A_1_1_C_SOW_Del_Rio_Sector_Janitorial-Groundskeeping_Service_Contract_FY_2016_base_year_.pdf
PDF 118 KB Posted
- Solicitation number
- HSBP1016Q0059
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
1. Introduction
This Statement of Work (SOW) is intended to support the facility services to include grounds maintenance at U.S. Customs and Border Protection (CBP) sites. All service work shall be performed on CBP properties as specified by Building Entity (BE). Typical service work will be performed within a 5 to 7 day week observed by the building occupants, unless changes are specifically approved by the Contracting Officer’s Representative (COR) or Government Authorized Representative. Site descriptions for Building Entity (BE) are located on the “Worksite Identification” Fact Sheet as Attachment A. The Contractor agrees that the “Task and Frequency Chart” attached to this document as Attachment B and completed by a Government Authorized Representative or COR will act as, but not be limited to, the minimum tasks and frequencies to be performed by the Contractor.
All work shall be performed as specified at the U.S. Customs and Border Protection (CBP) Building Entity (BE) Site defined in Section 3, Scope, below. Custodial services will be performed within the normal five to seven-day week observed by the building occupants, unless changes are specifically approved by the Contracting Officer's Representative (COR) or Government Authorized Representative.
No work shall be performed when the government has no work force on duty available for the inspection of the contractor's work unless prior approval of the Government Authorized Representative is obtained. Heavy duty cleaning shall be completed after the normal working hours of the building occupants. Heavy duty cleaning is defined as any custodial cleaning work that will negatively impact the production of a work group. All equipment used in the project will be new.
1.1 Scope
The Contractor shall provide all management, supervision, labor, transportation, supplies, and equipment (except as otherwise provided), and shall plan, schedule, coordinate and assure a clean, neat and professional appearance at the CBP site. The Contractor shall provide custodial and related services in accordance with the requirements of this SOW.
The “Task and Frequency” Charts for this contract is set forth in Attachment B of this SOW.
2. Description of Tasks and Deliverables
Please put a check mark to the left of each of the services to be included in this contract agreement.
_X_ Custodial Services _X_ Land and Grounds Maintenance
The Contract Services Guidelines for the Contractor are given below, including quality standards, but may not be limited to just those items listed. Questions should be addressed to the Government Authorized Representative.
4.1 Custodial Services
4.1 Vacuum Carpet The contractor shall vacuum all carpeted floor areas so that after vacuuming, the carpet is clean, free of all visible litter, dust, and soil. The contractor shall remove all spots. The contractor is only responsible for removing spots smaller than two square feet. All tears, burns, and raveling shall be brought to the attention of the COR.
4.1 Shampoo Carpet All locations with carpet shall be shampooed per the carpet manufacturer’s recommendations, and shampooing standards, to be free of spots, stains, chemicals and moisture. The carpet along the walls and in corners shall also be free of spots and stains. The carpet shall be free of unsavory odors including lingering cleaning product odors.
4.1 Sweep Floors The Contractor shall sweep all non-carpeted floor surface areas, including corners and abutments, so that after sweeping the floors are free of spills, trash, visible litter, dust, and debris. No dirt shall be left in corners, under furniture or behind doors. The Contractor shall move chairs, trash receptacles, and easily movable items to sweep underneath and return them to their original positions.
4.1 Mopping The contractor shall damp mop and spray buff the tile and resilient flooring areas, unless specified otherwise by the material manufacturer’s recommendations, or industry standards, including corners and abutments, so that after mopping, they are clean and free of dirt, water streaks, rust stains, mop marks, string, gum, grease, tar and all foreign items and present an overall appearance of cleanliness.
4.1 Spray Buff Floors The Contractor shall apply a uniform and non-slip floor finish coating, so that the floors have a glossy appearance, and are free of scuffmarks, heel marks, and other stains and discolorations. The Contractor shall not apply floor finish to surfaces that have not been cleaned. All surfaces shall be dry and the corners clean. The Contractor shall move chairs, trash receptacles, and easily movable items to mop underneath and return to original positions. The Contractor shall remove all splash marks or mop streaks on furniture, walls, baseboards etc., or mop strands remaining in the area. The Contractor shall display caution signs when cleaning floors in an area where people other than contract personnel are or will be present before the floors are dry.
2.1.1 Strip Wax and Apply New Wax Strip and wax all hard surface floors in accordance with the manufacturer’s recommendations. If a new base coat of wax is required it shall be placed on the floor, so that after buffing, the finish is clean, glossy and uniform in all areas. The products used for this procedure should be those that are recommended by the material manufacturer and must provide a non-slip surface. There shall be no build-up of wax in corners, at doorstops, or next to carpeted areas.
2.1.2 Clean Walk-Off Mats The Contractor shall vacuum all carpet-type entrance mats to remove soil and grit and to restore resiliency of the carpet pile (shampoo only if needed to restore resiliency and to maintain color definition). The Contractor shall sweep, vacuum, or hose-down outside rubber or polyester entrance mats to remove soil and grit. Soil and moisture underneath entrance mats shall be removed by the Contractor and mats returned to their normal location.
