Appendix A- Project Site Pictures.doc

DOC document 260 KB Posted

Attached to
RESIN FLOORING
Solicitation number
HSCG39-12-P-EB014
Issued by

About this file

Appendix A

View the file

Other files

File Type Posted
Updated.doc DOC document
Appendix B- Perdure-E02 Technical Data Sheet.pdf PDF
SF-1449.pdf PDF
LTR CCR.doc DOC document
Appendix B- Perdure E10 Technical Date Sheet.pdf PDF
Appendix C.pdf PDF
WDOL.PDF PDF
Men's Varsity Locker Room Flooring SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Coast Guard Academy

Men’s Varsity Locker Room Flooring

Appendix A

Picture shows cracks in floor.

Cove base needed on locker bases as well as wall.

Lockers and benches will be removed prior to start of project.

Picture shows seams in floor.

Further example of locker base in need of cove base.

Picture shows close-up view of locker bases.

Non-skid tape is present in front of lockers throughout the space.

Picture shows transition between locker room concrete floor and tiled floors in the bathroom and shower area.

Close-up view of wall in need of cove base as well as further example of non-skid tape used in space.

These pictures do not represent all of the conditions prospective contractors can expect at the project site.

Statement of Work

Appendix A - 1/2

File details come from the government source that posted it. Updated .