ULAD Question and Answers.xls

XLS spreadsheet 60 KB Posted

Attached to
Ultra Light Aircraft Detection (ULAD)
Solicitation number
HSBP1010R0074
Issued by

About this file

Response to Questions

View the file

Other files

File Type Posted
ULAD Amendment 0005.pdf PDF
ULAD Amendment 0004.pdf PDF
ULAD Amendment 0003.pdf PDF
ULAD SF 30 Amendment 0002.pdf PDF
ULAD Attachment J12 —
ULAD Attachment J13 —
Attachment J 16 revised.pdf PDF
ULAD Solicitation Amendment 0001.pdf PDF
ULAD Interested Vendor.doc DOC document
Attachment 10.pdf PDF
ULAD Solicitation.PDF PDF
Attachment 3.PDF PDF
Attachment 5.PDF PDF
Attachment 14.PDF PDF
SF 1449.pdf PDF
Attachment 1.PDF PDF
Attachment 8.PDF PDF
Attachment 13.PDF PDF
Attachment 12.PDF PDF
Attachment 6.PDF PDF
Attachment 15.pdf PDF
Attachment 16.pdf PDF
Attachment 4.PDF PDF
Attachment 11.PDF PDF
Attachment 2.PDF PDF
Attachment 9 —
Attachment 7.pdf PDF
ULAD Question and Answers —
HSBP1010R0074 Final Draft RFP 100908.doc DOC document
Attachment 8 NDA DHS_Form_11000-6.pdf PDF
Attachment 3 CBP Training Development Standards.pdf PDF
ULAD Concept Drawing Attachment 7.ppt PPT presentation
Attachment 6.doc DOC document
ULAD Attachment 4.doc DOC document
ULAD Attachment 2.docx DOCX document
Attachment 5 ULAD Subcontracting Plan Outline.pdf PDF
HSBP1010R0074 Draft RFP —
ULAD Attachment 1 Draft.doc DOC document
Draft RFP —
ULAD Attachment 2 Draft.doc DOC document
ULAD Attachment 3 Draft.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Paragraph numberQuestion or CommentAnswers
B.1, CLIN 0003, page 6“The Contractor shall deliver… one (1) to a maximum of (50) units…” This does not seem to agree with the CLIN 0003 in the table on page 5. How do these relate to one another?This information has been retracted and replaced with updated CLIN information.
B.1, CLIN 1001, 2001, 3001, 4001Same question as above for “(6 through 10 units)”See answer to Question # 1
B.1 page 11What are the periods of performance for the Options 1 to 4?Be for 1 year each option period should government elect to exercise.
C.1, 4.3, page 13, and Attachment #1 Factor 1-3“…at least five (25) targets…” What is the correct number of targets? Attachment #1 also says “25”Should be 25 simultaneous.
C.1, 6.0 Applicable DocumentsAttachment numbering does not agree with attachments – “Attachment 2” should be “Attachment 1”, and no “CBP Training and Development Standards” were attached to the draft RFPAttachment number is correct. Attachment 4, 5, & 6 were not posted with Draft RFP.
L.12, B. Vol II – Cost/Price ProposalWill there be more specific instructions on the cost section, such as provide cost estimates for each CLIN?Yes
Attachment 1, ULAD Capabilities Matrix, Factor # 1-1Since only a radar signature is cited, does this imply that there is no appreciable IR or acoustic signature from the ultra-light in some or all of its flight modes? Please clarifyNo, we have no IR signature information to provide
Attachment 1, ULAD Capabilities Matrix, Factor # 1-1Are there required track accuracies and resolutions in all three dimensions and velocity? Please clarifyNo requirement for track accuracy or velocity
Attachment 1, ULAD Capabilities Matrix, Factor # 1-1Is there a required maximum false track rate? Please clarifyNo requirement, this will be developed from first unit field testing and operational testing
Attachment 1, ULAD Capabilities Matrix, Factor # 1-1The objective velocities imply some overlap with General Aviation Aircraft (GAA) and UASs, is it desired or required to have an integrated Secondary Surveillance Radar (SSR) with Mode C, Mode 2 decode available to aid in differentiation? Please clarifyNice but not necessary.
