Att 7_CDRLs.pdf
PDF 2 MB Posted
- Solicitation number
- HSBP1012R0018_DRAFT_RFP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT RFP_KU BAND_01062012.PDF | ||
| ATTACHMENT 3_Ku Band BLOSDD_REQUIREMENTVERIFICATION CROSS-REFERENCE MATRIX.doc | DOC document | |
| Attachment 1_CLIN Structure_12222011.doc | DOC document | |
| Attachment 9_DD FORM 250.pdf | ||
| Attachment 5_Past_Performance_Questionnaire1.pdf | ||
| ATTACHMENT 2_Ku Band BLOSDD_SOW.doc | DOC document | |
| ATTACHMENT 6_Ku Band BLOSDD_DHC-8 Aircraft | — | |
| ATTACHMENT 4_Ku Band BLOSDD_Acronym and Abbreviation List.docx | DOCX document | |
| Attachment 8_SB_Sub Plan Outline 10-1-11 FY 12-13.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 7
CONTRACT DATA REQUIREMENTS LIST
(CDRLs)
DRAFT
aData Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information i. estimated to average I IO hours per re'ponse, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Iefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704"() 188), Washington, DC 20S03. Please DO NOT RETIJRN your form to either of these addresses, Send completed form to the Government Issuing Contracting Officer for ContractlPR No. listed in Block E.IC. CATEGORY:A. CONTRACT LINE ITEM NO, IB. ExmB~
TDP TM OTHER MGMT
D, SYSTEMIITEM
Ku Band BLOSSDD
IE, CONTRACTIPR NO, F, CONTRACTOR
L DATA ITEM NO, /2. TITLE OF DATA ITEM
AOO I Integrated Master Schedule and Project Management Plan
3. SUBTITLE
IMS andPMP 4, AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX
5, CONTRACT REFERENCE
SOW Para C.4.2
6. REQUIRING OFFICE
CBP Office of Air and Marine Program Office
7, DD250REQ
LT
9, DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
12, DATE OF FIRST
SUBMISSION
SEE REMARKS
14. DISTRIBUTION
a. ADDRESSEE b, COPIES
8, APPCODE
N/A
II. AS OF DATE
N/A
13, DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16, REMARKS
BLK 5: Contractor format, prefer softcopy compatible with MS Project 2000 and MS Office.
BLK 9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office of Air and Marine.
BLK 10: Updates to be submitted in conjunction with Monthly Progress Reports, or as they occur.
BLK 12: Submit within fourteen (l4) calendar days of contract award.
BLK 13: The COTR shall review the draft for technical sufficiency and return to the Contractor, within fourteen (14) calendar days following receipt of the Project Management Plan and Integrated Master Schedule. Upon receipt of the COTR's comments on the draft, the Contractor shall review and re-submit the final version within fourteen (14) calendar days.
BLK 15: Distribute I softcopy electronically unless precluded by content whereby 1 CD ROM copy will be accepted.
Program Office I I
I
15, TOTAL I 1
G, PREPARED BY H. DATE L APPROVED BY 1. DATE
DD FORM 1423-1, FEB 2001 Page 1 of21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 0 f20Pages
(1 Data Item)
Fonn Approved OMB No. 0704-0188
Public reporting burden for this collection of iofonnation is estimated to average 110 hours per response, including the time for reviewing ins1nlctions, searching existiog data sources, gathering and maintaining the data needed, and completing and reviewiog the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of infonnation, including suggestions for redacing this burden, to Department of Defense, Washington HeadqUllJ1ers Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractiog Officer for ConttactlPR No. listed in Block E.IC. CATEGORY:A. CONTRACT UNE ITEM NO. IB. EXillB~ TDP TM OTHER MGMT
IE.D. SYSTEMIITEM CONTRACTIPR NO.
Ku Band BLOSSDD
F. CONTRACTOR
I. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
Structural and Stress Loads Analysis Report
4. AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX
S. CONTRACT REFERENCE
SOW Para C.4.7
6. REQUIRING OFFICE
CBP Air and Marine Program Office
7. DD2S0REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ONEIR
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APPCODE
N/A
II. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
BLK5: Contractor fonnat, softcopy compatible with MS Office.
BLK9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office of Air and Marine.
BLK 10/13: The Government will have fourteen (14) calendar days to review, accept, and/or comment on the draft deliverable.
BLK 12: Submit 1 draft copy to the COTR no later than thirty (30) calendar days prior to the scheduled system acceptance test
BLK 13: After the COTR reviews and comments on the deliverable, the Contractor shall incorporate Government comments and submit revised structural and stress analysis report within fourteen (14) calendar days of receipt of the comments/ need for revision is identified unless extended by the Program Office.
BLK 15: Distribute I hardcopy
BLK 15: Distribute I softcopy electronically unless precluded by content whereby I CD ROM copy will be accepted.
