AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
,1 . CONTRACT ID CODE IPA~E OF PAGES
I 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. ,5. PROJECT NO. (If applicable)
A0010 08/16/2012 20067677
6. 1SSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE I Department of Homeland Security Department of Homeland Security Customs and Border Protection Customs and Border Protection Procurement Directorate Procurement Directorate 1300 Pennsylvania Ave, NW, STE 1310 1300 Pennsylvania Ave, NW, STE 1310 Washington, DC 20229 Washington , DC 20229
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION r-:--:- NO.
0 HSBP1 012R0020
9B. DATED (SEE ITEM 11)
03/16/2012 -
10A. MODIFICATION OF CONTRACT/ORDER NO.
0 10B. DATED (SEE ITEM 13)
CODE jFACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
~ The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers 0 is extended , ~ is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE
PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
NA
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor 0 is not, ~ is required to sign this document and return ____ _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment A0009 inadvertently excluded three pages from the Schedule B. This amendment hereby corrects that error.
Vendors shall note that the page count for Attachment 1 entitled Schedule B found under Section J:1 "LIST OF ATIACHMENTS" in the Terms and Conditions is increased to 20 pages.
ATIACHMENTS:
Revised Schedule B
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 1 OA, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Kerri A. Bishop
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16C. D
(Signature of person authorized to sign) /cQ..
NSN 7540-01-152-8070
Previous edition unusable
D FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
HSBP1012R0020 A0010
CUT SHEET
REVISED SCHEDULE B
CONTRACT TYPE
** In addition to completing this Price Schedule, Offeror shall complete and submit the Pricing Schedule for the Sample Task Order, which can be found in Section J, Attachment 6 of this solicitation, as part of its Volume I - Price Proposal.
SECTION B: SCHEDULE OF SUPPLIES/SERVICES
This solicitation will result in a single award Indefinite Delivery Indefinite Quantity (IDIQ) contract with Fixed Price and Time & Materials CLINs for the purchase of Transportation, Medical Escort, and Guard Services along the Southwest Border. The Contractor shall perform the work as set forth in the Performance Work Statement, Quality Assurance Plan, and Work Statements as specifically described in individual delivery orders. Delivery Orders issued under this contract shall be issued on a Fixed-Price (FP) and Fixed Unit Price basis.
Task orders and/or written authorizations applicable to the T&M CLINS shall be issued at the Unit Prices contained in the Schedule. The total amount of hours and/or material for each T&M task order or authorization shall be determined, as applicable, for each Surge/Flex requirement. All T&M Labor Rates shall be proposed as fully burdened rates.
1.1 52 WEEKS $ $
1.2 52 WEEKS $ $
1.3 52 WEEKS $ $
1.4 52 WEEKS $ $
1.5 52 WEEKS $ $
1.6 52 WEEKS $ $
1.7 52 WEEKS $ $
1.8 52 WEEKS $ $
1.9 52 WEEKS $ $
CLIN 1.0 TOTAL PRICE: $
SECTION B: SCHEDULE OF SUPPLIES/SERVICES
Base Year (One year from date of award)
CLIN#
1.0 Mission Support Base - Fixed-Price Weekly Operational Rate (All Labor/
Vehicles/Equipment/ Supplies/ Fleet Operations & Maintenance (excluding fuel)) in accordance with PWS Appendices A - C