Attachment 1, ULAD Capabilities Matrix, Factor # 1-2Is the data required to be recorded directly at the radar for Law Enforcement Agency (LEA) evidentiary reasons with a requirement for data integrity? Please clarifyData recorded at the AMOCC
Attachment 1, ULAD Capabilities Matrix, Factor # 2-3Factor 2-3 states that the systems will be transported using existing CBP vehicles. What vehicles, make and model will be used for transporting the system? Please clarifyVendor should specify
Page 63, paragraph L-12This paragraph states that “The request for proposal is due on August 16, 2010 at 3:30 PM EST. Please clarifyDisregard due date of August 16, 2010. RFP due date will be in actual RFP solicitation.
Paragraph numberQuestion/Comment
NoneWill the final RFP be written to consider Passive Acoustic Sensor Detection System for detecting and tracking Ultra Light Aircraft?Written to consider all effective means
NoneAre the detection assets to be distributed by regions? Can the quantity, size of the regions and locations be provided?No. Solutions will be required to cover all regions
NoneWould there be a requirement to network regional assets into a centralized regional facility or mobile center?All data returned to the AMOCC through land line or satellite link.
Page 5, Paragraph B. 1Will the CBP exercise multiple CLINS for the units simultaneously during the base period and/or the option periods? (Example: exercise CLIN 0003A , CLIN 0003B and CLIN 0003E at the same time)Possible, the number of CLIN's exercised will be dependent on the Government's need.
NoneWill there be a requirement to network regional assets into a centralized regional facility or mobile center?Answered
Page 12, Section 3.0, 2nd ParagraphWhat type of communications assets are in place at the existing CBP facilities?Satcom as currently employed by AMOCC
Page 12, Section 3.0, 2nd ParagraphWhat type of communications assets are envisioned when the units are remotely deployed?Satcom as currently employed by AMOCC
NoneCan you provide a network diagram for the principle nodes along with the node functionality description?Not at this time
Page 12, Section 3.0, 2nd ParagraphDoes the CBP have re-fuelers to replenish fuel at the sites for the generators of the remotely deployed units?Yes- that is the plan.
NoneWould the capability to control the CBP UAV assets add to system capability if this was inherent at no additional cost?Not at this time.
NoneAre the operating areas of the CBP UAV's somewhat fixed or normal? If so what is the size of the operating area in sq kilometers?This is operationally sensitive information.
NoneAre you able and willing to receive DoD classified material?No. Solutions will be required to cover all regions
Performance objectives 4.1Given that this is a low/slow flying aircraft detection problem would consideration be given to reducing threshold altitude to 5,000 MSL? Technically, this is a clean breakpoint between ‘low flying’ and more normal altitudes which are picked up by conventional radar systems. It also allows for mix of optimal solutionsNo
Performance objectives 4.2What consideration has been given to non line of sight scenarios particularly with respect to range/gaps in coverage?None
Performance objectives 4.2Wouldn’t a minimum detection range less than 1km be more appropriate particularly in rugged non line of sight terrain? The requirements matrix shows a height of 33 ft. We assume this is the correct minimum range. Has consideration been given to line of defense type systems vs radar where requirement is linear range of coverage rather than circular range?
Performance objectives 4.3Is the requirement 5 or 25 simultaneous targets? See typo. What operational scenarios support this requirement?25 is correct. Has to do with commercial aircraft in the target area.
Performance objectives 4.3Are the 5 targets identical? What is their spacing in the sky?Not necessarily.
Performance objectives 4.4What method of transport is envisioned? Is this transit case in back of agent truck? More MSS like integrated vehicle? Any requirement for hand carry? Is that desirable?Transit case, 2-man carry envisioned but not required.
N/ASince Section M is missing, can you provide the evaluation criteria and ranking?Section M will be provided with release of the actual RFP.
Pg 5, B.1For the Volume Discount for Base Period 1 in the table, please clarify if the quantities should be 6 through 10 instead of 2 through 5.See answer to question # 1.
pg 12, 3.0, 3rd paraWhat is considered "real time" data transfer to the AMOC? How much latency is acceptable? Also, how much latency is acceptable in regard to remote control of sensors?Consideration will be given for low latency in both cases.
pg 12, 3.0, 3rd paraThere is no appendix A. Do you mean attachement 3?Yes, wording will be corrected.
pg 47, J.1Attachments 4, 5, & 6 were not provided with the draft rfp and will be needed to respond to a final rfp. Please provide.See answer to question # 8.
pg 63, L.12Paragraph 1 says to submit 8 hard copies and 2 CDs. Paragraph 3 says to electronically submit to the e‐mail address listed. Please clarify submission requirements (i.e. one or the other or both).Inconsistency noted, actual RFP will clarify submission requirements.
pg 64, L.12, ADoes the Transmittal Letter (Section 1) count towards the 50pg limit of the Technical Volume.See answer to question # 46.
pg 64, L.12, ADoes the PWS (Section 4) count towards the 50pg limit of the technical volumeSee answer to question # 46.
pg 65, L.12, BParagaph 1 says to submit "five (8)" hard copies. Please clarify the number of Cost Proposals to be submitted.See answer to question # 46.
