Text version
The file's text, extracted by GovTribe without its formatting.
Attachment 1
ULAD Capabilities Matrix
| Factor # |
| Mission Element |
| Category |
| Description |
| Threshold |
| Objective |
| Remarks |
| 1-1 |
| Detect/ Track |
| Sensor Capability |
| Capability to detect and track small airborne targets of interest (TOI) |
| 1 m2 |
| Less than 0.5 m2 |
| Threshold is a Key Performance Parameter (KPP) |
| 1-1 |
| Detect/ Track |
| Sensor Capability |
| Range at which the sensor unit can detect and track TOIs |
| 20 km |
| 50 km |
| Threshold is a Key Performance Parameter (KPP) |
| 1-1 |
| Detect/ Track |
| Sensor Capability |
| Altitude at which the sensor unit can detect and track TOIs |
| 33 ft. AGL to 10,000 MSL |
| 33 Ft. AGL to 15,000 MSL |
| Threshold is a Key Performance Parameter (KPP) |
| 1-1 |
| Detect/ Track |
| Sensor Capability |
| Velocities at which the sensor unit can detect and track TOIs |
| 24 - 55 knots |
| 24 - 150 knots |
| Ultra Light Aircraft generally fly within these airspeeds |
| 1-2 |
| ID/ Class/ Respond/ Resolve |
| System |
| Provide data to AMOC |
| From any US border location |
| 1-3 |
| Track |
| Sensor Capability |
| Number of TOIs that each sensor unit can track at one time. TOI is defined as a small, low, slow flying aircraft. |
| 25 |
| Unlimited |
| Threshold is a Key Performance Parameter (KPP) |
| 1-4 |
| Reliability |
| System Capability |
| System (Sensor unit and comms/power unit) should be able to operate in extreme temperatures |
| -40 F to 125 F |
| Unlimited |
| 1-4 |
| Reliability |
| System Capability |
| System (Sensor unit and comms/power unit) should be able to operate in given humidity range |
| Up to 95% at 40°C |
| 0 to 100% |
COTS norms for threshold
| 1-5 |
| Communications |
| System |
| Communicate data securely to AMOC and interface with AMOSS |
| Data must be in AMOSS compatible data format |
| None |
| Acceptable AMOSS date formats are attached |
| 1-6 |
| Communications |
| Sensor Capability |
| The AMOC should have remote control of the sensor unit |
| Power on/off, standby, adjust frequency/gain |
| Unlimited |
| Remote control includes typical radar control functions such as power up/down, adjust frequency/gain |
2-1
| Availability |
| System Capability |
| Percentage of time (excluding transport or setup/assembly or remove/disassemble) the system is available |
| 90% |
| 95% |
| Sensor unit should be able to operate in 24 hours/day for 96 continuous hours per week over at least six months before failure. |
| 2-1 |
| Reliability |
| System Capability |
| When deployed at existing CBP facilities with available power/comms the sensor should be able to operate for extended periods of time |
| 14 days continuously |
| Unlimited |
| 2-2 |
| Reliability |
| System Capability |
| When deployed remotely with comms/power unit, the system should be able to operate for extended periods of time |
| 96 hours continuous |
| None |
| When deployed remotely the System will be monitored by CBP agent(s) |
| 2-3 |
| Reliability |
| System Capability |
| System should be able to withstand transport over un-improved roads and rugged terrain |
| 2.5g |
| No objective listed |
| System will be transported using existing CBP vehicles |
| 2-4 |
| Maintainability |
| System |
| Safe to operate and maintain |
| Less than 100W/m2 RF energy at 1 m or greater |
| 2-5 |
| Availability |
| System |
| Rapid recovery from system failures (commanded restart) |
| 5 minutes or less |
2 minutes or less
| 2-6 |
| Maintainability |
| System Capability |
| Time within which the System should be able to be deployed (set up and operating) once on-site |
| 3 hours |
| 30 minutes |
| Setup by 1 person |
| 2-7 |
| Survivability |
| System |
| The system operates in urban and industrial EMI environments without degradation. |
| IEC 61000 compliant |
| Performance |
| On-time delivery |
| Offeror’s on-time delivery rate exceeds 85% |
3-2
| Other |
| Performance |
| Customer satisfaction |
| Offeror’s independently-obtained customer feedback is free of valid complaints |
| 4-1 |
| Other |
| Cost |
| Acquisition Cost is reasonable and affordable |
| Acquisition cost does not exceed budget |
| 4-2 |
| Other |
| Cost |
| Life Cycle Cost is reasonable and affordable |
| Annual maintenance cost does not exceed acquisition cost |
| Five year maintenance cost does not exceed acquisition cost |