TOTALItem Description UNIT PRICE/RATE
EST
QUANTITY
UNIT
Del Rio (DRT)
El Centro (ELC)
El Paso (EPT)
Laredo (LRT)
Yuma (YUM)
San Diego (SDC)
Tucson (TCA)
Marfa (MAR)
Rio Grande Valley (RGV)
B-2 HSBP1012R0020
2.1 92,102 HOURS
2.1.1
2.1.1.1 TBD HOURS $ (labor rate)
2.1.1.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
2.1.2
2.1.2.1 TBD HOURS $ (labor rate)
2.1.2.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
2.1.3
2.1.3.1 TBD HOURS $ (labor rate)
2.1.3.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
2.1.4
2.1.4.1 TBD HOURS $ (labor rate)
2.1.4.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
2.1.5
2.1.5.1 TBD HOURS $ (labor rate)
2.1.5.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
2.1.6
2.1.6.1 TBD HOURS $ (labor rate)
2.1.6.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
2.1.7
2.1.7.1 TBD HOURS $ (labor rate)
2.1.7.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
2.1.8
2.1.8.1 TBD HOURS $ (labor rate)
2.1.8.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
2.1.9
2.1.9.1 TBD HOURS $ (labor rate)
2.1.9.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
2.2 59,062 HOURS
2.2.1 TBD HOURS $ (vehicle rate)
2.2.2 TBD HOURS $ (vehicle rate)
2.2.3 TBD HOURS $ (vehicle rate)
Yuma (YUM) Note: [2.1.9.1, 2.1.9.2, etc…labor categories to be
Note: [2.1.6.1, 2.1.6.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
EST
QUANTITY
(NTE)
Item Description TOTAL UNIT PRICE/RATEUNIT determined by offeror based on labor approach in accordance with PWS Sections]
San Diego (SDC) Note: [2.1.7.1, 2.1.7.2, etc…labor categories to be determined by offeror based on labor approach
Rio Grande Valley (RGV)
Marfa (MAR) in accordance with PWS Sections]
Tucson (TCA) Note: [2.1.8.1, 2.1.8.2, etc…labor categories to be
TBD = to be determined upon task order in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]
Note: [2.1.5.1, 2.1.5.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
Laredo (LRT) Note: [2.1.4.1, 2.1.4.2, etc…labor categories to be determined by offeror based on labor approach
El Paso (ELP) Note: [2.1.3.1, 2.1.3.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
Note: [2.1.2.1, 2.1.2.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
CLIN#
Labor Surge/Flex Vehicle Surge/Flex
[Time]
Transport Labor Surge/Flex (reference PWS Section 4.12.3) determined by offeror based on labor approach
2.0
Del Rio (DRT) Note: [2.1.1.1, 2.1.1.2, etc…labor categories to be
High Capacity in accordance with PWS Sections]
Low Capacity
Medium Capacity
Vehicles Surge/Flex
El Centro (ELC)
B-3 HSBP1012R0020
3.0
NTE ~ ~
200,000$
4.0
NTE ~ ~
300,000$
CLIN#
EST
QUANTITY
(NTE)
NTE = not to exceed EA = each
5.0
~ 3,935,000$ NTE ~
UNIT PRICE/RATE TOTAL UNIT
Travel [Materials]
MTRT [Materials-pre-approved vehicle maintenance contingencies and any cross-state licensing requirements] (reference PWS Section 4.12.4)
Fuel [Materials] (vendors are encouraged to provide optional fuel consumption reduction/greenhouse gas minimizing proposals (i.e. show how average fuel cost per mile traveled may be reduced. Vendors shall use $3.50/gal as the average cost per gallon for their calculations) (reference the PWS and Evaluation Criteria (Section M))
Item Description
~ $6.0 Transition Plan---Fixed Price (See PWS Section 6.1 and Provision L.12 for this Requirement)
EA
B-4 HSBP1012R0020
7.1 52 WEEKS $ $
7.2 52 WEEKS $ $
7.3 52 WEEKS $ $
7.4 52 WEEKS $ $
7.5 52 WEEKS $ $
7.6 52 WEEKS $ $
7.7 52 WEEKS $ $
7.8 52 WEEKS $ $
