HSBP1012R0020 A0010_8.16.2012.pdf

PDF 391 KB Posted

Attached to
Southwest Border Transportation, Medical Escort and Guard Services
Solicitation number
HSBP1012R0020
Issued by

About this file

HSBP1012R0020 A0010_8.16.2012

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

,1 . CONTRACT ID CODE IPA~E OF PAGES

I 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. ,5. PROJECT NO. (If applicable)

A0010 08/16/2012 20067677

6. 1SSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE I Department of Homeland Security Department of Homeland Security Customs and Border Protection Customs and Border Protection Procurement Directorate Procurement Directorate 1300 Pennsylvania Ave, NW, STE 1310 1300 Pennsylvania Ave, NW, STE 1310 Washington, DC 20229 Washington , DC 20229

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION r-:--:- NO.

0 HSBP1 012R0020

9B. DATED (SEE ITEM 11)

03/16/2012 -

10A. MODIFICATION OF CONTRACT/ORDER NO.

0 10B. DATED (SEE ITEM 13)

CODE jFACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

~ The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers 0 is extended , ~ is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE

PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

NA

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor 0 is not, ~ is required to sign this document and return ____ _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment A0009 inadvertently excluded three pages from the Schedule B. This amendment hereby corrects that error.

Vendors shall note that the page count for Attachment 1 entitled Schedule B found under Section J:1 "LIST OF ATIACHMENTS" in the Terms and Conditions is increased to 20 pages.

ATIACHMENTS:

Revised Schedule B

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 1 OA, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Kerri A. Bishop

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16C. D

(Signature of person authorized to sign) /cQ..

NSN 7540-01-152-8070

Previous edition unusable

D FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

HSBP1012R0020 A0010

CUT SHEET

REVISED SCHEDULE B

CONTRACT TYPE

** In addition to completing this Price Schedule, Offeror shall complete and submit the Pricing Schedule for the Sample Task Order, which can be found in Section J, Attachment 6 of this solicitation, as part of its Volume I - Price Proposal.

SECTION B: SCHEDULE OF SUPPLIES/SERVICES

This solicitation will result in a single award Indefinite Delivery Indefinite Quantity (IDIQ) contract with Fixed Price and Time & Materials CLINs for the purchase of Transportation, Medical Escort, and Guard Services along the Southwest Border. The Contractor shall perform the work as set forth in the Performance Work Statement, Quality Assurance Plan, and Work Statements as specifically described in individual delivery orders. Delivery Orders issued under this contract shall be issued on a Fixed-Price (FP) and Fixed Unit Price basis.

Task orders and/or written authorizations applicable to the T&M CLINS shall be issued at the Unit Prices contained in the Schedule. The total amount of hours and/or material for each T&M task order or authorization shall be determined, as applicable, for each Surge/Flex requirement. All T&M Labor Rates shall be proposed as fully burdened rates.

1.1 52 WEEKS $ $

1.2 52 WEEKS $ $

1.3 52 WEEKS $ $

1.4 52 WEEKS $ $

1.5 52 WEEKS $ $

1.6 52 WEEKS $ $

1.7 52 WEEKS $ $

1.8 52 WEEKS $ $

1.9 52 WEEKS $ $

CLIN 1.0 TOTAL PRICE: $

SECTION B: SCHEDULE OF SUPPLIES/SERVICES

Base Year (One year from date of award)

CLIN#

1.0 Mission Support Base - Fixed-Price Weekly Operational Rate (All Labor/

Vehicles/Equipment/ Supplies/ Fleet Operations & Maintenance (excluding fuel)) in accordance with PWS Appendices A - C

TOTALItem Description UNIT PRICE/RATE

EST

QUANTITY

UNIT

Del Rio (DRT)

El Centro (ELC)

El Paso (EPT)

Laredo (LRT)

Yuma (YUM)

San Diego (SDC)

Tucson (TCA)

Marfa (MAR)

Rio Grande Valley (RGV)

