About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to HOSE ASSEMBLIES, newest first.
File Type Posted
4TK323(P00002)CY.pdf PDF
STATEMENT_OF_WORK_REV._072814.pdf PDF
AMENDMENT_1.pdf PDF
14-3444TK323A_RFQ.pdf PDF
SFLCStdSpec0000.pdf PDF
SFLCStdSpec5000.pdf PDF
225-WLB_573_1_2_-_M.pdf PDF
14-3444TK323.pdf PDF
225-WLB_573_1_1_-_M.pdf PDF
06214_Commercial_Supplies__Services_Clauses__Provisions_2005-74_0614.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK ITEM 1: Buoy Crane, Flex Hose Assemblies, Renew

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to fabricate and renew designated hose assemblies.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 225 WLB 573-001, Rev M, Buoy Handling System Arrangement

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 3557, Section 573-A, Feb 2010, Manufacturer's

Instruction Book-SWBS Group(s) 568-573, Crane, Buoy, Model TB90-60 (Hulls 201, 202, 203, 204, 205)

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2012, Auxiliary Machine Systems

OTHER REFERENCES

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not Applicable.

3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Interferences in way of work include, but are not limited to the following:

• Height above deck (shipcheck recommended)

3.2 Renewal. The Contractor shall renew the following hose assemblies, listed in the following pages, in accordance with paragraph C2.2 of SFLC Std Spec 5000, and in accordance with TP-3557.

3.2.1 Renew all lost system fluids.

3.2.2 Maintain existing system cleanliness.

3.2.3 Wrap all hose end fittings exposed to weather with a suitable commercially available protective tape, completely covering all exposed metal. The tape shall be a petrolatum base compound on a fabric carrier.

3.2.4 The Contractor shall hydrostatically test all hoses and fittings iaw 46 CFR Subpart 56.97-5, which requires a test pressure of twice the rated working pressure of the hose.

3.2.5 Hose Tags- Each hose shall have a tag affixed that indicates install date and pressure of hydrostatic test

4. NOTES

4.1 Protective tape source. The tape may be aqquired through the following sources

• Densyl Tape [www.densona.com]

• Carbowrap Marine Tape [www.carboline.com]

• Petrotape. [www.pertotape.co.za], or equivalent) gerona Typewritten Text

CFR 345

Buoy Crane Hose Replacement.pdf
KUKUI CRANE HOSE LIST