Attachment 1Does the table contain all KPPs for the system or are there more? If there are more, please provide.All are contained.
Attachment 1Several of these requirements are not technical or performance related. Is this matrix to be interpreted as the technical/performance requirements for the system or as the evaluation criteria for the proposal? Please clarify.Evaluation criteria.
Attachment 1, Factor 1‐3Please specify an objective value for the number of simultaneous tracks.25
Attachment 1, Factor 1‐4Please specify an objective value for operational temperature range.minus 40 to plus 125F
Attachment 1, Factor 1‐5Does the objective value of "None" mean that the data must be AMOSS compatible for both the threshold and objective cases.Yes
Attachment 1, Factor 1‐6Please specify an objective capability for remote control.on/off, pointing
Attachment 1, Factor 2‐1Should the threshold Ao be 75%, as described in CLIN 0008, Case A on page 9 of the RFP?Wll be revised in RFP.
Attachment 1, Factor 2‐1Please specify a value for the objective deployment time.Three hours
Attachment 1, Factor 2‐2Does the objective value of "None" mean that the 96 hours of continuous operation applies to both the threshold and objective cases?yes
Attachment 2, pg 1Where can we obtain the DHS/CBP Enterprise Architecture and Technical Reference Models, as referenced in Attachment 2?These documents will be provided to the successful vendor upon award.
Attachment 2, pg 1Where is the HSAR clause incorporated into the SOO and which CLIN(s) does the scope described flow into?Clause is referenced in Section I and relative to CLIN 0010.
GeneralIs there GFE contemplated for this program? If so, please provide the GFE list.No, other than satellite channels and integration into the AMOSS
Draft RFP, B.1, CLIN 0003, p. 5-6The CLIN 0003 Description states that the contractor shall deliver one (1) to a maximum of fifty (50) units based on volume discounts selected by the Government. The CLIN structure as outlined on the table on Page 5 does not reflect up to Qty 50. The maximum Qty is 5 units, although the Option Period summary CLIN reads “Volume Discount Units (6 through 10).”See answer to question # 1.
Please clarify the table on Page 5. Our recommendation is to increase quantities to allow for maximum volume discountsSee answer to question # 1.
Draft RFP, B.1, p. 5Please specify the Option Period schedule as described in Schedule of Supplies/Services Table.Will be clarified in the RFP as one year.
Draft RFP, L, L.12, p. 64Is the Executive Summary in Section 2 the same Executive Summary called out under Section 3 for Volume I, Technical?Will be clarified in the RFP as one year.
Please clarify the number and placement of Executive Summaries required for Volume 1, Technical.Will be clarified in the RFP as one year.
Draft RFP, L, L.12, p. 65Is Section 6 included in the Volume I 50 page count?Will be clarified in the RFP as one year.
Draft RFP, L, L.12, p. 64Is the Transmittal letter included in the Volume I 50 page count?Will be clarified in the RFP as one year.
Draft RFP, L, L.12, p. 64Are the Table of Contents, Table of Figures, and Table of Tables included in the Volume I 50 page count?Will be clarified in the RFP as one year.
Draft RFP, E.4 & E.5, p. 15Please clarify the following: “Every ULAD, with exception of the first unit shall be subject to FAT.”Will be clarified in the RFP as one year.
Please consider First Article Test (FAT) for first unit testing and Production Acceptance Test (PAT) for all follow-on units after FAT.Will be clarified in the RFP as one year.
Draft RFP, B, CLIN 0004, p. 7CLIN 0004, Train the Trainer Course states: “The vendor shall use the CBP Training Development Standards October 2008 for development of the T3 Course.”Will be provided with actual RFP.
Please provide the standard needed for training material development.