7.9 52 WEEKS $ $
CLIN 7.0 TOTAL PRICE: $
Yuma (YUM)
San Diego (SDC)
Tucson (TCA)
Marfa (MAR)
Rio Grande Valley (RGV)
El Paso (EPT)
Laredo (LRT)
Del Rio (DRT)
El Centro (ELC)
UNIT UNIT PRICE/RATE TOTAL
7.0 Mission Support Base - Fixed-Price Weekly Operational Rate (All Labor/
Vehicles/Equipment/ Supplies/ Fleet Operations & Maintenance (excluding fuel)) in accordance with PWS Appendices A - C
CLIN# Item Description
EST
QUANTITY
SECTION B: SCHEDULE OF SUPPLIES/SERVICES
Option Year One (One year from Base Year end date)
B-5 HSBP1012R0020
8.1 92,102 HOURS
8.1.1
8.1.1.1 TBD HOURS $ (labor rate)
8.1.1.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
8.1.2
8.1.2.1 TBD HOURS $ (labor rate)
8.1.2.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
8.1.3
8.1.3.1 TBD HOURS $ (labor rate)
8.1.3.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
8.1.4
8.1.4.1 TBD HOURS $ (labor rate)
8.1.4.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
8.1.5
8.1.5.1 TBD HOURS $ (labor rate)
8.1.5.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
8.1.6
8.1.6.1 TBD HOURS $ (labor rate)
8.1.6.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
8.1.7
8.1.7.1 TBD HOURS $ (labor rate)
8.1.7.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
8.1.8
8.1.8.1 TBD HOURS $ (labor rate)
8.1.8.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
8.1.9
8.1.9.1 TBD HOURS $ (labor rate)
8.1.9.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
8.2 59,062 HOURS
8.2.1 TBD HOURS $ (vehicle rate)
8.2.2 TBD HOURS $ (vehicle rate)
8.2.3 TBD HOURS $ (vehicle rate)
TBD = to be determined upon task order
High Capacity
Low Capacity
Medium Capacity in accordance with PWS Sections]
Vehicles Surge/Flex
Yuma (YUM) Note: [8.1.9.1, 8.1.9.2, etc…labor categories to be determined by offeror based on labor approach
Tucson (TCA) Note: [8.1.8.1, 8.1.8.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
Note: [8.1.7.1, 8.1.7.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]
San Diego (SDC) in accordance with PWS Sections]
Rio Grande Valley (RGV) Note: [8.1.6.1, 8.1.6.2, etc…labor categories to be
Marfa (MAR) Note: [8.1.5.1, 8.1.5.2, etc…labor categories to be determined by offeror based on labor approach
Laredo (LRT) Note: [8.1.4.1, 8.1.4.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
Note: [8.1.3.1, 8.1.3.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]
El Paso (ELP) in accordance with PWS Sections]
El Centro (ELC) Note: [8.1.2.1, 8.1.2.2, etc…labor categories to be
Transport Labor Surge/Flex (reference PWS Section 4.12.3)
Del Rio (DRT) Note: [8.1.1.1, 8.1.1.2, etc…labor categories to be determined by offeror based on labor approach
CLIN# Item Description UNIT PRICE/RATE TOTAL
8.0 Labor Surge/Flex
Vehicle Surge/Flex [Time]
EST
QUANTITY
(NTE)
UNIT
B-6 HSBP1012R0020
9.0
NTE ~ ~
200,000$
10.0
NTE ~ ~
300,000$
NTE ~ ~ 3,935,000$
UNIT PRICE/RATE TOTAL
MTRT [Materials-pre-approved vehicle maintenance contingencies and any cross-state licensing requirements] (reference PWS Section 4.12.4)
Travel [Materials]
CLIN# Item Description
EST
QUANTITY
(NTE)
UNIT
11.0
Fuel [Materials] (vendors are encouraged to provide optional fuel consumption reduction/greenhouse gas minimizing proposals (i.e. show how average fuel cost per mile traveled may be reduced. Vendors shall use $3.50/gal as the average cost per gallon for their calculations) (reference the PWS and Evaluation Criteria (Section M))
NTE = not to exceed EA = each
B-7 HSBP1012R0020
12.1 52 WEEKS $ $
12.2 52 WEEKS $ $