Program Office I 2
I
15. TOTAL I 2
G. PREPARED BY IH. DATE II. APPROVED BY 1. DATE
DD FORM 1423-1, FEB 2001 Page 2 of2t
(J Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this colle.:tion of infonnation is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintllining the data needed, and completing and reviewing the collection of information. Send COtn!Ilellts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Dire.:torate for Infonnation Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188). Washington, DC 20503. Please DO NOT RETURN your fonn to either oftheso .ddresses. Send completed fonn to the Government lssuin~ Conttactin~ Officer for ConttactiPR No. listed in Block E.IA CONTRACT LINE ITEM NO. lB. EXHIB: C CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
Ku Band BLOSSDD
IE. CONTRACTIPR NO. F. CONTRACTOR
1. DATAITEMNO'l2. TITLE OF DATA ITEM
A003 Scientific and Technical Reports
3. SUBTITLE
E3 Control Plan
4. AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX
5. CONTRACT REFERENCE
SOW Para CA.8
6. REQUIRING OFFICE
CBP Air and Marine Progt"am Office
7. DD250REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ONEIR
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APPCODE
N/A
II. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
J6.REMARKS
BLK5: Contractor format, softcopy compatible with MS Office.
BLK9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U,S, Customs and Border Protection Office of Air and Marine, BLK 10/13: The Government will have fourteen (14) calendar days to review, accept, and/or comment on the draft deliverable, BLK 12: Submit 1 draft copy to COTR no later than fourteen (14) calendar days prior to the Critical Design Review (CDR), BLK 13: After the Government reviews and comments on the deliverable, the Contractor shall incorporate Government comments and submit change pages into the final E3 control plan within seven (7) calendar days of receipt of the comments/ need for revision is identified unless extended by the Program Office.
BLK 15: Distribute 1 hardcopy
BLK 15: Distribute I softcopy electronically unless precluded by content whereby 1 CD ROM copy will be accepted, Program Office I 2
15. TOTAL 1 2
G. PREPARED BY I. APPROVED BYIH. DATE 1 1. DATE
DD FORM 1423-1, FEB 2001 Page 3 of21
CONTRACT DATA REQUIREMENTS LIST Form Approved
(1 Data Item) OMB No. 0704-0188 Public reporting burden for this collection of infotllUltion is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of infOtllUltion. Send comments regarding this burden estimate or any other aspect of this collection of infOtllUltion, including suggestions for reducing this burden, to Department of Defense, Washington Headqwuters Services, Directorate for InfotllUltion Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704·0188), Washington, DC 20503. Please 00 NOT RETURN your form to either ofthese addresses. Send completed form to the Government Issuing Contracting Officer for ContractlPR No. listed in Block E.IA. CONTRACT LINE ITEM NO. IB. EXHIB: C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEMIITEM IE. CONTRACTIPR NO.
Ku Band BLOSSDD
F. CONTRACTOR
1. DATA ITEM NO. 12, TITLE OF DATA ITEM
A004 Scientific and Technical Reports
3. SUBTITLE
Antenna Location Analysis Report
4. AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX
5. CONTRACT REFERENCE
SOW Para CA.9
6. REQUIRING OFFICE
CBP Air and Marine Program Office
7. DD250REQ
LT
9. DlST STATEMENT
REQUIRED
C
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
14. DlSTRffiUTION
a. ADDRESSEE
b. COPIES
8. APPCODE
N/A
I I. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
BLK5: Contractor format, softcopy compatible with MS Office.
BLK9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office of Air and Marine.
BLK 10113: The Government will have seven (7) calendar days to review, accept, and/or comment on the draft deliverable.
BLK 12/13: Submit I draft copy no later than thirty (30) calendar days prior to the Critical Design Review (CDR).
After the government reviews and comments on the deliverable, the contractor shall incorporate Government comments and submit change pages into the final antenna location analysis report within seven (7) calendar days after receipt of the comments/ need for revision is identified unless extended by the Program Office.
BLK 15: Distribute I hardcopy
BLK 15: Distribute 1 softcopy electronically unless precluded by content whereby 1 CD ROM copy will be accepted.
Program Office I 2
15. TOTAL I 2
G. PREPAREDBY lH. DATE lI. APPROVED BY 1. DATE
DD FORM 1423-1, FEB 2001 Page 40f21
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reponing burden for this collection of infonnation is estimated to average 110 bours per response, including the time for reviewing instructions, searcbing existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions fur reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budge~ Paperwork Reduction Project (0704-0188). Washington, DC 20503. Please DO NOT RETURN Y!'ur form to either of Ibese addresses. Send coltlJ)leted fonn to the Guvernment Issuin&..Contracting Officer fur Contrsct/PR No. listed in Block E.