B-2 HSBP1012R0020

2.1 92,102 HOURS

2.1.1

2.1.1.1 TBD HOURS $ (labor rate)

2.1.1.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

2.1.2

2.1.2.1 TBD HOURS $ (labor rate)

2.1.2.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

2.1.3

2.1.3.1 TBD HOURS $ (labor rate)

2.1.3.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

2.1.4

2.1.4.1 TBD HOURS $ (labor rate)

2.1.4.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

2.1.5

2.1.5.1 TBD HOURS $ (labor rate)

2.1.5.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

2.1.6

2.1.6.1 TBD HOURS $ (labor rate)

2.1.6.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

2.1.7

2.1.7.1 TBD HOURS $ (labor rate)

2.1.7.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

2.1.8

2.1.8.1 TBD HOURS $ (labor rate)

2.1.8.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

2.1.9

2.1.9.1 TBD HOURS $ (labor rate)

2.1.9.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

2.2 59,062 HOURS

2.2.1 TBD HOURS $ (vehicle rate)

2.2.2 TBD HOURS $ (vehicle rate)

2.2.3 TBD HOURS $ (vehicle rate)

Yuma (YUM) Note: [2.1.9.1, 2.1.9.2, etc…labor categories to be

Note: [2.1.6.1, 2.1.6.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

EST

QUANTITY

(NTE)

Item Description TOTAL UNIT PRICE/RATEUNIT determined by offeror based on labor approach in accordance with PWS Sections]

San Diego (SDC) Note: [2.1.7.1, 2.1.7.2, etc…labor categories to be determined by offeror based on labor approach

Rio Grande Valley (RGV)

Marfa (MAR) in accordance with PWS Sections]

Tucson (TCA) Note: [2.1.8.1, 2.1.8.2, etc…labor categories to be

TBD = to be determined upon task order in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]

Note: [2.1.5.1, 2.1.5.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

Laredo (LRT) Note: [2.1.4.1, 2.1.4.2, etc…labor categories to be determined by offeror based on labor approach

El Paso (ELP) Note: [2.1.3.1, 2.1.3.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

Note: [2.1.2.1, 2.1.2.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

CLIN#

Labor Surge/Flex Vehicle Surge/Flex

[Time]

Transport Labor Surge/Flex (reference PWS Section 4.12.3) determined by offeror based on labor approach

2.0

Del Rio (DRT) Note: [2.1.1.1, 2.1.1.2, etc…labor categories to be

High Capacity in accordance with PWS Sections]

Low Capacity

Medium Capacity

Vehicles Surge/Flex

El Centro (ELC)

B-3 HSBP1012R0020

3.0

NTE ~ ~

200,000$

4.0

NTE ~ ~

300,000$

CLIN#

EST

QUANTITY

(NTE)

NTE = not to exceed EA = each

5.0

~ 3,935,000$ NTE ~

UNIT PRICE/RATE TOTAL UNIT

Travel [Materials]

MTRT [Materials-pre-approved vehicle maintenance contingencies and any cross-state licensing requirements] (reference PWS Section 4.12.4)

Fuel [Materials] (vendors are encouraged to provide optional fuel consumption reduction/greenhouse gas minimizing proposals (i.e. show how average fuel cost per mile traveled may be reduced. Vendors shall use $3.50/gal as the average cost per gallon for their calculations) (reference the PWS and Evaluation Criteria (Section M))

Item Description

~ $6.0 Transition Plan---Fixed Price (See PWS Section 6.1 and Provision L.12 for this Requirement)

EA

B-4 HSBP1012R0020

7.1 52 WEEKS $ $

7.2 52 WEEKS $ $

7.3 52 WEEKS $ $

7.4 52 WEEKS $ $

7.5 52 WEEKS $ $

7.6 52 WEEKS $ $

7.7 52 WEEKS $ $

7.8 52 WEEKS $ $

7.9 52 WEEKS $ $

CLIN 7.0 TOTAL PRICE: $

Yuma (YUM)

San Diego (SDC)

Tucson (TCA)

Marfa (MAR)

Rio Grande Valley (RGV)

El Paso (EPT)

Laredo (LRT)

Del Rio (DRT)

El Centro (ELC)

UNIT UNIT PRICE/RATE TOTAL

7.0 Mission Support Base - Fixed-Price Weekly Operational Rate (All Labor/

Vehicles/Equipment/ Supplies/ Fleet Operations & Maintenance (excluding fuel)) in accordance with PWS Appendices A - C

CLIN# Item Description

EST

QUANTITY

SECTION B: SCHEDULE OF SUPPLIES/SERVICES

Option Year One (One year from Base Year end date)