12.3 52 WEEKS $ $
12.4 52 WEEKS $ $
12.5 52 WEEKS $ $
12.6 52 WEEKS $ $
12.7 52 WEEKS $ $
12.8 52 WEEKS $ $
12.9 52 WEEKS $ $
CLIN 12.0 TOTAL PRICE: $
Yuma (YUM)
San Diego (SDC)
Tucson (TCA)
Marfa (MAR)
Rio Grande Valley (RGV)
El Paso (EPT)
Laredo (LRT)
Del Rio (DRT)
El Centro (ELC)
UNIT UNIT PRICE/RATE TOTAL
12.0 Mission Support Base - Fixed-Price Weekly Operational Rate (All Labor/
Vehicles/Equipment/ Supplies/ Fleet Operations & Maintenance (excluding fuel)) in accordance with PWS Appendices A - C
CLIN# Item Description
EST
QUANTITY
SECTION B: SCHEDULE OF SUPPLIES/SERVICES
Option Year Two (One year from Option Year One end date)
B-8 HSBP1012R0020
13.1 92,102 HOURS
13.1.1
13.1.1.1 TBD HOURS $ (labor rate)
13.1.1.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
13.1.2
13.1.2.1 TBD HOURS $ (labor rate)
13.1.2.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
13.1.3
13.1.3.1 TBD HOURS $ (labor rate)
13.1.3.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
13.1.4
13.1.4.1 TBD HOURS $ (labor rate)
13.1.4.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
13.1.5
13.1.5.1 TBD HOURS $ (labor rate)
13.1.5.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
13.1.6
13.1.6.1 TBD HOURS $ (labor rate)
13.1.6.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
13.1.7
13.1.7.1 TBD HOURS $ (labor rate)
13.1.7.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
13.1.8
13.1.8.1 TBD HOURS $ (labor rate)
8.1.8.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
13.1.9
13.1.9.1 TBD HOURS $ (labor rate)
13.1.9.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
13.2 59,062 HOURS
13.2.1 TBD HOURS $ (vehicle rate)
13.2.2 TBD HOURS $ (vehicle rate)
13.2.3 TBD HOURS $ (vehicle rate)
TBD = to be determined upon task order
High Capacity
Low Capacity
Medium Capacity in accordance with PWS Sections]
Vehicles Surge/Flex
Yuma (YUM) Note: [13.1.9.1, 13.1.9.2, etc…labor categories to be determined by offeror based on labor approach
Tucson (TCA) Note: [13.1.8.1, 13.1.8.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
Note: [13.1.7.1, 13.1.7.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]
San Diego (SDC) in accordance with PWS Sections]
Rio Grande Valley (RGV) Note: [13.1.6.1, 13.1.6.2, etc…labor categories to be
Marfa (MAR) Note: [13.1.5.1, 13.1.5.2, etc…labor categories to be determined by offeror based on labor approach
Laredo (LRT) Note: [13.1.4.1, 13.1.4.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
Note: [13.1.3.1, 13.1.3.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]
El Paso (ELP) in accordance with PWS Sections]
El Centro (ELC) Note: [13.1.2.1, 13.1.2.2, etc…labor categories to be
Transport Labor Surge/Flex (reference PWS Section 4.12.3)
Del Rio (DRT) Note: [13.1.1.1, 13.1.1.2, etc…labor categories to be determined by offeror based on labor approach
Item DescriptionCLIN#
EST
QUANTITY
(NTE)
UNIT PRICE/RATE TOTAL
13.0 Labor Surge/Flex
Vehicle Surge/Flex [Time]
B-9 HSBP1012R0020
14.0
NTE ~ ~
200,000$
15.0
NTE ~ ~
300,000$
NTE ~ ~ 3,935,000$
UNIT PRICE/RATE TOTAL
MTRT [Materials-pre-approved vehicle maintenance contingencies and any cross-state licensing requirements] (reference PWS Section 4.12.4)
Travel [Materials]
CLIN# Item Description
EST
QUANTITY
(NTE)
UNIT
16.0
Fuel [Materials] (vendors are encouraged to provide optional fuel consumption reduction/greenhouse gas minimizing proposals (i.e. show how average fuel cost per mile traveled may be reduced. Vendors shall use $3.50/gal as the average cost per gallon for their calculations) (reference the PWS and Evaluation Criteria (Section M))
