCK AND REPAIRS OF CG 49423, USCG ANT DULUTH
SEE PAGE 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
HSCG40-11-Q-P30U50
CG 49423, ANT DULUTH
Amendment 0002
The purpose of this amendment is as follows:
1.) The following Request for Clarifications are answered:
WORK ITEM 29 RENEW EXHAUST MUFFLER
• QUESTION: Is the Insulation on the Exhaust to be re-used? Also the spec calls to renew the inlet and outlet hoses. The print only shows 5” SS pipe, is this the same item?"
o ANSWER: The insulation will be re-used. If it is determined that it will need replacement during the removal, a CFR will be submitted. There are no hoses. The specification is supposed to read “flex couplings” as per 3.5.1. “Requirements.”
WORK ITEM 40 INSPECT PIPING
• QUESTION: SubCLINs 40A thru 40 D, are they bid per foot? Per spool piece? Please define the
(1) unit.
o ANSWER: Contractors shall bid on inspecting per foot. Piping length is identified in the name of the work items.
• QUESTION: Reference drawing 49BUSL 200-002 rev-A, Machinery Arrangement does not show piping systems, just machinery.
o ANSWER: The following are the correct drawings and will be supplied to the contractors who requested original sets of drawings.
49A-BUSL-256-1 PROPULSION AND GENERATOR ENGINE SEA WATER AND
JACKET WATER COOLING SYSTEMS
49A-BUSL-512-2 HVAC SEAWATER COOLING
49A-BUSL-523-1 DECK WASHDOWN SYSTEM
2.) All other terms and conditions cited in the original solicitation/specifications remain unchanged.
File details come from the government source that posted it. Updated .