B-5 HSBP1012R0020

8.1 92,102 HOURS

8.1.1

8.1.1.1 TBD HOURS $ (labor rate)

8.1.1.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

8.1.2

8.1.2.1 TBD HOURS $ (labor rate)

8.1.2.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

8.1.3

8.1.3.1 TBD HOURS $ (labor rate)

8.1.3.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

8.1.4

8.1.4.1 TBD HOURS $ (labor rate)

8.1.4.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

8.1.5

8.1.5.1 TBD HOURS $ (labor rate)

8.1.5.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

8.1.6

8.1.6.1 TBD HOURS $ (labor rate)

8.1.6.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

8.1.7

8.1.7.1 TBD HOURS $ (labor rate)

8.1.7.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

8.1.8

8.1.8.1 TBD HOURS $ (labor rate)

8.1.8.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

8.1.9

8.1.9.1 TBD HOURS $ (labor rate)

8.1.9.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

8.2 59,062 HOURS

8.2.1 TBD HOURS $ (vehicle rate)

8.2.2 TBD HOURS $ (vehicle rate)

8.2.3 TBD HOURS $ (vehicle rate)

TBD = to be determined upon task order

High Capacity

Low Capacity

Medium Capacity in accordance with PWS Sections]

Vehicles Surge/Flex

Yuma (YUM) Note: [8.1.9.1, 8.1.9.2, etc…labor categories to be determined by offeror based on labor approach

Tucson (TCA) Note: [8.1.8.1, 8.1.8.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

Note: [8.1.7.1, 8.1.7.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]

San Diego (SDC) in accordance with PWS Sections]

Rio Grande Valley (RGV) Note: [8.1.6.1, 8.1.6.2, etc…labor categories to be

Marfa (MAR) Note: [8.1.5.1, 8.1.5.2, etc…labor categories to be determined by offeror based on labor approach

Laredo (LRT) Note: [8.1.4.1, 8.1.4.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

Note: [8.1.3.1, 8.1.3.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]

El Paso (ELP) in accordance with PWS Sections]

El Centro (ELC) Note: [8.1.2.1, 8.1.2.2, etc…labor categories to be

Transport Labor Surge/Flex (reference PWS Section 4.12.3)

Del Rio (DRT) Note: [8.1.1.1, 8.1.1.2, etc…labor categories to be determined by offeror based on labor approach

CLIN# Item Description UNIT PRICE/RATE TOTAL

8.0 Labor Surge/Flex

Vehicle Surge/Flex [Time]

EST

QUANTITY

(NTE)

UNIT

B-6 HSBP1012R0020

9.0

NTE ~ ~

200,000$

10.0

NTE ~ ~

300,000$

NTE ~ ~ 3,935,000$

UNIT PRICE/RATE TOTAL

MTRT [Materials-pre-approved vehicle maintenance contingencies and any cross-state licensing requirements] (reference PWS Section 4.12.4)

Travel [Materials]

CLIN# Item Description

EST

QUANTITY

(NTE)

UNIT

11.0

Fuel [Materials] (vendors are encouraged to provide optional fuel consumption reduction/greenhouse gas minimizing proposals (i.e. show how average fuel cost per mile traveled may be reduced. Vendors shall use $3.50/gal as the average cost per gallon for their calculations) (reference the PWS and Evaluation Criteria (Section M))

NTE = not to exceed EA = each

B-7 HSBP1012R0020

12.1 52 WEEKS $ $

12.2 52 WEEKS $ $

12.3 52 WEEKS $ $

12.4 52 WEEKS $ $

12.5 52 WEEKS $ $

12.6 52 WEEKS $ $

12.7 52 WEEKS $ $

12.8 52 WEEKS $ $

12.9 52 WEEKS $ $

CLIN 12.0 TOTAL PRICE: $

Yuma (YUM)

San Diego (SDC)

Tucson (TCA)

Marfa (MAR)

Rio Grande Valley (RGV)

El Paso (EPT)

Laredo (LRT)

Del Rio (DRT)

El Centro (ELC)

UNIT UNIT PRICE/RATE TOTAL

12.0 Mission Support Base - Fixed-Price Weekly Operational Rate (All Labor/

Vehicles/Equipment/ Supplies/ Fleet Operations & Maintenance (excluding fuel)) in accordance with PWS Appendices A - C

