This document is an example Risk Register associated with the Broad-Spectrum Antagonists For Editors (B-SAFE) federal grant opportunity (Solicitation Number: HR001124S0032). The Risk Register identifies various risks related to the program, including the risk statement, likelihood of occurrence, potential consequence/impact, risk categorization (high, moderate, low), and mitigation strategies.
The associated federal grant opportunity is a solicitation from the Defense Advanced Research Projects Agency (DARPA) seeking innovative proposals to identify and optimize novel molecules that exhibit inhibitory effects on CRISPR-CRISPR associated proteins gene editing processes. The program is interested in transformative approaches to discover or design novel inhibitors with enhanced activity, utility, and breadth of coverage. Incremental improvements to the existing state-of-the-art are excluded. The funding instruments include Cooperative Agreements and Procurement Contracts, and the target applicant types are broadly defined as "Other". This opportunity falls under DARPA's Research and Technology Development program (CFDA 12.910).
Risk Register Template
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B-SAFE_QA_v2.docx | DOCX document | |
| HR001124S0032_Attachment_B_Abstract_Template_V2.docx | DOCX document | |
| HR001124S0032-Amendment-01.pdf | ||
| Attachment_F_DARPAStandardCostProposalSpreadSheet_TwoTAs.xlsx | XLSX spreadsheet | |
| Attachment_E_Proposal_Instructions_and_Volume_II_Template__Cost_revised20240614_1350.docx | DOCX document | |
| HR001124S0032_Attachment_C_Proposal_Summary_Slide_Template.pptx | PPTX presentation | |
| Attachment_D_Proposal_Instructions_and_Volume_I_Template__Technical_and_Management_revised20240614_1350.docx | DOCX document | |
| HR001124S0032_Attachment_B_Abstract_Template.docx | DOCX document | |
| HR001124S0032_Attachment_A_Abstract_Summary_Slide_Template.pptx | PPTX presentation | |
| HR001124S0032.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment G: HR001124S0032 Risk Register | |||||
| Source Selection Information – See FAR 2.101 and 3.104 | |||||
| Example Risk Register. Please utilize the DoD framework for risk categorization. | |||||
| WBS/Task/Gantt | Risk Statement | Likelihood of event occurring | Consequence/Impact to program (Cost, Schedule, Performance) | Risk categorization | Mitigation Strategy |
| What is the problem statement (in complete sentences) | Use DoD likelihood criteria with levels 1-5, as below: |
Level 5: Near certainty Level 4: Highly likely Level 3: Likely Level 2: Low likelihood Level 1: Not likely Use DoD consequence criteria with levels 1-5, as below:
Level 5: Critical impact Level 4: Significant impact Level 3: Moderate impact Level 2: Minor impact Level 1: Minimal impact Use DoD risk matrix with categories as below:
High Moderate Low