Cost Summary

Prime Name:
Proposal Title:
PhaseLabor Hours Total (Sum of Columns C, D and E)Labor Hours
PrimeLabor Hours SubcontractorsLabor Hours ConsultantsLabor Cost PrimeLabor Cost SubcontractorsLabor Cost ConsultantsTotal Cost
Phase 10.00$0.00Notes:

--Line 4 should show the totals related to the column title for Phase 1, Line 9 should show the totals related to the column title for Phase 2, etc… -- Do not enter information in grey cells -- Fee and G&A should not be included in the table.

-- Add additional lines for Subcontractors and Consultants, as needed.

Prime
Sub 1 Name
Consultant 1
Phase 20.00$0.00
Prime
Sub 1 Name
Consultant 1
Phase 30.00$0.00
Prime
Sub 1 Name
Consultant 1
Total Labor$0.00
PhaseMaterialsTravelOther Direct Costs (ODCs)Total Cost
Phase 1$0.00
Phase 2$0.00
Phase 3$0.00
Total Material, Travel, ODC$0.00
Note: Phase 1 (Base), includes Tunnel Circuit

Phase 2 (Option 1), includes Urban Circuit and Cave Circuit Phase 3 (Option 2), includes Final Event

Example Material Table

Prime Name:
Proposal Title:
BOM NumberPart NumberPart DescriptionManufacturerQuantity requiredUnit PriceTotal Cost

Total Material $0.00

Example Travel Table

Prime Name:
Proposal Title:
Trip NumberDestinationPurpose of Trip# People# NightsTotal Cost

Total Travel $0.00