CLIN# Item Description

EST

QUANTITY

SECTION B: SCHEDULE OF SUPPLIES/SERVICES

Option Year Two (One year from Option Year One end date)

B-8 HSBP1012R0020

13.1 92,102 HOURS

13.1.1

13.1.1.1 TBD HOURS $ (labor rate)

13.1.1.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

13.1.2

13.1.2.1 TBD HOURS $ (labor rate)

13.1.2.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

13.1.3

13.1.3.1 TBD HOURS $ (labor rate)

13.1.3.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

13.1.4

13.1.4.1 TBD HOURS $ (labor rate)

13.1.4.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

13.1.5

13.1.5.1 TBD HOURS $ (labor rate)

13.1.5.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

13.1.6

13.1.6.1 TBD HOURS $ (labor rate)

13.1.6.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

13.1.7

13.1.7.1 TBD HOURS $ (labor rate)

13.1.7.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

13.1.8

13.1.8.1 TBD HOURS $ (labor rate)

8.1.8.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

13.1.9

13.1.9.1 TBD HOURS $ (labor rate)

13.1.9.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

13.2 59,062 HOURS

13.2.1 TBD HOURS $ (vehicle rate)

13.2.2 TBD HOURS $ (vehicle rate)

13.2.3 TBD HOURS $ (vehicle rate)

TBD = to be determined upon task order

High Capacity

Low Capacity

Medium Capacity in accordance with PWS Sections]

Vehicles Surge/Flex

Yuma (YUM) Note: [13.1.9.1, 13.1.9.2, etc…labor categories to be determined by offeror based on labor approach

Tucson (TCA) Note: [13.1.8.1, 13.1.8.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

Note: [13.1.7.1, 13.1.7.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]

San Diego (SDC) in accordance with PWS Sections]

Rio Grande Valley (RGV) Note: [13.1.6.1, 13.1.6.2, etc…labor categories to be

Marfa (MAR) Note: [13.1.5.1, 13.1.5.2, etc…labor categories to be determined by offeror based on labor approach

Laredo (LRT) Note: [13.1.4.1, 13.1.4.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

Note: [13.1.3.1, 13.1.3.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]

El Paso (ELP) in accordance with PWS Sections]

El Centro (ELC) Note: [13.1.2.1, 13.1.2.2, etc…labor categories to be

Transport Labor Surge/Flex (reference PWS Section 4.12.3)

Del Rio (DRT) Note: [13.1.1.1, 13.1.1.2, etc…labor categories to be determined by offeror based on labor approach

Item DescriptionCLIN#

EST

QUANTITY

(NTE)

UNIT PRICE/RATE TOTAL

13.0 Labor Surge/Flex

Vehicle Surge/Flex [Time]

B-9 HSBP1012R0020

14.0

NTE ~ ~

200,000$

15.0

NTE ~ ~

300,000$

NTE ~ ~ 3,935,000$

UNIT PRICE/RATE TOTAL

MTRT [Materials-pre-approved vehicle maintenance contingencies and any cross-state licensing requirements] (reference PWS Section 4.12.4)

Travel [Materials]

CLIN# Item Description

EST

QUANTITY

(NTE)

UNIT

16.0

Fuel [Materials] (vendors are encouraged to provide optional fuel consumption reduction/greenhouse gas minimizing proposals (i.e. show how average fuel cost per mile traveled may be reduced. Vendors shall use $3.50/gal as the average cost per gallon for their calculations) (reference the PWS and Evaluation Criteria (Section M))

NTE = not to exceed

B-10 HSBP1012R0020

17.1 52 WEEKS $ $

17.2 52 WEEKS $ $

17.3 52 WEEKS $ $

17.4 52 WEEKS $ $

17.5 52 WEEKS $ $

17.6 52 WEEKS $ $

17.7 52 WEEKS $ $

17.8 52 WEEKS $ $

17.9 52 WEEKS $ $

CLIN 17.0 TOTAL PRICE: $

Yuma (YUM)

San Diego (SDC)

Tucson (TCA)

Marfa (MAR)

Rio Grande Valley (RGV)

El Paso (EPT)

Laredo (LRT)

Del Rio (DRT)

El Centro (ELC)

UNIT UNIT PRICE/RATE TOTAL

17.0 Mission Support Base - Fixed-Price Weekly Operational Rate (All Labor/

Vehicles/Equipment/ Supplies/ Fleet Operations & Maintenance (excluding fuel)) in accordance with PWS Appendices A - C

CLIN# Item Description

EST

QUANTITY

SECTION B: SCHEDULE OF SUPPLIES/SERVICES

Option Year Three (One year from Option Year Two end date)

B-11 HSBP1012R0020

18.1 92,102 HOURS

18.1.1

18.1.1.1 TBD HOURS $ (labor rate)

18.1.1.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

18.1.2

18.1.2.1 TBD HOURS $ (labor rate)

18.1.2.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

18.1.3

18.1.3.1 TBD HOURS $ (labor rate)

18.1.3.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

18.1.4

18.1.4.1 TBD HOURS $ (labor rate)

18.1.4.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

18.1.5

18.1.5.1 TBD HOURS $ (labor rate)

18.1.5.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

18.1.6

18.1.6.1 TBD HOURS $ (labor rate)

18.1.6.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

18.1.7

18.1.7.1 TBD HOURS $ (labor rate)

18.1.7.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

18.1.8

18.1.8.1 TBD HOURS $ (labor rate)

18.1.8.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

18.1.9

18.1.9.1 TBD HOURS $ (labor rate)

18.1.9.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

18.2 59,062 HOURS

18.2.1 TBD HOURS $ (vehicle rate)

18.2.2 TBD HOURS $ (vehicle rate)

18.2.3 TBD HOURS $ (vehicle rate)

TBD = to be determined upon task order

High Capacity

Low Capacity

Medium Capacity in accordance with PWS Sections]

Vehicles Surge/Flex

Yuma (YUM) Note: [18.1.9.1, 18.1.9.2, etc…labor categories to be determined by offeror based on labor approach

Tucson (TCA) Note: [18.1.8.1, 18.1.8.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

Note: [18.1.7.1, 18.1.7.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]

San Diego (SDC) in accordance with PWS Sections]

Rio Grande Valley (RGV) Note: [18.1.6.1, 18.1.6.2, etc…labor categories to be

Marfa (MAR) Note: [18.1.5.1, 18.1.5.2, etc…labor categories to be determined by offeror based on labor approach

Laredo (LRT) Note: [18.1.4.1, 18.1.4.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

Note: [18.1.3.1, 18.1.3.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]

El Paso (ELP) in accordance with PWS Sections]

El Centro (ELC) Note: [18.1.2.1, 18.1.2.2, etc…labor categories to be

Transport Labor Surge/Flex (reference PWS Section 4.12.3)

Del Rio (DRT) Note: [18.1.1.1, 18.1.1.2, etc…labor categories to be determined by offeror based on labor approach

Item DescriptionCLIN#

EST

QUANTITY

(NTE)

UNIT PRICE/RATE TOTAL

18.0 Labor Surge/Flex

Vehicle Surge/Flex [Time]

B-12 HSBP1012R0020

19.0

NTE ~ ~

200,000$

20.0

NTE ~ ~

300,000$

~ 3,935,000$

Travel [Materials]

UNIT PRICE/RATE TOTAL

MTRT [Materials-pre-approved vehicle maintenance contingencies and any cross-state licensing requirements] (reference PWS Section 4.12.4)

21.0

Fuel [Materials] (vendors are encouraged to provide optional fuel consumption reduction/greenhouse gas minimizing proposals (i.e.

show how average fuel cost per mile traveled may be reduced. Vendors shall use $3.50/gal as the average cost per gallon for their calculations)

(reference the PWS and Evaluation Criteria (Section M))

NTE ~

CLIN# Item Description

EST

QUANTITY

(NTE)

UNIT

NTE = not to exceed

B-13 HSBP1012R0020

22.1 52 WEEKS $ $

22.2 52 WEEKS $ $

22.3 52 WEEKS $ $

22.4 52 WEEKS $ $

22.5 52 WEEKS $ $

22.6 52 WEEKS $ $

22.7 52 WEEKS $ $

22.8 52 WEEKS $ $

22.9 52 WEEKS $ $

CLIN 22.0 TOTAL PRICE: $

Del Rio (DRT)

Tucson (TCA)

UNIT PRICE/RATE TOTAL

22.0 Mission Support Base - Fixed-Price Weekly Operational Rate (All Labor/

Vehicles/Equipment/ Supplies/ Fleet Operations & Maintenance (excluding fuel)) in accordance with PWS Appendices A - C