2.1.3 Remove Trash The Contractor shall empty and return to their initial location all wastebaskets, cigarette butt receptacles (ash trays, butt cans, etc), and other trash containers within the area, including exterior receptacles designated by the COR. Boxes, cans, and papers placed near a trash receptacle marked "TRASH" shall be removed by the Contractor. Any obviously soiled or torn plastic trash receptacle liners in such receptacles shall be replaced. The Contractor shall remove ashes and debris from community cigarette butt receptacles and place in a nonflammable container. The Contractor shall dispose of trash in plastic bags secured with bag ties. The Contractor shall pick up any trash that may fall from the dumpsters during the removal of collected trash. All solid waste collected as a requirement of this contract shall be placed in dumpster containers on the site.
2.1.4 Perform Low Dusting The Contractor shall thoroughly dust all horizontal surfaces on furniture below 7’0” from the floor so that after dusting, all dust, lint, litter, and dry soil shall be removed from surfaces of cleared desks, chairs, file cabinets, and other types of office furniture and equipment, and from ledges, window sills, hand rails, etc.
NOTE: In dusting of horizontal spaces, working papers on desks shall not be disturbed. The Contractor shall not dust typewriters, computers, and other computer equipment, business machines and equipment of similar nature. There shall be no streaks. Corners, crevices, moldings and ledges shall be free of all dust. There shall be no oil, spots, or smudges on dusted surfaces caused by dusting tools.
2.1.5 Clean Glass The Contractor shall damp wipe mirrors and both sides of all glass in doors, display cases and adjacent trim, partitions and bookcases and any other glass within approximately 7’0” of the floor so that after cleaning the glass, there shall be no traces of film, dirt, smudges, water, and shall not be cloudy.
2.1.6 Clean Exercise Room Equipment (if applicable) Wipe down surfaces of exercise equipment, including mats beneath the equipment, with a disinfectant that won’t damage or degrade any of the parts of the equipment. Exercise equipment shall be free of dirt, dust, streaks, and spots.
2.1.7 Clean Drinking Fountains The porcelain or stainless steel surfaces shall be clean and bright, and they shall be free of dust, spots, stains, and streaks. Drinking fountains shall be kept free of trash, ink, coffee grounds, etc., and nozzles free from encrustation.
2.1.8 Perform Spot Cleaning The Contractor shall perform spot cleaning by removing smudges, fingerprints, marks, streaks, etc., from washable surfaces of walls, partitions, baseboards, doors, floors and fixtures. The Contractor shall use germicidal detergent in restrooms, locker rooms, exercise rooms, break areas, and drinking fountains. The Contractor shall polish brass hardware, aluminum bars, and other metal on doors and cigarette urns with a polishing compound. The cleaning and polishing chemicals and compounds should be those recommended by the material manufacturer for the specific material. Chemicals and compounds used by the Contractor that damage the surfaces will become the responsibility of the Contractor to repair or replace to the satisfaction of Government Authorized Representative at no additional cost to the Government. After spot cleaning by the Contractor, the surface shall have a clean, uniform appearance, free of streaks, smudges, fingerprints, spots, marks and other evidence of removed soil.
2.1.9 Sweep and Damp Mop Restroom Locker Room, Exercise Room, Shower Floors, Holding Cells, or Other Tiled or Smooth Surface Floors. The Contractor shall sweep the floor so it is free of visible litter, dust, and foreign debris, and then damp mop accessible areas. The Contractor shall disinfect all surfaces of partitions, stalls, faces of toilet bowls, urinals, lavatories, showers, dispensers, and other such surfaces, using a germicidal detergent. Damaged fixtures will be the responsibility of the Contractor to repair or replace to the satisfaction of the Government Authorized Representative.
2.1.10 De-scaling Restrooms, Showers, Holding Cells The Contractor shall machine de-scale toilet bowls and urinals, so that after de-scaling, the entire surface shall be free from streaks, stains, scale, scum, urine deposits, and rust stains.
NOTE: Holding cells will only be entered for the purpose of cleaning or re-supplying when detainees are not present.
2.1.11 Supply Restrooms, Locker Rooms, Kitchen/Break Areas, Holding Cells The Contractor shall re-supply restrooms, locker rooms, kitchen/break areas, and holding cells with toilet paper, paper towels and hand soap so that after re-supplying, the rooms are stocked so that supplies do not run out prior to the next re-supply period.
NOTE: The contractor shall replenish all dispensers in all toilet rooms to maximum capacity during the last day of the contract period. Paper supplies and hand soap remaining at the termination of the last official workday shall not be removed from the dispensers or compound.
2.1.12 Apply Floor Finish on Restroom and Locker Room Floors The Contractor shall apply a uniform coating of non-slip floor finish so that the floor presents a uniform glossy appearance. Use products that are recommended by the material manufacturer. The Contractor shall remove floor finish solutions from baseboards, trash receptacles, lockers, toilets, and urinals, and return all moved items to the proper positions after applying floor finish.