Draft RFP, B, p. 7Are the items listed in the ILSP all CDRLs? Please consider updating the CDRL Table to include required items.Yes
Draft RFP, H, H.3, p. 24The Draft RFP states: “This contract requires access to classified national security information up to the level.” However, the security level is not provided. What is the highest security level required to perform this contract?Law enforcement sensitive
Draft RFP, C, 3.0, p. 12The Government states the system must be transportable. Please provide a description of the transportability requirements and the vehicles to be used for transport.Contractor is free to describe this requirement
Draft RFP, B.1, CLIN 0002, p. 6CLIN 0002 reads that the system will be priced after successful FAT completion. Did the Government intend this to mean delivery of the unit? It is assumed the system price will be established for the individual unit at proposal/award. Please clarify.See answer to question # 1.
Draft RFP, B.1, CLIN 0006, p. 7CLIN 0006 Product Drawing Package. The paragraph reads that the goal of the drawing package is to provide adequate system level logistics support. It then reads that the drawings will be used to provide technical data for competitive procurement of spares (not system level end item). Does the Government anticipate competitive procurement of the spares? Would the spares to be procured from other than the OEM be determined with recommendation from the OEM?Paragraph will be revised. Government does not intend competitive procurement of spares.
Recommend either the OEM provide spares OR the Government along with the OEM work together to determine the spares to be competitively procuredSee answer for question # 83.
Draft RFP, E.5, p. 15States “The Vendor shall price FAT support labor under CLIN 0008 and Travel under CLIN 009. If requested by the Government, Vendor support costs for subject matter expertise shall be billed under CLIN 0008 (Vendor Technical Support).” CLIN 0009 is for Vendor Technical Support per page 9. Is FAT support to be priced under CLIN 0009 or CLIN 0008 (Maintenance & Repair Service)? Further, CLIN 0009 Page 9 reads that no travel will be priced under that CLIN.Paragraph will be revised.
Please clarify where FAT support and travel for FAT support should be priced.Revised RFP will stipulate.
Draft RFP, F.8, p. 18CLIN 0002 states that the Individual Unit will be delivered with the FAT Unit. Section B CLIN 0002 (Page 6) states that the Individual Unit will be delivered with modifications recommended from completion of FAT.Paragraph will be revised.
Please clarify the delivery date of the Individual Unit under CLIN 0002.Delivery date TBD after contract award.
Draft RFP, CLIN 0010, p. 10For the communication unit, does the communications service plan need to be priced in the proposal or can we propose a communication unit that will operate on an existing CBP service plan? If separate pricing is required, what is the required period of service?No, that is govt. furnished.
Draft RFP, C, 4.5, p. 13What is the preferred fuel type for the power generation unit?No preference
Draft RFP, B, CLIN 0001, p. 6Will CBP provide fuel for the power generation unit during FAT?Yes
Draft RFP, B, CLIN 0001, p. 6Will CBP provide all required test aircraft during FAT?Yes
Attachment 1, 2-6, p. N/AThe capabilities matrix specifies a 3 hr threshold setup time and 30 min objective. The remarks identify “setup by one person.” Is the remark noted for one person a threshold or objective capability? Additionally, please clarify the rationale for requiring setup by one person?Both threshold and objective. Transport and assemble may require two persons, operating only one.
Attachment 1, 4-2, p. N/ALifecycle cost is identified as a requirement, but not called out in the ILSP as a development item, nor is there an applicable CDRL. Please clarify.This should be called out in a CDRL
Attachment 1,1-1, p. N/A(Velocity) Is 24 knots the minimal radial velocity of the Ultra Light Aircraft to the sensor, or the aircraft velocity?Aircraft velocity.
Attachment 1, 1-4, p. N/AIs sensor performance degradation acceptable in inclement weather (rain, dust storm, etc.)? To what level?Yes, contractor should specify.
Attachment 1, 2-4, p. N/AThe threshold capability states that the system shall be safe to operator and maintain with less than 100W/m2 RF energy at 1m or greater. Should this be 1m or less?Yes
Is there a peak power limitation to ensure safe operation?No
Attachment 1, p. N/AWhat are the Probability of Detection, Probability of False Alarm, and Swerling Model Type for the maximum detection range of the specified 1m2 (0.5m2) radar cross section target?Unknown. Target is generic. --- RCS requirement is a best estimate. Probability of detection at max range is system dependent. There are no requirements on Probability of False Alarm; the AMOC will identify the type of target.
Please provide specific parameters so that sensor performance can be consistently characterized.Unknown. Target is generic
Attachment 2, p. 1The first paragraph states: “The Offeror shall ensure that the design conforms to the DHS and CBP enterprise architecture (EA), the DHS and CBP technical reference models (TRM), and all DHS and CBP policies and guidelines as promulgated by the DHS and CBP Chief Information Officers (CIO), Chief Technology Officers (CTO) and Chief Architects (CA) such as the CBP Information Technology Enterprise Principles and the DHS Service Oriented Architecture - Technical Framework.” However, the link provided does not work.These documents will be provided to the successful vendor upon award.
Please provide documentation on the DHS and CBP EAs, including the currently released versions of the TRMs for both, and the "DHS Service Oriented Architecture - Technical Framework."These documents will be provided to the successful vendor upon award.
SOO 1.0The stated intent is to acquire a system to detect and track slow, low, and low radar cross section aircraft flying across US borders. Will a system of systems approach to improve probability of detection be more favorably considered?Consideration is performanced based
SOO 1.0 & 2.0Is it true that these systems will be deployed to monitor segments of the border for intruding aircraft, and relocated at will, but will not monitor the entire border simultaneously?Yes
SOO 4.0There is no mention of a probability of detection requirement for the system. Is there one, and if so what is it?None mentioned for this target set. Evaluation will be based upon vendor spec, FAT test, and Operational Tests from first option award.
SOO 4.0Because common system solutions (e.g., radar) when deployed can also be observed by adversary spotters from across the border, has any consideration been given to low profile solutions to monitor border segments not covered by common systems?Not at this time
SOO 4.2Knowing that any line-of-sight system used in rugged and mountainous terrain will have “dead space” for aircraft flying at the lowest altitudes, what portion of the evaluation criteria will recognize non-line-of-sight solutions?Non-line of sight solutions are acceptable
NoneThe elevation angle is critical to detecting and tracking targets when the radar is mounted on a high location, which is the typical location for an air defense radar, especially against low altitude targets. Is there a requirement to the maximum look-down and look-up as well as to the azimuth coverage? If there will be no such requirements in the final RFP, will these functions be evaluated?No requirement in the RFP but those functions will be considered.
NoneThere is no specification for Identification Friend-or-Foe (IFF) capability. Will integrated IFF capability be evaluated if offered as an option?IFF will be considered.
NoneWill operating and support (O&S) costs be a factor in the ULAD proposal evaluation?Yes
NoneIs COTS equipment required? TRL 9? Is TRL 8 sufficient?Components, sensor, apu, satcom, need to be TRL 9
Attachment 1In lieu of the set of EMI/EMC standard the ULAD system is required to operate “in urban and industrial EMI environments without degradation.” in compliance with IEC 61000. Which specific requirements of IEC 61000 the ULAD system needs to comply with (conducted susceptibility, radiated susceptibility, other..)? Is there any test data required in support of this requirement or is the operational data sufficient? Does this requirement pertain to the Electronic counter-countermeasures (ECCM)?All requirements will be considered. All data will be considered. No ECCM.
Attachment 1Factor 1-2 Mission Element states: “ID/ Class/ Respond/ Resolve” and the description states “Provide data to AMOC.” Is there a list of parameters (data) that need to be a part of the data, transmitted to the AMOC?No.
Paragraph NumberQuestion/Comment
SOO 4.4What number of operators are associated with the maximum three hour pack/un-pack time?2 transport and set-up.
SOO 4.5When deployed to remote areas without CBP communications, what is the operator environment expected to be (unprotected, environmentally protected shelter, etc.)?Secure, unprotected.
SOO 4.9Please define transport over rugged terrain, define the maximum load requirements (size/weight/volume), methods of transportation (type of vehicle, airlift, etc.).Depends on contractor system design. 2-man carry of components and surface transport preferred.
What is the expected field of view to target object(s) of interest. Like 180 degrees field of view.Depends on the sensor selected and its location.
Page 6, Section B.1, 1st paragraphIs DHS/CBP willing to accommodate a limited duration loan of the ULAD First Article Test asset for completion of FAT, with subsequent return to the contractor?Yes if the duration allows for FAT.