A. CONTRACT LlNE ITEM NO. lB. EXHIBIT Ie. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM IE. CONTRACTIPR NO. F. CONTRACTOR
Ku Band BLOSSDD
1. DATA ITEM NO. 12. TITLE OF DATA ITEM
A005 Scientific and Technical Reports
4. AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX
5. CONTRACT REFERENCE
SOW Para C.4.10
7. DD250REQ 9. D1STSTATEMENT 10. FREQUENCYREQUIRED
LT ONE/R
8. APPCODE C 11. AS OF DATE
N/A N/A
16. REMARKS
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
BLK 5: Contractor format, softcopy compatible with MS Office.
BLK 9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office of Air and Marine.
BLK 10/13: The Government will have fourteen (14) calendar days to review, accept, and/or comment on the draft deliverable
BLK 12: Submit I draft copy no later than sixty (60) calendar days prior to the scheduled system acceptance test.
BLK 13: After the Government reviews and comments on the deliverable, the Contractor shall incorporate Government comments and submit change pages into the electrical load analysis within fourteen (14) calendar days after receipt of the comments/ need for revision is identified unless extended by the Program Office.
BLK 15: Distribute I hardcopy
BLK 15: Distribute 1 softcopy electronically unless precluded by content whereby 1 CD ROM copy will be accepted.
G. PREPARED BY / H. DATE /1. APPROVED BY
3. SUBTITLE
Electrical Load Analysis Report
6. REQUIRING OFFICE
CBP Air and Marine Program Office
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Draft Final
Reg Repro
Program Office 1 2
15. TOTAL 2
J. DATE
DD FORM 1423-1, FEB 200 I Page 50f21
Public reporting burden for this collection of infonnation is estimated w average 110 hours per response, including the time for reviewing insttuctions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Direcwrate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204. Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for ContractlPR No. listed in Block E.
A. CONTRACT LINE ITEM NO. IB. EXHIB: IC. CATEGORY;
TDP TM OTHER MISC
D. SYSTEM/ITEM IE. CONTRACTIPR NO. F. CONTRACTOR
Ku Band BLOSSDD I. DATA ITEM NO. l2. TITLE OF DATA ITEM 3. SUBTITLE
A006 Certification DD 250 and Form 337
4. AUTHORITY (Data 5. CONTRACT REFERENCE 6. REQUIRING OFFICE Acquisition Document No.)
XX-XXXX-XXXXX SOW Para C.4.l2 CBP Air and Marine Program Office
7. DD250REQ 9. DlST STATEMENT' 10 FREQUENCY 12. DATE OF FIRST
REQUIRED !' SUBMISSION 14. DISTRIBUTION
LT ONETIME N/A b. COPIES
8. APPCODE C I I. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Draft Final
SUBMISSION
N/A N/A N/A Reg Repro
16. REMARKS
Program Office 1
BLK 9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office of Air and Marine.
BLK lO: Complete a Form 337 for the DHC-8 and DD 250 for the P-3 to certify modification upon system acceptance.
BLK 12: Submit the final certification within sixty (60) calendar days of system acceptance.
BLK 15: Distribute 1 softcopy electronically unless precluded by content whereby 1 CD ROM copy will be accepted.
I
15. TOTAL I
G. PREPARED BY IH. DATE II. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 Page 6 of 21
(l Data Item) OMB No. 0704-0188
Public reporting burden fo, this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information. including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway. Suite 1204, Arlington, VA. 22202-4302. and to the Office of Management and Budget, Paperwork Reduction Project (0704.0188). Washington.
DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuin~ Contr.ctin~ Officer for ContractJPR No. listed in Block E.
A. CONTRACT LINE ITEM NO. lB. EXffiB: IC. CATEGORY:
TDP TM OTHER TMSS
D. SYSTEMIITEM IE. CONTRACTIPR NO. F. CONTRACTOR
Ku Band BLOSSDD
I. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007 Commercial Off-the-Shelf Manuals and Associated Manufacturer and Vendor Warranties Supplemental Data
4. AUTHORITY (Data 5. CONTRACT REFERENCE 6. REQUIRING OFFICE Acquisition Document No.)
XX-XXXX-XXXXX SOW Para 6.1 CBP Air and Marine Program Office
7. DD250REQ 9. DIST STATEMENT l 10 FREQUENCY 12. DATE OF FIRST
14. DISTRIBUTIONREQUIRED i' SUBMISSION
LT ASREQ SEE REMARKS b. COPIES
8. APPCODE C 11. AS OF DATE \3. DATE OF SUBSEQUENT a. ADDRESSEE Draft Final
SUBMISSION
N/A N/A N/A Reg Repro
16. REMARKS
Program Office 2
BLK5: Contractor format, softcopy compatible with MS Office.
BLK9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office of Air and Marine.
BLK 10: Deliver original warranties as received from vendors and manufacturers or modified standard commercial warranty within fourteen (14) calendar days of system acceptance.
BLK 15: Distribute 1 hardcopy via mail.