NTE = not to exceed
B-10 HSBP1012R0020
17.1 52 WEEKS $ $
17.2 52 WEEKS $ $
17.3 52 WEEKS $ $
17.4 52 WEEKS $ $
17.5 52 WEEKS $ $
17.6 52 WEEKS $ $
17.7 52 WEEKS $ $
17.8 52 WEEKS $ $
17.9 52 WEEKS $ $
CLIN 17.0 TOTAL PRICE: $
Yuma (YUM)
San Diego (SDC)
Tucson (TCA)
Marfa (MAR)
Rio Grande Valley (RGV)
El Paso (EPT)
Laredo (LRT)
Del Rio (DRT)
El Centro (ELC)
UNIT UNIT PRICE/RATE TOTAL
17.0 Mission Support Base - Fixed-Price Weekly Operational Rate (All Labor/
Vehicles/Equipment/ Supplies/ Fleet Operations & Maintenance (excluding fuel)) in accordance with PWS Appendices A - C
CLIN# Item Description
EST
QUANTITY
SECTION B: SCHEDULE OF SUPPLIES/SERVICES
Option Year Three (One year from Option Year Two end date)
B-11 HSBP1012R0020
18.1 92,102 HOURS
18.1.1
18.1.1.1 TBD HOURS $ (labor rate)
18.1.1.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
18.1.2
18.1.2.1 TBD HOURS $ (labor rate)
18.1.2.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
18.1.3
18.1.3.1 TBD HOURS $ (labor rate)
18.1.3.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
18.1.4
18.1.4.1 TBD HOURS $ (labor rate)
18.1.4.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
18.1.5
18.1.5.1 TBD HOURS $ (labor rate)
18.1.5.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
18.1.6
18.1.6.1 TBD HOURS $ (labor rate)
18.1.6.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
18.1.7
18.1.7.1 TBD HOURS $ (labor rate)
18.1.7.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
18.1.8
18.1.8.1 TBD HOURS $ (labor rate)
18.1.8.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
18.1.9
18.1.9.1 TBD HOURS $ (labor rate)
18.1.9.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
18.2 59,062 HOURS
18.2.1 TBD HOURS $ (vehicle rate)
18.2.2 TBD HOURS $ (vehicle rate)
18.2.3 TBD HOURS $ (vehicle rate)
TBD = to be determined upon task order
High Capacity
Low Capacity
Medium Capacity in accordance with PWS Sections]
Vehicles Surge/Flex
Yuma (YUM) Note: [18.1.9.1, 18.1.9.2, etc…labor categories to be determined by offeror based on labor approach
Tucson (TCA) Note: [18.1.8.1, 18.1.8.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
Note: [18.1.7.1, 18.1.7.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]
San Diego (SDC) in accordance with PWS Sections]
Rio Grande Valley (RGV) Note: [18.1.6.1, 18.1.6.2, etc…labor categories to be
Marfa (MAR) Note: [18.1.5.1, 18.1.5.2, etc…labor categories to be determined by offeror based on labor approach
Laredo (LRT) Note: [18.1.4.1, 18.1.4.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
Note: [18.1.3.1, 18.1.3.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]
El Paso (ELP) in accordance with PWS Sections]
El Centro (ELC) Note: [18.1.2.1, 18.1.2.2, etc…labor categories to be
Transport Labor Surge/Flex (reference PWS Section 4.12.3)
Del Rio (DRT) Note: [18.1.1.1, 18.1.1.2, etc…labor categories to be determined by offeror based on labor approach
Item DescriptionCLIN#
EST
QUANTITY
(NTE)
UNIT PRICE/RATE TOTAL
18.0 Labor Surge/Flex
Vehicle Surge/Flex [Time]
B-12 HSBP1012R0020
19.0
NTE ~ ~
200,000$
20.0
NTE ~ ~
300,000$
~ 3,935,000$
Travel [Materials]
UNIT PRICE/RATE TOTAL
MTRT [Materials-pre-approved vehicle maintenance contingencies and any cross-state licensing requirements] (reference PWS Section 4.12.4)
21.0
Fuel [Materials] (vendors are encouraged to provide optional fuel consumption reduction/greenhouse gas minimizing proposals (i.e.
