HS Reqs and Checklist.pdf

PDF 938 KB Posted

Attached to
761/26433. SAR; Richfield Landfill - Landfill Gas OMM Project
Solicitation number
RFQ 171 260000000406 1
Issued by
Genesee County, Michigan

About this file

This document is a Health and Safety Requirements and Checklist for subcontractors supporting hazardous waste site projects in Michigan, specifically for the Richfield Landfill Landfill Gas Operations, Maintenance, and Monitoring (OMM) Project. The requirements establish compliance standards under OSHA 29 CFR 1910.120 (Hazardous Waste Operations and Emergency Response) for all subcontractor personnel who may encounter hazardous waste during project activities. Bidders must submit a completed Contractor Health and Safety Questionnaire (Attachment 1) along with OSHA Form 300A/300 Injury and Illness annual summary logs for the three preceding full calendar years; bids lacking these documents will be deemed nonresponsive. The submission checklist identifies which documents must accompany every submittal, which documents are required if included in a proposal, and which documents must be provided to the Tetra Tech Project Manager after notice of award and prior to mobilization.

The health and safety questionnaire collects comprehensive information including company background, Workers' Compensation Experience Modification Rate (EMR) for the last three years with supporting documentation from the insurance carrier, OSHA injury and illness data with calculated incidence rates, occupational fatality history, property damage claims exceeding $1,000, written safety program documentation, employee training verification in hazardous waste operations, HAZWOPER standard compliance, medical surveillance program participation, and identification of any lower-tier subcontractors. Bidders must certify the accuracy of submitted information, with misrepresentation grounds for immediate termination and disqualification from future contracts. Post-award requirements include employee information for site access, employee training and medical surveillance letters with individual certificates and clearances for each participating employee, and chemical inventory with Material Safety Data Sheets, all due prior to job mobilization.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

January 2023

Health and Safety Requirements For Various Services

In Support of High-Hazard Site Projects

The activities to be performed by the selected subcontractor will require providing various support services in support of a hazardous waste site activity, and there may be some potential for subcontractor personnel to encounter hazardous waste in the performance of their tasks. Therefore, the requirements of OSHA standard 29 CFR 1910.120 (entitled Hazardous Waste Operations and Emergency Response) are applicable to subcontractor services. The Subcontractor will also be required to recognize and comply with any other OSHA or other regulatory requirements applicable to their services.

The Contractor Health and Safety Questionnaire included as Attachment 1 must be completed and included with bid submittals. Bidders should note that copies of their completed OSHA Injury and Illness annual summary Logs for the last 3 full calendar years must also be provided with submitted bids (i.e., OSHA Form 300 and Form 300A). Any bids received that do not include both a completed Questionnaire and accompanying OSHA 300A/300 Logs will be considered nonresponsive. If your organization is exempt from maintaining OSHA injury and illness documentation, a different form of documentation (containing at least the same information as the 300A/300 Logs) may be used, but this information must still be submitted with the bid.

The Checklist included below should be used to ensure that bidders comply with all Health and Safety submission requirements. The information provided as Attachment 2 (if provided) presents additional information and explanation for the bidder’s use in preparing their bid submissions and may be required of the successful bidder.

Bidder Health and Safety Submission Checklist

Item Include With

EVERY Submittal

If Part of a Proposal, Submit

With Proposal

Submit To Tetra Tech Project

Manager After Notice of Award and Prior To Mobilization

Completed Contractor Health And Safety Questionnaire X X OSHA 300A/300 Logs For Previous 3 Calendar Years (redacted if necessary)

X X

Letter from insurance carrier insurance stating the current EMR X X Current, valid certificate of insurance (i.e. ACORD Certificate or similar proof of coverage)

X X

Employee Information for Site Access X X Employee Training/Medical Surveillance Letter X X Copies of applicable employee training certificates and medical surveillance clearances (for each participating employee)

X

Chemical Inventory and Material Safety Data Sheets X

ATTACHMENT 1

CONTRACTOR HEALTH AND SAFETY QUESTIONNAIRE

Date: Telephone Number:

Fax Number:

E Mail Address:

Name of Company:

Address:

Submitted By: Title:

Type(s) of Primary Services Offered:

Your firm’s primary North American Industry Classification System (NAICS) code or Standard Industry Classification (SIC) code number: NAICS #: SIC #:

1. Has your company performed work as a subcontractor to Tetra Tech previously?

Yes No

If yes, explain the nature of the work, project location, Tetra Tech Point of Contact, and project dates (if your company has worked for Tetra Tech on multiple contracts, include this information only for the most recent job):

2. List your company’s Workers’ Compensation Experience Modification Rate (EMR) for the last 3 full years below. Put the most recent year first (i.e. 2022 or current 2023). Please attach documentation from your insurance carrier stating the current EMR. If you have different rates for interstate and intrastate, complete both of the following sections:

INTRASTATE EMRs Year 1: EMR : Carrier

Year 2: EMR : Carrier

Year 3: EMR: Carrier

INTERSTATE EMRs Year 1: EMR : Carrier

Year 2: EMR : Carrier

Year 3: EMR: Carrier

3. If you do not have any EMR information to provide, please explain (or attach additional documentation as necessary):

4. How long have you been covered by your current provider of worker’s compensation insurance?

years

5. Has there been a change in ownership in your company within the last 3 years?

Yes No

6. Does your company employ more than 10 full time employees?

Yes No

If yes, what is the average number of employees on your payroll for the last 3 years?

2022 2021

7. Using data from your OSHA 300 Logs for the last 3 full calendar years, complete the table below.

Put the most recent data first. A copy of each OSHA 300A/300 Log used to fill in the table MUST BE submitted with this questionnaire. If your organization is exempt from maintaining OSHA 300A/300 Logs, a different form of documentation (containing at least the same information as a 300A/300 Log) may be used, but this information must still be submitted.

Forms can be downloaded from OSHA: http://www.osha.gov/recordkeeping/RKforms.html

2020 2021 2022 A. Number of Fatalities (Total from column G on OSHA 300 Log) B. Number of cases that involved lost workdays and/or days of restricted work activity (Totals from columns H and I on OSHA 300 Log)

C. Total Recordable Cases (total number of entries in column A on the 300 Logs)

D. Total Man-hours worked E. OSHA Total Cases Incidence Rate* F. OSHA Lost Workday Cases

Incidence Rate*

* Instructions on calculating the OSHA Incidence Rates for Question #7:

The equations below demonstrate how to do the calculations.

Total Cases (item C) X 200,000 = OSHA Total Cases Incidence Rate (item E) Total Man-hours Worked (item D)

Lost Workday Cases (item B) X 200,000 = OSHA Lost Workday Cases Total Man-hours Worked (item D) Incidence Rate (item F)

Note: Only man-hours actually worked by direct employees of your company and temporary workers contracted and under the direct supervision of your company are to be used in calculating your OSHA Incidence Rates. Do not include any non-work hours even if these hours were paid (vacation, holidays, sick-time, etc.).

http://www.osha.gov/recordkeeping/RKforms.html

8. Please place a check beside the classification below which most closely describes your company’s primary type of business.

Classifications (Check one only)

Drilling Contractor Land Surveyor Waste Transporter Residential Building Contractor Non-residential Building Contractor Heavy Construction (except building) Highway/Street Contractor Heavy Construction (except highway) Plumbing, Heating, Air Conditioning Contractor Electrical Contractor Masonry/Stonework/Plastering Contractor Roofing/Siding/Sheet Metal Contractor Concrete Contractor Nondestructive Testing Miscellaneous Special Trades Other (please describe briefly)

9. Attach copies of any citations your company has received in the last 3 years from any government regulatory agency, such as Federal or state OSHA or EPA. Please include information as to the disposition of the citation and any corrective actions taken by your company.

If your company has not had any citations in the last 3 years, indicate so in the space provided.

No citations received in the last 3 years.

10. Has your company experienced any occupational fatalities in the past 5 years?

Yes No

If yes, provide an explanation below. List location, causes, and corrective actions (use additional sheets of paper as necessary)

11. Have your activities resulted in property damage claims in excess of $1,000 within the last 3 years?

Yes No

If yes, provide an explanation below (use additional sheets of paper as necessary)

12. Do you have a written occupational safety and health program? (If yes, we may request a copy) Yes No

13. If yes, who is responsible for administering the program?

14. Explain how health and safety requirements are implemented and enforced on your jobsites?

15. Indicate subject matter in which your employees have received training:

Yes No Yes No Company safety policy/rules Fire protection/hot work Confined space entry Decontamination Procedures Heavy equipment operation Hazard communication/Right-to-Know Health and safety plan requirements Electrical safety/lockout-tagout Chemical and physical hazard recognition

Fall Protection

Emergency response procedures First aid/CPR Injury reporting Drum handling Personal protective equipment Drilling hazards Non-injury accident reporting (near-miss)

Hearing conservation

Respiratory protection Trenching/excavation

16. Have the employees whom you intend to use on this project been trained in accordance with the OSHA Hazardous Waste and Emergency Response (HAZWOPER) standard [29 CFR 1910.120(e)]?

Yes No

17. What is the frequency of your HAZWOPER refresher training?

18. Can you provide documentation of such training?

Yes No

19. How many hours of initial HAZWOPER safety and health orientation training are conducted?

20. How many hours of annual HAZWOPER safety and health orientation training are conducted?

21. Do you conduct field safety inspections of work in progress? Yes No

a) If yes, who conducts inspection?

b) How often?

22. Do you conduct routine equipment inspection/maintenance on your vehicles including drill rigs, excavators etc.?

Yes No

23. Do you have a Medical Surveillance Program as required by 29 CFR 1910.120(f)?

Yes No

24. Do you intend to use ANY subcontractors in order to complete the proposed project?

Yes No

If yes, complete the following for EACH proposed lower-tier subcontractor. Include all subcontractors and be aware that they too will likely require Tetra Tech approval (attach additional sheets as necessary)

Name of lower-tier subcontractor #1:

Lower-tier subcontractor’s scope of work?

Name of lower-tier subcontractor #2:

Lower-tier subcontractor’s scope of work?

Name of lower-tier subcontractor #3:

Lower-tier subcontractor’s scope of work?

Name of lower-tier subcontractor #4:

Lower-tier subcontractor’s scope of work?

Name of lower-tier subcontractor #5:

Lower-tier subcontractor’s scope of work?

Please have an officer of the company sign below certifying that the information provided in this document is current and correct.

Officer Name (Printed)

Title

Signature

Date

MISREPRESENTATION OF DATA REQUESTED IS GROUNDS FOR IMMEDIATE TERMINATION OF

CURRENT SUBCONTRACTS AND DISQUALIFICATION FROM FUTURE CONSIDERATION.

Submit To Tetra Tech Project Manager After Notice of Award and Prior To MobilizationX:
Submit To Tetra Tech Project Manager After Notice of Award and Prior To MobilizationX_2:
Submit To Tetra Tech Project Manager After Notice of Award and Prior To MobilizationX_3:
Submit To Tetra Tech Project Manager After Notice of Award and Prior To MobilizationX_4:
XEmployee Information for Site Access:
XEmployee TrainingMedical Surveillance Letter:
XCopies of applicable employee training certificates and medical surveillance clearances for each participating employee:
XCopies of applicable employee training certificates and medical surveillance clearances for each participating employee_2:
XChemical Inventory and Material Safety Data Sheets:
XChemical Inventory and Material Safety Data Sheets_2:
Date:
Telephone Number:
Fax Number:
E Mail Address:
Name of Company:
Address 1:
Address 2:
Submitted By:
Title:
Types of Primary Services Offered 1:
Types of Primary Services Offered 2:
Has your company performed work as a subcontractor to Tetra Tech previously: Off
No: Off
NAICS:
SIC:
only for the most recent job 1:
only for the most recent job 2:
only for the most recent job 3:
Year 1:
Year 2:
Year 3:
Year 1_2:
Year 2_2:
Year 3_2:
EMR:
EMR_2:
EMR_3:
EMR_4:
EMR_5:
EMR_6:
Carrier:
Carrier_2:
Carrier_3:
Carrier_4:
Carrier_5:
Carrier_6:
Group1: Off
If you do not have any EMR information to provide please explain or attach additional:
documentation as necessary 1:
documentation as necessary 2:
How long have you been covered by your current provider of workers compensation insurance:
If yes what is the average number of employees on your payroll for the last 3 years:
2018:
2017:
A Number of Fatalities Total from column G on OSHA 300 Log:
A Number of Fatalities Total from column G on OSHA 300 Log2:
A Number of Fatalities Total from column G on OSHA 300 Log3:
B Number of cases that involved lost workdays andor days of restricted work activity Totals from columns H and I on OSHA 300 Log:
B Number of cases that involved lost workdays andor days of restricted work activity Totals from columns H and I on OSHA 300 Log2:
B Number of cases that involved lost workdays andor days of restricted work activity Totals from columns H and I on OSHA 300 Log3:
C Total Recordable Cases total number of entries in column A on the 300 Logs2:
C Total Recordable Cases total number of entries in column A on the 300 Logs3:
D Total Manhours worked:
D Total Manhours worked2:
D Total Manhours worked3:
E OSHA Total Cases Incidence Rate:
E OSHA Total Cases Incidence Rate2:
E OSHA Total Cases Incidence Rate3:
F OSHA Lost Workday Cases Incidence Rate:
F OSHA Lost Workday Cases Incidence Rate2:
F OSHA Lost Workday Cases Incidence Rate3:
Group2: Off
Group3: Off
C Total Recordable Cases total number of entries in column A on the 300 Logs:
undefined:
Has your company experienced any occupational fatalities in the past 5 years: Off
sheets of paper as necessary 1:
sheets of paper as necessary 2:
sheets of paper as necessary 3:
sheets of paper as necessary 4:
Have your activities resulted in property damage claims in excess of 1000 within the last 3: Off
If yes provide an explanation below use additional sheets of paper as necessary 1:
If yes provide an explanation below use additional sheets of paper as necessary 2:
Do you have a written occupational safety and health program If yes we may request a copy: Off
undefined_2:
Check Box2: Off
Check Box3: Off
Check Box17: Off
Check Box6: Off
Check Box5: Off
Check Box4: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box18: Off
Explain how health and safety requirements are implemented and enforced on your jobsites 1:
Explain how health and safety requirements are implemented and enforced on your jobsites 2:
Explain how health and safety requirements are implemented and enforced on your jobsites 3:
Explain how health and safety requirements are implemented and enforced on your jobsites 4:
and: Off
What is the frequency of your HAZWOPER refresher training:
Can you provide documentation of such training: Off
How many hours of initial HAZWOPER safety and health orientation training are conducted:
How many hours of annual HAZWOPER safety and health orientation training are conducted:
Do you conduct field safety inspections of work in progress:
undefined_3: Off
If yes who conducts inspection:
Do you conduct routine equipment inspectionmaintenance on your vehicles including drill rigs: Off
Check Box25: Off
Check Box24: Off
Check Box23: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box35: Off
Check Box34: Off
Check Box33: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off
Check Box39: Off
Name of lowertier subcontractor 1 1:
Name of lowertier subcontractor 1 2:
Lowertier subcontractors scope of work:
Name of lowertier subcontractor 2 1:
Name of lowertier subcontractor 2 2:
Lowertier subcontractors scope of work_2:
Name of lowertier subcontractor 3 1:
Name of lowertier subcontractor 3 2:
Lowertier subcontractors scope of work_3:
Name of lowertier subcontractor 4 1:
Name of lowertier subcontractor 4 2:
Lowertier subcontractors scope of work_4:
Name of lowertier subcontractor 5 1:
Name of lowertier subcontractor 5 2:
Lowertier subcontractors scope of work_5:
Officer Name:
Printed 1:
Printed 2:
Printed 3:
Group4: Off
Group6: Off

File details come from the government source that posted it. Updated .