BLK 15: Distribute I softcopy electronically unless precluded by content whereby 1 CD ROM copy will be accepted.
15. TOTAL 2
G. PREPARED BY IH. DATE II. APPROVED BY 1. DATE
DD FORM 1423-1, FEB 2001 Page 7 of21
Public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources.
galbering and maintaining the dam needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 121~ Jefferson Davis Highway, Suite 1204, Arlington. VA. 22202-4302, and 10 me Office of Management and Budge~ Paperwork Reduction Projecl (0704-0188), Washington, DC 2O~03. PIe••• DO NOT RETURN your form to either ofthese addresses. Send completed form 10 me Govemmenllssuing Contracting Officer for ContractlPR No. listed in Block E.
A. CONTRACT LINE ITEM NO. lB. EXlllB; IC. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM IE. CONTRACTfPR NO. F. CONTRACTOR
Ku Band BLOSSDD
I. DATA ITEM NO. 12. TITLE OF DATA ITEM 3. SUBTITLE
A008 Scientific and Technical Reports Weight and Balance Report
4. AUTHORITY (Data 5. CONTRACT REFERENCE 6. REQUIRING OFFICE Acquisition Document No.)
XX-XXXX-XXXXX SOW Para 6.1 CBP Air and Marine Program Office
7. DD 250 REQ 9. DlST STATEMENT 10. FREQUENCY
12. DATE OF FIRST
14. DISTRIBUTIONREQUIRED SUBMISSION
LT ONEIR SEE REMARKS b. COPIES
8. APPCODE C II. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Draft Final
SUBMISSION
N/A N/A N/A Reg Repro
16. REMARKS
Program Office 1 3
BLK5: Contractor format, softcopy compatible with MS Office.
BLK9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office ofAir and Marine.
BLK 12/13: Submit 1 draft copy no later than thirty (30) calendar days prior to the scheduled system acceptance test.
BLK 10/13: The Government will have fourteen (14) calendar days to review, accept, and/or comment on the draft deliverable.
After the Government reviews and comments on the deliverable, the Contractor shall incorporate Government comments and submit change pages into the final weight and balance report within fourteen (14) calendar days after receipt of the comments/ need for revision is identified unless extended by the Program Office.
BLK 15: Distribute 2 hardcopies
BLK 15: Distribute 1 softcopy electronically unless precluded by content whereby 1 CD ROM copy will be accepted.
i
15. TOTAL 1 3
G. PREPAREDBY IH. DATE II. APPROVED BY 1. DATE
DD FORM 1423-1, FEB 2001 Page 80f21
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated 1<> average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Departmenl of Defense, Washington Headquarters Services, Direc1<>rate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and 10 the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503, Please DO NOT RETURN vour form 10 either of these addresses, Send comllieted form 1<> the Government 1 •• uinR COntractinR Officer for ContractIPR No. listed in Block E.
A CON1RACT LINE ITEM NO. lB. EXHIB; IC. CATEGORY:
TDP TM OTHER MISC
D. SYSTEMIITEM CONTRACTIPR NO.
Ku Band BLOSSDD
I. DATAITEMNO./2. TITLE OF DATA ITEM
A009 Proposed Systems Integration Document
IE. F. CONTRACTOR
3. SUBTITLE
Systems Integration Diagram
4. AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX
5. CONTRACT REFERENCE
SOW Para 6.1
6. REQUIRING OFFICE
CBP Air and Marine Program Office
7. DD250REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ONEIR
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APPCODE
N/A
II. ASOFDATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE REMARKS
Draft Final
Reg Repro
16. REMARKS
BLK5: Contractor format, softcopy compatible with MS Office.
BLK9: Distribution authorized to U.s. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office of Air and Marine.
BLK 10: The Government will have fourteen (14) calendar days to review, accept, and/or comment on the draft deliverable.
BLK 12: Submit 1 draft copy no later than sixty (60) calendar days after contract award.
BLK 13: After the Government reviews and comments on the deliverable, the Contractor shall incorporate Government comments and submit change pages into the final diagram within fourteen (14) calendar days after receipt of the comments/need for revision is identified unless extended by the Program Office.
BLK 15: Distribute 2 hardcopies
BLK 15: Distribute 1 softcopy electronically unless precluded by content whereby 1 CD ROM copy will be accepted.
Program Office 1 3 i
15. TOTAL 1 3
G. PREPAREDBY / H. DATE /1. APPROVED BY 1. DATE
DD FORM 1423-1, FEB 2001 Page 90f21
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of infonnation i. estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data soun:es, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information. including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway. Suite 1204, Arlington. VA. 22202·4302. and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188). Washington.
DC 20503. Please 00 NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for ContractlPR No. listed in Block E.
A. CONTRACT LINE ITEM NO. IB. EXHIB: IC. CATEGORY:
TDP TM OTHER MISC
IE. CONTRACTIPR NO.D. SYSTEMIITEM
Ku Band BLOSSDD
F. CONTRACTOR
1. DATAITEMNO.!2. TITLE OF DATA ITEM
AOI0 Instructor Planning Document
3. SUBTITLE
Training Syllabus and Documentation
4. AUTHORITY (Data Acquisition Document No.)
:xxxxxx -XXXXX
5. CONTRACT REFERENCE
SOW Para 7.0
6. REQUIRING OFFICE
CBP Air and Marine Program Office
7. DD250REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ONEIR
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APPCODE
N/A
II. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE REMARKS
Draft Final
Reg Repro
16. REMARKS
BLK5: Contractor format, softcopy compatible with MS Office.
BLK9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use, Other requests for this document shall be referred to the U.S, Customs and Border Protection Office of Air and Marine.
BLK 12: Submit I draft copy no later than sixty (60) calendar days prior to the scheduled training.
BLK 10/13: The Training Syllabus shall include a) Aircrew, b) Maintenance, and c) Network Operation training, The Government will have fourteen (14) calendar days to review, accept, and/or comment on the draft deliverable.
BLK 13: After the Government reviews and comments on the deliverable, the Contractor shall incorporate Government comments and submit change pages into the final syllabus within fourteen (14) calendar days after receipt of the comments/need for revision is identified unless extended by the Program Office.
BLK 15: Distribute 1 softcopy electronically unless precluded by content whereby 1 CD ROM copy will be accepted.
Program Office 1 I
15. TOTAL 1 1
G. PREPARED BY IH. DATE II. APPROVED BY J DATE
DD FORM 1423-1, FEB 2001 Page 10 of21
Fonn Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searehing existing dBla sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of thi. collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquaners Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503, Please W NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for ContractIPR No. listed in Block E, A. CONTRACT LINE ITEM NO, IB. EXHIBIT Ic. CATEGORY:
A TDP TM OTHER TMSS
D, SYSTEMIlTEM IE, CONTRACTIPR NO, F. CONTRACTOR
Ku Band BLOSSDD
L DATA ITEM NO. /2. TITLE OF DATA ITEM
AOll Maintenance Plan
4. AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX
5. CONTRACT REFERENCE
SOW Para 8.1
7. DD250REQ 9, DlST STATEMENT
10, FREQUENCY
REQUIRED
LT ONEIR
8. APPCODE C II. AS OF DATE
N/A N/A
16. REMARKS
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
13. DATE OF SUBSEQUENT
SUBMISSION
SEE REMARKS
BLK 5: Contractor fonnat, softcopy compatible with MS Office.
BLK 9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office ofAir and Marine.
BLK 12: Submit no later than 60 calendar days prior to aircraft acceptance. All updates shall be automatically distributed to the Program Office within thirty (30) calendar days of receipt or publication.
B LK 10/13: The Government will have fourteen (14) calendar days to review, accept, and/or comment on the draft deliverable.
BLK 13: After the COTRreviews and comments on the deliverable, the Contractor shall incorporate Government comments and submit updated plan within fourteen (14) calendar days after receipt of the comments/need for revision is identified unless extended by the Program Office.
BLK 15: Distribute I hardcopy and 1 CD ROM softcopy of support plan.
G. PREPAREDBY IH. DATE II. APPROVED BY
3, SUBTITLE
Service Life Product Support Plan
6, REQUIRING OFFICE
CBP Air and Marine Program Office
14. DISTRIBUTION
b, COPIES a, ADDRESSEE Draft Final
Reg Repro
Program Office 1 2
15, TOTAL 2
1. DATE
DD FORM 1423-1, FEB 2001 Page 11 ofll
Form Approved OMB No. 0704-0188
Public reporting burden for this collectioo of information is estimated to average I IO hours per response, including the time for reviewing instruetions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 222024302, and 10 the Office of Management and Budge~ Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN vour form to either ofthese addresses. Send comoleted form to the Government Issuin2 ContmctinR Officer for ContmctlPR No. listed in Block E.
A. CONTRACT LINE ITEM NO. IB. EXHlB; IC. CATEGORY:
TDP TM OTHER ILSS lD. SYSTEM/ITEM E. CONTRACTIPR NO.
Ku Band BLOSSDD
F. CONTRACTOR
I. DATA ITEM NO. 12. TITLE OF DATA ITEM
A012 Recommended Spare Parts List
3. SUBTITLE
RSPL
4. AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX
5. CONTRACT REFERENCE
SOW Para 8.2
6. REQUIRING OFFICE
CBP Air and Marine Program Office
7. DD250REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ONEIR
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
14. DISTRIBUTION
a ADDRESSEE
b. COPIES
g. APPCODE
N/A
II. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
BLK 5: Contractor format, softcopy compatible with MS Office.
BLK 9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office of Air and Marine.