2.1.13 Perform High Dusting The Contractor shall perform high dusting, so that after dusting, all dust, lint, cobwebs, litter, and dry soil shall be removed from all surfaces 7'0" or more above the floor surface to include Venetian blinds, ceiling fans, where installed, and air supply/return vents. Frequencies may vary according to accessibility and visibility.
2.1.14 Clean Window Surfaces The Contractor shall clean interior and exterior window surfaces, so that after the windows have been cleaned, all traces of film, dirt, smudges, water and other foreign matter shall be removed from frames, casings, sill, and glass.
2.1.15 Light Fixtures The Contractor shall clean both permanently mounted and freestanding government light fixtures, so that after cleaning, light fixtures shall be free of bugs, dirt, dust, grease, or other foreign matter. This includes the interior and exterior of the fixtures.
Fixtures above typical ceiling height will be cleaned on the High Dusting schedule unless requested more frequently by the Government Authorized Representative.
2.1.16 Check and Replace Light Bulbs The Contractor will check all interior lighting fixtures include the garage(s) and any lighting fixtures attached to the exterior of the building, and will remove and replace any burned out bulbs within 24 hours of occurrence. The Government shall provide all bulbs for Government fixtures. Parking lot light bulbs will be the responsibility of the electrical contractor responsible for the site electrical system.
2.1.17 Wash Venetian Blinds Wash all Venetian blinds in buildings. Clean cords.
Defective cords shall be reported to the Government Authorized Representative who will make arrangements for replacements. Both sides of Venetian blind slats shall be clean and free of dust and water spots. Cords shall be free of dust, dirt, stains, and shall not be sticky to the touch.
2.1.18 Dust Venetian Blinds Dust or vacuum all Venetian blinds. Both sides of Venetian blind slats shall be dusted with a dry cloth so that after dusting, no dust or lint remains.
2.1.19 Clean Air Conditioning Vents Contractor will clean air conditioning vents so that they are free of any lint or dust and the surrounding area is free of discoloration. Vents above typical ceiling height will be cleaned on the High Dusting schedule or as requested by the Government Authorized Representative.
2.1.20 Clean Kennel Areas The kennel should be free of all solid animal waste, lose hairs, dirt, litter and debris, inside and outside of the kennels. The sidewalks leading to the kennel should also be free of waste, dirt, litter and debris. All surfaces shall be cleaned with non toxic chemicals to a height of 84 inches. The surface debris and excess cleaning solution should be rinsed into the drains. All drain channels between the inside and outside kennel shall also be cleaned. Movable items to include the dog’s platform should be moved by the contractor to sweep underneath and return to its initial location. All solid waste should be collected and placed in designated containers. Spills of all biohazard waste shall be cleaned up immediately. All water hoses on the outside of the kennel shall be drained during temperatures of 32 degrees or below.
Pull all hoses and other equipment out of dogs reach. Fully secure gates before releasing dogs to outside kennels.
NOTE: For tasks to be performed more frequently that twice a day, the second cleaning shall be performed no earlier than six hours after the first cleaning, and no later than twelve hours after the first cleaning. For tasks required less frequently than once a month, the Contractor is required to perform each listed task within the first month of contract performance and then on a regular schedule thereafter as stipulated in the task and frequency chart for the individual locations.
2.2 Land and Grounds Maintenance
NOTE: Because of varying, uncontrollable, weather conditions affecting growth of vegetation work requirement frequencies specified in this section only define normal requirements. The Contractor is expected to maintain the grounds in a manner that will present a well-groomed appearance throughout the year.
The Contractor will sign in or provide notice upon arrival to the Government Authorized Representative and review the completed work with the Government Authorized Representative for visual approval before signing out.
2.2.1 Policing/Perform Grounds Cleaning The Contractor shall clean grounds, landscape beds, driveways, parking areas, indoor parking areas, and sidewalks, so that after cleaning they are free of paper, trash, bottles and other discarded material. The Contractor shall remove empty boxes, and remove cans from the premises. Outdoor parking areas shall be hosed down with water to remove caked mud and dirt and machince swept
2.2.2 Grass Mowing Grass shall not be cut while wet from heavy dew or rainfall, unless the job is specifically ordered by the Government Authorized Representative. The Contractor shall mow all lawn areas on the property such that a uniform grass height between 1½” to 3" is maintained at all times. The uniform grass height can be altered by the Government Authorized
Representative for each facility. All grass shall present a well-groomed appearance at all times.
Where practical, each successive mowing will be in different directions, at approximately right angles to the direction of the previous mowing. The cutting edges of all mowing equipment used will be kept in sharp condition. Bruising (grass blade ends turn brown) or rough cutting of grass will not be acceptable. Mowers shall be of a type that causes clippings to be distributed evenly over the cut area. If the mowers used cause the grass to windrow, the windrowed grass shall be removed and hauled away from Government property to prevent thatch buildup. Aeration will be done once a year.
2.2.3 Mowing of Non-landscaped Areas The Contractor shall mow all non-landscaped (wild grass/weeds) areas including retaining water ponds at regular intervals during the year such that the wild grass does not exceed a height of three to six inches. The local Government Authorized Representative will define the maximum height per individual area. Grass cuttings of these areas will not be left in random piles or other unsightly conditions.
2.2.4 Grass Edging Grass adjacent to asphalt or concrete walks or driveways shall be trimmed and present a neat appearance. The contractor shall trim grass so as to maintain a growth free area between 1" and 1½” away from obstacles such as buildings, curbs, walkways, flagpoles, signs, parking lots, and fences. The Contractor is to remove the roots of all weeds so as to maintain a 12" diameter growth free area around trunks of all trees and shrubs. Edging is to be done without the use of chemicals.
2.2.5 Shrubbery Trimming All shrubs and hedges shall be maintained without the use of chemicals. Shrubs and hedges will be trimmed in a box fashion before new growth exceeds five inches. Warranted landscape materials that are dead or dying will be replaced within 30 days of identification at the Contractors expense if he supplied and planted them, and unit replacement pricing for non-warranted material replacements of dead or dying landscaping will be given to the Government Authorized Representative for approval prior to replacement of the material.
2.2.6 Weed Control Weeds on building grounds shall be controlled and eliminated in order to present a neat, well maintained appearance at all times. The Contractor shall maintain all landscaped areas (lawn and flowerbeds) weed-free without the use of chemicals. At the discretion of the Government Authorized Representative, where ongoing weed problems occur, environmentally safe chemicals approved for public use, or available off the self in stores, can be applied. If applicable, MSDS sheets must be presented to the Government Authorized Representative prior to the application.
2.2.7 Fertilizing The Contractor shall spread fertilizer over landscaped areas so that the fertilizer covers the area evenly. Lawn areas shall have a healthy green color and appearance. The contactor shall provide equipment to spread fertilizer. The areas where fertilizer has been spread shall be watered to a depth of 1" after applying fertilizer.
2.2.8 Watering The Contractor shall water shrubs, flowerbeds, hedges, trees and lawn areas. Watering shall be accomplished so that all landscaped areas are watered as needed per the specific plant needs and weather conditions, during the growing season. The Government shall provide hoses and sprinklers.
2.2.9 Rake and Remove Leaves Fence areas, shrub beds, flowerbeds, turf areas, sidewalks, drains, roadways and other surfaces shall be maintained free of leaves.
2.2.10 Parking Lots, and Driveways The Contractor shall machine sweep all asphalt and concrete parking lots and driveways, so that they are free of gravel, mud, weeds, leaves, rocks and other debris. Air blowers can be used to assist with the sweeping as long as all remaining loose unsightly debris is removed before the Contractor departs. Weeds growing in cracks shall be eliminated by the use of an environmentally safe chemical agent with the MSDS information for it provided by the Contractor to the Government Authorized Representative. Oil spills shall be cleaned four times per year, using an oil absorbent compound or Government Authorized Representative approved alternate environmentally safe material provided by the Contractor. The compound shall not be left on the lot overnight or unsupervised with children or pets in the area.
The Contractor shall take full responsibility for the proper disposal of the contaminated materials. The driveway or parking lot shall be free of oil or stains that can be tracked onto the sidewalk or into the building. Gravel driveways and lots shall be kept weed and debris free.
Areas being cleaned shall be marked off with Contractor provided traffic cones.
3. Site Specific Other Items
Unusual site specific needs such as the cleaning of stables, under computer room raised floors, or exterior furnishings such as gazebos, courtyards etc. are noted in Task and Frequency Charts
3.1 Government Furnished Items
3.2 Government Furnished Utilities and Storage
3.2.1 Electric Power Electrical power at existing outlets for the Contractor to operate such equipment as is necessary in the conduct of his work.
3.2.2 Hot and Cold Water Hot and cold water as necessary, limited to the normal water supply provided in the building. No special heating or cooling of the water will be provided.
3.2.3 Storage Space At some locations, space in the building for the storage of supplies and equipment to be used in the completion of work under the contract will be provided. The Contractor shall maintain this space in a neat and orderly condition. No flammable or explosive liquids such as gasoline will be stored in the building. The Government will not be responsible for damage or loss to the Contractor's stored supplies or equipment.
Secured janitor's closets, where available, will be provided for storing supplies and equipment.
3.3 Contractor Furnished Items
3.4 Contractor Item Responsibilities
3.4.1 Permits/Licenses In performing the work hereunder, the Contractor shall obtain and maintain in effect all necessary permits and licenses required by Federal, State or Local government or subdivisions thereof, or of any other duly constituted public authority. Further, the Contractor shall obey and abide by all applicable laws and ordinances.
3.5 Supervision, Supplies, Materials, Transportation and Equipment This contract calls for the Contractor to furnish all supervision, supplies, materials, transportation and equipment necessary for the completion of the work of this contract unless otherwise specified herein. Upon request of the Government Authorized Representative, the Contractor shall submit a list with the names of the manufacturer, the brand name, and intended use of each of the cleaning chemicals or agents intended for use in the completion of the work. Contractor must provide the MSDS sheets for any chemicals, cleaners, etc. Paper towels, hand soap, and toilet tissue, etc., shall be of a type and style which will be compatible with dispensers already installed in the building. The products must also meet the Environmental Requirements. The Contractor shall use recycled paper products and environmentally friendly materials. GSA PBS requires all building operations contractors to use recycled paper. e.g. seat covers and paper towels with 50% post consumer content. All chemicals used will be those commercially available which meet Federal, State and local codes.
3.6 All equipment must meet all applicable OSHA standards. Equipment may consist of sweepers, vacuum cleaners, buffers, lawnmowers, edger, clippers, and fertilizer spreaders, drive way sweeper, carpet shampooer. If equipment is determined unsafe by the COR, the Contractor shall immediately stop using the equipment.
3.6.1 Safety and Equipment condition The Contractor shall use only chemicals which are environmentally safe. The Contractor shall furnish and display caution signs to be used when cleaning floors where people other than contractor personnel are present before the floors are dry.
All equipment shall have bumpers and guards to prevent marking or scratching of fixtures, furnishings, or building surfaces.
3.7 RESPONSIBILITIES OF CONTRACTOR:
3.8 Responsibility for Government Property:
3.8.1 The Contractor assumes full responsibility for and shall indemnify the Government against any and all losses or damage of whatsoever kind and nature to any and all Government property, including any equipment, supplies, accessories, or parts furnished while in his custody and care for storage, repairs or service to be performed under the terms of this contract, resulting in whole or in part from the negligent acts or omissions of the Contractor, any subcontractor, or any employee, agent or representative of the Contractor or subcontractor.
3.8.2 If due to the fault, negligent acts (whether of commission or omission) and/or dishonesty of the Contractor or its employees, and Government –owned or controlled property is lost or damaged as a result of the Contractor’s performance of this contract, the Contractor shall be responsible to the Government for such loss or damage and the Government at its option, may in lieu of payment thereof, require the Contractor to replace a Contractor’s expense all property lost or damaged.
3.9 Responsibility for Injury:
The Contractor shall save and hold harmless and indemnify the Government against any and all liability claims, and cost of whatsoever kind and nature for injury to or death of any person or persons, and for loss or damage to any Contractor property or property owned by a third party occurring in connection with or in any way incident to or arising out of the occupancy, use, service, operation or performance of work under the terms of this contract, resulting in whole or in part from the acts or omissions of the Contractor, any subcontractor or any employee, agent, or representative of the Contractor or subcontractor.
3.10 Government’s Right of Recovery:
Nothing in the above paragraphs shall be considered to preclude the Government from receiving the benefits of any insurance the Contractor may carry which provides for the indemnification of any loss or destruction of, or damages to property in the custody and care of the Contractor where such loss, destruction of, or damage to Government property an upon the request of the Contracting Officer shall, at the Government’s expense, furnish to the Government all reasonable assistance and cooperation (including assistance in the prosecution of suit and the execution of instruments of assignment in favor of the Government) in obtaining recovery.
3.11 Government Liability:
The Government shall not be liable for any injury to the Contractor’s personnel or damage to the Contractor’s property unless such injury or damage is due to negligence on the part of the Government and is recoverable under the Federal Torts Claims Act, or pursuant to other Federal statutory authority.
3.12 CONTRACTOR’S INSURANCE REQUIREMENTS
3.13 The Contractor shall carry and maintain during the entire period of performance under this contract adequate insurance as follows:
3.13.1 Workman’s Compensation and Employee’s Liability Insurance: minimum $100,000 per incident.
3.13.2 Automobile Liability Insurance minimum $200,000 per person: $500,000 per accident for bodily injury; and property damages $20,000 per occurrence.
3.13.3 Comprehensive General Liability: minimum of $500,000 for bodily injury per occurrence.
3.13.4 Other insurance as required by the Contracting Officer
3.14 Prior to commencement of work, the Contractor shall submit on a form satisfactory to the Contracting Officer, evidence of all insurance coverage indicated above. In addition, the Contractor shall furnish written evidence on the commitment by the insurance carrier(s) to notify the Contracting Officer in writing any material change, expiration, or cancellation of any of the insurance policies not less than thirty (30) days before such change expires or cancellation is effective. Such written notices by the insurance carriers shall state, “firm commitments” to furnish notifications, not just “pledge endeavor” to furnish notifications of changes, expirations or cancellations. Certificates of such insurance shall be subject to the approval of the Contracting Officer for adequacy of protection.
3.15 NOTE: Contractor is advised that contractor employees driving privately owned vehicles on government property must maintain and provide proof when requested of auto liability insurance at least in the minimum amounts required by the state of Texas.
3.15.1 MODIFICATIONS, CHANGE ORDERS, DEVIATIONS: The Contracting Officer retains the sole right to issue modifications and change orders. In no event shall any understanding or agreement, contract modification, change orders or other matter in deviation from the terms of this contract between the Contractor and a person other than the Contracting Officer be effective or binding upon the Government. All such actions must be formalized by a proper contractual document executed by the Contracting Officer.
3.15.2 Conservation of Utilities
3.16 Operating Conditions
3.16.1 Operating Conditions The Contractor shall instruct its employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions, as noted below, which preclude the waste of utilities.
3.16.2 Lights Lights shall be used only in areas where and when work is being performed.
3.16.3 Controls for Heating, Ventilation and Air Conditioning Systems Workers shall not adjust mechanical equipment controls for heating, ventilation and air conditioning systems.
3.16.4 Water Faucets/Valves Water faucets or valves shall be turned off after the required usage has been accomplished.
3.16.5 Malfunctioning Faucets, Electrical outlets, Switches, etc. Any malfunctioning faucets, electric outlets, switches, etc., are to be identified by location and presented to the Government Authorized Representative for follow up as soon as they are found.
3.16.6 Supervision Responsibilities – Management Contact
3.17 Policy and Procedure
3.17.1 Supervision The Contractor shall be responsible for the supervision of his employees while performing under this contract. The Government Authorized Representative will perform periodic inspections in order to ensure compliance with requirements of this Contract, but will not attempt to supervise the Contractor’s employees.
3.17.2 Verbal Correspondence
3.17.3 The Contractor shall designate an English speaking contact person/representative who shall be the point of contact on behalf of the Contractor. Whenever the Contractor has personnel at a property at least one member will be able to communicate with property personnel in English.
3.17.4 Contact Information The Contractor must provide the name(s), addresses, and phone numbers of persons representing the Contractor to the Government Authorized Representative five (5) days prior to beginning the work under this contract.
3.17.5 Inspection Reviews The Contractor is required to have their representatives review the work being performed to ensure compliance with the terms and specifications of this contract.
These inspection reviews shall be completed at least once per week throughout the duration of the contract. The representatives may also serve in a supervisory capacity if the Contractor so desires.
3.17.6 Contract Authority The Contractor’s representatives designated in writing by the Contractor shall have complete authority to act for the Contractor during the duration of this contract. The representatives shall be contacted by the Government Authorized Representative in the event of any problems or special circumstances.
3.17.7 LOST AND FOUND PROPERTY: It is the responsibility of the Contractor to ensure that all items of personal or monetary value found by the Contractor’s employees are turned in to the Patrol Agent In Charge of the site no later than the next workday.
3.17.8 Other Contractor Considerations
Loss of Equipment The Government cannot and shall not be held responsible for loss of tools, equipment, and materials sustained by the Contractor.
3.17.9 Accident Report Procedures
Personnel or Property Accident Reporting In the event of an accident involving Government personnel or property, where the Government Authorized Representative perceived a lack of effective completion by the Contractor’s personnel was a factor, the Contractor shall submit a report within 1 workday after an accident to the Contracting Officer in letter form that will include the following: time and date of occurrence; the place of occurrence; a list of personnel directly involved; a narrative description of the accident that includes a chronological order of the accident and circumstances; and witnesses names and contact information.
3.17.10 ACCIDENT PREVENTION:
3.17.11 The Contractor shall provide and maintain work environments and procedures that will:
3.17.12 Safeguard the public and Government personnel, property, materials, supplies and equipment exposed to Contractor operations and activities.
3.17.13 Avoid interruptions of Government operations; and Control costs in the performance of this contract.
3.17.14 Comply with the standards issued by the Secretary of Labor at 29 CFR part 1910, occupational safety and health standards. To include HAZMAT exposure such as blood borne pathogens.
3.17.15 Ensure any additional measures the Contracting Officer determines to be reasonably necessary for this purpose are taken.
3.17.16 Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition that poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally with written confirmation and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s manager at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action.
3.17.17 If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.
3.17.18 Use of Government Premises
3.18 Government Premises
3.18.1 Operation Compliance of Premises The Contractor shall comply with all regulations and security requirements governing the operation of the premises, which are occupied, or the area in which the contract work is to be done.
3.18.2 Interruption/Interference with Government business The Contractor shall perform the contract in such a manner as to not interrupt of interfere with the conduct of Government business.
3.18.3 Contractor Legal Requirements, Permits/Code Compliance
Local, City, County and State Licenses, and Permits The Contractor shall obtain at his own expense, all necessary local, city, county and state licenses, permits, and shall conform to all laws, regulations, and ordinances and code requirements applicable to satisfactory completion of this contract. Full responsibility for compliance with this clause shall rest with the Contractor and the Government shall assume no liability for failure.
3.18.4 Hazardous Materials
Disposal and chain of disposal Hazardous materials or waste, including, but not limited to, Blood borne Pathogens, hazardous cleaning chemicals, and other dangerous materials will be properly disposed of by the Contractor and the chain of disposal given to the Government Authorized Representative prior to final invoicing. Contractor shall have a material safety data sheet (MSDS) in the workplace for each hazardous chemical that they use. Contractor shall develop, implement and maintain at each contract location a written hazardous communication (HazCom) program. The contractor shall make the written HazCom program available upon request to the employees and the Government. The quantity of flammable or combustible liquids stored on the site shall be the required supply for one day. Storage of chemicals in the occupied offices shall be prohibited. The contractor is required to secure the storage areas.
HAZMAT Exposure (Blood Borne Pathegens) Holding Cells. Due to the risk of exposure Government recommends the following vaccination shots:
Hepatitis B Series, IAW 29 CFR 1910.1030
Flu Shot
Tetanus
Blood lead level testing for those who clean the range (see 29 CFR 1910.1025)
TB screening annually or when exposed to TB.
3.18.4.1.1. Physical Security
3.19 Security Requirements
3.19.1 Keys, Codes and Proximity Cards The Contractor shall establish and implement methods of ensuring that all keys, codes and proximity cards issued to the Contractor by the Government are not lost, or misplaced, and not used by unauthorized persons. No keys, codes or proximity cards issued to the Contractor by the Government shall be duplicated.
3.19.2 Key Control The Contractor shall develop procedures covering key control that will be included in the Quality Control Plan (QCP-Section 22.0). The Contractor shall report loss of keys, access codes or cards immediately to the Contracting Officer's Government Authorized Representative. The QCP shall include the control procedures for Government provided key lock combinations.
3.19.3 Use of keys and assigned work areas It is the responsibility of the Contractor to prohibit the use of keys, codes and proximity cards issued by the Government by any person other than the Contractor's employees. It is also the responsibility of the Contractor to prohibit the opening of locked areas by the Contractor's employees engaged in the completion of assigned work in those areas.
3.19.4 Security Badge Prior to commencing work on the project, the Government shall furnish security badges to the Contractor and the Contractor's employees, which must be worn at all times while on the government installation.
3.19.5 Security Processing and Badge Fabrication When any Contractor or subcontractor personnel enter the facility for the first time, the Contractor shall allow one hour for security processing and the fabrication of the buildings security badge or pass, as may be required by the Government Authorized Representative.
3.19.6 Security Badge Reviews Security badges shall be subject to periodic review by the Government Authorized Representative. The Contractor's employees shall present themselves for the issuance of renewed badges when required by the Government as scheduled by the Government Authorized Representative.
3.19.7 Sign-in and Sign-out at Facility The Government reserves the right to require Contractor personnel to "sign-in" upon entry and "sign-out" upon departure from the facilities.
3.19.8 Lost badges/passes The Contractor shall notify the Government Authorized Representative immediately when employee's badges or passes are lost and immediately apply for re-issuance of a replacement badge or pass.
3.19.9 Contract Employee dismissed/terminated/reassigned It is the Contractor's responsibility to return all keys, badges, codes and proximity cards to the Government Authorized Representative or his designee when a Contractor employee is dismissed, terminated or assigned to duties not within the scope of this contract.
3.19.10 Level of site access The Government reserves the right to set the conditions of access for contract personnel. Depending on security levels of designated offices, contract personnel may require a Government Officer escort.
3.19.11 Conduct, Supervision, Schedules, Manager Qualifications
3.20 Supervision/Manager Expectations
3.20.1 Orientation of Facility The Contractor and his employees and any subcontractor shall become familiar with and obey all station regulations, including fire, traffic and security regulations. All contract employees must have attended an orientation conducted by the Government Authorized Representative (or his or her designee). The orientation will include an explanation of the occupant agency's function and may include a tour of the building/facility. It will also familiarize contract employees with key client agency personnel and areas of the building/facility requiring special attention. The Contractor's managers and supervisors shall be able to read, write, speak and understand English to the satisfaction of the Government Authorized Representative. All personnel shall keep within the limits of the work area and not enter any restricted areas unless required to do so and are cleared for such entry. The Contractor shall be responsible to the Government for acts and omissions of his own employees and of subcontractors and their employees.
3.20.2 CONTRACTOR’S EMPLOYEES:
3.21 The Contractor must agree that each person employed by his firm or any Subcontractor(s) shall have a Social Security Card issued, by the U.S. Social Security Administration, (a) be a United States citizen or (b) a person lawfully admitted into the United States, eligible for employment.
3.22 Subject to existing laws, regulations and other provisions of this contract, illegal or undocumented aliens shall not be employed by the Contractor to work on under or with this Contract. The Contractor will ensure that this provision is expressly incorporated into any and all subcontracts or subordinate agreements issued in support of this contract.
3.23 Personnel Training:
3.23.1 All contract employees must have attended an orientation conducted by the COR (or his or her designee). The orientation will include an explanation or the occupant agency’s function and may include a tour of the building/facility. It will also familiarize contract employees with key client agency personnel and areas of the building/facility requiring special attention.
3.23.2 The Contractor is required to provide tenant relations training for their employees.
This training will stress the importance of conflict avoidance and problem resolutions. Emphasis will be placed on grooming, proper attire and the importance of professionalism and courtesy in day-to-day contacts with building occupants and visitors.
3.23.3 Training shall include all applicable OSHA and other related standards.
3.23.4 Detainees The Department of Homeland Security has taken aliens from various nations into physical custody at some facilities pending the conclusion of immigration hearings, release on bonds, recognizance or supervision. The Contractor's employees must realize that the detainees are detained against their will and would seize any opportunity to escape. The Contractor's employees should not have contact with detainees. Contractor's employees shall not engage in conversation with detainees.
3.23.5 Appearance Contractor personnel shall present a neat appearance and be easily recognized. This shall be accomplished by wearing clothing bearing the name of the company.
3.23.6 Submittal of daily work schedules Managers and supervisors shall be responsible for submitting the Contractor employees daily work schedules one week prior to the execution of the work. FEDERAL HOLIDAY: Holidays in each calendar year identified as follows:
3.23.7 New Year’s Day, January 1;
3.23.8 Martin Luther King’s Birthday, the third Monday in January:
3.23.9 Washington’s Birthday, the third Monday in February;
3.23.10 Memorial Day, the last Monday in May;
3.23.11 Independence Day, July 4;
3.23.12 Labor Day, the first Monday in September
3.23.13 Columbus Day, the second Monday in October
3.23.14 Veteran’s Day, November 11;
3.23.15 Thanksgiving Day, the fourth Thursday in November; and
3.23.16 Christmas Day, December 25.
3.23.17 Timeline regarding dismissed/terminated/reassigned contract employees The Contractor shall notify the Government Authorized Representative in writing the names of any employees no longer working on the project within one (1) workday after that employee is terminated or no longer expected to work under this contract. The Contractor must return all security badges, keys, access codes, and proximity cards issued by DHS to the Government Authorized Representative after an employee of the Contractor is no longer working on the project.
3.23.18 Management Personnel Qualifications Qualifications of managers and supervisors. Managers and supervisors engaged in directing the work to be accomplished under this contract shall possess at least 2 years of recent experience (within the past 5 years), directing cleaning-type operations in a manager capacity for buildings of the approximate size of the building(s) to be cleaned under this contract. Competent management personnel shall be employed. The management personnel shall provide evidence of any supervisory training courses taken. At the discretion of the Contracting Officer, experience may be substituted for formal training. A detailed resume for managers and supervisors containing the information specified below must be submitted to the CO prior to award for evaluation. Management employees must provide a resume.
3.23.19 Quality Control Program
Quality Control Plan The Contractor must submit two copies of a detailed Quality Control Plan (QCP) with their contract proposal. The plan will be site specific and will inform the Government Authorized Representative how the work, supervision, project management and follow up will be performed in this contract to insure compliance with all requirements. The QCP is intended to provide a structured process and detailed plan that will help the Contractor manage the project and identify any deficiencies before the work execution becomes unacceptable.
The QCP must be kept current at all times to reflect all contract modifications and changes in plan. If anything in the plan is revised, the plan must be physically updated, and the changes are to be reported to the Government Authorized Representative and approved by the Contracting Officer.
3.23.20 Surveillance by Customer Complaint
Investigation/Validation/Notification and Record archive When a complaint is received, the Government Authorized Representative will investigate, validate the complaint, notify the Contractor of the defect and maintain a record of the complaint.
3.23.21 Contracting Officer Authority
Issuing Modifications and Change Orders The Contracting Officer retains the sole right to issue modifications and change orders. In no event shall any understanding or agreement, contract modification, change orders or other matter in deviation from the terms of this contract, between the Contractor and a person other than the Contracting Officer, be effective or binding upon the Government. All such actions must be formalized by a proper contractual document executed by the Contracting Officer.
3.23.22 Contracting Officer Representative (COR)
3.24 CO/COR/Government Authorized Representative Responsibilities
3.24.1 Technical Contact/Technical Representative This will be the U.S. Customs and Border Protection technical contact person or Contracting Officer’s Representative. The (COR) information will be provided upon award of the contract. Contracting Officer retains the sole right to issue modifications and change orders. In no event shall any understanding or agreement, contract modification, change orders or other matter in deviation from the terms of this contract, between the Contractor and a person other than the Contracting Officer, be effective or binding upon the Government. All such actions must be formalized by a proper contractual document executed by the Contracting Officer.
3.24.2 COR Responsibilities The Contracting Officer will designate the COR or Government Authorized Representative at time of contract award. The responsibilities of the Government Authorized Representative include, but are not limited to determining the adequacy of Contractor completion efforts in accordance with the conditions of this contract.
3.24.3 Inspection and Monitoring of the Contractor’s work The Government Authorized Representative is responsible for the inspection and monitoring of the Contractor's work. The responsibilities of the Government Authorized Representative include, but are not limited to: inspecting the work to ensure compliance with the contract requirements;
documenting through written inspections reports conferring with representative of the contractor regarding any problems encountered in the successful execution of the work.
3.24.4 Review of Contractor provided service level being performed In addition to the above; the Government Authorized Representative will make a periodic walk through the building and other areas covered by this contract to ascertain the level of services being performed. The Contractor will be notified of any deficiencies noted.
3.24.5 Definitions/Acronyms
As used throughout this contract, the following definitions/acronyms shall have the meaning set forth below:
BE – Business Entity - Site descriptions for Building Entity (BE) are located on the “Worksite Identification” Fact Sheet as Attachment A.
Carpet Spotting – To remove soil marks on carpet surfaces differing…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .