HR001123S0025_Attachment_1_Proposer_Checklist.pdf

PDF 974 KB Posted

Attached to
Faithful Integration and Reverse-engineering and Emulation (FIRE) Federal contract opportunity
Solicitation number
HR001123S0025
Issued by
Defense Advanced Research Projects Agency

View the file

Other files for this federal contract opportunity

Other files attached to Faithful Integration and Reverse-engineering and Emulation (FIRE), newest first.
File Type Posted
HR001123S0025-Amendment-02.pdf PDF
HR001123S0025_Industry_Day_Slides.pdf PDF
FAQ_v3b.pdf PDF
HR001123S0025_FAQ.pdf PDF
HR001123S0025_Proposers_Profiles.pdf PDF
DARPAStandardCostProposalSpreadsheet__Four_TAs_.xlsx XLSX spreadsheet
FAQ v3b.pdf PDF
DARPAStandardCostProposalSpreadsheet (Four TAs).xlsx XLSX spreadsheet
HR001123S0025 Industry Day Slides.pdf PDF
HR001123S0025 FAQ.pdf PDF
HR001123S0025 Proposers Profiles.pdf PDF
HR001123S0025-Amendment-01.pdf PDF
HR001123S0025_Attachment_2_Proposal_Summary_Chart_Template.pptx PPTX presentation
HR001123S0025.pdf PDF
HR001123S0025_Attachment_5_FIRE_Controlled_Unclassified_Information_Guide.pdf PDF
HR001123S0025_Attachment_3_SingleTA.xlsx XLSX spreadsheet
HR001123S0025_Attachment_3_MultipleTAs.xlsx XLSX spreadsheet
HR001123S0025_Attachment_6_SECRET_Request_Form.docx DOCX document
HR001123S0025_Attachment_4_OT_Certs_Template.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

The following checklist is provided to assist the proposer in developing a complete and responsive cost volume. Full instructions appear w i t h i n this BAA. This worksheet must be included with the coversheet of the Cost Proposal.

1. Are all items from section "Volume II, Cost Proposal" included on your Cost Proposal cover sheet?

○ YES ○ NO

If reply is “No”, please explain:

2. Does your Cost Proposal include (1) a summary cost buildup by Phase, (2) a summary cost buildup by Year, and (3) a detailed cost buildup of for each Phase that breaks out each task and shows the cost per month?

○ YES ○ NO Appears on Page(s) [Type text]

If reply is “No”, please explain:

3. Does your cost proposal (detailed cost buildup #3 above in item 2) show a breakdown of the major cost items listed below:

Direct Labor (Labor Categories, Hours, Rates)

○ YES ○ NO Appears on Page(s) [Type text] Indirect Costs/Rates (i.e., overhead charges, fringe benefits, G&A)

○ YES ○ NO Appears on Page(s) [Type text] Materials and/or Equipment

○ YES ○ NO Appears on Page(s) [Type text] Subcontracts/Consultants

○ YES ○ NO Appears on Page(s) [Type text] Other Direct Costs

○ YES ○ NO Appears on Page(s) [Type text] Travel

○ YES ○ NO Appears on Page(s) [Type text]

If reply is “No”, please explain:

Revision September 2021

4. Have you provided documentation for proposed costs related to travel, to include purpose of trips, departure and arrival destinations and sample airfare?

○ YES ○ NO Appears on Page(s) [Type text]

If reply is “No”, please explain:

5. Does your cost proposal include a complete itemized list of all material and equipment items to be purchased (a priced bill-of-materials (BOM))?

○ YES ○ NO Appears on Page(s) [Type text]

If reply is “No”, please explain:

6. Does your cost proposal include vendor quotes or written engineering estimates (basis of estimate) for all material and equipment with a unit price exceeding the threshold specified in the BAA?

○ YES ○ NO Appears on Page(s) [Type text]

If reply is “No”, please explain:

7. Does your cost proposal include a clear justification for the cost of labor (written labor basis-of-estimate (BOE)) providing rationale for the labor categories and hours proposed for each task?

○ YES ○ NO Appears on Page(s) [Type text]

If reply is “No”, please explain:

8. Do you have subcontractors/consultants? If YES, continue to question 9. If NO, skip to question 13.

○ YES ○ NO Appears on Page(s) [Type text]

9. Does your cost proposal include copies of all subcontractor/consultant technical (to include Statement of Work) and cost proposals?

○ YES ○ NO Appears on Page(s) [Type text]

If reply is “No”, please explain:

10. Do all subcontract proposals include the required summary buildup, detailed cost buildup, and supporting documentation (SOW, Bill-of-Materials, Basis-of-Estimate, Vendor Quotes, etc.)?

○ YES ○ NO Appears on Page(s) [Type text]

If reply is “No”, please explain:

11. Does your cost proposal include copies of consultant agreements, if available?

○ YES ○ NO Appears on Page(s) [Type text]

If reply is “No”, please explain:

12. If requesting a FAR-based contract, does your cost proposal include a tech/cost analysis for all proposed subcontractors?

○ YES ○ NO Appears on Page(s) [Type text]

If reply is “No”, please explain:

13. Have all team members (prime and subcontractors) who are considered a Federally Funded Research & Development Center (FFRDC) or Government entity included documentation that clearly demonstrates work is not otherwise available from the private sector AND provided a letter on letterhead from the sponsoring organization citing the specific authority establishing their eligibility to propose to government solicitations and compete with industry?

○ YES ○ NO Appears on Page(s) [Type text]

If reply is “No”, please explain:

14. Does your proposal include a response regarding Organizational Conflicts of Interest?

○ YES ○ NO Appears on Page(s) [Type text]

If reply is “No”, please explain:

15. Does your proposal include a completed Data Rights Assertions table/certification?

○ YES ○ NO Appears on Page(s) [Type texteee]

If reply is “No”, please explain:

16. Do you possess a DCAA-approved cost accounting system?

○ YES ○ NO Appears on Page(s)

If reply is “Yes”, and you are seeking a cost reimbursement contract, please provide a copy of this approval with your cost proposal. Appears on Page(s)

If reply is “No”, and you are seeking a cost reimbursement contract, please provided a completed SF 1408 with your cost proposal. Appears on Page(s)

17. Does your proposal include utilization of any DARPA Toolbox supplier agreements in the prime or subcontractor Bill of Materials? For information, see https://www.darpa.mil/work-with-us/darpa-toolbox-initiative

○ YES ○ NO Appears on Page(s)

and 3 a detailed cost buildup of for each Phase that breaks out each task and shows the cost per month: Off
and arrival destinations and sample airfare: Off
purchased a priced bill-of-materials BOM: Off
material and equipment with a unit price exceeding $5000: Off
BOE providing rationale for the labor categories and hours proposed for each task: Off
8 Do you have subcontractorsconsultants? If YES, continue to question 9 If NO, skip to question 13: Off
Work and cost proposals: Off
Proposal cover sheet: Off
Text1:
Text2:
Text5:
Text6:
Text7:
Text8:
Text4:
Text3:
Text9:
Text11:
Text14:
Text16:
Text18:
Text21:
Text23:
Text25:
Text27:
Text29:
Text31:
Text12:
Text15:
Text17:
Text19:
Text20:
Text22:
Text24:
Text26:
Text28:
Text30:
Text13:
Text32:
Text33:
Text35:
Text36:
Group15: Off
Group14: Off
Group13: Off
Group12: Off
Group11: Off
Group10: Off
Group1: Off
Text34:
DCAA: Off
DARPA Toolbox: Off
Text37:
Text10:
Indirect Costs/Rates (i:
e:
, overhead charges, fringe benefits, G&A: Off
Travel: Off
Other Direct Costs: Off
Subcontracts/Consultants: Off
Materials and/or Equipment: Off
Direct Labor (Labor Categories, Hours, Rates: Off

File details come from the government source that posted it. Updated .