BLK 12: Submit the recommended spare parts list and support equipment commensurate with the number of systems installed no later than thirty (30) calendar days prior to initial system delivery.
BLK 15: Distribute 1 hard copy and 1 soft copy electronically unless precluded by content whereby 1 CD ROM copy will be accepted.
Program Office 2
I
15. TOTAL 2
G. PREPARED BY DATElH. lI. APPROVED BY 1. DATE
DD FORM 1423-1, FEB 2001 Page 12 of21
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average Ito hours per response. including the time for reviewing instructions, searching existing data sources.
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information. including suggestions for reducing this burden. to Department of Defense. Washington Headquarten; Services. Directorate for Information Operations and Reports. 1215 Jefferson Davis Highway. Suile 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either ofthese addresses. Send completed form to the Government Issuing Contracting Officer for ContractJPR No. listed in Block E.
A. CONTRACT LINE ITEM NO. IB. ExmB~ IC. CATEGORY:
TDP TM OTHER ILSS
D. SYSTEMIITEM IE. CONTRACTIPR NO.
Ku Band BLOSSDD
F. CONTRACTOR
L DATA ITEM NO. 12. TITLE OF DATA ITEM
A013 Critical Design Review Report
3. SUBTITLE
CDR Report
4. AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX
5, CONTRACT REFERENCE
SOW Para 9.1
6. REQUIRING OFFICE
CBP Air and Marine Program Office
7. DD250REQ
LT
9. DIST STATEMENT
REQUIRED
C
10, FREQUENCY
ONEIR
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APPCODE
N/A
I I. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft
Reg Repro
16. REMARKS
BLK5: Contractor format, softcopy compatible with MS Office.
BLK9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office ofAir and Marine.
BLK 12: Submit I draft copy no later than fourteen (14) calendar days after the scheduled Critical Design Review (CDR).
BLK 13: The Government will have thirty (30) calendar days to review, accept, and/or comment on the draft deliverable.
After the Government reviews and comments on the deliverable, the Contractor shall incorporate Government comments and submit change pages into the final CDR Report within thirty (30) calendar days after receipt of the comments/need for revision is identified unless extended by the Program Office.
BLK 15: Distribute 2 hardcopies and I softcopy electronically unless precluded by content whereby I CD ROM copy will be accepted.
Program Office 1 3
15. TOTAL I 3
G, PREPARED BY IH. DATE II. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 Page 13 of21
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collectinn of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Infonnation Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either ofthese addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. IB. EXHIBZ ICT~;GORY: TM _ OTHER NDT!
D. SYSTEMIITEM
Ku Band BLOSSDD
IE. CONTRACTIPR NO. F. CONTRACTOR
L DATA ITEM NO. 12. TITLE OF DATA ITEM
A014 Test Plan
3. SUBTITLE
Ground Test Plan
4. AUTHORITY (Data Acquisition Document No,)
XX-XXXX-XXXXX
5. CONTRACT REFERENCE
SOW Para 10.1
6. REQUIRING OFFICE
CBP Air and Marine Program Office
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ONEIR
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
14, DISTRIBUTION
a. ADDRESSEE
b. COPIES
8, APPCODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
16. REMARKS
BLK5: Contractor format, softcopy compatible with MS Office.
BLK9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office of Air and Marine.
BLK 12: Submit 1 draft copy no later than ninety (90) calendar days prior to the scheduled system acceptance test.
BLK 13: The Government will thirty (30) calendar days to review, accept, and/or comment on the draft deliverable.
After the Government reviews and comments on the deliverable, the Contractor shall incorporate Government comments and submit change pages into the fmal test plan within thirty (30) calendar days after receipt of the comments/need for revision is identified unless extended by the Program Office.
BLK 15: Distribute 2 hardcopies and 1 softcopy electronically unless precluded by content whereby I CD ROM copy will be accepted.
Program Office I I
15. TOTAL 1 1
G, PREPARED BY IH. DATE II. APPROVED BY 1. DATE
DD FORM 1423-1, FEB 2001 Page 14 of21
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of infolllllllion i. estimated 10 average 110 hours per response, including the time for reviewing instructions. searching existing data sources, gatheting and maintaining the data needed, and completing and reviewing the colleclion of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN vour form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for ContractlPR No. lisred in Block E.
A CONTRACT LINE ITEM NO. IB. EXffiBIT IC CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM /E. CONTRACTIPRNO. F. CONTRACTOR
Ku Band BLOSSDD
l. DATA ITEM NO. 12. TITLE OF DATA ITEM
A015 Test Plan
5. CONTRACT REFERENCE
3. SUBTITLE
Flight Test Plan
6. REQUIRING OFFICE 4. AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX SOW Para 10.2 CBP Air and Marine Program Office
7. DD250REQ 9. DIST STATEMENT 10. FRF..QUENCY
12. DATE OF FIRST
REQUIRED SUBMISSION
LT ONEIR SEE REMARKS
8. APPCODE C II. ASOFDATE 13. DATE OF SUBSEQUENT
SUBMISSION
N/A N/A N/A
16. REMARKS
BLK 5: Contractor format, softcopy compatible with MS Office.
