Turbocharger.doc

DOC document 25 KB Posted

Attached to
Overhauling Turbochargers
Solicitation number
HSCG40-08-R-50034
Issued by

About this file

Presolicitation Notice

View the file

Other files

File Type Posted
standard form 33.doc DOC document
turbocharger.sol.pkg.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair of Compression Systems Turbochargers—The U.S. Coast Guard ELC anticipates conducting negotiation with Compression Systems and its authorized repair facilities. Contract period of performance will be a base year with four (4) one (1) year options, for the inspection and repair of Elliott Turbochargers Models H564 and BC370H used on Coast Guard 378’ WHEC, and 110’ WPB vessels. Total estimated quantity per year for the H564 (NSN: 2950-01-057-7734) is 8 each. Total estimated quantity per year for the BC370H (NSN: 2950-01-211-3165) is 12 each. Contractor will provide all labor and material required to perform the following work on the turbochargers (1) receive; (2) disassemble; (3) inspect; (4) provide a condition report; (5) repair; (6) reassemble; (7) test; and (8) preserve and install in a reusable shipping container. All efforts shall be in accordance with Compression Systems, Instruction Book TC-30E, Shop Practice Manual SP-315A, Paxman Diesels Ltd., Instruction Manual 200.M6, dated May 1985 “Elliott Turbocharger, MIL-C-104B, MIL-P-116J, MIL-E-15090C, MIL-P-20087, MIL-P-24441/1B, MIL-I-45208A, MIL-STD-271-F, and ANSI/NCSL Z540-1-1994. In addition, contractors shall conduct all work and tests in accordance with Coast Guard Standard Repair Specification (SRS) 4331-R-251-52 dated 6/91, Rev 5, dated 10/95. All parts to be furnished and used with the repairs must be Elliott parts. Delivery F.O.B. Destination to Commanding Officer, Receiving Room-Bldg. #88, U.S. Coast Guard YARD, 2401 Hawkins Point Road, Baltimore MD 21226. Delivery for inspection reports is 45 calendar days after Coast Guard approval of Inspection Report. Delivery for the turbochargers will be 60 days after approval of inspection reports. Any contractor who plans to submit a bid in response to this solicitation shall contact Sharon Johnson at Sharon.D.Johnson@uscg.mil or (410) 762-6465 and provide your company name, address, and email information. See Numbered Note 22 & 26.

File details come from the government source that posted it. Updated .