show how average fuel cost per mile traveled may be reduced. Vendors shall use $3.50/gal as the average cost per gallon for their calculations)
(reference the PWS and Evaluation Criteria (Section M))
NTE ~
CLIN# Item Description
EST
QUANTITY
(NTE)
UNIT
NTE = not to exceed
B-13 HSBP1012R0020
22.1 52 WEEKS $ $
22.2 52 WEEKS $ $
22.3 52 WEEKS $ $
22.4 52 WEEKS $ $
22.5 52 WEEKS $ $
22.6 52 WEEKS $ $
22.7 52 WEEKS $ $
22.8 52 WEEKS $ $
22.9 52 WEEKS $ $
CLIN 22.0 TOTAL PRICE: $
Del Rio (DRT)
Tucson (TCA)
UNIT PRICE/RATE TOTAL
22.0 Mission Support Base - Fixed-Price Weekly Operational Rate (All Labor/
Vehicles/Equipment/ Supplies/ Fleet Operations & Maintenance (excluding fuel)) in accordance with PWS Appendices A - C
UNIT
SECTION B: SCHEDULE OF SUPPLIES/SERVICES
CLIN# Item Description
EST
QUANTITY
Option Year Four (One year from Option Year Three end date)
Yuma (YUM)
Rio Grande Valley (RGV)
San Diego (SDC)
Laredo (LRT)
Marfa (MAR)
El Centro (ELC)
El Paso (EPT)
B-14 HSBP1012R0020
23.1 92,102 HOURS
23.1.1
23.1.1.1 TBD HOURS $ (labor rate)
23.1.1.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
23.1.2
23.1.2.1 TBD HOURS $ (labor rate)
23.1.2.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
23.1.3
23.1.3.1 TBD HOURS $ (labor rate)
23.1.3.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
23.1.4
23.1.4.1 TBD HOURS $ (labor rate)
23.1.4.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
23.1.5
23.1.5.1 TBD HOURS $ (labor rate)
23.1.5.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
23.1.6
23.1.6.1 TBD HOURS $ (labor rate)
23.1.6.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
23.1.7
23.1.7.1 TBD HOURS $ (labor rate)
23.1.7.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
23.1.8
23.1.8.1 TBD HOURS $ (labor rate)
23.1.8.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
23.1.9
23.1.9.1 TBD HOURS $ (labor rate)
23.1.9.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
23.2 59,062 HOURS
23.2.1 TBD HOURS $ (vehicle rate)
23.2.2 TBD HOURS $ (vehicle rate)
23.2.3 TBD HOURS $ (vehicle rate)
TOTAL
23.0 Labor Surge/Flex
Vehicle Surge/Flex [Time]
UNIT PRICE/RATECLIN# Item Description
EST
QUANTITY
(NTE)
TBD = to be determined upon task order
High Capacity
Low Capacity
Medium Capacity
Vehicles Surge/Flex
Yuma (YUM) Note: [23.1.9.1, 23.1.9.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
Note: [23.1.8.1, 23.1.8.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]
Tucson (TCA) in accordance with PWS Sections]
San Diego (SDC) Note: [23.1.7.1, 23.1.7.2, etc…labor categories to be
Rio Grande Valley (RGV) Note: [23.1.6.1, 23.1.6.2, etc…labor categories to be determined by offeror based on labor approach
Marfa (MAR) Note: [23.1.5.1, 23.1.5.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
Note: [23.1.4.1, 23.1.4.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]
Laredo (LRT) in accordance with PWS Sections]
El Paso (ELP) Note: [23.1.3.1, 23.1.3.2, etc…labor categories to be
El Centro (ELC) Note: [23.1.2.1, 23.1.2.2, etc…labor categories to be determined by offeror based on labor approach
Note: [23.1.1.1, 23.1.1.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
Del Rio (DRT)
Transport Labor Surge/Flex (reference PWS Section 4.12.3)
B-15 HSBP1012R0020
24.0
NTE ~ ~
200,000$
25.0
NTE ~ ~
300,000$
MTRT [Materials-pre-approved vehicle maintenance contingencies and any cross-state licensing requirements] (reference PWS Section 4.12.4)
Travel [Materials]
26.0
Fuel [Materials] (vendors are encouraged to provide optional fuel consumption reduction/greenhouse gas minimizing proposals (i.e. show how average fuel cost per mile traveled may be reduced. Vendors shall use $3.50/gal as the average cost per gallon for their calculations) (reference the PWS and Evaluation Criteria (Section M))
CLIN# Item Description
EST
QUANTITY
(NTE)
UNIT
NTE = not to exceed EA = each
NTE ~ ~ 3,935,000$
UNIT PRICE/RATE TOTAL
B-16 HSBP1012R0020
HSBP1012R0012 A0010
27.1 26 WEEKS $ $
27.2 26 WEEKS $ $
27.3 26 WEEKS $ $
27.4 26 WEEKS $ $