BLK 9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office of Air and Marine.
BLK 12: Submit I draft copy no later than ninety (90) calendar days prior to the scheduled system acceptance test.
BLK 13: The Government will have thirty (30) calendar days to review, accept, and/or comment on the draft deliverable.
After the Government reviews and comments on the deliverable, the Contractor shall incorporate Government comments and submit change pages into the fmal test plan within thirty (30) calendar days after receipt ofthe comments/need for revision is identified unless extended by the Program Office.
BLK 15: Distribute 1 softcopy electronically unless precluded by content whereby 1 CD ROM copy will be accepted.
G. PREPAREDBY IH. DATE II. APPROVED BY
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Draft Final
Reg Repro
Program Office 1 1
15. TOTAL
1. DATE
DD FORM 1423-1, FEB 2001 Page 15 of21
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing inslrUctions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of informlltion. Send comments regarding this burden estimale or any other aspecl of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorare for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and 10 the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form 10 the Government Issuing Contracting Officer for ConiractiPR No. listed in Block E.IC. CATEGORY:A CONTRACT LINE ITEM NO. IB. ExmB;
TDP TM OTHER TMSS
IE. CONTRACTIPR NO. D. SYSTEMIITEM
Ku Band BLOSSDD
F, CONTRACTOR
I. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
Technical Manuals and Supplements
3. SUBTITLE
Ku Band BLOSDD System Flight Checklists and Maintenance Manuals
4. AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX
5. CONTRACT REFERENCE
SOW Para 11.1
6. REQUIRING OFFICE
CBP Air and Marine Program Office
7. DD250REQ
LT
9. DlST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APPCODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE REMARKS
Draft Final
Reg Repro
16. REMARKS
BLK 5: Contractor format, softcopy compatible with MS Office.
BLK9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office of Air and Marine.
BLK 12: Submit no later than sixty (60) calendar days prior to aircraft acceptance. All manual updates shall be automatically distributed to the Program Office within thirty (30) calendar days of receipt or publication.
BLK 13: After the Government reviews and comments on the deliverable, the Contractor shall incorporate Government comments and submit change pages into the final maintenance manuals, ICAs, and flight check lists within fourteen
(14) calendar days after receipt of the comments/need for revision is identified unless extended by the Program Office.
BLK 15: Provide 1 CD ROM softcopy and five hard copies of the flight manual and five hard copies of checklists distributed for the first aircraft.
BLK 15: Provide 1 hard copy of the flight manual and one hard copy of the checklist distributed for each subsequent aircraft.
BLK 15: Provide one CD ROM softcopy and two hard copies of the maintenance manual. The maintenance manual shall include the following:
a. Wiring diagrams for avionics installations
b. Wiring diagrams for all other electrical installations
c. Spare parts catalog
d. Operating, troubleshooting charts/guides and maintenance manuals for all
CFE avionics and mission equipment
e. Ku Band BLOSDD System support plan
Program Office 111 5/5 III
15. TOTAL 111 5/5 111
G. PREPAREDBY IH. DATE II. APPROVED BY 1. DATE
DD FORM 1423-1, FEB 2001 Page 16 of21
Fonn Approved OMB No. 0704-0188
Public reporting burden for this collection of infonnation is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of infonnation. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704'()188), Washington, DC 20503. Please DO NOT RETURN your fonn to either ofthese addresses. Send completed form to the Government Issuing Contracting Officer for ContractlPR No. listed in Block E.IA. CONTRACT LINE ITEM NO. lB. EXHIB: C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACTIPR NO.
Ku Band BLOSSDD
I F. CONTRACTOR
I. DATA ITEM NO. 12. TITLE OF DATA ITEM
AO 17 Scientific and Technical Reports
3. SUBTITLE
Ground Test Report
4. AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX
5. CONTRACT REFERENCE
SOW Para 12.1
6. REQUIRING OFFICE
CBP Air and Marine Program Office
7. DD250REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APPCODE
N/A
II. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
BLK5: Contractor fonnat, softcopy compatible with MS Office.
BLK9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office of Air and Marine.
BLK 10: A fonnal ground test report is required after completion of the ground test program.
BLK 12: Submit the report within thirty (30) calendar days following completion of the ground test.
BLK 15: Distribute 1 softcopy electronically unless precluded by content whereby 1 CD ROM copy will be accepted.
