5-HR001117S0011_Attachment_5_Proposal_Template_Cost_Volume_Route.docx
DOCX document 34 KB Posted
- Attached to
- OFFensive Swarm Enabled Tactics (OFFSET) Amendment 5 - Swarm Sprint 4 Federal contract opportunity
- Solicitation number
- HR001117S0011
About this file
This document provides a proposal template and cost volume for responding to a Broad Agency Announcement seeking proposals for the design, development, and demonstration of a swarm system architecture encoded in a game-based environment and embodied in physical swarm autonomous platforms. Key details include:
-
Proposals are due by February 15, 2017 and should include a technical proposal, cost proposal, and supporting documentation using the templates provided. The cost proposal template requests itemized direct, indirect, and other costs by task and month over the period of performance.
-
The Defense Advanced Research Projects Agency is seeking innovative approaches to advance swarm tactics through novel swarm system architectures, realistic game-based environments, and physical swarm platform demonstrations. Awards may be in the form of contracts or other transactions agreements.
-
Proposers must include a DUNS number, TIN/EIN, CAGE code, and milestones with completion criteria, due dates, and payment schedules if requesting an other transaction agreement. Subcontractor costs must also be provided.
Not Listed
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Source Selection Information – See FAR 2.101 and 3.104
HR001117S0011 OFFSET BAA
Attachment 5 Cost Volume Template
All pages shall be formatted for printing on 8-1/2 by 11 inch paper with 1-inch margins and font size not smaller than 12-point. Font sizes of 8- or 10-point may be used for figures, tables, and charts. Submissions must be written in English. The Cost Volume must be in .pdf, .odx, .doc, .docx, .ppt, .pptx, .xls, or .xlsx formats.
The Cost Volume should include a working spreadsheet file (.xls or equivalent format) that addresses the applicable cost information requested below and provides formula traceability among all components of the Cost Volume. Spreadsheet files must be included as a separate file in the full proposal package.
Costs must be traceable between the prime proposer and all subcontractors/consultants, as well as between the cost volume and the SOW. This includes ensuring a consistent task structure across all proposal documents. Cost information must be provided in sufficient detail to substantiate the proposed prices.
No page limit is specified for the Cost Volume.
The prime proposer is responsible for the compilation and submission of all non-proprietary subcontractor cost proposals. Proposal submissions will not be considered complete until the Government has received all subcontractor cost proposals.
Source Selection Information – See FAR 2.101 and 3.104 Proprietary subcontractor/consultant cost proposals may be included as part of the Cost Volume or e-mailed separately by the subcontractor to OFFSET@darpa.mil. E-mail messages must include “Subcontractor Cost Proposal” in the subject line and identify the principal investigator, prime proposer organization and proposal title in the body of the message.
HR001117S0011 3
<PRIME ORGANIZATION LOGO>
HR001117S0011
Volume 2: Cost Volume
Proposal Title
Proposer Organization
| Type of Organization |
| Choose one: Large Business, Small Disadvantaged Business, Other Small Business, HBCU, MI, Other Educational, or Other Nonprofit |
Proposer Reference Number, if any
| Technical Point of Contact (POC) |
| Name: |
Address:
Telephone:
E-mail:
| Administrative POC |
| Name: |
Address:
Telephone:
E-mail:
Technical Area
| Award Instrument Requested |
| Choose one: procurement contract (specify type), grant, cooperative agreement or OT |
Place(s) of Performance
Period(s) of Performance
| Other Team Members (subcontractors and consultants), if any |
| Technical POC Name: |
Organization:
Organization Type:
| Total Proposed Cost |
| Vignette 1 (Base): $ |
Vignette 2 (Option): $ Vignette 3 (Option): $ Total: $
Data Universal Numbering System (DUNS) number[footnoteRef:1] [1: The DUNS number is used as the contractor identification code for all Government procurement-related activities. Go to http://fedgov.dnb.com/webform/index.jsp to request a DUNS number (may take at least 1 business day). See Section VI.B.7 for further information.]
Taxpayer identification number (TIN)[footnoteRef:2] [2: See http://www.irs.gov/businesses/small/international/article/0,,id=96696,00.html for information on requesting a TIN. Note, requests may take from 1 business day to 1 month depending on the method (online, fax, mail).]
Commercial and Government Entity (CAGE) code[footnoteRef:3] [3: A CAGE Code identifies companies doing or wishing to do business with the Federal Government. See Section VI.B.7 for further information.]
Date Proposal was Prepared
Proposal Validity Period (minimum 180 days)
Table of Contents
| Cost Details | 3 | |
| 1. | Cost Summaries Table | 3 |
| 2. | Cost Details | 3 |
| 3. | Requirements for proposers requesting an Other Transaction | 3 |
Cost Details [Provide the following cost details broken down by phase, month, and task. Include supporting documentation describing the method used to estimate costs.]
1. Cost Summaries Table For information regarding this section refer to the BAA Section IV.B.2.b.ii.
2. Cost Details
a. Direct Labor For information regarding this section refer to the BAA Section IV B.2.b.iii.
b. Indirect Costs For information regarding this section refer to the BAA Section IV B.2.b.iii.
c. Materials For information regarding this section refer to the BAA Section IV B.2.b.iii.
d. Travel For information regarding this section refer to the BAA Section IV B.2.b.iii.
e. Subcontractor Consultant Costs For information regarding this section refer to the BAA Section IV B.2.b.iii.
f. Other Direct Costs For information regarding this section refer to the BAA Section IV B.2.b.iii.
g. Subawardee Proposals For information regarding this section refer to the BAA Section IV B.2.b.iii.
3. Requirements for proposers requesting an Other Transaction The Government may award either a Federal Acquisition Regulation (FAR)-based contract or an Other Transaction for Prototype (OT) agreement for prototype system development.
All proposers requesting an Other Transaction must include a detailed list of milestones. Each milestone must include the following:
· milestone description,
· completion criteria,
· due date, and
· payment/funding schedule (to include, if cost share is proposed, awardee and Government share amounts).
It is noted that, at a minimum, milestones should relate directly to accomplishment of program technical metrics as defined in the BAA and/or the proposer’s proposal. Agreement type, expenditure or fixed-price based, will be subject to negotiation by the Agreements Officer. Do not include proprietary data.
File details come from the government source that posted it. Updated .