27.5 26 WEEKS $ $
27.6 26 WEEKS $ $
27.7 26 WEEKS $ $
27.8 26 WEEKS $ $
27.9 26 WEEKS $ $
CLIN 27.0 TOTAL PRICE: $
Yuma (YUM)
San Diego (SDC)
Tucson (TCA)
Marfa (MAR)
Rio Grande Valley (RGV)
El Paso (EPT)
Laredo (LRT)
Del Rio (DRT)
El Centro (ELC)
UNIT
UNIT
PRICE/RATE
TOTAL
27.0 Mission Support Base - Fixed-Price Weekly Operational Rate (All Labor/
Vehicles/Equipment/ Supplies/ Fleet Operations & Maintenance (excluding fuel)) in accordance with PWS Appendices A - C
CLIN# Item Description
EST
QUANTITY
SECTION B: SCHEDULE OF SUPPLIES/SERVICES
Six month Extension (52.217-8) (6 months from Option Year Four end) bidjofc Typewritten Text
B-17 HSBP1012R0020
bidjofc Typewritten Text bidjofc Typewritten Text bidjofc Typewritten Text bidjofc Sticky Note Accepted set by bidjofc
28.1 46,051 HOURS
28.1.1
28.1.1.1 TBD HOURS $ (labor rate)
28.1.1.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
28.1.2
28.1.2.1 TBD HOURS $ (labor rate)
28.1.2.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
28.1.3
28.1.3.1 TBD HOURS $ (labor rate)
28.1.3.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
28.1.4
28.1.4.1 TBD HOURS $ (labor rate)
28.1.4.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
28.1.5
28.1.5.1 TBD HOURS $ (labor rate)
28.1.5.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
28.1.6
28.1.6.1 TBD HOURS $ (labor rate)
28.1.6.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
28.1.7
28.1.7.1 TBD HOURS $ (labor rate)
28.1.7.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
28.1.8
28.1.8.1 TBD HOURS $ (labor rate)
28.1.8.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
28.1.9
28.1.9.1 TBD HOURS $ (labor rate)
28.1.9.2 TBD HOURS $ (labor rate)
etc… TBD HOURS $ (labor rate)
28.2 29,531 HOURS
28.2.1 TBD HOURS $ (vehicle rate)
28.2.2 TBD HOURS $ (vehicle rate)
28.2.3 TBD HOURS $ (vehicle rate)
TBD = to be determined upon task order
High Capacity
Low Capacity
Medium Capacity in accordance with PWS Sections]
Vehicles Surge/Flex
Yuma (YUM) Note: [28.1.9.1, 28.1.9.2, etc…labor categories to be determined by offeror based on labor approach
Tucson (TCA) Note: [28.1.8.1, 28.1.8.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
Note: [28.1.7.1, 28.1.7.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]
San Diego (SDC) in accordance with PWS Sections]
Rio Grande Valley (RGV) Note: [28.1.6.1, 28.1.6.2, etc…labor categories to be
Marfa (MAR) Note: [28.1.5.1, 28.1.5.2, etc…labor categories to be determined by offeror based on labor approach
Laredo (LRT) Note: [28.1.4.1, 28.1.4.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections]
Note: [28.1.3.1, 28.1.3.2, etc…labor categories to be determined by offeror based on labor approach in accordance with PWS Sections] determined by offeror based on labor approach in accordance with PWS Sections]
El Paso (ELP) in accordance with PWS Sections]
El Centro (ELC) Note: [28.1.2.1, 28.1.2.2, etc…labor categories to be
Transport Labor Surge/Flex (reference PWS Section 4.12.3)
Del Rio (DRT) Note: [28.1.1.1, 28.1.1.2, etc…labor categories to be determined by offeror based on labor approach
UNIT
UNIT
PRICE/RATE
TOTAL
Labor Surge/Flex
Vehicle Surge/Flex [Time]
CLIN# Item Description
EST
QUANTITY
(NTE)
bidjofc Typewritten Text
B-18 HSBP1012R0020
29.0
NTE ~ ~
100,000$
30.0
NTE ~ ~
150,000$
NTE = not to exceed EA = each
~ 1,967,500$ 31.0
Fuel [Materials] (vendors are encouraged to provide optional fuel consumption reduction/greenhouse gas minimizing proposals (i.e. show how average fuel cost per mile traveled may be reduced. Vendors shall use $3.50/gal as the average cost per gallon for their calculations) (reference the PWS and
Evaluation Criteria (Section M))
NTE ~
MTRT [Materials-pre-approved vehicle maintenance contingencies and any cross-state licensing requirements] (reference PWS Section 4.12.4)
Travel [Materials]
EST
QUANTITY
(NTE)
UNIT
UNIT
PRICE/RATE
TOTAL CLIN# Item Description bidjofc Typewritten Text
B-19 HSBP1012R0020
File details come from the government source that posted it. Updated .