Program Office I
15. TOTAL 1
G. PREPARED BY IH. DATE II. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 Page 170f21
Fonn Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searclting existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or ""Yother aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Infonnation Operations and Reports, 1215 Jetrerson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, aud to the Office of Management and Budget, PapeIWork Reduction Project (0704-0188), Washington, DC 20503. PI..se DO NOT RETURN your form to either of these addresses. Send completed fonn to the Government Issuing Contracting Officer for Contrac1lPR No. listed in Block E.IC. CATEGORY:A. CONTRACT LINE ITEM NO. lB. EXHIB;
TDP TM OTHER MISC
D. SYSTEM/ITEM IE. CONTRACTIPR NO.
Ku Band BLOSSDD
F. CONTRACTOR
1. DATA ITEM NO. 12. TITLE OF DATA ITEM
AO 18 Scientific and Technical Reports
3. SUBTITLE
Flight Test Report
4. AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX
5. CONTRACT REFERENCE
SOW Para 12.2
6. REQUIRING OFFICE
CBP Air and Marine Program Office
7. DD250REQ
LT
9. DISTSTATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APPCODE
N/A
11. AS OF DATE
N/A
B. DATE OF SUBSEQUENT
SUBMISSION
N/A ~fthiS
16. REMARKS
BLK5: Contractor fonnat, softcopy compatible with MS Office.
BLK9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use. Other requests for this document shall be referred to the U.S. Customs and Border Protection Office of Air and Marine.
BLK 10: A fonnal flight test report is required after completion of the flight test program.
BLK 12: Submit the report within thirty (30) calendar days following completion of the flight test.
BLK 15: Distribute 1 softcopy electronically unless precluded by content whereby 1 CD ROM copy will be accepted.
Program Office 1
15. TOTAL I
G. PREPARED BY IH. DATE II. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 Page 18 of21
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of infonnation is estimated to average 110 hours per response, including the time for reviewing ins1nlctioos, searching e,osting data sources, gathering and maintaining the data needed, and completing and reviewing the collection of infonnation. Send comments regarding this burden estimate or any other aspert of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reperts, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202·4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704'()ISS), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed fonn to the Government Issuing Contractinl!: Officer for ContractIPR No. listed in Block E.
A. CONTRACT LINE ITEM NO. IB. EXHIBIT IC. CATEGORY:
A TDP TM _ OTHER SESS
D. SYSTEM/ITEM IE. CONTRACTIPR NO. F. CONTRACTOR
Ku Band BLOSSDD
3. SUBTITLE1. DATA ITEM NO. 12. TITLE OF DATA ITEM
AO 19 Developmental Design Drawings Engineering and Design Schematics
4. AUT~ORITY (Data 5. CONTRACT REFERENCE AcqUIsItIon Document No.)
XX-XXXX-XXXXX SOW Para 12.3
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY
REQUIRED
LT ASREQ
12. DATE OF FIRST
SUBMISSION
SEE REMARKS
6. REQUIRING OFFICE
CBP Air and Marine Program Office
14. DISTRIBUTION
b. COPIES
8. APPCODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Draft Final
SUBMISSION
NIA NIA SEE REMARKS
16. REMARKS
BLK 5: Contractor format, softcopy compatible with MS Office, BLK 9: Distribution authorized to U.S. Government agencies and their contractors; administrative or operational use, Other requests for this document shall be referred to the U,S. Customs and Border Protection Office of Air and Marine.
BLK 12/13: Submit I draft copy no later than sixty (60) calendar days prior to system acceptance.
BLK 10/13: The Government will have thirty (30) calendar days to review, accept, and/or comment on the draft deliverable.
After the government reviews and comments on the deliverable, the contractor shall incorporate Government comments and submit change pages into the fmal design drawings within thirty (30) calendar days after receipt of the comments/need for revision is identified unless extended by the Program Office.
BLK 15: Distribute I hard copy via mail.
BLK 15: Distribute I softcopy electronically unless precluded by content whereby 1 CD ROM copy will be accepted.
G. PREPAREDBY IH. DATE II. APPROVED BY
Program Office I
~~.ro
15. TOTAL
J. DATE
DD FORM 1423-1, FEB 2001 Page 19 oUI
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 houn per response, including the time for reviewing inslIUctions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington HeadqWlrters Services, Directorate for Information Operations and Reports, 1215 lefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either ofthese addresses. Send completed form to the Govemmentlssuin~ Contractim( Offi= for ContractlPR No. listed in Block E.IA. CONTRACT LINE ITEM NO. lB. EXHlBZ C. CATEGORY:
TDP TM OTHER ILSS
D. SYSTEM/ITEM
Ku Band BLOSSDD
IE. CONTRACTIPR NO. F. CONTRACTOR
I. DATA ITEM NO. 12. TITLE OF DATA ITEM
A020 Software Version Description Document
3. SUBTITLE
Software Description
4. AUTHORITY (Data Acquisition Document No.)
XX-XXXX-XXXXX
5. CONTRACT REFERENCE
SOW Para 12.4
6. REQUIRING OFFICE
CB…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .