Amended statement of work-see statement 3.01-D

View the file

Other files

File Type Posted
CameraLayout.pdf PDF
SF-98.pdf PDF
RFQ Letter.pdf PDF
SF18.pdf PDF
Solicitation - Section B-K - Single Service.doc.pdf PDF
Contractor Req For Clarification.doc DOC document
DOL-WD.pdf PDF
statement of work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW) FOR STATION MONTEREY 9-Camera Surveillance System

1. GENERAL REQUIREMENTS:

The contractor shall provide all materials, labor, equipment, transportation & supervision necessary to perform the installation of an eight camera surveillance system at the Coast Guard Station Monterey located at 100 Lighthouse Monterey, CA 93940. The exact location and type of work to be preformed shall be provided in the text below.

Required Licenses: In addition to the work stated above, the contractor must provide the following license. All required licenses and permits must be current upon acceptance of contract and it is the contractor’s responsibility to ensure that the required licenses and permits remain current for the duration of the contract.

2. SCOPE OF WORK:

3. 1 Construction

9-Camera Surveillance System

1.01 General

A. Contractor shall furnish all labor, materials, equipment and incidentals required to provide a nine camera surveillance system with a complete three year warranty, as specified herein.

2.01 Operation Conditions

A. Each camera shall be recorded with a Pelco DX4600 with DVDRW and 1TB HDD for storage.

B. Each camera shall be able to be controlled with a Keyboard with Joystick.

C. Each camera shall be monitored on a 32” LCD Display Monitor with mount.

D. Camera at Pier location shall be Pan, Tilt, Zoom, Pelco Spectra IV SE Stainless Steel, 35X zoom.

E. Each (3) Pan, Tilt, Zoom, Pelco Spectra IV SE Stainless Steel, 35X zoom.

F. Each (4) Fixed camera shall be a High Resolution, with zoom and night viewing capabilities.

G. One Pelco, Fixed Indoor camera to be installed at armory access door located in Administration Building.

H. This 9-Camera Surveillance System shall come with a complete three year warranty.

3.01 Construction

A. The 9-Camera Surveillance System shall be wired via analog throughout the Station. Building Interconnects is existing using existing Cat 5 wire between each location.

B. All exterior wire shall be in conduit where required.

C. Contractor shall provide power to be installed to each camera to meet NEC and CA requirements.

D. Each camera shall have a battery back-up in case of power failure.

4.01 Removal

a. Contractor is to remove, dispose of existing camera system and all excess materials not used.

b. A disposal shall be performed as per CA. Regulations require.

c. There are no known contaminants in the construction area where contractors will be present.

Security

a. Contractors will have access to the construction site during normal working hours of 0700-1600 M-F.

b. Public restrooms and eating establishments and located in a very short distance to the job site.

c. Contractors will have limited gated access during work hours only. They can call the COTR for entry if needed.

d. Parking will be available up to a total of and not to exceed 3 cars, trucks, SUV’s

e. All Contractors and Laborers shall have Identification with them at all times to verify that they are with awarded contractor.

ADDITIONAL INFORMATION:

Schedule of Installation: The contractor will notify the COTR of the time dates the work will be preformed and within two days of start of work.

Removal of existing fence: The contractor is to take care when removing old fence and to back fill any holes where the existing post were removed.

Safety: All work and equipment shall be maintained and used in a safe and effective manner and used in accordance with the manufacturer’s recommendation. All OSHA requirements must be met.

Damages: All operations performed by the contractor shall be conducted in a manner that ensures the homes and government property not is damaged. If damage to property should occur, the contractor shall replace the same or reimburse the Government for replacement of the same if deemed necessary by the Contracting Officer or his authorized representative.

Subcontracting: Considerations for any subcontracting shall first be reviewed by the COTR and the Contracting Officer. All potential subcontractors must possess current licenses as required by law in their trade.

a. ADDITIONAL INFORMATION:

Schedule of Installation: The contractor will notify the COTR of the time dates the work will be preformed and within two days of start of work.

Safety: All work and equipment shall be maintained and used in a safe, effective manner, used in accordance with the manufacturer’s recommendation and industry standard. All OSHA requirements must be met.

Damages: All operations performed by the contractor shall be conducted in a manner that ensures that government and city property not be damaged. If damage to property should occur, the contractor shall replace the same or reimburse the Government for replacement of the same if deemed necessary by the Contracting Officer or his authorized representative.

Point of contact for all site visits will be EM3 Bryan Kees. He can be contacted at work# 831-647-7346, cell# 831-901-5468. A site visit is highly encouraged.