UNIT

SECTION B: SCHEDULE OF SUPPLIES/SERVICES

CLIN# Item Description

EST

QUANTITY

Option Year Four (One year from Option Year Three end date)

Yuma (YUM)

Rio Grande Valley (RGV)

San Diego (SDC)

Laredo (LRT)

Marfa (MAR)

El Centro (ELC)

El Paso (EPT)

B-14 HSBP1012R0020

23.1 92,102 HOURS

23.1.1

23.1.1.1 TBD HOURS $ (labor rate)

23.1.1.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

23.1.2

23.1.2.1 TBD HOURS $ (labor rate)

23.1.2.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

23.1.3

23.1.3.1 TBD HOURS $ (labor rate)

23.1.3.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

23.1.4

23.1.4.1 TBD HOURS $ (labor rate)

23.1.4.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

23.1.5

23.1.5.1 TBD HOURS $ (labor rate)

23.1.5.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

23.1.6

23.1.6.1 TBD HOURS $ (labor rate)

23.1.6.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

23.1.7

23.1.7.1 TBD HOURS $ (labor rate)

23.1.7.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

23.1.8

23.1.8.1 TBD HOURS $ (labor rate)

23.1.8.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

23.1.9

23.1.9.1 TBD HOURS $ (labor rate)

23.1.9.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

23.2 59,062 HOURS

23.2.1 TBD HOURS $ (vehicle rate)

23.2.2 TBD HOURS $ (vehicle rate)

23.2.3 TBD HOURS $ (vehicle rate)

TOTAL

23.0 Labor Surge/Flex

Vehicle Surge/Flex [Time]

UNIT PRICE/RATECLIN# Item Description

EST

QUANTITY

(NTE)

TBD = to be determined upon task order

High Capacity

Low Capacity

Medium Capacity

Vehicles Surge/Flex

Yuma (YUM) Note: [23.1.9.1, 23.1.9.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

Note: [23.1.8.1, 23.1.8.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]

Tucson (TCA) in accordance with PWS Sections]

San Diego (SDC) Note: [23.1.7.1, 23.1.7.2, etc…labor categories to be

Rio Grande Valley (RGV) Note: [23.1.6.1, 23.1.6.2, etc…labor categories to be determined by offeror based on labor approach

Marfa (MAR) Note: [23.1.5.1, 23.1.5.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

Note: [23.1.4.1, 23.1.4.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]

Laredo (LRT) in accordance with PWS Sections]

El Paso (ELP) Note: [23.1.3.1, 23.1.3.2, etc…labor categories to be

El Centro (ELC) Note: [23.1.2.1, 23.1.2.2, etc…labor categories to be determined by offeror based on labor approach

Note: [23.1.1.1, 23.1.1.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

Del Rio (DRT)

Transport Labor Surge/Flex (reference PWS Section 4.12.3)

B-15 HSBP1012R0020

24.0

NTE ~ ~

200,000$

25.0

NTE ~ ~

300,000$

MTRT [Materials-pre-approved vehicle maintenance contingencies and any cross-state licensing requirements] (reference PWS Section 4.12.4)

Travel [Materials]

26.0

Fuel [Materials] (vendors are encouraged to provide optional fuel consumption reduction/greenhouse gas minimizing proposals (i.e. show how average fuel cost per mile traveled may be reduced. Vendors shall use $3.50/gal as the average cost per gallon for their calculations) (reference the PWS and Evaluation Criteria (Section M))

CLIN# Item Description

EST

QUANTITY

(NTE)

UNIT

NTE = not to exceed EA = each

NTE ~ ~ 3,935,000$

UNIT PRICE/RATE TOTAL

B-16 HSBP1012R0020

HSBP1012R0012 A0010

27.1 26 WEEKS $ $

27.2 26 WEEKS $ $

27.3 26 WEEKS $ $

27.4 26 WEEKS $ $

27.5 26 WEEKS $ $

27.6 26 WEEKS $ $

27.7 26 WEEKS $ $

27.8 26 WEEKS $ $

27.9 26 WEEKS $ $

CLIN 27.0 TOTAL PRICE: $

Yuma (YUM)

San Diego (SDC)

Tucson (TCA)

Marfa (MAR)

Rio Grande Valley (RGV)

El Paso (EPT)