NoneWould DHS/CBP be willing to conduct face to face technical information discussions with the vendors prior to the release of the RFP in order to clarify requirements, exchange technical information and present proprietary information?No
Page 18, Section F.8 CLIN DeliveryWhat is the required ARO delivery date for the first production unit? Is there a 'required delivery date' or 'no later than delivery date for the first production systems?TBD after contract award
SOO Section 3.0Scope: The SOO states "The system will transmit real time sensor data to the Air and Marine Operations Center (AMOC) in Riverside, CA" Is there any requirement or desire to share real time sensor data between remote units?No
SOO Section 3.0Scope: The SOO states "The system will transmit real time sensor data to the Air and Marine Operations Center (AMOC) in Riverside, CA" Is there any requirement for remote units to generate alarms, alerts, or reports or will this be done at the AMOC based upon sensor data received? Additionally, is there a requirement for remote units to archive data for forensic analysis and/or data extraction?No to all.
SOO Section 4.0Performance Objectives: Have any frequency bands been ruled out for sensors?No
SOO Section 5.0Risk Mitigation: Is the risk mitigation desired for the specific sensor performance and operation or will it also include the concept of operation as well? For the remote locations, will the sensors be unattended or will they have some protection force provided. The successful employment of these sensors will have varying degrees of risk, so will the government ask the contractors to include in this their risk mitigation plan?Risk for sensor system only, remote sensors will be attended, contractors should include their risk mitigation plan.
SOO Section 6.0Applicable Document: Can the government provide the CBP Training Development Standards referenced as Attachment 5 in this section?Will be provided with actual RFP.
Section E (E.5)ULAD First Article Test : The RFP states “The Vendor shall price FAT support labor under CLIN 0008 and Travel under CLIN 0009. If requested by the Government, Vendor support costs for subject matter expertise shall be billed under CLIN 0008 (Vendor Technical Support)." Should reference to CLIN 0008 be CLIN 0009 and the reference to CLIN 0009 be CLIN 0011?This information has been retracted and replaced with updated CLIN information.
Section E (E.6)Product Acceptance Criteria: Can the govt provide additional insight into the product acceptance criteria. A lot of the components are anticipated as being COTS equipment with the understanding that the existing components will be acceptable for use provided they meet the performance and environmental requirements. Does the govt anticipate additional testing for commercial components that are specified to meet the performance and environmental requirements? Will the govt provide detailed acceptance criteria to define the specific areas tested and gates that need to be completed to ensure what is expected by the government to accept the FAT?Government will provide updated information in Section E.
Section F.9ULAD CDRL Delivery: Can the government provide additional insight into the CDRL deliverable content to include acceptable format for those areas not provided?Government will provide updated information in Section F.
GeneralThere presently is no section M (Evaluation Factors). Can the government provide additional insight into how they plan to evaluate the proposals?Will be provided with actual RFP.
GeneralThe website indicates that the anticipated release date of the RFP is on or about 6 August 2010 and will close 30 days thereafter. How many days does the government plan to allow until contract award?Disregard due date of August 16, 2010. RFP due date will be in actual RFP solicitation.
ULAD Capabilities Matrix: Factor #1-1What is the envelope of altitude vs. range profiles for ULA target trajectory?Unknown. Target is generic; 33 ft to 15,000 ft is from max range to a range dependent on radar system
ULAD Capabilities Matrix: Factor #1What are maneuverability capabilities of the ULA – turn rates, speed variations, altitude changes?Unknown. Target is generic
ULAD Capabilities Matrix: Factor #1Is the maximum radiated power peak or average?Average
Draft RFP page 6: CLIN 0003 – Volume Discount UnitsHow are the quantities between 6 and 50 to be bid?See answer to question # 1.
Draft RFP Section C SOO: P 3.0 Scope, Scenario 1 and 2Does the buyer expect a single configuration for both the self contained and CBP base options? If different, we recommend that the pricing matrix be amended to reflect the configurations, the quantities required and delivery requirements for each.Single sensor configuration that can be used in either option.
Draft RFP Section C SOO: P 3.0 Scope, Scenario 1 and 2If a self contained system is required, please define the minimum requirements for the entire system. This may define size, weight, vehicle mounting interface, mast height, operator display and interface etc.Contractor is free to describe this requirement
Draft RFP Section C SOO: P 3.0 Scope, 3rd paragraphFor the deployment scenario in which the system is remotely deployed, does the delivered system include two communications terminals, one at the sensor site and one at the AMOC? Is the communication path-line-of-sight at all times? What is the maximum distance?One terminal, two way com, LOS satellite linked direct from SW/US to Riverside, CA.

Sheet2

Sheet3

File details come from the government source that posted it. Updated .