HR001117S0011_3_Attachment_4_Cost_Summary.xlsx

XLSX spreadsheet 99 KB Posted

Attached to
OFFensive Swarm Enabled Tactics (OFFSET) Amendment 5 - Swarm Sprint 4 Federal contract opportunity
Solicitation number
HR001117S0011
Issued by
Defense Advanced Research Projects Agency

About this file

This document includes cost tables and templates for a proposal response to a federal contract solicitation. The solicitation seeks proposals for the OFFensive Swarm Enabled Tactics program to design, develop and demonstrate a swarm system architecture encoded in a game environment and embodied in physical swarm platforms. The cost tables require proposers to provide labor hours and costs by task for the base effort and any option periods, along with materials, travel and subcontractor costs. The templates provide guidance on the level of detail required for items like staff qualifications, bills of materials, and travel plans. Proposers are instructed to complete the templates and include them along with a cost proposal in response to the solicitation.

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to OFFensive Swarm Enabled Tactics (OFFSET) Amendment 5 - Swarm Sprint 4, newest first.
File Type Posted
OFFSET_Swarm_Sprint_4_BAA_FAQ.pdf PDF
HR001117S0011-Amendment-05.pdf PDF
HR001117S0011_5_Attachment_2_Proposal_Cover_Sheet.pdf PDF
HR001117S0011_5_Attachment_1_Attachments_Checklist_V2.docx DOCX document
HR001117S0011_5_Attachment_8_Accelerator.docx DOCX document
HR001117S0011_5_Attachment_4_Cost_Summary.xlsx XLSX spreadsheet
HR001117S0011_5_Attachment_5_Admin_National_Policy.docx DOCX document
HR001117S0011_5_Attachment_3_Summary_Slide.pptx PPTX presentation
HR001117S0011_5_Attachment_6_Tech_Proposal_Template.docx DOCX document
HR001117S0011_5_Attachment_7_Cost_Proposal_Template.docx DOCX document
OFFSET_Swarm_Sprint_3_BAA_FAQ_V3_final.docx DOCX document
OFFSET_Swarm_Sprint_3_BAA_FAQ_V1.docx DOCX document
HR001117S0011-Amendment-04.pdf PDF
HR001117S0011_3_Attachment_7_Cost_Proposal_Template.docx DOCX document
HR001117S0011_3_Attachment_4_Cost_Summary.xlsx XLSX spreadsheet
HR001117S0011_3_Attachment_3_Summary_Slides.pptx PPTX presentation
HR001117S0011_3_Attachment_8_Accelerator.docx DOCX document
HR001117S0011_3_Attachment_6_Tech_Proposal_Template.docx DOCX document
HR001117S0011_3_Attachment_1_Attachments_Checklist.docx DOCX document
HR001117S0011_3_Attachment_5_Admin_National_Policy.docx DOCX document
HR001117S0011_3_Attachment_2_Proposal_Cover_Sheet.pdf PDF
HR001117S0011_3_Attachment_3_Summary_Slides.pptx PPTX presentation
HR001117S0011-Amendment-03.pdf PDF
HR001117S0011_3_Attachment_5_Admin_National_Policy.docx DOCX document
HR001117S0011_3_Attachment_8_Accelerator.docx DOCX document
HR001117S0011_3_Attachment_6_Tech_Proposal_Template.docx DOCX document
HR001117S0011_3_Attachment_1_Attachments_Checklist.docx DOCX document
HR001117S0011_3_Attachment_7_Cost_Proposal_Template.docx DOCX document
HR001117S0011_3_Attachment_2_Proposal_Cover_Sheet.pdf PDF
OFFSET_Sprint_2_FAQ.docx DOCX document
HR001117S0011_2_Attachment_2_Cost_Summary.xlsx XLSX spreadsheet
HR001117S0011_2_Attachment_5_Accelerator_THC_clean.DOCX DOCX document
HR001117S0011_2_Attachment_3_Summary_Slide_THC.PPTX PPTX presentation
HR001117S0011_2_Attachment_1_Cover_Page_and_Technical_Proposal_THC_clean.DOCX DOCX document
HR001117S0011-Amendment-02.pdf PDF
HR001117S0011_2_Attachment_4_Proposal_Template_Adm_National_Policy_THC_clean.DOCX DOCX document
OFFSET_Sprint_1_FAQ_Conformed_through_20-Nov-17.pdf PDF
HR001117S0011_1_Attachment_1_Cover_Page_and_Proposal_Template.docx DOCX document
HR001117S0011_1_Attachment_2_Cost_Summary_Spreadsheet.xlsx XLSX spreadsheet
HR001117S0011_1_Attachment_3_Summary_Slide.pptx PPTX presentation
HR001117S0011_1_Attachment_4_Admin_and_National_Policy_Reqs.docx DOCX document
HR001117S0011-Amendment-01.pdf PDF
2-HR001117S0011_Attachment_2_Proposal_Template_LoE_table_Route.xlsx XLSX spreadsheet
5-HR001117S0011_Attachment_5_Proposal_Template_Cost_Volume_Route.docx DOCX document
6-HR001117S0011_Attachment_6_Proposal_Template_Adm_National_Policy_Route.docx DOCX document
HR001117S0011.pdf PDF
3-HR001117S0011_Attachment_3_Proposal_Template_Milestones_Deliverables_Route.docx DOCX document
1-HR001117S0011_Attachment_1_Proposal_Template_Slides_Route.PPTX PPTX presentation
4-HR001117S0011_Attachment_4_Proposal_Template_Technical_Management_Route.docx DOCX document
7-HR001117S0011_Attachment_7_SCG_Request_Form.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE 1 Cost Summary

PROPOSER NAME:
PROPOSER ORGANIZATION:
TABLE 1: Cost Summary
Base EffortOption 1Option 2 (Accelerator)Total Program
CategoryLaborTravelMats & EquipOther ODCTotal BaseLaborTravelMats & EquipOther ODCTotal O1LaborTravelMats & EquipOther ODCTotal O2LaborTravelMats & EquipOther ODC
Prime Performer (no sub costs included)$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
Subcontractor 1 (no prime costs included)$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
Subcontractor 2 (no prime costs included)$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
Subcontractor 3 (no prime costs included)$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
Independent Consultant 1 (no prime/sub costs included)$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
Total$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
Total by Phase$0$0$0$0

&"Times New Roman,Regular"&12&K000000Source Selection Information — see FAR 2.101 & 3.104

&"Times New Roman,Regular"&12&K000000BAA# HR001117S0011-3 &"Times New Roman,Regular"&12&K000000OFFensive Swarm-Enabled Tactics (OFFSET) &"Times New Roman,Regular"&12&K000000Page &P of &N

Notes

1-Numbers are illustrative

2-Numbers in blue are inputs; numbers in black are computed by formulas

3-Prime and subcontractor/consultant costs should not be combined on lines in the Cost Summary Table

4-Add or subtract rows/columns depending on number of subcontractors/consultants proposed for the effort

5-Total Program Costs should be consistent throughout worksheets (Table 1 and Table 2), Cost Volume, and Cover Sheet

6-Pasting into proposal as a picture will produce the best results; please also submit as excel

7-Phase totals should include G&A and fee

TABLE 2 Level-of-Effort

TABLE 2: Level of Effort, By Hours/By Task
DurationIntensityLabor Hours
SOW Task(months)(hrs/mo)SrMidJrTotalSubCInd. ConsltTotal
1<Phase 1 Task 1 name>615724068024944- 02001,144
1.1<Subtask 1.1 name>57280280- 0360- 0200560
1.2<Subtask 1.2 name>319516040024584- 0- 0584
2<Phase 1 Task 2 name>63851084001,8002,3081,400- 03,708
2.1<Subtask 2.1 name>2984483201,6001,968600- 02,568
2.2<Subtask 2.2 name>4856080200340800- 01,140
Phase 1 Total Hours3481,0801,8243,2521,4002004,852
DurationIntensityLabor Hours
SOW Task(months)(hrs/mo)SrMidJrTotalSubCInd. ConsltTotal
1<Option Task 1 name>8100176560648001001001,000May zero-out blue entries if not proposing an Option
1.1<Subtask 1.1 name>7519624024360100100560
1.2<Subtask 1.2 name>41108032040440- 0- 0440
2<Option Task 2 name>64171805201,8002,5001,240- 03,740
2.1<Subtask 2.1 name>44351404001,2001,740400- 02,140
2.2<Subtask 2.2 name>419040120600760840- 01,600
Option Total Hours3561,0801,8643,3001,3401004,740
Project Total Hours7042,1603,6886,5522,7403009,592
DurationIntensityLabor Hours
SOW Task(months)(hrs/mo)SrMidJrTotalSubCInd. ConsltTotal
1<Accelerator Option Task 1 name>8100176560648001001001,000May zero-out blue entries if not proposing an Option
1.1<Subtask 1.1 name>7519624024360100100560
1.2<Subtask 1.2 name>41108032040440- 0- 0440
2<Accelerator Option Task 2 name>64171805201,8002,5001,240- 03,740
2.1<Subtask 2.1 name>44351404001,2001,740400- 02,140
2.2<Subtask 2.2 name>419040120600760840- 01,600
Option Total Hours3561,0801,8643,3001,3401004,740
Project Total Hours1,0603,2405,5529,8524,08040013,932

&"Times New Roman,Regular"&12Source Selection Information — see FAR 2.101 & 3.104

&"Times New Roman,Regular"&12BAA# HR001117S0011-3&"Times New Roman,Regular"&12
OFFensive Swarm-Enabled Tactics (OFFSET)&"Times New Roman,Regular"&12Page &P of &N

Notes

1-Numbers are illustrative

2-Numbers in blue are inputs; numbers in black are computed by formulas

3-Total Program Costs should be consistent throughout worksheets (Table 1 and Table 2), Cost Volume, and Cover Sheet

4-In the Task table, lines roll-up subtask numbers, so each Total Hours row should only sum the task lines

5-Adding more tasks will require editing the Total Hours formulas

6-Pasting into proposal as a picture will produce the best results; please also submit as excel

TABLE 3 Bill of Materials

TABLE 3: Bill of Materials
BASEBOM numberPart NumberPart DescriptionManufacturerQuantity requiredUnit Price ($)Total Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Base Material Cost$0.00
OPTION 1BOM numberPart NumberPart DescriptionManufacturerQuantity requiredUnit Price ($)Total Cost
$0.00May delete entries if not proposing an Option
$0.00
$0.00
$0.00
$0.00
Option 1 Material Cost$0.00
OPTION 2BOM numberPart NumberPart DescriptionManufacturerQuantity requiredUnit Price ($)Total Cost
$0.00May delete entries if not proposing an Option
$0.00
$0.00
$0.00
$0.00
Option 2 Material Cost$0.00

TOTAL MATERIAL COSTS $0.00

&"Times New Roman,Regular"&12Source Selection Information — see FAR 2.101 & 3.104

&"Times New Roman,Regular"&12BAA# HR001117S0011-3 &"Times New Roman,Regular"&12OFFensive Swarm-Enabled Tactics (OFFSET) &"Times New Roman,Regular"&12Page &P of &N

Notes

1-Part Descriptions should be explanatory and not be designated as "General" or "MISC"

TABLE 4 Travel

TABLE 4: Travel Summary Table
Purpose of TripFrom (Originating Location)To (Destination Location)Prime (P) or Subcontractor (S)No. StaffNo. Mtg Days Per TripNo. Nights Per TripAirfare/Rail ($)Ground Trans/Day ($)Meals / Day ($)Lodging / Day ($)Cost Per Person ($)Total ($)COMPLETE TRAVEL TABLE
$0$0
$0$0
$0$0
$0$0
$0$0
Total Travel$0.00
Purpose of TripFrom (Originating Location)To (Destination Location)Prime (P) or Subcontractor (S)No. StaffNo. Mtg Days Per TripNo. Nights Per TripAirfare/Rail ($)Ground Trans/Day ($)Meals / Day ($)Lodging / Day ($)Cost Per Person ($)Total ($)EXAMPLE TABLE/ILLUSTRATIVE
TIM1New York, NYArlington, VAP221$325$20$35$200$635$1,270
TIM1Princeton, NJArlington, VAS121$250$40$200$530$530
TIM2New York, NYArlington, VAP221$325$20$35$200$635$1,270
TIM2Princeton, NJArlington, VAS121$250$40$200$530$530
Total Travel$3,600.00

&"Times New Roman,Regular"&12Source Selection Information — see FAR 2.101 & 3.104

&"Times New Roman,Regular"&12BAA# HR001117S0011-3 &"Times New Roman,Regular"&12OFFensive Swarm-Enabled Tactics (OFFSET) &"Times New Roman,Regular"&12Page &P of &N

Notes

1-For each Purpose of Trip, please use individual lines for Prime personnel (P) and Subcontractor personnel (S) with associated costs, so that total travel costs match those cited in the Cost Volume.

2-It is expected that conference costs are not allowable for this effort

3-Purpose of Trip may include Technical Exchange Meetings and/or other relevant Sprint events proposed

4-For Locations, please use City/State. If outside of US, please use City/Country

Dashboard

&"Times New Roman,Regular"&12Source Selection Information — see FAR 2.101 & 3.104

&"Times New Roman,Regular"&12BAA# HR001117S0011-3 &"Times New Roman,Regular"&12OFFensive Swarm-Enabled Tactics (OFFSET) &"Times New Roman,Regular"&12Page &P of &N image1.emf image2.emf image3.emf image4.emf image5.emf image6.emf image7.emf image8.emf image9.emf image10.emf

File details come from the government source that posted it. Updated .