Laredo (LRT)

Del Rio (DRT)

El Centro (ELC)

UNIT

UNIT

PRICE/RATE

TOTAL

27.0 Mission Support Base - Fixed-Price Weekly Operational Rate (All Labor/

Vehicles/Equipment/ Supplies/ Fleet Operations & Maintenance (excluding fuel)) in accordance with PWS Appendices A - C

CLIN# Item Description

EST

QUANTITY

SECTION B: SCHEDULE OF SUPPLIES/SERVICES

Six month Extension (52.217-8) (6 months from Option Year Four end) bidjofc Typewritten Text

B-17 HSBP1012R0020

bidjofc Typewritten Text bidjofc Typewritten Text bidjofc Typewritten Text bidjofc Sticky Note Accepted set by bidjofc

28.1 46,051 HOURS

28.1.1

28.1.1.1 TBD HOURS $ (labor rate)

28.1.1.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

28.1.2

28.1.2.1 TBD HOURS $ (labor rate)

28.1.2.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

28.1.3

28.1.3.1 TBD HOURS $ (labor rate)

28.1.3.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

28.1.4

28.1.4.1 TBD HOURS $ (labor rate)

28.1.4.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

28.1.5

28.1.5.1 TBD HOURS $ (labor rate)

28.1.5.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

28.1.6

28.1.6.1 TBD HOURS $ (labor rate)

28.1.6.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

28.1.7

28.1.7.1 TBD HOURS $ (labor rate)

28.1.7.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

28.1.8

28.1.8.1 TBD HOURS $ (labor rate)

28.1.8.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

28.1.9

28.1.9.1 TBD HOURS $ (labor rate)

28.1.9.2 TBD HOURS $ (labor rate)

etc… TBD HOURS $ (labor rate)

28.2 29,531 HOURS

28.2.1 TBD HOURS $ (vehicle rate)

28.2.2 TBD HOURS $ (vehicle rate)

28.2.3 TBD HOURS $ (vehicle rate)

TBD = to be determined upon task order

High Capacity

Low Capacity

Medium Capacity in accordance with PWS Sections]

Vehicles Surge/Flex

Yuma (YUM) Note: [28.1.9.1, 28.1.9.2, etc…labor categories to be determined by offeror based on labor approach

Tucson (TCA) Note: [28.1.8.1, 28.1.8.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

Note: [28.1.7.1, 28.1.7.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]

San Diego (SDC) in accordance with PWS Sections]

Rio Grande Valley (RGV) Note: [28.1.6.1, 28.1.6.2, etc…labor categories to be

Marfa (MAR) Note: [28.1.5.1, 28.1.5.2, etc…labor categories to be determined by offeror based on labor approach

Laredo (LRT) Note: [28.1.4.1, 28.1.4.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]

Note: [28.1.3.1, 28.1.3.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]

El Paso (ELP) in accordance with PWS Sections]

El Centro (ELC) Note: [28.1.2.1, 28.1.2.2, etc…labor categories to be

Transport Labor Surge/Flex (reference PWS Section 4.12.3)

Del Rio (DRT) Note: [28.1.1.1, 28.1.1.2, etc…labor categories to be determined by offeror based on labor approach

UNIT

UNIT

PRICE/RATE

TOTAL

Labor Surge/Flex

Vehicle Surge/Flex [Time]

CLIN# Item Description

EST

QUANTITY

(NTE)

bidjofc Typewritten Text

B-18 HSBP1012R0020

29.0

NTE ~ ~

100,000$

30.0

NTE ~ ~

150,000$

NTE = not to exceed EA = each

~ 1,967,500$ 31.0

Fuel [Materials] (vendors are encouraged to provide optional fuel consumption reduction/greenhouse gas minimizing proposals (i.e. show how average fuel cost per mile traveled may be reduced. Vendors shall use $3.50/gal as the average cost per gallon for their calculations) (reference the PWS and

Evaluation Criteria (Section M))

NTE ~

MTRT [Materials-pre-approved vehicle maintenance contingencies and any cross-state licensing requirements] (reference PWS Section 4.12.4)

Travel [Materials]

EST

QUANTITY

(NTE)

UNIT

UNIT

PRICE/RATE

TOTAL CLIN# Item Description bidjofc Typewritten Text

B-19 HSBP1012R0020

File details come from the government source that posted it. Updated .